Project Topic 1: Moore Housing Contractors
Moore Housing Contractors is negotiating a deal with
Countryside Realtors to build six houses in a new development.
Countryside wants Moore Contractors to start in late winter or
early spring when the weather begins to moderate and build
through the summer and fall. The summer months are a busy
time for the realty company, and it believes it can sell the
houses almost as soon as they are ready or sometimes before.
The houses all have similar floor plans and are of approximately
equal size; only the exteriors are noticeably different. The
completion time is so critical for Countryside Realtors that it is
insisting a project management network accompany the
contractor’s bid for the job with an estimate of the completion
time for a house. The realtor also needs to be able to plan its
offerings and marketing for the summer. The realtor wants each
house to be completed within 45 days after it is started. If a
house is not completed within this frame, the realtor wants to be
able to charge the contractor a penalty. Mary and Sandy Moore,
the president and vice president of Moore Housing Contractors,
are concerned about the prospect of a penalty. They want to be
confident they can meet the deadline for a house before entering
into any agreement with a penalty involved. If there is a
reasonable likelihood they cannot finish a house within the 45
days, they want to increase their bid to cover potential penalty
charges. The Moores are experienced home builders, so it was
not difficult for them to list the activities involved in building a
house or to estimate activity times. However, they made their
estimates conservatively and tended to increase their pessimistic
estimates to compensate for the possibility of bad weather and
variations in their workforce. Following is a list of the activities
for building a house and the activity estimates:
Activity
Description
Predecessors
Time (days)
a
m
b
A
Excavation, pour footers
-
3
4
6
B
Lay foundation
A
2
3
5
C
Frame and roof
B
2
4
5
D
Lay drain tiles
B
1
2
4
E
Sewer (floor) drains
B
1
2
3
F
Install insulation
C
2
4
5
G
Pour basement floor
E
2
3
6
H
Rough plumbing, pipes
E
2
4
7
I
Install windows
F
1
3
4
J
Rough electrical wiring
F
1
2
4
K
Install furnace, air conditioner
C, G
3
5
8
L
Exterior brickwork
I
4
6
10
M
Install plasterboard, mud, plaster
J, H, K
6
8
12
N
Roof shingles, flashing
L
2
3
6
O
Attach gutter, downspouts
N
1
2
5
P
Grading
D, O
2
3
7
Q
Lay subflooring
M, N
3
4
6
R
Lay driveway, walks, landscape
P
4
6
10
S
Finish carpentry
Q
3
6
12
T
Kitchen cabinetry, sink, and appliances
Q
2
4
8
U
Bathroom cabinetry, fixtures
Q
2
3
6
V
Painting (interior and exterior)
S, T, U
4
6
10
W
Finish wood floors, lay carpet
S, V
2
5
8
X
Final electrical, light fixtures
V
1
3
4
1. Develop a CPM/PERT network (draw the network, find
expected completion time, variances, ESTs, LSTs, EFTs, LFTs,
and slack for each activity, and expected project completion
time and critical path).
2. Determine the probability that the contractors can complete a
house within 45 days.
3. Does it appear that the Moores might need to increase their
bid to compensate for potential penalties?
4. Indicate which project activities Moore Contractors should be
particularly diligent to keep on schedule by making sure
workers and materials are always available.
5. Indicate which activities the company might shift workers
from as the need arises.
The Moores also developed the budget for building a house. The
budget estimates before project start is provided in the table
below:
Activity
Total budgeted cost ($)
A
$20,000
B
$21,000
C
$25,000
D
$5,000
E
$6,000
F
$4,000
G
$15,000
H
$11,000
I
$8,000
J
$7,000
K
$6,000
L
$13,000
M
$6,000
N
$3,000
O
$2,500
P
$3,500
Q
$8,000
R
$11,000
S
$9,000
T
$8,000
U
$4,000
V
$6,000
W
$8,000
X
$2,000
6. Develop budgeted cost estimates per day from the start of the
project until its completion using both ESTs and LSTs of each
activity.
In the 12th day of the project, the Moores wanted to know the
status of the project. Activities A, B, C, D, and E have been
finished and incurred costs of $19,000, $24,000, $25,000,
$4,000, and $8,000, respectively. Activity G is 80% finished
with incurred costs of $13,000, activity H is 60% finished with
incurred costs of $7,000, and activity F was just started (5%
completed) and incurred a starting cost of $600. The other
activities have not been started.
7. Is the project of building the first house on schedule?
8. What is the value of work completed?
9. Are there any cost overruns?
Suppose the Countryside Realtors wanted to have each house
finished in 35 days. Moore Contractors has a plan developed for
this type of situation, as well. This plan includes adding extra
resources such as equipment and people to each of the activities
A – X needed for building a house. The crash time and crash
cost for each activity are presented in the table below:
Activity
Crash time
Crash cost
A
3
$28,000
B
2
$26,000
C
3
$31,000
D
1
$6,500
E
1
$7,000
F
3
$5,000
G
2
$18,000
H
3
$12,000
I
2
$10,000
J
1
$7,500
K
3
$9,000
L
3
$19,000
M
6
$8,000
N
1
$4,000
O
1
$3,000
P
2
$4,000
Q
3
$10,000
R
4
$13,000
S
3
$12,000
T
3
$9,000
U
2
$6,000
V
5
$9,000
W
4
$9,000
X
1
$4,000
10. Calculate the project crash cost under this scenario.
11. Using the crash time and crash cost in the table above,
calculate the shortest possible delivery time and its cost.

More Related Content

Similar to Project Topic 1 Moore Housing ContractorsMoore Housing Contra.docx

Running head HOUSE BUILDING PROJECT PLAN .docx
Running head HOUSE BUILDING PROJECT PLAN                         .docxRunning head HOUSE BUILDING PROJECT PLAN                         .docx
Running head HOUSE BUILDING PROJECT PLAN .docx
charisellington63520
 
Running head HOUSE BUILDING PROJECT PLAN .docx
Running head HOUSE BUILDING PROJECT PLAN                         .docxRunning head HOUSE BUILDING PROJECT PLAN                         .docx
Running head HOUSE BUILDING PROJECT PLAN .docx
wlynn1
 
PT2520Statement of Work · History· Scope· Constraints.docx
PT2520Statement of Work · History· Scope· Constraints.docxPT2520Statement of Work · History· Scope· Constraints.docx
PT2520Statement of Work · History· Scope· Constraints.docx
amrit47
 
PROJ 420 Course Project
PROJ 420 Course ProjectPROJ 420 Course Project
PROJ 420 Course Project
gsb100
 

Similar to Project Topic 1 Moore Housing ContractorsMoore Housing Contra.docx (20)

QEN Portfolio CV Residential
QEN Portfolio CV ResidentialQEN Portfolio CV Residential
QEN Portfolio CV Residential
 
Niagara falls construction project asli terkunci
Niagara falls construction project asli terkunciNiagara falls construction project asli terkunci
Niagara falls construction project asli terkunci
 
Construction Services And Maintenance Proposal PowerPoint Presentation Slides
Construction Services And Maintenance Proposal PowerPoint Presentation SlidesConstruction Services And Maintenance Proposal PowerPoint Presentation Slides
Construction Services And Maintenance Proposal PowerPoint Presentation Slides
 
Kent Pecoy & Sons Construction, Inc. - Connecticut Builder
Kent Pecoy & Sons Construction, Inc. - Connecticut BuilderKent Pecoy & Sons Construction, Inc. - Connecticut Builder
Kent Pecoy & Sons Construction, Inc. - Connecticut Builder
 
C21SGRProjectPresentation
C21SGRProjectPresentationC21SGRProjectPresentation
C21SGRProjectPresentation
 
UNIT-2.pptx
UNIT-2.pptxUNIT-2.pptx
UNIT-2.pptx
 
R2R Meeting 13 ppt
R2R Meeting 13 pptR2R Meeting 13 ppt
R2R Meeting 13 ppt
 
2022 Ten Real Estate Trends
2022 Ten Real Estate Trends2022 Ten Real Estate Trends
2022 Ten Real Estate Trends
 
Running head HOUSE BUILDING PROJECT PLAN .docx
Running head HOUSE BUILDING PROJECT PLAN                         .docxRunning head HOUSE BUILDING PROJECT PLAN                         .docx
Running head HOUSE BUILDING PROJECT PLAN .docx
 
Running head HOUSE BUILDING PROJECT PLAN .docx
Running head HOUSE BUILDING PROJECT PLAN                         .docxRunning head HOUSE BUILDING PROJECT PLAN                         .docx
Running head HOUSE BUILDING PROJECT PLAN .docx
 
PT2520Statement of Work · History· Scope· Constraints.docx
PT2520Statement of Work · History· Scope· Constraints.docxPT2520Statement of Work · History· Scope· Constraints.docx
PT2520Statement of Work · History· Scope· Constraints.docx
 
PROJ 420 Course Project
PROJ 420 Course ProjectPROJ 420 Course Project
PROJ 420 Course Project
 
Farrington
FarringtonFarrington
Farrington
 
The network-diagram-and-critical-path-adapted
The network-diagram-and-critical-path-adaptedThe network-diagram-and-critical-path-adapted
The network-diagram-and-critical-path-adapted
 
2020 0122 presentation - Kamal Hyder
2020 0122 presentation - Kamal Hyder2020 0122 presentation - Kamal Hyder
2020 0122 presentation - Kamal Hyder
 
June 2014
June 2014June 2014
June 2014
 
Cebu Condominium investment
Cebu Condominium investmentCebu Condominium investment
Cebu Condominium investment
 
Village green release design guidelines
Village green release design guidelinesVillage green release design guidelines
Village green release design guidelines
 
Stage 13 revised design guidelines grand vista release
Stage 13 revised design guidelines grand vista releaseStage 13 revised design guidelines grand vista release
Stage 13 revised design guidelines grand vista release
 
Tim projects completed
Tim projects completedTim projects completed
Tim projects completed
 

More from wkyra78

Melissa HinkhouseWeek 3-Original PostNURS 6050 Policy and A.docx
Melissa HinkhouseWeek 3-Original PostNURS 6050 Policy and A.docxMelissa HinkhouseWeek 3-Original PostNURS 6050 Policy and A.docx
Melissa HinkhouseWeek 3-Original PostNURS 6050 Policy and A.docx
wkyra78
 
Melissa HinkhouseAdvanced Pharmacology NURS-6521N-43Professo.docx
Melissa HinkhouseAdvanced Pharmacology NURS-6521N-43Professo.docxMelissa HinkhouseAdvanced Pharmacology NURS-6521N-43Professo.docx
Melissa HinkhouseAdvanced Pharmacology NURS-6521N-43Professo.docx
wkyra78
 
member is a security software architect in a cloud service provider .docx
member is a security software architect in a cloud service provider .docxmember is a security software architect in a cloud service provider .docx
member is a security software architect in a cloud service provider .docx
wkyra78
 
Melissa ShortridgeWeek 6COLLAPSEMy own attitude has ch.docx
Melissa ShortridgeWeek 6COLLAPSEMy own attitude has ch.docxMelissa ShortridgeWeek 6COLLAPSEMy own attitude has ch.docx
Melissa ShortridgeWeek 6COLLAPSEMy own attitude has ch.docx
wkyra78
 
Measurement  of  the  angle  θ          .docx
Measurement  of  the  angle  θ          .docxMeasurement  of  the  angle  θ          .docx
Measurement  of  the  angle  θ          .docx
wkyra78
 
Measurement of the angle θ For better understanding .docx
Measurement of the angle θ     For better understanding .docxMeasurement of the angle θ     For better understanding .docx
Measurement of the angle θ For better understanding .docx
wkyra78
 
Meaning-Making Forum 2 (Week 5)Meaning-Making Forums 1-4 are thi.docx
Meaning-Making Forum 2 (Week 5)Meaning-Making Forums 1-4 are thi.docxMeaning-Making Forum 2 (Week 5)Meaning-Making Forums 1-4 are thi.docx
Meaning-Making Forum 2 (Week 5)Meaning-Making Forums 1-4 are thi.docx
wkyra78
 
MBA6231 - 1.1 - project charter.docxProject Charter Pr.docx
MBA6231 - 1.1 - project charter.docxProject Charter Pr.docxMBA6231 - 1.1 - project charter.docxProject Charter Pr.docx
MBA6231 - 1.1 - project charter.docxProject Charter Pr.docx
wkyra78
 
MediationNameAMUDate.docx
MediationNameAMUDate.docxMediationNameAMUDate.docx
MediationNameAMUDate.docx
wkyra78
 
Media Content AnalysisPurpose Evaluate the quality and value of.docx
Media Content AnalysisPurpose Evaluate the quality and value of.docxMedia Content AnalysisPurpose Evaluate the quality and value of.docx
Media Content AnalysisPurpose Evaluate the quality and value of.docx
wkyra78
 
MBA 5110 – Business Organization and ManagementMidterm ExamAns.docx
MBA 5110 – Business Organization and ManagementMidterm ExamAns.docxMBA 5110 – Business Organization and ManagementMidterm ExamAns.docx
MBA 5110 – Business Organization and ManagementMidterm ExamAns.docx
wkyra78
 

More from wkyra78 (20)

Melissa HinkhouseWeek 3-Original PostNURS 6050 Policy and A.docx
Melissa HinkhouseWeek 3-Original PostNURS 6050 Policy and A.docxMelissa HinkhouseWeek 3-Original PostNURS 6050 Policy and A.docx
Melissa HinkhouseWeek 3-Original PostNURS 6050 Policy and A.docx
 
Melissa HinkhouseAdvanced Pharmacology NURS-6521N-43Professo.docx
Melissa HinkhouseAdvanced Pharmacology NURS-6521N-43Professo.docxMelissa HinkhouseAdvanced Pharmacology NURS-6521N-43Professo.docx
Melissa HinkhouseAdvanced Pharmacology NURS-6521N-43Professo.docx
 
Meiner, S. E., & Yeager, J. J. (2019). Chapter 17Chap.docx
Meiner, S. E., & Yeager, J. J. (2019).    Chapter 17Chap.docxMeiner, S. E., & Yeager, J. J. (2019).    Chapter 17Chap.docx
Meiner, S. E., & Yeager, J. J. (2019). Chapter 17Chap.docx
 
member is a security software architect in a cloud service provider .docx
member is a security software architect in a cloud service provider .docxmember is a security software architect in a cloud service provider .docx
member is a security software architect in a cloud service provider .docx
 
Melissa ShortridgeWeek 6COLLAPSEMy own attitude has ch.docx
Melissa ShortridgeWeek 6COLLAPSEMy own attitude has ch.docxMelissa ShortridgeWeek 6COLLAPSEMy own attitude has ch.docx
Melissa ShortridgeWeek 6COLLAPSEMy own attitude has ch.docx
 
Melissa is a 15-year-old high school student. Over the last week.docx
Melissa is a 15-year-old high school student. Over the last week.docxMelissa is a 15-year-old high school student. Over the last week.docx
Melissa is a 15-year-old high school student. Over the last week.docx
 
Measurement  of  the  angle  θ          .docx
Measurement  of  the  angle  θ          .docxMeasurement  of  the  angle  θ          .docx
Measurement  of  the  angle  θ          .docx
 
Measurement of the angle θ For better understanding .docx
Measurement of the angle θ     For better understanding .docxMeasurement of the angle θ     For better understanding .docx
Measurement of the angle θ For better understanding .docx
 
Meaning-Making Forum 2 (Week 5)Meaning-Making Forums 1-4 are thi.docx
Meaning-Making Forum 2 (Week 5)Meaning-Making Forums 1-4 are thi.docxMeaning-Making Forum 2 (Week 5)Meaning-Making Forums 1-4 are thi.docx
Meaning-Making Forum 2 (Week 5)Meaning-Making Forums 1-4 are thi.docx
 
MBA6231 - 1.1 - project charter.docxProject Charter Pr.docx
MBA6231 - 1.1 - project charter.docxProject Charter Pr.docxMBA6231 - 1.1 - project charter.docxProject Charter Pr.docx
MBA6231 - 1.1 - project charter.docxProject Charter Pr.docx
 
Medication Errors Led to Disastrous Outcomes1. Search th.docx
Medication Errors Led to Disastrous Outcomes1. Search th.docxMedication Errors Led to Disastrous Outcomes1. Search th.docx
Medication Errors Led to Disastrous Outcomes1. Search th.docx
 
Meet, call, Skype or Zoom with a retired athlete and interview himh.docx
Meet, call, Skype or Zoom with a retired athlete and interview himh.docxMeet, call, Skype or Zoom with a retired athlete and interview himh.docx
Meet, call, Skype or Zoom with a retired athlete and interview himh.docx
 
Medication Administration Make a list of the most common med.docx
Medication Administration Make a list of the most common med.docxMedication Administration Make a list of the most common med.docx
Medication Administration Make a list of the most common med.docx
 
media portfolio”about chapter 1 to 15 from the book  Ci.docx
media portfolio”about chapter 1 to 15 from the book  Ci.docxmedia portfolio”about chapter 1 to 15 from the book  Ci.docx
media portfolio”about chapter 1 to 15 from the book  Ci.docx
 
MediationNameAMUDate.docx
MediationNameAMUDate.docxMediationNameAMUDate.docx
MediationNameAMUDate.docx
 
Media coverage influences the publics perception of the crimina.docx
Media coverage influences the publics perception of the crimina.docxMedia coverage influences the publics perception of the crimina.docx
Media coverage influences the publics perception of the crimina.docx
 
Media Content AnalysisPurpose Evaluate the quality and value of.docx
Media Content AnalysisPurpose Evaluate the quality and value of.docxMedia Content AnalysisPurpose Evaluate the quality and value of.docx
Media Content AnalysisPurpose Evaluate the quality and value of.docx
 
Mayan gods and goddesses are very much a part of this text.  Their i.docx
Mayan gods and goddesses are very much a part of this text.  Their i.docxMayan gods and goddesses are very much a part of this text.  Their i.docx
Mayan gods and goddesses are very much a part of this text.  Their i.docx
 
Media and SocietyIn 1,100 words, complete the followingAn.docx
Media and SocietyIn 1,100 words, complete the followingAn.docxMedia and SocietyIn 1,100 words, complete the followingAn.docx
Media and SocietyIn 1,100 words, complete the followingAn.docx
 
MBA 5110 – Business Organization and ManagementMidterm ExamAns.docx
MBA 5110 – Business Organization and ManagementMidterm ExamAns.docxMBA 5110 – Business Organization and ManagementMidterm ExamAns.docx
MBA 5110 – Business Organization and ManagementMidterm ExamAns.docx
 

Recently uploaded

Spellings Wk 4 and Wk 5 for Grade 4 at CAPS
Spellings Wk 4 and Wk 5 for Grade 4 at CAPSSpellings Wk 4 and Wk 5 for Grade 4 at CAPS
Spellings Wk 4 and Wk 5 for Grade 4 at CAPS
AnaAcapella
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
heathfieldcps1
 

Recently uploaded (20)

SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentation
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
Basic Intentional Injuries Health Education
Basic Intentional Injuries Health EducationBasic Intentional Injuries Health Education
Basic Intentional Injuries Health Education
 
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptxCOMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
 
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptxOn_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POS
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
Spellings Wk 4 and Wk 5 for Grade 4 at CAPS
Spellings Wk 4 and Wk 5 for Grade 4 at CAPSSpellings Wk 4 and Wk 5 for Grade 4 at CAPS
Spellings Wk 4 and Wk 5 for Grade 4 at CAPS
 
How to Add a Tool Tip to a Field in Odoo 17
How to Add a Tool Tip to a Field in Odoo 17How to Add a Tool Tip to a Field in Odoo 17
How to Add a Tool Tip to a Field in Odoo 17
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
Details on CBSE Compartment Exam.pptx1111
Details on CBSE Compartment Exam.pptx1111Details on CBSE Compartment Exam.pptx1111
Details on CBSE Compartment Exam.pptx1111
 
dusjagr & nano talk on open tools for agriculture research and learning
dusjagr & nano talk on open tools for agriculture research and learningdusjagr & nano talk on open tools for agriculture research and learning
dusjagr & nano talk on open tools for agriculture research and learning
 
Tatlong Kwento ni Lola basyang-1.pdf arts
Tatlong Kwento ni Lola basyang-1.pdf artsTatlong Kwento ni Lola basyang-1.pdf arts
Tatlong Kwento ni Lola basyang-1.pdf arts
 
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
 
Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structure
 
OSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & SystemsOSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & Systems
 
Simple, Complex, and Compound Sentences Exercises.pdf
Simple, Complex, and Compound Sentences Exercises.pdfSimple, Complex, and Compound Sentences Exercises.pdf
Simple, Complex, and Compound Sentences Exercises.pdf
 
latest AZ-104 Exam Questions and Answers
latest AZ-104 Exam Questions and Answerslatest AZ-104 Exam Questions and Answers
latest AZ-104 Exam Questions and Answers
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptx
 

Project Topic 1 Moore Housing ContractorsMoore Housing Contra.docx

  • 1. Project Topic 1: Moore Housing Contractors Moore Housing Contractors is negotiating a deal with Countryside Realtors to build six houses in a new development. Countryside wants Moore Contractors to start in late winter or early spring when the weather begins to moderate and build through the summer and fall. The summer months are a busy time for the realty company, and it believes it can sell the houses almost as soon as they are ready or sometimes before. The houses all have similar floor plans and are of approximately equal size; only the exteriors are noticeably different. The completion time is so critical for Countryside Realtors that it is insisting a project management network accompany the contractor’s bid for the job with an estimate of the completion time for a house. The realtor also needs to be able to plan its offerings and marketing for the summer. The realtor wants each house to be completed within 45 days after it is started. If a house is not completed within this frame, the realtor wants to be able to charge the contractor a penalty. Mary and Sandy Moore, the president and vice president of Moore Housing Contractors, are concerned about the prospect of a penalty. They want to be confident they can meet the deadline for a house before entering into any agreement with a penalty involved. If there is a reasonable likelihood they cannot finish a house within the 45 days, they want to increase their bid to cover potential penalty charges. The Moores are experienced home builders, so it was not difficult for them to list the activities involved in building a house or to estimate activity times. However, they made their estimates conservatively and tended to increase their pessimistic estimates to compensate for the possibility of bad weather and variations in their workforce. Following is a list of the activities for building a house and the activity estimates:
  • 2. Activity Description Predecessors Time (days) a m b A Excavation, pour footers - 3 4 6 B Lay foundation A 2 3 5 C Frame and roof B 2 4 5 D Lay drain tiles B 1 2 4 E Sewer (floor) drains
  • 3. B 1 2 3 F Install insulation C 2 4 5 G Pour basement floor E 2 3 6 H Rough plumbing, pipes E 2 4 7 I Install windows F 1 3 4 J Rough electrical wiring F 1 2 4 K Install furnace, air conditioner
  • 4. C, G 3 5 8 L Exterior brickwork I 4 6 10 M Install plasterboard, mud, plaster J, H, K 6 8 12 N Roof shingles, flashing L 2 3 6 O Attach gutter, downspouts N 1 2 5 P Grading D, O 2 3 7 Q Lay subflooring
  • 5. M, N 3 4 6 R Lay driveway, walks, landscape P 4 6 10 S Finish carpentry Q 3 6 12 T Kitchen cabinetry, sink, and appliances Q 2 4 8 U Bathroom cabinetry, fixtures Q 2 3 6 V Painting (interior and exterior) S, T, U 4 6 10 W Finish wood floors, lay carpet
  • 6. S, V 2 5 8 X Final electrical, light fixtures V 1 3 4 1. Develop a CPM/PERT network (draw the network, find expected completion time, variances, ESTs, LSTs, EFTs, LFTs, and slack for each activity, and expected project completion time and critical path). 2. Determine the probability that the contractors can complete a house within 45 days. 3. Does it appear that the Moores might need to increase their bid to compensate for potential penalties? 4. Indicate which project activities Moore Contractors should be particularly diligent to keep on schedule by making sure workers and materials are always available. 5. Indicate which activities the company might shift workers from as the need arises. The Moores also developed the budget for building a house. The budget estimates before project start is provided in the table below: Activity Total budgeted cost ($) A $20,000 B $21,000 C $25,000
  • 8. V $6,000 W $8,000 X $2,000 6. Develop budgeted cost estimates per day from the start of the
  • 9. project until its completion using both ESTs and LSTs of each activity. In the 12th day of the project, the Moores wanted to know the status of the project. Activities A, B, C, D, and E have been finished and incurred costs of $19,000, $24,000, $25,000, $4,000, and $8,000, respectively. Activity G is 80% finished with incurred costs of $13,000, activity H is 60% finished with incurred costs of $7,000, and activity F was just started (5% completed) and incurred a starting cost of $600. The other activities have not been started. 7. Is the project of building the first house on schedule? 8. What is the value of work completed? 9. Are there any cost overruns? Suppose the Countryside Realtors wanted to have each house finished in 35 days. Moore Contractors has a plan developed for this type of situation, as well. This plan includes adding extra resources such as equipment and people to each of the activities A – X needed for building a house. The crash time and crash cost for each activity are presented in the table below: Activity Crash time Crash cost A 3 $28,000 B 2 $26,000 C 3 $31,000 D 1
  • 12. 10. Calculate the project crash cost under this scenario. 11. Using the crash time and crash cost in the table above, calculate the shortest possible delivery time and its cost.