ACTIVITY HAZARD ANALYSIS
                                 LIGHT BULB REPLACEMENT
PRINCIPAL STEPS                  POTENTIAL HAZARDS                        RECOMMENDED CONTROLS

1. Changing light bulbs in
structure


   a. minor repairs to           1. Electrical shock                      1. All equipment as well as circuits to be
electrical outlets and bulbs                                              worked on shall be de-energized before
                                                                          work is started and personnel protected
                                                                          by clearance procedures and grounding.

   b. changing bulbs             2. Falling from ladders and sustaining   1. Prior to climbing poles, ladders,
                                 injuries                                 scaffolds, or other elevated structures, an
                                                                          inspection shall determine that the
                                                                          structures are capable of sustaining the
                                                                          additional or unbalanced stresses to
                                                                          which they will be subjected.

2. Replacing light bulbs in      1. Electrical shock                      1. Switches and/or breakers shall be
project building                                                          locked off.
   a.    removing old or                                                  2. Switches and/or breakers will be
         broken bulbs                                                     marked to prohibit accidental operations
   b.    installing new light                                             during maintenance.
         bulbs                                                            3. Light fixture will be grounded.
                                                                          4. Exposed empty light sockets and
                                                                          broken bulbs will not be permitted.
                                                                          5. Care will be taken to insure adequate
                                                                          clearance from distribution lines.
                                                                          6. Portable metal or conductive ladders
                                                                          shall not be used near energized lines.

                                 2. Material in eye                       1. Wear eye protection equipment.


                                 3. Laceration, cut or abrasion to skin   1. Inspect work area and equipment for
                                                                          hazardous conditions and correct before
                                                                          continuing work.
                                                                          2. Wear proper clothing and safety
                                                                          equipment (gloves, boots, hard hat).
                                                                          3. Create awareness through active
                                                                          safety program.
                                                                          4. Instruction in first aid treatment.

                                 4. Falls                                 1. Use of ladders shall conform to safety
                                                                          codes for Portable Ladders ANSI A14.1,
                                                                          Portable Metal Ladders ANSI A14.2, and
                                                                          Job Made Ladders ANSI A14.4.
                                                                          2. Portable ladders shall be used at such
                                                                          a pitch that the horizontal distance from
                                                                          top support to foot of the ladder will be
                                                                          no greater than ¼ the vertical distance
                                                                          between these points.
                                                                          3. The supports on which the ladder
                                                                          rests, both top and bottom, shall be rigid,
                                                                          capable of supporting the loads to be
                                                                          imposed and such that lateral
                                                                          displacement cannot occur.
                                                                          4. All portable ladders shall be sufficient
                                                                          length and shall be placed so that workers
                                                                          will not stretch or assume a hazardous
                                                                          position.
                                                                          5. Wear proper protective footgear.
                                                                          6. Safety belt, harnesses, lanyards, drop
                                                                          lines and lifelines will be used when in
                                                                          doubt of the person’s safety.
                                                                          7. Access ways shall be clear of material
                                                                          and any debris that would create a
                                                                          tripping hazard.
3. Replacing security light   1. Electrical shock                      1. Before an employee performs any
bulbs                                                                  servicing on a system where unexpected
   a.   remove old bulb                                                energizing could occur, lockout/tagout
   b.   replace with new                                               procedures shall be implemented.
        bulb                                                           2. Switches and/or breakers will be
                                                                       marked to prohibit accidental operation
                                                                       during maintenance.
                                                                       3. Light fixture will be grounded.
                                                                       4. Exposed empty light sockets and
                                                                       broken bulbs will not be permitted.
                                                                       5. Care will be taken to insure adequate
                                                                       clearance from distribution lines.
                                                                       6. Portable metal or conductive ladders
                                                                       shall not be used near energized lines.

                              2. Material in eye                       1. Wear eye protection equipment.


                              3. Laceration, cut or abrasion to skin   1. Inspect work area and equipment for
                                                                       hazardous conditions and correct before
                                                                       continuing work.
                                                                       2. Wear proper clothing and safety
                                                                       equipment (gloves, boots, hard hat).
                                                                       3. Create awareness through active
                                                                       safety program.
                                                                       4. Instruction in first aid treatment.
                                                                       5. Instruction in first aid treatment.

                              4. Falls                                 1. Use of ladders shall conform to safety
                                                                       codes for Portable Ladders ANSI A14.1,
                                                                       Portable Metal Ladders ANSI A14.2, and
                                                                       Job Made Ladders ANSI A14.4.
                                                                       2. Portable ladders shall be used at such
                                                                       a pitch that the horizontal distance from
                                                                       top support to foot of the ladder will be
                                                                       no greater than ¼ the vertical distance
                                                                       between these points.
                                                                       3. The supports on which the ladder
                                                                       rests, both top and bottom, shall be rigid,
                                                                       capable of supporting the loads to be
                                                                       imposed and such that lateral
                                                                       displacement cannot occur.
                                                                       4. All portable ladders shall be sufficient
                                                                       length and shall be placed so that workers
                                                                       will not stretch or assume a hazardous
                                                                       position.
                                                                       5. Wear proper protective footgear.
                                                                       6. Safety belt, harnesses, lanyards, drop
                                                                       lines and lifelines will be used when in
                                                                       doubt of the person’s safety.
                                                                       7. Access ways shall be clear of material
                                                                       and any debris that would create a
                                                                       tripping hazard.

More Related Content

What's hot

Methodstatement welding
Methodstatement weldingMethodstatement welding
Methodstatement weldingAanand Subi
 
30 Workplace Temporary Electrical Supply Risk Assessment Templates.docx
30 Workplace Temporary Electrical Supply Risk Assessment Templates.docx30 Workplace Temporary Electrical Supply Risk Assessment Templates.docx
30 Workplace Temporary Electrical Supply Risk Assessment Templates.docxDwarika Bhushan Sharma
 
Ma 003 erecting & removing scaffolding in tanks
Ma 003  erecting & removing scaffolding in tanksMa 003  erecting & removing scaffolding in tanks
Ma 003 erecting & removing scaffolding in tanksYousif Fikry
 
1926 cranes safety 2016 one hour
1926 cranes safety 2016 one hour1926 cranes safety 2016 one hour
1926 cranes safety 2016 one hourJohn Newquist
 
8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templates8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templatesDwarika Bhushan Sharma
 
Liftingproedure
LiftingproedureLiftingproedure
LiftingproedureZhai Rull
 
6 excavations (temporary works) risk assessment templates
6 excavations (temporary works) risk assessment templates6 excavations (temporary works) risk assessment templates
6 excavations (temporary works) risk assessment templatesDwarika Bhushan Sharma
 
Work at Height | Safety during work at hight
Work at Height | Safety during work at hightWork at Height | Safety during work at hight
Work at Height | Safety during work at hightGaurav Singh Rajput
 
29 workplace temporary lighting risk assessment templates
29 workplace temporary lighting risk assessment templates29 workplace temporary lighting risk assessment templates
29 workplace temporary lighting risk assessment templatesDwarika Bhushan Sharma
 
10 use of mobile concrete pump risk assessment templates
10 use of mobile concrete pump risk assessment templates10 use of mobile concrete pump risk assessment templates
10 use of mobile concrete pump risk assessment templatesDwarika Bhushan Sharma
 
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh RajputJob Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh RajputGaurav Singh Rajput
 
Job safety Analysis
Job safety Analysis Job safety Analysis
Job safety Analysis Deepu Rajan
 
22 casting of concrete columns risk assessment templates
22 casting of concrete columns risk assessment templates22 casting of concrete columns risk assessment templates
22 casting of concrete columns risk assessment templatesDwarika Bhushan Sharma
 
Risk assessment for testing & commissioning of cranes
Risk assessment for  testing & commissioning of cranesRisk assessment for  testing & commissioning of cranes
Risk assessment for testing & commissioning of cranesAzmeel Contracting Company
 
Excavation & Trenching Safety
Excavation & Trenching Safety Excavation & Trenching Safety
Excavation & Trenching Safety Reliance
 

What's hot (20)

Methodstatement welding
Methodstatement weldingMethodstatement welding
Methodstatement welding
 
Lifting plan template
Lifting plan templateLifting plan template
Lifting plan template
 
30 Workplace Temporary Electrical Supply Risk Assessment Templates.docx
30 Workplace Temporary Electrical Supply Risk Assessment Templates.docx30 Workplace Temporary Electrical Supply Risk Assessment Templates.docx
30 Workplace Temporary Electrical Supply Risk Assessment Templates.docx
 
Ma 003 erecting & removing scaffolding in tanks
Ma 003  erecting & removing scaffolding in tanksMa 003  erecting & removing scaffolding in tanks
Ma 003 erecting & removing scaffolding in tanks
 
Work at height safety
Work at height safetyWork at height safety
Work at height safety
 
1926 cranes safety 2016 one hour
1926 cranes safety 2016 one hour1926 cranes safety 2016 one hour
1926 cranes safety 2016 one hour
 
8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templates8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templates
 
Liftingproedure
LiftingproedureLiftingproedure
Liftingproedure
 
6 excavations (temporary works) risk assessment templates
6 excavations (temporary works) risk assessment templates6 excavations (temporary works) risk assessment templates
6 excavations (temporary works) risk assessment templates
 
Work at Height | Safety during work at hight
Work at Height | Safety during work at hightWork at Height | Safety during work at hight
Work at Height | Safety during work at hight
 
Overhead Crane
Overhead CraneOverhead Crane
Overhead Crane
 
Rigging and lifting
Rigging and liftingRigging and lifting
Rigging and lifting
 
29 workplace temporary lighting risk assessment templates
29 workplace temporary lighting risk assessment templates29 workplace temporary lighting risk assessment templates
29 workplace temporary lighting risk assessment templates
 
10 use of mobile concrete pump risk assessment templates
10 use of mobile concrete pump risk assessment templates10 use of mobile concrete pump risk assessment templates
10 use of mobile concrete pump risk assessment templates
 
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh RajputJob Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
 
Job safety Analysis
Job safety Analysis Job safety Analysis
Job safety Analysis
 
22 casting of concrete columns risk assessment templates
22 casting of concrete columns risk assessment templates22 casting of concrete columns risk assessment templates
22 casting of concrete columns risk assessment templates
 
Overhead Crane Operators by
Overhead  Crane Operators byOverhead  Crane Operators by
Overhead Crane Operators by
 
Risk assessment for testing & commissioning of cranes
Risk assessment for  testing & commissioning of cranesRisk assessment for  testing & commissioning of cranes
Risk assessment for testing & commissioning of cranes
 
Excavation & Trenching Safety
Excavation & Trenching Safety Excavation & Trenching Safety
Excavation & Trenching Safety
 

More from vtsiri

Combustible Dust 2015 nfpa 644
Combustible Dust 2015 nfpa 644Combustible Dust 2015 nfpa 644
Combustible Dust 2015 nfpa 644vtsiri
 
Understanding Legionnaires’ Disease A Fact Sheet For Workers And Unions
Understanding Legionnaires’ Disease A Fact Sheet For Workers And UnionsUnderstanding Legionnaires’ Disease A Fact Sheet For Workers And Unions
Understanding Legionnaires’ Disease A Fact Sheet For Workers And Unionsvtsiri
 
Tree trimming update mi 2015
Tree trimming update mi 2015Tree trimming update mi 2015
Tree trimming update mi 2015vtsiri
 
Gi forklift and mat handling 2015
Gi forklift and mat handling 2015Gi forklift and mat handling 2015
Gi forklift and mat handling 2015vtsiri
 
Capacitive app note
Capacitive app noteCapacitive app note
Capacitive app notevtsiri
 
Trenching 2014 year in review
Trenching 2014 year in reviewTrenching 2014 year in review
Trenching 2014 year in reviewvtsiri
 
Industrial electrical safety
Industrial electrical safetyIndustrial electrical safety
Industrial electrical safetyvtsiri
 
2015 industrial hygiene & respiratory care
2015 industrial hygiene & respiratory care2015 industrial hygiene & respiratory care
2015 industrial hygiene & respiratory carevtsiri
 
Fy2014 mfc construction_1.2015
Fy2014 mfc construction_1.2015Fy2014 mfc construction_1.2015
Fy2014 mfc construction_1.2015vtsiri
 
Fy2014 mfc general industry 1.2015
Fy2014 mfc general industry 1.2015Fy2014 mfc general industry 1.2015
Fy2014 mfc general industry 1.2015vtsiri
 
Construction issues for 2015
Construction issues for 2015Construction issues for 2015
Construction issues for 2015vtsiri
 
OSHA record keeping update
OSHA record keeping  updateOSHA record keeping  update
OSHA record keeping updatevtsiri
 
Gi 2014 fire siosh
Gi 2014 fire sioshGi 2014 fire siosh
Gi 2014 fire sioshvtsiri
 
General Industry 2014 ppe newsletter
General Industry 2014 ppe newsletterGeneral Industry 2014 ppe newsletter
General Industry 2014 ppe newslettervtsiri
 
OSHA regulations Fall protection
OSHA regulations Fall protection OSHA regulations Fall protection
OSHA regulations Fall protection vtsiri
 
Gi2013 introduction to safety
Gi2013 introduction to safetyGi2013 introduction to safety
Gi2013 introduction to safetyvtsiri
 
1926 power transmission fall issues 2014
1926 power transmission fall issues 20141926 power transmission fall issues 2014
1926 power transmission fall issues 2014vtsiri
 
Scaffold safety email
Scaffold safety emailScaffold safety email
Scaffold safety emailvtsiri
 
Welding Safety 2014
Welding Safety 2014Welding Safety 2014
Welding Safety 2014vtsiri
 
Ladder safety
Ladder safetyLadder safety
Ladder safetyvtsiri
 

More from vtsiri (20)

Combustible Dust 2015 nfpa 644
Combustible Dust 2015 nfpa 644Combustible Dust 2015 nfpa 644
Combustible Dust 2015 nfpa 644
 
Understanding Legionnaires’ Disease A Fact Sheet For Workers And Unions
Understanding Legionnaires’ Disease A Fact Sheet For Workers And UnionsUnderstanding Legionnaires’ Disease A Fact Sheet For Workers And Unions
Understanding Legionnaires’ Disease A Fact Sheet For Workers And Unions
 
Tree trimming update mi 2015
Tree trimming update mi 2015Tree trimming update mi 2015
Tree trimming update mi 2015
 
Gi forklift and mat handling 2015
Gi forklift and mat handling 2015Gi forklift and mat handling 2015
Gi forklift and mat handling 2015
 
Capacitive app note
Capacitive app noteCapacitive app note
Capacitive app note
 
Trenching 2014 year in review
Trenching 2014 year in reviewTrenching 2014 year in review
Trenching 2014 year in review
 
Industrial electrical safety
Industrial electrical safetyIndustrial electrical safety
Industrial electrical safety
 
2015 industrial hygiene & respiratory care
2015 industrial hygiene & respiratory care2015 industrial hygiene & respiratory care
2015 industrial hygiene & respiratory care
 
Fy2014 mfc construction_1.2015
Fy2014 mfc construction_1.2015Fy2014 mfc construction_1.2015
Fy2014 mfc construction_1.2015
 
Fy2014 mfc general industry 1.2015
Fy2014 mfc general industry 1.2015Fy2014 mfc general industry 1.2015
Fy2014 mfc general industry 1.2015
 
Construction issues for 2015
Construction issues for 2015Construction issues for 2015
Construction issues for 2015
 
OSHA record keeping update
OSHA record keeping  updateOSHA record keeping  update
OSHA record keeping update
 
Gi 2014 fire siosh
Gi 2014 fire sioshGi 2014 fire siosh
Gi 2014 fire siosh
 
General Industry 2014 ppe newsletter
General Industry 2014 ppe newsletterGeneral Industry 2014 ppe newsletter
General Industry 2014 ppe newsletter
 
OSHA regulations Fall protection
OSHA regulations Fall protection OSHA regulations Fall protection
OSHA regulations Fall protection
 
Gi2013 introduction to safety
Gi2013 introduction to safetyGi2013 introduction to safety
Gi2013 introduction to safety
 
1926 power transmission fall issues 2014
1926 power transmission fall issues 20141926 power transmission fall issues 2014
1926 power transmission fall issues 2014
 
Scaffold safety email
Scaffold safety emailScaffold safety email
Scaffold safety email
 
Welding Safety 2014
Welding Safety 2014Welding Safety 2014
Welding Safety 2014
 
Ladder safety
Ladder safetyLadder safety
Ladder safety
 

Light bulb jsa

  • 1. ACTIVITY HAZARD ANALYSIS LIGHT BULB REPLACEMENT PRINCIPAL STEPS POTENTIAL HAZARDS RECOMMENDED CONTROLS 1. Changing light bulbs in structure a. minor repairs to 1. Electrical shock 1. All equipment as well as circuits to be electrical outlets and bulbs worked on shall be de-energized before work is started and personnel protected by clearance procedures and grounding. b. changing bulbs 2. Falling from ladders and sustaining 1. Prior to climbing poles, ladders, injuries scaffolds, or other elevated structures, an inspection shall determine that the structures are capable of sustaining the additional or unbalanced stresses to which they will be subjected. 2. Replacing light bulbs in 1. Electrical shock 1. Switches and/or breakers shall be project building locked off. a. removing old or 2. Switches and/or breakers will be broken bulbs marked to prohibit accidental operations b. installing new light during maintenance. bulbs 3. Light fixture will be grounded. 4. Exposed empty light sockets and broken bulbs will not be permitted. 5. Care will be taken to insure adequate clearance from distribution lines. 6. Portable metal or conductive ladders shall not be used near energized lines. 2. Material in eye 1. Wear eye protection equipment. 3. Laceration, cut or abrasion to skin 1. Inspect work area and equipment for hazardous conditions and correct before continuing work. 2. Wear proper clothing and safety equipment (gloves, boots, hard hat). 3. Create awareness through active safety program. 4. Instruction in first aid treatment. 4. Falls 1. Use of ladders shall conform to safety codes for Portable Ladders ANSI A14.1, Portable Metal Ladders ANSI A14.2, and Job Made Ladders ANSI A14.4. 2. Portable ladders shall be used at such a pitch that the horizontal distance from top support to foot of the ladder will be no greater than ¼ the vertical distance between these points. 3. The supports on which the ladder rests, both top and bottom, shall be rigid, capable of supporting the loads to be imposed and such that lateral displacement cannot occur. 4. All portable ladders shall be sufficient length and shall be placed so that workers will not stretch or assume a hazardous position. 5. Wear proper protective footgear. 6. Safety belt, harnesses, lanyards, drop lines and lifelines will be used when in doubt of the person’s safety. 7. Access ways shall be clear of material and any debris that would create a tripping hazard.
  • 2. 3. Replacing security light 1. Electrical shock 1. Before an employee performs any bulbs servicing on a system where unexpected a. remove old bulb energizing could occur, lockout/tagout b. replace with new procedures shall be implemented. bulb 2. Switches and/or breakers will be marked to prohibit accidental operation during maintenance. 3. Light fixture will be grounded. 4. Exposed empty light sockets and broken bulbs will not be permitted. 5. Care will be taken to insure adequate clearance from distribution lines. 6. Portable metal or conductive ladders shall not be used near energized lines. 2. Material in eye 1. Wear eye protection equipment. 3. Laceration, cut or abrasion to skin 1. Inspect work area and equipment for hazardous conditions and correct before continuing work. 2. Wear proper clothing and safety equipment (gloves, boots, hard hat). 3. Create awareness through active safety program. 4. Instruction in first aid treatment. 5. Instruction in first aid treatment. 4. Falls 1. Use of ladders shall conform to safety codes for Portable Ladders ANSI A14.1, Portable Metal Ladders ANSI A14.2, and Job Made Ladders ANSI A14.4. 2. Portable ladders shall be used at such a pitch that the horizontal distance from top support to foot of the ladder will be no greater than ¼ the vertical distance between these points. 3. The supports on which the ladder rests, both top and bottom, shall be rigid, capable of supporting the loads to be imposed and such that lateral displacement cannot occur. 4. All portable ladders shall be sufficient length and shall be placed so that workers will not stretch or assume a hazardous position. 5. Wear proper protective footgear. 6. Safety belt, harnesses, lanyards, drop lines and lifelines will be used when in doubt of the person’s safety. 7. Access ways shall be clear of material and any debris that would create a tripping hazard.