PVC INSULATED CABLES FOR
WORKING
VOLTAGES UP TO AND INCLUDING
1 100 VOLTS — AS PER IS 694
1. SCOPE
Covered:
• Unarmoured PVC insulated cables with copper or
aluminium conductors and flexible cords with copper
conductors for electric power and lighting for voltages
up to and including 1100 V.
• Applicable for cables where the combination of
ambient temperature and temperature rise due to load
results in a continuous conductor temperature not
exceeding 70ºC.
1. SCOPE
Not Covered:
• Telephone cables
• PVC data transmission cables
• Instrumentation cables
• PVC insulated screened communication cables
(braid/wires/tapes)
• Flexible power cord other than PVC insulated.
2. CONSTRUCTION
3. TESTS
Type Tests
• Tests required to be made before supply on a general
commercial basis on a type of cable in order to
demonstrate satisfactory performance characteristics
to meet the intended application.
• Type tests need not be repeated unless changes are
made in the cable materials or design which might
change the performance characteristics.
Acceptance Tests
• Tests carried out on samples taken from a lot for the
purpose of acceptance of the lot.
3. TESTS
Routine Tests
• Tests made by manufacturer on all finished cable
lengths to demonstrate the integrity of the cable.
a) Conductor resistance test, and
b) High voltage test.
Optional Tests
• Special tests to be carried out when required by
agreement between the purchaser and the supplier.
3. TESTS
3. TESTS
3. TESTS
The following shall constitute acceptance tests:
• Annealing test (for copper),
• Tensile test (for aluminium),
• Wrapping test (for aluminium),
• Conductor resistance test,
• Test for thickness of insulation and sheath,
• Tensile strength and elongation at break of insulation
and sheath,
• Insulation resistance test,
• High voltage test, and
• Flammability test.
3. TESTS
3. TESTS
3. TESTS
Note:
Unless otherwise stated, the tests shall be carried out in
accordance with appropriate part of IS 10810, taking into
account the additional information given in this standard.
1. High Voltage Test (Water ImmersionTest)
(Type Test)
• ac test
• dc test
2. High Voltage Test (at Room Temperature)
(Acceptance and Routine Test)
3. TESTS
3. Spark Test
3. TESTS
4. Flammability Test:
• The period of burning after removal of flame shall not
exceed 60 seconds and the unaffected (uncharred)
portion from the lower edge of the top clamp shall be
at least 50 mm.
5. Oxygen Index Test:
• The test on samples of insulation/sheath (as
applicable) shall be done at 27 ± 2°C. The oxygen
index shall not be less than 29.
6. Test for Halogen Acid Gas Evolution
• The level of HCl evolved shall not exceed 20 percent
by weight.
3. TESTS
7. Test for Temperature Index
• The measured value of Temperature Index shall be 21
at a temperature of 250°C.
8. Measurement of Smoke Density Rating
9. Flexing Test
10. Additional Ageing Test (For Cables for Outdoor
Use)
3. TESTS
Ageing Test (For Cables for Outdoor Use)
Ageing of Sample
• A sample of at least 6 m long, of the finished cable
shall be suspended in a heating chamber and exposed
to a temperature of 80±2ºC during a period of 168
hours.
• Immediately after this, the sample shall be placed in a
bath of boiling water for a period of 8 hours and in a
water-bath at 25ºC for 16 hours.
• This procedure shall be repeated on 5 successive
days.
• The ends of the sample shall protrude at least 200 mm
above the water level.
3. TESTS
Testing and Evaluation
• A sample, 5 m long, taken from the conditioned
sample shall be tested for high voltage test in
accordance with High Voltage Test (at Room
Temperature).
• The remaining conditioned sample shall be submitted
to cold bend cold impact test as appropriate.
ADDITIONAL POINTS TO BE
NOTED
• For cables for outdoor use, the cables shall meet the
requirements of additional ageing test ( see 15.4 ).
• The cables intended for low-temperature conditions
shall meet the requirements of cold bend or cold
impact test whichever is applicable ( see 15.4 ).
• These cables may be used on dc systems for rated
voltages up to and including 1 500 V.
Lv cable is_694

More Related Content

What's hot

Heat treatment part 2
Heat treatment part 2Heat treatment part 2
Heat treatment part 2Naman Dave
 
Testing/Manufacture/Rubber & plastic testing equipments
Testing/Manufacture/Rubber & plastic testing equipmentsTesting/Manufacture/Rubber & plastic testing equipments
Testing/Manufacture/Rubber & plastic testing equipmentsfec2020
 
Nitriding and carbonitriding copy
Nitriding and carbonitriding   copyNitriding and carbonitriding   copy
Nitriding and carbonitriding copyBASIT ALI KHAN
 
Mechanical testing and carburising of the automobile parts
Mechanical testing and carburising of the automobile partsMechanical testing and carburising of the automobile parts
Mechanical testing and carburising of the automobile partsMihir Patel
 
EM-Unit-IV- Case hardening
EM-Unit-IV- Case hardeningEM-Unit-IV- Case hardening
EM-Unit-IV- Case hardeningMohanumar S
 
Bogie hearth furnance
Bogie hearth furnanceBogie hearth furnance
Bogie hearth furnanceAbdul Rahman
 
Flame Spray Company Profile 2016
Flame Spray Company Profile 2016Flame Spray Company Profile 2016
Flame Spray Company Profile 2016Andrea Chierichetti
 
Heat treatment of steels- II
Heat treatment of steels- IIHeat treatment of steels- II
Heat treatment of steels- IINishant Khatod
 

What's hot (14)

Insulation Resistance Test
Insulation Resistance TestInsulation Resistance Test
Insulation Resistance Test
 
Carburizing
CarburizingCarburizing
Carburizing
 
Heat treatment part 2
Heat treatment part 2Heat treatment part 2
Heat treatment part 2
 
Heat treatment 2
Heat treatment 2Heat treatment 2
Heat treatment 2
 
Testing/Manufacture/Rubber & plastic testing equipments
Testing/Manufacture/Rubber & plastic testing equipmentsTesting/Manufacture/Rubber & plastic testing equipments
Testing/Manufacture/Rubber & plastic testing equipments
 
Nitriding and carbonitriding copy
Nitriding and carbonitriding   copyNitriding and carbonitriding   copy
Nitriding and carbonitriding copy
 
Mechanical testing and carburising of the automobile parts
Mechanical testing and carburising of the automobile partsMechanical testing and carburising of the automobile parts
Mechanical testing and carburising of the automobile parts
 
Case hardening
Case hardeningCase hardening
Case hardening
 
Carbonitriding
CarbonitridingCarbonitriding
Carbonitriding
 
Heat Treatment
Heat TreatmentHeat Treatment
Heat Treatment
 
EM-Unit-IV- Case hardening
EM-Unit-IV- Case hardeningEM-Unit-IV- Case hardening
EM-Unit-IV- Case hardening
 
Bogie hearth furnance
Bogie hearth furnanceBogie hearth furnance
Bogie hearth furnance
 
Flame Spray Company Profile 2016
Flame Spray Company Profile 2016Flame Spray Company Profile 2016
Flame Spray Company Profile 2016
 
Heat treatment of steels- II
Heat treatment of steels- IIHeat treatment of steels- II
Heat treatment of steels- II
 

Viewers also liked

Informatica y convergencia tegnologica
Informatica y convergencia tegnologicaInformatica y convergencia tegnologica
Informatica y convergencia tegnologicaaura123y
 
Slumber Pm Review
Slumber Pm ReviewSlumber Pm Review
Slumber Pm ReviewSlumber PM
 
Whatcolombia 160905010357
Whatcolombia 160905010357Whatcolombia 160905010357
Whatcolombia 160905010357Marjorie Lamus
 
Increasing Global Competence
Increasing Global CompetenceIncreasing Global Competence
Increasing Global CompetenceTracie Kirven
 
Ch 20 2 Electric Current And Ohm’S Law
Ch 20 2 Electric Current And Ohm’S LawCh 20 2 Electric Current And Ohm’S Law
Ch 20 2 Electric Current And Ohm’S Lawrobtownsend
 
Creating an Interactive Content Strategy that Works with Technology
Creating an Interactive Content Strategy that Works with TechnologyCreating an Interactive Content Strategy that Works with Technology
Creating an Interactive Content Strategy that Works with Technologyion interactive
 
American Comm Centers Brochure 2
American Comm Centers Brochure 2American Comm Centers Brochure 2
American Comm Centers Brochure 2Steve Moeller
 

Viewers also liked (13)

DGM_finalPresentation
DGM_finalPresentationDGM_finalPresentation
DGM_finalPresentation
 
Informatica y convergencia tegnologica
Informatica y convergencia tegnologicaInformatica y convergencia tegnologica
Informatica y convergencia tegnologica
 
Slumber Pm Review
Slumber Pm ReviewSlumber Pm Review
Slumber Pm Review
 
Lv cable is_694
Lv cable is_694Lv cable is_694
Lv cable is_694
 
Derechos de autor
Derechos de  autorDerechos de  autor
Derechos de autor
 
The Visual Essay
The Visual Essay The Visual Essay
The Visual Essay
 
Slidesharecamila
SlidesharecamilaSlidesharecamila
Slidesharecamila
 
MOHAMAD ZAYED
MOHAMAD ZAYEDMOHAMAD ZAYED
MOHAMAD ZAYED
 
Whatcolombia 160905010357
Whatcolombia 160905010357Whatcolombia 160905010357
Whatcolombia 160905010357
 
Increasing Global Competence
Increasing Global CompetenceIncreasing Global Competence
Increasing Global Competence
 
Ch 20 2 Electric Current And Ohm’S Law
Ch 20 2 Electric Current And Ohm’S LawCh 20 2 Electric Current And Ohm’S Law
Ch 20 2 Electric Current And Ohm’S Law
 
Creating an Interactive Content Strategy that Works with Technology
Creating an Interactive Content Strategy that Works with TechnologyCreating an Interactive Content Strategy that Works with Technology
Creating an Interactive Content Strategy that Works with Technology
 
American Comm Centers Brochure 2
American Comm Centers Brochure 2American Comm Centers Brochure 2
American Comm Centers Brochure 2
 

Similar to Lv cable is_694

Cables22-1-19.pptx
Cables22-1-19.pptxCables22-1-19.pptx
Cables22-1-19.pptxIAIvachan
 
Development and testing of ipc
Development and testing of ipcDevelopment and testing of ipc
Development and testing of ipcHarish Agarwal
 
Isolator and bushing
Isolator and bushingIsolator and bushing
Isolator and bushingNovia Putri
 
PPT on Mdpe inspection.pptx
PPT on Mdpe inspection.pptxPPT on Mdpe inspection.pptx
PPT on Mdpe inspection.pptxHimanshu Shukla
 
A presentation on reinforcement detailing in the manufacturing process
A presentation on reinforcement detailing in the manufacturing processA presentation on reinforcement detailing in the manufacturing process
A presentation on reinforcement detailing in the manufacturing processRohanDas52
 
MANUFACTURING PROCESS OF 600 MW TURBO GENERTOR STATOR WINDING BAR
MANUFACTURING PROCESS OF 600 MW TURBO GENERTOR STATOR WINDING BAR MANUFACTURING PROCESS OF 600 MW TURBO GENERTOR STATOR WINDING BAR
MANUFACTURING PROCESS OF 600 MW TURBO GENERTOR STATOR WINDING BAR Shubham Kulshreshtha
 
pdfslide.net_iec-61439pptx.pptx
pdfslide.net_iec-61439pptx.pptxpdfslide.net_iec-61439pptx.pptx
pdfslide.net_iec-61439pptx.pptxjiguparmar
 
Traction distribution
Traction distribution Traction distribution
Traction distribution Amit Kumar
 
Quality control (training course)
Quality control (training course)Quality control (training course)
Quality control (training course)fikireyesus
 
Quality control (training course)
Quality control (training course)Quality control (training course)
Quality control (training course)fikireyesus
 
Design, planning and layout of high voltage lab
Design, planning and layout of high voltage labDesign, planning and layout of high voltage lab
Design, planning and layout of high voltage labNidhi Maru
 
Corrosion Testing Metthods of universsaldfnkasf
Corrosion Testing Metthods of universsaldfnkasfCorrosion Testing Metthods of universsaldfnkasf
Corrosion Testing Metthods of universsaldfnkasfsivathangaiah1
 
Design, Planning and Layout of high voltage laboratory
Design, Planning and Layout of high voltage laboratory Design, Planning and Layout of high voltage laboratory
Design, Planning and Layout of high voltage laboratory vishalgohel12195
 
Heatfast HF2260 Heat Tracing Cable - Spec Sheet
Heatfast HF2260 Heat Tracing Cable - Spec SheetHeatfast HF2260 Heat Tracing Cable - Spec Sheet
Heatfast HF2260 Heat Tracing Cable - Spec SheetThorne & Derrick UK
 
Fire Rated and Special Application Enclosures for Hazardous Areas
Fire Rated and Special Application Enclosures for Hazardous AreasFire Rated and Special Application Enclosures for Hazardous Areas
Fire Rated and Special Application Enclosures for Hazardous AreasAbtech Ltd
 

Similar to Lv cable is_694 (20)

Cables22-1-19.pptx
Cables22-1-19.pptxCables22-1-19.pptx
Cables22-1-19.pptx
 
2013 design for compliance
2013   design for compliance2013   design for compliance
2013 design for compliance
 
Development and testing of ipc
Development and testing of ipcDevelopment and testing of ipc
Development and testing of ipc
 
Isolator and bushing
Isolator and bushingIsolator and bushing
Isolator and bushing
 
Marine and Offshore Cables - Noskab Catalogue
Marine and Offshore Cables - Noskab CatalogueMarine and Offshore Cables - Noskab Catalogue
Marine and Offshore Cables - Noskab Catalogue
 
PPT on Mdpe inspection.pptx
PPT on Mdpe inspection.pptxPPT on Mdpe inspection.pptx
PPT on Mdpe inspection.pptx
 
A presentation on reinforcement detailing in the manufacturing process
A presentation on reinforcement detailing in the manufacturing processA presentation on reinforcement detailing in the manufacturing process
A presentation on reinforcement detailing in the manufacturing process
 
Module 6part1
Module 6part1Module 6part1
Module 6part1
 
MANUFACTURING PROCESS OF 600 MW TURBO GENERTOR STATOR WINDING BAR
MANUFACTURING PROCESS OF 600 MW TURBO GENERTOR STATOR WINDING BAR MANUFACTURING PROCESS OF 600 MW TURBO GENERTOR STATOR WINDING BAR
MANUFACTURING PROCESS OF 600 MW TURBO GENERTOR STATOR WINDING BAR
 
pdfslide.net_iec-61439pptx.pptx
pdfslide.net_iec-61439pptx.pptxpdfslide.net_iec-61439pptx.pptx
pdfslide.net_iec-61439pptx.pptx
 
Traction distribution
Traction distribution Traction distribution
Traction distribution
 
Quality control (training course)
Quality control (training course)Quality control (training course)
Quality control (training course)
 
Quality control (training course)
Quality control (training course)Quality control (training course)
Quality control (training course)
 
Design, planning and layout of high voltage lab
Design, planning and layout of high voltage labDesign, planning and layout of high voltage lab
Design, planning and layout of high voltage lab
 
Megger regidez dielectrica oil test- OTS seminar
Megger   regidez dielectrica oil test- OTS seminarMegger   regidez dielectrica oil test- OTS seminar
Megger regidez dielectrica oil test- OTS seminar
 
Corrosion Testing Metthods of universsaldfnkasf
Corrosion Testing Metthods of universsaldfnkasfCorrosion Testing Metthods of universsaldfnkasf
Corrosion Testing Metthods of universsaldfnkasf
 
Design, Planning and Layout of high voltage laboratory
Design, Planning and Layout of high voltage laboratory Design, Planning and Layout of high voltage laboratory
Design, Planning and Layout of high voltage laboratory
 
Heatfast HF2260 Heat Tracing Cable - Spec Sheet
Heatfast HF2260 Heat Tracing Cable - Spec SheetHeatfast HF2260 Heat Tracing Cable - Spec Sheet
Heatfast HF2260 Heat Tracing Cable - Spec Sheet
 
BR-High-Power-Test-Lab-Brochure
BR-High-Power-Test-Lab-BrochureBR-High-Power-Test-Lab-Brochure
BR-High-Power-Test-Lab-Brochure
 
Fire Rated and Special Application Enclosures for Hazardous Areas
Fire Rated and Special Application Enclosures for Hazardous AreasFire Rated and Special Application Enclosures for Hazardous Areas
Fire Rated and Special Application Enclosures for Hazardous Areas
 

Recently uploaded

Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 

Recently uploaded (20)

Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 

Lv cable is_694

  • 1. PVC INSULATED CABLES FOR WORKING VOLTAGES UP TO AND INCLUDING 1 100 VOLTS — AS PER IS 694
  • 2. 1. SCOPE Covered: • Unarmoured PVC insulated cables with copper or aluminium conductors and flexible cords with copper conductors for electric power and lighting for voltages up to and including 1100 V. • Applicable for cables where the combination of ambient temperature and temperature rise due to load results in a continuous conductor temperature not exceeding 70ºC.
  • 3. 1. SCOPE Not Covered: • Telephone cables • PVC data transmission cables • Instrumentation cables • PVC insulated screened communication cables (braid/wires/tapes) • Flexible power cord other than PVC insulated.
  • 5. 3. TESTS Type Tests • Tests required to be made before supply on a general commercial basis on a type of cable in order to demonstrate satisfactory performance characteristics to meet the intended application. • Type tests need not be repeated unless changes are made in the cable materials or design which might change the performance characteristics. Acceptance Tests • Tests carried out on samples taken from a lot for the purpose of acceptance of the lot.
  • 6. 3. TESTS Routine Tests • Tests made by manufacturer on all finished cable lengths to demonstrate the integrity of the cable. a) Conductor resistance test, and b) High voltage test. Optional Tests • Special tests to be carried out when required by agreement between the purchaser and the supplier.
  • 9. 3. TESTS The following shall constitute acceptance tests: • Annealing test (for copper), • Tensile test (for aluminium), • Wrapping test (for aluminium), • Conductor resistance test, • Test for thickness of insulation and sheath, • Tensile strength and elongation at break of insulation and sheath, • Insulation resistance test, • High voltage test, and • Flammability test.
  • 12. 3. TESTS Note: Unless otherwise stated, the tests shall be carried out in accordance with appropriate part of IS 10810, taking into account the additional information given in this standard. 1. High Voltage Test (Water ImmersionTest) (Type Test) • ac test • dc test 2. High Voltage Test (at Room Temperature) (Acceptance and Routine Test)
  • 14. 3. TESTS 4. Flammability Test: • The period of burning after removal of flame shall not exceed 60 seconds and the unaffected (uncharred) portion from the lower edge of the top clamp shall be at least 50 mm. 5. Oxygen Index Test: • The test on samples of insulation/sheath (as applicable) shall be done at 27 ± 2°C. The oxygen index shall not be less than 29. 6. Test for Halogen Acid Gas Evolution • The level of HCl evolved shall not exceed 20 percent by weight.
  • 15. 3. TESTS 7. Test for Temperature Index • The measured value of Temperature Index shall be 21 at a temperature of 250°C. 8. Measurement of Smoke Density Rating 9. Flexing Test 10. Additional Ageing Test (For Cables for Outdoor Use)
  • 16. 3. TESTS Ageing Test (For Cables for Outdoor Use) Ageing of Sample • A sample of at least 6 m long, of the finished cable shall be suspended in a heating chamber and exposed to a temperature of 80±2ºC during a period of 168 hours. • Immediately after this, the sample shall be placed in a bath of boiling water for a period of 8 hours and in a water-bath at 25ºC for 16 hours. • This procedure shall be repeated on 5 successive days. • The ends of the sample shall protrude at least 200 mm above the water level.
  • 17. 3. TESTS Testing and Evaluation • A sample, 5 m long, taken from the conditioned sample shall be tested for high voltage test in accordance with High Voltage Test (at Room Temperature). • The remaining conditioned sample shall be submitted to cold bend cold impact test as appropriate.
  • 18. ADDITIONAL POINTS TO BE NOTED • For cables for outdoor use, the cables shall meet the requirements of additional ageing test ( see 15.4 ). • The cables intended for low-temperature conditions shall meet the requirements of cold bend or cold impact test whichever is applicable ( see 15.4 ). • These cables may be used on dc systems for rated voltages up to and including 1 500 V.