What is a Septic Tank?
A Septic Tank is a below ground watertight box
(concrete, plastic or fiberglass), often about 9
x 5 x 6 feet. It separates the liquids and solids,
provides digestion of some organics (mainly by
bacteria which live without oxygen) and
storage. It discharges partially filtered and
clarified effluent to the drainfield for final
treatment.
Who has a Septic Tank System?
If a building (with plumbing facilities) is
not on a city sewer system, then in most
cases it has a septic tank system (also
known as an On-site Wastewater
Disposal System, or Subsurface
Wastewater Disposal System) to dispose
of the wastewater
What is an On-site Wastewater System?
An On-site Wastewater Disposal System collects,
treats and disposes of all the wastewater produced
in a building. A conventional system includes a
Septic Tank, a Distribution Device and a Drainfield
Typical Septic System
SEPTIC TANK
 It is a primary horizontal continuous flow
type of sedimentation tank having extra
provision to digestion of settled sludge .
 Properties
 Detention time- 12 to 36 hr.
 It removes 60% to 70% of dissolve
matters.
 Cleaning period-6 month to 3 years.
DESIGN OF SEPTIC TANK
 DETENTION PERIOD METHOD
 RATIONAL METHOD
A. Detention period method
1. Detention period (t) is assumed in between 12 to 36
hrs (common value = 24 hrs).
2. Assuming rate of sewage flow (lpcd) [90 to 150 lpcd]
and knowing population to be served; total discharge
(Q) is determined.
3. Volume is calculated by V=Q. t
4. Depth is assumed 1 to 2 m.
5. Surface area is calculated by As = V / depth.
6. Assuming L/B ratio in between 2 to 4 length
and breadth can be fixed.
Rational Method
1. Settling zone is kept min 30 cm deep.
2. Digestion zone is provided as 0.032
m3/capita.
3. Sludge storage zone of 7.30 m3/100
persons for cleaning interval of 1 year is
provided.
4. Surface area of 0.92 m2/10 lpm of flow is
provided.
5. Free board of 0.3 m is provided. ( depth 1 to
2 m, L/B ratio 2 to 4).
Anaerobic Digestion
ORGANIC MATTER GASES + HUMUS
CO2
CH4
H2S
NH3
Advantage Disadvantage
1. It can be easily
constructed.
2. No maintenance
problem.
3. It excellently remove
BOD.
4. Very less amount of
solids are produced.
5. Low cost
1. Its size should be very
large to serve many
people.
2. Smell problem
3. It needs periodic
cleaning.
Septic tank

More Related Content

What's hot

Maintenance of water supply
Maintenance of water supplyMaintenance of water supply
Maintenance of water supplydhara dattani
 
Sewage Conveyance and Pumping
Sewage Conveyance and PumpingSewage Conveyance and Pumping
Sewage Conveyance and PumpingGAURAV. H .TANDON
 
Collection and estimation of sewage
Collection and estimation of sewageCollection and estimation of sewage
Collection and estimation of sewageBibhabasu Mohanty
 
Spillways and Flood Control Works
Spillways and Flood Control WorksSpillways and Flood Control Works
Spillways and Flood Control WorksGAURAV. H .TANDON
 
Drought management and water harvesting m5
Drought management and water harvesting m5Drought management and water harvesting m5
Drought management and water harvesting m5Bibhabasu Mohanty
 
SEWERAGE SYSTEMS ppt by mayank oza
SEWERAGE SYSTEMS ppt by mayank ozaSEWERAGE SYSTEMS ppt by mayank oza
SEWERAGE SYSTEMS ppt by mayank ozaMayank Oza
 
Storage and distribution reservoirs
Storage and distribution reservoirsStorage and distribution reservoirs
Storage and distribution reservoirsfarooq husain
 
2170609 irrigation engineering cross drainage works
2170609 irrigation engineering cross drainage works2170609 irrigation engineering cross drainage works
2170609 irrigation engineering cross drainage worksJaydeep Dave
 
Lec 1 (wastewater collection system)
Lec 1 (wastewater collection system)Lec 1 (wastewater collection system)
Lec 1 (wastewater collection system)5032683
 

What's hot (20)

Septic tank
Septic tankSeptic tank
Septic tank
 
Maintenance of water supply
Maintenance of water supplyMaintenance of water supply
Maintenance of water supply
 
Sewage Conveyance and Pumping
Sewage Conveyance and PumpingSewage Conveyance and Pumping
Sewage Conveyance and Pumping
 
Sewer appurtenances
Sewer appurtenancesSewer appurtenances
Sewer appurtenances
 
Sewer Appurtenances
Sewer AppurtenancesSewer Appurtenances
Sewer Appurtenances
 
Collection and estimation of sewage
Collection and estimation of sewageCollection and estimation of sewage
Collection and estimation of sewage
 
Spillways and Flood Control Works
Spillways and Flood Control WorksSpillways and Flood Control Works
Spillways and Flood Control Works
 
Drought management and water harvesting m5
Drought management and water harvesting m5Drought management and water harvesting m5
Drought management and water harvesting m5
 
Drainage
DrainageDrainage
Drainage
 
SEWERAGE SYSTEMS ppt by mayank oza
SEWERAGE SYSTEMS ppt by mayank ozaSEWERAGE SYSTEMS ppt by mayank oza
SEWERAGE SYSTEMS ppt by mayank oza
 
L 13 grit chamber
L 13 grit chamberL 13 grit chamber
L 13 grit chamber
 
Water treatment process
Water treatment processWater treatment process
Water treatment process
 
Gravity dam
Gravity damGravity dam
Gravity dam
 
Storm water drainage
Storm water drainageStorm water drainage
Storm water drainage
 
Storage and distribution reservoirs
Storage and distribution reservoirsStorage and distribution reservoirs
Storage and distribution reservoirs
 
Characteristics of sewage
Characteristics of sewageCharacteristics of sewage
Characteristics of sewage
 
Canal design
Canal designCanal design
Canal design
 
Drainage System
Drainage SystemDrainage System
Drainage System
 
2170609 irrigation engineering cross drainage works
2170609 irrigation engineering cross drainage works2170609 irrigation engineering cross drainage works
2170609 irrigation engineering cross drainage works
 
Lec 1 (wastewater collection system)
Lec 1 (wastewater collection system)Lec 1 (wastewater collection system)
Lec 1 (wastewater collection system)
 

Similar to Septic tank

Construction details of septic tank (Rakesh Kumar Ghritlahare)
Construction details of septic tank (Rakesh Kumar Ghritlahare)Construction details of septic tank (Rakesh Kumar Ghritlahare)
Construction details of septic tank (Rakesh Kumar Ghritlahare)RAKESH KUMAR GHRITLAHARE
 
Ecw 579 week 6. latest
Ecw 579 week 6. latestEcw 579 week 6. latest
Ecw 579 week 6. latestAdilah Anuar
 
Design of Sewage Treatment Plant
Design of Sewage Treatment PlantDesign of Sewage Treatment Plant
Design of Sewage Treatment PlantPhurba Tamang
 
Septic tank process&design
Septic tank process&designSeptic tank process&design
Septic tank process&designmsrimurali
 
Municipal wastewater treatment
Municipal wastewater treatmentMunicipal wastewater treatment
Municipal wastewater treatmentParsaAmouzesh
 
Filtration unit in water treatment plant
Filtration unit in water treatment plantFiltration unit in water treatment plant
Filtration unit in water treatment plantAamir Patni
 
Sewage treatment plant design may 24
Sewage treatment plant design may 24Sewage treatment plant design may 24
Sewage treatment plant design may 249642808711
 
Chapter_3.pptx on waste water treatment course
Chapter_3.pptx on waste water treatment courseChapter_3.pptx on waste water treatment course
Chapter_3.pptx on waste water treatment courseManamnoBeza1
 
Human waste (excreta disposal) mechanisms
Human waste (excreta disposal) mechanismsHuman waste (excreta disposal) mechanisms
Human waste (excreta disposal) mechanismsMtMt37
 
Septictank 150312104320-conversion-gate01
Septictank 150312104320-conversion-gate01Septictank 150312104320-conversion-gate01
Septictank 150312104320-conversion-gate01Newaz Kabir
 
Design of 210 Mld Sewage Treatment Plant
Design of 210 Mld Sewage Treatment PlantDesign of 210 Mld Sewage Treatment Plant
Design of 210 Mld Sewage Treatment PlantARUN KUMAR
 
Wastewater treatment
Wastewater treatmentWastewater treatment
Wastewater treatmentRanjan Das
 
Wastewater Treatment Process (from Sewage Filtration onwards)
Wastewater Treatment Process (from Sewage Filtration onwards)Wastewater Treatment Process (from Sewage Filtration onwards)
Wastewater Treatment Process (from Sewage Filtration onwards)JUBIN ADHIKARI
 

Similar to Septic tank (20)

Construction details of septic tank (rkg)
Construction details of septic tank (rkg)Construction details of septic tank (rkg)
Construction details of septic tank (rkg)
 
Construction details of septic tank (Rakesh Kumar Ghritlahare)
Construction details of septic tank (Rakesh Kumar Ghritlahare)Construction details of septic tank (Rakesh Kumar Ghritlahare)
Construction details of septic tank (Rakesh Kumar Ghritlahare)
 
Etp presentation
Etp presentationEtp presentation
Etp presentation
 
Unit 4
Unit  4Unit  4
Unit 4
 
Ecw 579 week 6. latest
Ecw 579 week 6. latestEcw 579 week 6. latest
Ecw 579 week 6. latest
 
Design of Sewage Treatment Plant
Design of Sewage Treatment PlantDesign of Sewage Treatment Plant
Design of Sewage Treatment Plant
 
Septic tank process&design
Septic tank process&designSeptic tank process&design
Septic tank process&design
 
Municipal wastewater treatment
Municipal wastewater treatmentMunicipal wastewater treatment
Municipal wastewater treatment
 
Septictankprocessdesign
SeptictankprocessdesignSeptictankprocessdesign
Septictankprocessdesign
 
Water treatment
Water treatmentWater treatment
Water treatment
 
Filtration unit in water treatment plant
Filtration unit in water treatment plantFiltration unit in water treatment plant
Filtration unit in water treatment plant
 
Sewage treatment plant design may 24
Sewage treatment plant design may 24Sewage treatment plant design may 24
Sewage treatment plant design may 24
 
Chapter_3.pptx on waste water treatment course
Chapter_3.pptx on waste water treatment courseChapter_3.pptx on waste water treatment course
Chapter_3.pptx on waste water treatment course
 
Human waste (excreta disposal) mechanisms
Human waste (excreta disposal) mechanismsHuman waste (excreta disposal) mechanisms
Human waste (excreta disposal) mechanisms
 
Septictank 150312104320-conversion-gate01
Septictank 150312104320-conversion-gate01Septictank 150312104320-conversion-gate01
Septictank 150312104320-conversion-gate01
 
Design of 210 Mld Sewage Treatment Plant
Design of 210 Mld Sewage Treatment PlantDesign of 210 Mld Sewage Treatment Plant
Design of 210 Mld Sewage Treatment Plant
 
NUKE PPT.pdf
NUKE PPT.pdfNUKE PPT.pdf
NUKE PPT.pdf
 
Wastewater treatment
Wastewater treatmentWastewater treatment
Wastewater treatment
 
MBR.pptx
MBR.pptxMBR.pptx
MBR.pptx
 
Wastewater Treatment Process (from Sewage Filtration onwards)
Wastewater Treatment Process (from Sewage Filtration onwards)Wastewater Treatment Process (from Sewage Filtration onwards)
Wastewater Treatment Process (from Sewage Filtration onwards)
 

Recently uploaded

BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppCeline George
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxRoyAbrique
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxOH TEIK BIN
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Celine George
 
Concept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfConcept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfUmakantAnnand
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
MENTAL STATUS EXAMINATION format.docx
MENTAL     STATUS EXAMINATION format.docxMENTAL     STATUS EXAMINATION format.docx
MENTAL STATUS EXAMINATION format.docxPoojaSen20
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 

Recently uploaded (20)

BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website App
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptx
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
 
Concept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfConcept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.Compdf
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
MENTAL STATUS EXAMINATION format.docx
MENTAL     STATUS EXAMINATION format.docxMENTAL     STATUS EXAMINATION format.docx
MENTAL STATUS EXAMINATION format.docx
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 

Septic tank

  • 1.
  • 2. What is a Septic Tank? A Septic Tank is a below ground watertight box (concrete, plastic or fiberglass), often about 9 x 5 x 6 feet. It separates the liquids and solids, provides digestion of some organics (mainly by bacteria which live without oxygen) and storage. It discharges partially filtered and clarified effluent to the drainfield for final treatment.
  • 3.
  • 4. Who has a Septic Tank System? If a building (with plumbing facilities) is not on a city sewer system, then in most cases it has a septic tank system (also known as an On-site Wastewater Disposal System, or Subsurface Wastewater Disposal System) to dispose of the wastewater
  • 5. What is an On-site Wastewater System? An On-site Wastewater Disposal System collects, treats and disposes of all the wastewater produced in a building. A conventional system includes a Septic Tank, a Distribution Device and a Drainfield
  • 7. SEPTIC TANK  It is a primary horizontal continuous flow type of sedimentation tank having extra provision to digestion of settled sludge .  Properties  Detention time- 12 to 36 hr.  It removes 60% to 70% of dissolve matters.  Cleaning period-6 month to 3 years.
  • 8. DESIGN OF SEPTIC TANK  DETENTION PERIOD METHOD  RATIONAL METHOD A. Detention period method 1. Detention period (t) is assumed in between 12 to 36 hrs (common value = 24 hrs). 2. Assuming rate of sewage flow (lpcd) [90 to 150 lpcd] and knowing population to be served; total discharge (Q) is determined. 3. Volume is calculated by V=Q. t 4. Depth is assumed 1 to 2 m. 5. Surface area is calculated by As = V / depth. 6. Assuming L/B ratio in between 2 to 4 length and breadth can be fixed.
  • 9. Rational Method 1. Settling zone is kept min 30 cm deep. 2. Digestion zone is provided as 0.032 m3/capita. 3. Sludge storage zone of 7.30 m3/100 persons for cleaning interval of 1 year is provided. 4. Surface area of 0.92 m2/10 lpm of flow is provided. 5. Free board of 0.3 m is provided. ( depth 1 to 2 m, L/B ratio 2 to 4).
  • 10. Anaerobic Digestion ORGANIC MATTER GASES + HUMUS CO2 CH4 H2S NH3
  • 11. Advantage Disadvantage 1. It can be easily constructed. 2. No maintenance problem. 3. It excellently remove BOD. 4. Very less amount of solids are produced. 5. Low cost 1. Its size should be very large to serve many people. 2. Smell problem 3. It needs periodic cleaning.