INDIAN ELECTRICITY RULES 1956
The Indian Electricity Act, 1910 deals with the provisions
relating to supply and use of electrical energy and the rights
and obligations of persons licensed under part II of that act
to supply energy.
Section 35 - Advisory boards
Under section 36A of the Act, a board called Central
Electricity Board is constituted to exercise the powers
conferred by Section 37.
PART IV
Section 36A –Central Electricity Board shall be
constituted to exercise the powers conferred by section
37
The board shall consist of
1. A chairman and five other members to be nominated
by Central Government
2. One member to be nominated by government of each
state
3. One member by railway board
4. One member by Chief Inspector of Mines
5. One member by ISI
PART IV
Section 37 – Powers for Board to make rules
CEB may make the rules to regulate the generation,
transmission, supply and use of energy.
In exercise of the powers conferred under the
sections the Central Electricity Board frames the
Indian Electricity Rules
IE RULES
• The rules regarding the safety in
construction and use of electrical
installations / plants / equipments are
framed by Central Electricity Board.
• The I.E. rules were first framed in 1922 and
amended in 1937 and 1956.
Objective of I.E. Rules
• To regulate the relation between the
Electricity Supplier and Consumer
• To make the generation, transmission,
distribution and the use of electricity as safe
as possible.
INDIAN ELECTRICITY RULES 1956
• Chapter I – Rules 1 to 3 Preliminary
• Chapter II – Rules 4 to 10 Inspectors
• Chapter III – Rules 11 to 28 License
• Chapter IV – Rules 29 to 46 General
Safety Precautions
• Chapter V – Rules 47 to 59 General
conditions relating to supply and use of
energy
• Chapter VI – Rules 60 to 62 Electric
supply lines, systems and apparatus for
low and medium voltages
INDIAN ELECTRICITY RULES 1956
• Chapter VII – Rules 63 to 73 Electric supply
lines, systems and apparatus for high and
extra high voltages.
• Chapter VIII – Rules 74 to 93 Overhead
lines
• ChapterIX–Rules 94 to 108Electric Traction
• Chapter X – Rules 109 to 132 Additional
precautions to be adopted in Mines and oil
fields
• Chapter XI – Rules 133 to 143 Miscellaneous
• Annexures XIV
INDIAN ELECTRICITY RULES 1956
Rule 1, 2 & 3 comes under the heading of preliminary.
Rule1–Short title and commencement.
Rule 2 – Definition – Act, ampere, authorised person, danger,
earthing system, cable, span, supplier, system, lighting arrester.
Ampere – means a unit of electric current
Bare – means not covered with insulating material
Cable – means a length of insulated single conductor (solid /
standard) or of two more such conductors each provided with its
own insulation which are laid up together, such insulated conductors
may or may not be provided with an overall mechanical protective
covering.
Danger – means danger to health or danger to life or any part of body from
shock, burn or other injury to persons or property or from fire or
explosion, attendant upon the generation, transmission, transformations,
conversion, distribution or use of energy.
RULE 3 AUTHORISATION
Sub rule 2A – No person shall be authorised to operate or
undertake operation and maintenance of any part or
whole of generating station of capacity 100MWand above
together with the associated substation unless he is
adequately qualified and has successfully undergone the
type of training specified in Annexure XVI.
1. Training may be arranged in his own institute.
2. This deals with details of training for skilled employees
and fresh engineers.
CREATION OF INSTITUTE
Every training institute shall be established adjacent to a
power station so as to facilitate familiarization and
provide in plant training.
INDIAN ELECTRICITY RULES 1956
Chapter III – deals with
qualifications of inspectors,
powers to the electrical inspectors.
Rule 5 Entry and Inspection.
Any Inspector may enter, inspect
and examine any place.
INDIAN ELECTRICITY RULES 1956
Chapter IV – General safety requirements
Rule 29 Construction, installation,
protection, operation and maintenance of
electric supply lines and apparatus.
INDIAN ELECTRICITY RULES 1956
•All electric supply lines and apparatus shall be of
sufficient ratings for powers, insulation and estimated
fault current and sufficient mechanical strength for the
duty which they may be required to perform under the
environmental conditions of installations and shall be
constructed, installed, protected, worked and maintained
in such a manner as to ensure safety of personnel and
property.
•The relevant code of practice of the BIS may be followed
to carry out the purpose of this rule and in the event of any
inconsistency the provisions of these rules shall prevail .
INDIAN ELECTRICITY RULES 1956
Rule 29 Where death is caused by
electrocution on account of defective
insulation of an electric pump and the
earthing system, the principal of the
Institution, its secretary and Chief
Executive of the governing body of the
institution where the accident takes
place are all liable to prosecution.
INDIAN ELECTRICITY RULES 1956
Rule 30 (4) The customer shall
also ensure that the insulation
under his control is maintained
in a safe condition.
Accidents & Main Reasons
Unauthorized persons working on lines / equipment
Working without using safety appliances
Working without obtaining proper line clear
Working without proper instructions from superiors
Wrong instructions from person who received
the line clear
Negligence, carelessness, haste and overconfidence
Lack of knowledge on feeding arrangements
Precautions to avoid accidents
• Obtaining proper line clear from all possible sources of
supply shall be taken and the following precautions are
to be taken.
• 1. Till a L.C. is received from all sources
every line or equipment shall be treated as live.
• 2. Hang “Danger” boards at all strategic
places to ensure safety at work spot
• 3. Explain the area which is safe to work
and ensure that every employee in your team
has understood the same.
•
Precautions to avoid accidents(Contd.)
• 4. Nominate one among the team exclusively to
reap a close watch and ensure that every person in
the team is safe.
• 5. Earthing is to be provided on both sides of the
work spot before proceeding with the work.
• 6. All safety rules are to be followed till entire
work is completed.
• 7. Insulated earth rods with clamps shall be used
and the person using the earth rods shall keep safe
distance from earthing wires.
• 8. Examine earth rods and every safety
appliance before using
• 9. No person shall be allowed work if he is under
the influence of alcoholic drinks under inebriated
condition.
INDIAN ELECTRICITY RULES 1956
Rule 32 An indication of a permanent
nature shall be provided by the
owner of the earth neutral conductor
to enable such conductor to be
distinguished from any live
conductor.
INDIAN ELECTRICITY RULES 1956
Rule 33 Earthed terminal on
consumer’s premises.
The consumer shall take all
reasonable precautions to prevent
mechanical damage to the earthed
terminal and its lead belonging to
the supplier.
INDIAN ELECTRICITY RULES 1956
Rule 34 Accessibility of bare
conductors where bare conductors
are used in a building
The owner of such conductors shall
*Ensure that they are inaccessible
* Provide in readily accessibility
position switches for rendering them
dead whenever necessary.
INDIAN ELECTRICITY RULES 1956
Rule 35 Danger Notices
The owner of every medium, high and extra high
voltage installation shall affix permanently a Danger
Notice in Hindi or English and the local language of
the district with a sign of skull and bones (design as
per ISS No.2551) on
a. Every motor, generator, transformer and other
electrical plant and equipment together with
apparatus used for controlling or regulating the
same.
b. All supports of high and extra high voltage
overhead lines which can be easily climbed upon
without the aid of ladder or special apparatus.
INDIAN ELECTRICITY RULES 1956
Rule 36
1. Handling of electric supply lines and apparatus Before any
conductor or apparatus is handled adequate precaution shall be
taken by earthing or other suitable means to discharge.
Every person who is working on an electric supply line or
apparatus or both shall be provided with tools and devices such
as gloves, rubber shoes, safety belts, ladders, earthing devices,
helmets for protection him from mechanical or electrical injury.
Such tools and devices shall always be maintained in sound and
efficient working condition.
2. No person shall work on any live electric supply line or
apparatus and no person shall assist such person on such work,
unless he is authorised in that behalf and takes the safety
measures approved by the Inspector.
INDIAN ELECTRICITY RULES 1956
Rule 37 supply to vehicles, cranes, etc.
Every person owning a vehicle,
traveling crane or the like to which is
energy supplied from an external
source shall ensure that it is efficiently
controlled by a suitable switch
enabling all voltage to be cut off in one
operation and the owner shall ensure
rails if used are electrically continuous
and earthed.
INDIAN ELECTRICITY RULES 1956
Rule 38 cables for portable or transportable
apparatus
1. Flexible cables shall not be used for portable
or transportable motors, generators,
transformers, electric drills, electric sprays,
welding sets, unless they are heavily insulated
and adequately protected.
2. The cable shall be three core type and four
core type for portable and transportable
apparatus working on single phase and three
phase supply respectively and wire meant for
ground connection shall be easily identifiable.
INDIAN ELECTRICITY RULES 1956
Rule 42 Accidental charge
The owners of all circuits and apparatus
shall so arrange them that there shall be no
danger of any part thereof becoming
accidentally charged to any voltage beyond
the limits of voltage for which they are
intended
When AC and DC circuits are installed on
the same support they shall be so arranged
and protected that they shall not come into
contact with each other when live.
INDIAN ELECTRICITY RULES 1956
Rule 43 Provisions applicable to protective equipment.
1. Fire buckets filled with clean dry sand ready for
immediate use for extinguishing fire in addition to
fire extinguishers (in all generating station, sub
station and switching station).
2. The fire extinguishers shall be tested for satisfactory
operation at least once in a year and record of such
tests shall be maintained.
3. First aid boxes or cup boards marked and equipped
with such contents as the State Government may
specify shall be provided and maintained in every
generating station, sub station and switching station
so as to be readily accessible during all working
hours.
INDIAN ELECTRICITY RULES 1956
Rule 44 Instructions for restoration of
persons suffering from electric shock.
Instructions in English or Hindi and
local language for the restoration of
persons suffering from electric shock.
INDIAN ELECTRICITY RULES 1956
Rule 44A Intimation of Accident
If any accident occurs in connection with
the generation, transmission, supply or use
of energy in or in connection with any part
of the electric supply lines or other works of
any person and the accident results is or is
likely to have resulted is loss of human or
animal, such person or any authorised
person of the electricity board not below the
rank of a J.E or equivalent shall send a
telegraphic report to Inspector within 24
hours.
INDIAN ELECTRICITY RULES 1956
Rule 46A Periodical Inspection and
testing of consumers’ installation
Where an installation is already
connected to the supply system of the
supplier, every such installation shall be
periodically inspected and tested at
intervals not exceeding five years either
by the Inspector or by the supplier, in
the case of installation in mines, oil fields
and railways by the Central
Government.
INDIAN ELECTRICITY RULES 1956
Chapter V – General condition relating to supply
and use of energy
Rule 48 Precautions against leakage before
connection
The supplier shall not connect supply unless he is
reasonably satisfied that the connection will not at any
time cause a leakage from that installation or apparatus
of a magnitude detrimental to safety.
Compliance with this rule shall be checked by
measuring the insulating resistance as provided below:
High voltage equipments shall have the IR value as
stipulated in the relevant Indian Standard.
INDIAN ELECTRICITY RULES 1956
Rule 50 supply and use of energy
The following controls of requisite capacity to
carry and break the current after the point of
commencement of supply as defined in Rule
58.
1. A linked switch with fuse or a CB for low and
medium volt consumers.
2. CB for EHV consumer
INDIAN ELECTRICITY RULES 1956
3. The supply of energy to each motor or a group
of motors or other apparatus meant for
operating one particular machine in controlled
by a suitable linked switch or a CB or an
emergency tripping device placed in such a
position as to cut off supply by the person
incharge.
5.Adequate precautions shall be taken to ensure
that no live parts are so exposed as to cause
danger.
INDIAN ELECTRICITY RULES 1956
Rule 54 Declared voltage of supply to
consumer.
The variation shall not vary
1. Low and medium voltage by more than
6%
2. High voltage more than 6% on higher
side, 9% on lower side
3. EHV, 10% on higher side and 12.5% on
lower side .
INDIAN ELECTRICITY RULES 1956
Rule 55 Declared frequency
A supplier shall not permit the
frequency of an alternating
current supply to vary from
the declared frequency by
more than 3%.
INDIAN ELECTRICITY RULES 1956
Chapter – VI Electric supply line, systems and apparatus
for low and medium voltage.
Rule 61 connecting with earth
The following provisions shall apply to the connection with
earth of systems
1. Neutral conductor of a 3Ø 4 wire
2. Middle conductor of a 2Ø 3 wire system
shall be earthed by not less than two separate and distant
connections with a minimum of two different earth
electrode. The earth electrodes may be inter connected
to reduce earth resistance
1. All earthing systems belonging to the supplier shall be
tested for resistance on dry day during dry season not
less than once every two years.
INDIAN ELECTRICITY RULES 1956
Rule 61 Earth leakage protective devices.
The supply of energy to every electrical
installation shall be controlled by an
earth leakage protective device as to
disconnect the supply instantly on the
occurrence of earth fault or leakage of
current (>5KW loads).
INDIAN ELECTRICITY RULES 1956
Chapter VII Electric supply line,
system apparatus for high and
extra high voltage
INDIAN ELECTRICITY RULES 1956
Rule 64A Additional provisions for use of energy at
high and extra high voltage
1. Inter locks
a. Isolator and Circuit Breaker
b. Isolator and earth switch
2. Protection : All the system and circuits shall be so
protected as to automatically disconnect the supply
under abnormal conditions.
• Overcurrent, Earthfault for machines
• Bucchholz relay 1000 KVA and above Tfrs
• Differential protection 10 MVA and above Tfrs,
1000 KVA and above generators with differential
INDIAN ELECTRICITY RULES 1956
Rule 67 connection with earth
All non-current carrying metal
parts associated with HV / EHV
installations shall be effectively
earthed to a grounding system
or mat.
INDIAN ELECTRICITY RULES 1956
Chapter VIII-OVERHEAD LINES
Rule 77 Clearance above ground of the
lowest conductor
1. Over head line across the street
a. Low and medium voltage 5.8 mtr.
b. High voltage 6.1 mtr
2. Along the street
a. Low and medium voltage 5.5 mtr.
b. High voltage 5.8 mtr
INDIAN ELECTRICITY RULES 1956
Rule 78 clearance from building
Low voltage, medium voltage,
above roof 2.5 mtrs.
Horizontal clearance 1.2 mtrs.
High voltage upto 33 KV
above roof 3.7 mtrs.
Extra high voltage
above roof 3.7 mtr + 0.3 mtr for every
addition of 33KV.
CLEARANCE BETWEEN POWER AND
TELECOM LINES
Minimum clearances between, lines of various voltages
LT lines (400 / 230 V) - 4 feet - 1.22 meter
11 kV lines - 6 feet - 1.83 meter
33 / 66 kV lines - 8 feet - 2.44 meter
132 kV lines - 10 feet - 3.05 meter
220 kV lines - 15 feet 4.88 meter
Note:-
Guard rings are to be provided at crossings of telecom lines with
power lines upto 33 kV
INDIAN ELECTRICITY RULES 1956
Rule 88 Guarding
When overhead line crosses or is in
proximity to another overhead line,
guarding arrangements shall be
provided so as to guard against the
possibility of their coming in to contact
with each other.
Every guard wire shall be actual
breaking strength of not less than 635
kg.
CASE STUDIES
01. Water tap giving shock
• One end of heater (neutral) is connected to the
pipe as return path. Pipe is not earthed. Say :
1000W heater, 200 Volts, R x 10 Ohm (Pipe line)
• voltage produced across the pipe 50V.
Remedy : heater must be connected to neutral
and pipe should be earthed.
02. Shock from wet wall
• The insulation of phase lines found damaged
and surrounded by water spumes or moisture.
This led to electrical leakage due to wall wet.
Remedy : Damaged wire to be replaced by
healthy ones.
03. Fan giving shock
• The flexible wire supplying electricity to a table
fan in the house had cracked. The wire was
touching the body of the fan.
Remedy : Proper inspection of cable and
adequately insulate the wire or replace the wire.
04. Fire in multi-storied Buildings
• In a multi-storied office building, paper files were
stocked which were touching the wires in
junction-box. Some local heat adequate to burn
one paper was generated which resulted in fire
which burnt the whole building.
Remedy : Proper stocking of the inflammable
material away from the fire / heat.
• Fire detecting system should have been checked
from time to time.
05. Shock from motor pump
• No bush was in the terminal box
• with the result that wires were touching the edge
of the terminal box hole
• after some time the insulation of wires were got
damaged and bare conductor came in touch with
the metallic cover of the box
• an operator accidentally touched the motor got
fatal electric shock
• no earthing was provided for the motor
remedy
• proper earthing of the motor could have saved
the life as earthing could have isolated the motor
from supply in case of fault.
6 steps safety methods
1. Think - Be aware(thinking of personal, job oriented
problems while working-ticket to an accident)
2. Understand the procedure(thoroughly familiar with all
safety procedures, knowledge of required steps and
reasons)
3. Follow the procedure
4. Use appropriate safety equipment(nothing sadder
than an accident report which explains that the dead
or injured worker was not wearing safety equipment.
5. Ask if you are unsure and do not assume(ignorance
kills and injuries many people, encourage to ask
questions and should be answered by a qualified
person)
6. Do not answer if you do not know

More Related Content

What's hot

Testing of circuit breakers
Testing of circuit breakersTesting of circuit breakers
Testing of circuit breakersKabilesh K
 
Protection against overvoltage
Protection against overvoltageProtection against overvoltage
Protection against overvoltagevishalgohel12195
 
Electrical distribution system
Electrical distribution system Electrical distribution system
Electrical distribution system Ankush Bharti
 
Electrical Design calculations
Electrical Design calculationsElectrical Design calculations
Electrical Design calculationsPankaj Chavan
 
Types of wires and cables
Types of wires and cablesTypes of wires and cables
Types of wires and cablesDhruvit Kardani
 
Supply system (Electrical Power System)
Supply system (Electrical Power System)Supply system (Electrical Power System)
Supply system (Electrical Power System)Abhishek Choksi
 
Presentation on substations
Presentation on substationsPresentation on substations
Presentation on substationsvishalgohel12195
 
400kv sub-station-final-ppt-by-mohit
400kv sub-station-final-ppt-by-mohit400kv sub-station-final-ppt-by-mohit
400kv sub-station-final-ppt-by-mohitMohit Awasthi
 
Unit 01 electrical wiring diagrams
Unit 01 electrical wiring diagramsUnit 01 electrical wiring diagrams
Unit 01 electrical wiring diagramsParneet Chowdhary
 
Seminar on Gas Insulated Substation
Seminar on Gas Insulated SubstationSeminar on Gas Insulated Substation
Seminar on Gas Insulated SubstationSoumya Raj Poddar
 
Electrical installation for commercial & public building
Electrical installation for commercial & public buildingElectrical installation for commercial & public building
Electrical installation for commercial & public buildingddsshukla
 
SLD-LINE LENGTH-NAMEPLATE DETAILS OF 765/400/220KV EQUIPMENT DETAILS-TYPES OF...
SLD-LINE LENGTH-NAMEPLATE DETAILS OF 765/400/220KV EQUIPMENT DETAILS-TYPES OF...SLD-LINE LENGTH-NAMEPLATE DETAILS OF 765/400/220KV EQUIPMENT DETAILS-TYPES OF...
SLD-LINE LENGTH-NAMEPLATE DETAILS OF 765/400/220KV EQUIPMENT DETAILS-TYPES OF...Pavan choudhary
 
POWER SYSTEM PROTECTION
POWER SYSTEM PROTECTION POWER SYSTEM PROTECTION
POWER SYSTEM PROTECTION moiz89
 
Presentation on 132/33 KVSubstation Training
Presentation on 132/33 KVSubstation Training Presentation on 132/33 KVSubstation Training
Presentation on 132/33 KVSubstation Training Sakshi Rastogi
 

What's hot (20)

Protection and Switchgear
Protection and SwitchgearProtection and Switchgear
Protection and Switchgear
 
Testing of circuit breakers
Testing of circuit breakersTesting of circuit breakers
Testing of circuit breakers
 
Protection against overvoltage
Protection against overvoltageProtection against overvoltage
Protection against overvoltage
 
Electrical distribution system
Electrical distribution system Electrical distribution system
Electrical distribution system
 
Breaker Operation & Maintenance
Breaker Operation & MaintenanceBreaker Operation & Maintenance
Breaker Operation & Maintenance
 
Vacuum circuit breaker
Vacuum circuit breakerVacuum circuit breaker
Vacuum circuit breaker
 
Electrical Design calculations
Electrical Design calculationsElectrical Design calculations
Electrical Design calculations
 
Types of wires and cables
Types of wires and cablesTypes of wires and cables
Types of wires and cables
 
Supply system (Electrical Power System)
Supply system (Electrical Power System)Supply system (Electrical Power System)
Supply system (Electrical Power System)
 
Wiring systems
Wiring systemsWiring systems
Wiring systems
 
Presentation on substations
Presentation on substationsPresentation on substations
Presentation on substations
 
400kv sub-station-final-ppt-by-mohit
400kv sub-station-final-ppt-by-mohit400kv sub-station-final-ppt-by-mohit
400kv sub-station-final-ppt-by-mohit
 
Unit 01 electrical wiring diagrams
Unit 01 electrical wiring diagramsUnit 01 electrical wiring diagrams
Unit 01 electrical wiring diagrams
 
Seminar on Gas Insulated Substation
Seminar on Gas Insulated SubstationSeminar on Gas Insulated Substation
Seminar on Gas Insulated Substation
 
Electricity act 2003
Electricity act 2003Electricity act 2003
Electricity act 2003
 
Electrical installation for commercial & public building
Electrical installation for commercial & public buildingElectrical installation for commercial & public building
Electrical installation for commercial & public building
 
SLD-LINE LENGTH-NAMEPLATE DETAILS OF 765/400/220KV EQUIPMENT DETAILS-TYPES OF...
SLD-LINE LENGTH-NAMEPLATE DETAILS OF 765/400/220KV EQUIPMENT DETAILS-TYPES OF...SLD-LINE LENGTH-NAMEPLATE DETAILS OF 765/400/220KV EQUIPMENT DETAILS-TYPES OF...
SLD-LINE LENGTH-NAMEPLATE DETAILS OF 765/400/220KV EQUIPMENT DETAILS-TYPES OF...
 
Single line diagram
Single line diagramSingle line diagram
Single line diagram
 
POWER SYSTEM PROTECTION
POWER SYSTEM PROTECTION POWER SYSTEM PROTECTION
POWER SYSTEM PROTECTION
 
Presentation on 132/33 KVSubstation Training
Presentation on 132/33 KVSubstation Training Presentation on 132/33 KVSubstation Training
Presentation on 132/33 KVSubstation Training
 

Similar to fdocuments.in_ie-rules1956.ppt

200745907-CEA-Safety-Rules-2010.pptx
200745907-CEA-Safety-Rules-2010.pptx200745907-CEA-Safety-Rules-2010.pptx
200745907-CEA-Safety-Rules-2010.pptxAmitNag22
 
MSOSH-Electrical Safety-Day 1-26.06.2023.pdf
MSOSH-Electrical Safety-Day 1-26.06.2023.pdfMSOSH-Electrical Safety-Day 1-26.06.2023.pdf
MSOSH-Electrical Safety-Day 1-26.06.2023.pdfNateJames12
 
Final_NFE,May23-Lenin-CEA-Safety- Regulations PPT.pptx
Final_NFE,May23-Lenin-CEA-Safety- Regulations PPT.pptxFinal_NFE,May23-Lenin-CEA-Safety- Regulations PPT.pptx
Final_NFE,May23-Lenin-CEA-Safety- Regulations PPT.pptxssuser4bcf3b
 
Electrical Safety Week new.ppt
Electrical Safety Week new.pptElectrical Safety Week new.ppt
Electrical Safety Week new.pptsantubanga333
 
Module-4-Electrical Safety in industrial safety
Module-4-Electrical Safety in industrial safetyModule-4-Electrical Safety in industrial safety
Module-4-Electrical Safety in industrial safetysrujanmoily
 
6a_ELECTRIC SAFETY.ppt
6a_ELECTRIC SAFETY.ppt6a_ELECTRIC SAFETY.ppt
6a_ELECTRIC SAFETY.pptSyamKazuma1
 
2. What ARE the Electricity at Work Regulations 1989
2. What ARE the Electricity at Work Regulations 19892. What ARE the Electricity at Work Regulations 1989
2. What ARE the Electricity at Work Regulations 1989Muhammad Hammad Lateef
 
Electrical Safety - Class.ppt
Electrical Safety - Class.pptElectrical Safety - Class.ppt
Electrical Safety - Class.pptamit173203
 
Electrical safety in construction
Electrical safety in constructionElectrical safety in construction
Electrical safety in constructionsrinivas2036
 
Safety management in electrification of railways
Safety management in electrification of railwaysSafety management in electrification of railways
Safety management in electrification of railwaysSuresh Sunny
 
Safety rules 2014
Safety rules 2014Safety rules 2014
Safety rules 2014AYM1979
 
Central electricity authority regulations wikipedia
Central electricity authority regulations   wikipediaCentral electricity authority regulations   wikipedia
Central electricity authority regulations wikipediasuryadeepzala1
 
Electrical safety in power stations
Electrical safety in power stationsElectrical safety in power stations
Electrical safety in power stationsManohar Tatwawadi
 
High Voltage Proximity Act National Grid
High Voltage Proximity Act National GridHigh Voltage Proximity Act National Grid
High Voltage Proximity Act National GridMartin Demarest
 
TSS-TECH-PRO-0001 Rev 01 Legal Booklet Electric Fencing and Labour Department
TSS-TECH-PRO-0001 Rev 01 Legal Booklet Electric Fencing and Labour DepartmentTSS-TECH-PRO-0001 Rev 01 Legal Booklet Electric Fencing and Labour Department
TSS-TECH-PRO-0001 Rev 01 Legal Booklet Electric Fencing and Labour DepartmentTrusted Security Solutions
 

Similar to fdocuments.in_ie-rules1956.ppt (20)

200745907-CEA-Safety-Rules-2010.pptx
200745907-CEA-Safety-Rules-2010.pptx200745907-CEA-Safety-Rules-2010.pptx
200745907-CEA-Safety-Rules-2010.pptx
 
MSOSH-Electrical Safety-Day 1-26.06.2023.pdf
MSOSH-Electrical Safety-Day 1-26.06.2023.pdfMSOSH-Electrical Safety-Day 1-26.06.2023.pdf
MSOSH-Electrical Safety-Day 1-26.06.2023.pdf
 
Final_NFE,May23-Lenin-CEA-Safety- Regulations PPT.pptx
Final_NFE,May23-Lenin-CEA-Safety- Regulations PPT.pptxFinal_NFE,May23-Lenin-CEA-Safety- Regulations PPT.pptx
Final_NFE,May23-Lenin-CEA-Safety- Regulations PPT.pptx
 
Electrical Safety Week new.ppt
Electrical Safety Week new.pptElectrical Safety Week new.ppt
Electrical Safety Week new.ppt
 
Module-4-Electrical Safety in industrial safety
Module-4-Electrical Safety in industrial safetyModule-4-Electrical Safety in industrial safety
Module-4-Electrical Safety in industrial safety
 
6a_ELECTRIC SAFETY.ppt
6a_ELECTRIC SAFETY.ppt6a_ELECTRIC SAFETY.ppt
6a_ELECTRIC SAFETY.ppt
 
2. What ARE the Electricity at Work Regulations 1989
2. What ARE the Electricity at Work Regulations 19892. What ARE the Electricity at Work Regulations 1989
2. What ARE the Electricity at Work Regulations 1989
 
Electrical Safety - Class.ppt
Electrical Safety - Class.pptElectrical Safety - Class.ppt
Electrical Safety - Class.ppt
 
safetymanual .pdf
safetymanual .pdfsafetymanual .pdf
safetymanual .pdf
 
Electrical safety in construction
Electrical safety in constructionElectrical safety in construction
Electrical safety in construction
 
Safety management in electrification of railways
Safety management in electrification of railwaysSafety management in electrification of railways
Safety management in electrification of railways
 
Safety+manual
Safety+manualSafety+manual
Safety+manual
 
Safety rules 2014
Safety rules 2014Safety rules 2014
Safety rules 2014
 
4143813.ppt
4143813.ppt4143813.ppt
4143813.ppt
 
Central electricity authority regulations wikipedia
Central electricity authority regulations   wikipediaCentral electricity authority regulations   wikipedia
Central electricity authority regulations wikipedia
 
Safety Electrical .pptx
Safety Electrical .pptxSafety Electrical .pptx
Safety Electrical .pptx
 
Electrical safety in power stations
Electrical safety in power stationsElectrical safety in power stations
Electrical safety in power stations
 
Electricity on site
Electricity on siteElectricity on site
Electricity on site
 
High Voltage Proximity Act National Grid
High Voltage Proximity Act National GridHigh Voltage Proximity Act National Grid
High Voltage Proximity Act National Grid
 
TSS-TECH-PRO-0001 Rev 01 Legal Booklet Electric Fencing and Labour Department
TSS-TECH-PRO-0001 Rev 01 Legal Booklet Electric Fencing and Labour DepartmentTSS-TECH-PRO-0001 Rev 01 Legal Booklet Electric Fencing and Labour Department
TSS-TECH-PRO-0001 Rev 01 Legal Booklet Electric Fencing and Labour Department
 

More from vaasuchetu

EEC NOTES.docx
EEC NOTES.docxEEC NOTES.docx
EEC NOTES.docxvaasuchetu
 
New Document(17) (1).pdf
New Document(17) (1).pdfNew Document(17) (1).pdf
New Document(17) (1).pdfvaasuchetu
 
SERVICE MAINS.pdf
SERVICE MAINS.pdfSERVICE MAINS.pdf
SERVICE MAINS.pdfvaasuchetu
 
result template.docx
result template.docxresult template.docx
result template.docxvaasuchetu
 
Introduction slides.pptx
Introduction slides.pptxIntroduction slides.pptx
Introduction slides.pptxvaasuchetu
 
Grid Connected Solar Electric Systems The Earthscan Expert Handbook for Plann...
Grid Connected Solar Electric Systems The Earthscan Expert Handbook for Plann...Grid Connected Solar Electric Systems The Earthscan Expert Handbook for Plann...
Grid Connected Solar Electric Systems The Earthscan Expert Handbook for Plann...vaasuchetu
 
Electricity Act.ppt
Electricity Act.pptElectricity Act.ppt
Electricity Act.pptvaasuchetu
 
Introduction slides.pptx
Introduction slides.pptxIntroduction slides.pptx
Introduction slides.pptxvaasuchetu
 
Electric current
Electric currentElectric current
Electric currentvaasuchetu
 

More from vaasuchetu (12)

EEC NOTES.docx
EEC NOTES.docxEEC NOTES.docx
EEC NOTES.docx
 
New Document(17) (1).pdf
New Document(17) (1).pdfNew Document(17) (1).pdf
New Document(17) (1).pdf
 
SERVICE MAINS.pdf
SERVICE MAINS.pdfSERVICE MAINS.pdf
SERVICE MAINS.pdf
 
os vs ug.pdf
os vs ug.pdfos vs ug.pdf
os vs ug.pdf
 
result template.docx
result template.docxresult template.docx
result template.docx
 
15ee553.docx
15ee553.docx15ee553.docx
15ee553.docx
 
Introduction slides.pptx
Introduction slides.pptxIntroduction slides.pptx
Introduction slides.pptx
 
Grid Connected Solar Electric Systems The Earthscan Expert Handbook for Plann...
Grid Connected Solar Electric Systems The Earthscan Expert Handbook for Plann...Grid Connected Solar Electric Systems The Earthscan Expert Handbook for Plann...
Grid Connected Solar Electric Systems The Earthscan Expert Handbook for Plann...
 
Electricity Act.ppt
Electricity Act.pptElectricity Act.ppt
Electricity Act.ppt
 
Introduction slides.pptx
Introduction slides.pptxIntroduction slides.pptx
Introduction slides.pptx
 
Electric current
Electric currentElectric current
Electric current
 
Unit1
Unit1Unit1
Unit1
 

Recently uploaded

Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and usesDevarapalliHaritha
 
microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacingjaychoudhary37
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 

Recently uploaded (20)

Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and uses
 
microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacing
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 

fdocuments.in_ie-rules1956.ppt

  • 1. INDIAN ELECTRICITY RULES 1956 The Indian Electricity Act, 1910 deals with the provisions relating to supply and use of electrical energy and the rights and obligations of persons licensed under part II of that act to supply energy. Section 35 - Advisory boards Under section 36A of the Act, a board called Central Electricity Board is constituted to exercise the powers conferred by Section 37.
  • 2. PART IV Section 36A –Central Electricity Board shall be constituted to exercise the powers conferred by section 37 The board shall consist of 1. A chairman and five other members to be nominated by Central Government 2. One member to be nominated by government of each state 3. One member by railway board 4. One member by Chief Inspector of Mines 5. One member by ISI
  • 3. PART IV Section 37 – Powers for Board to make rules CEB may make the rules to regulate the generation, transmission, supply and use of energy. In exercise of the powers conferred under the sections the Central Electricity Board frames the Indian Electricity Rules
  • 4. IE RULES • The rules regarding the safety in construction and use of electrical installations / plants / equipments are framed by Central Electricity Board. • The I.E. rules were first framed in 1922 and amended in 1937 and 1956. Objective of I.E. Rules • To regulate the relation between the Electricity Supplier and Consumer • To make the generation, transmission, distribution and the use of electricity as safe as possible.
  • 5. INDIAN ELECTRICITY RULES 1956 • Chapter I – Rules 1 to 3 Preliminary • Chapter II – Rules 4 to 10 Inspectors • Chapter III – Rules 11 to 28 License • Chapter IV – Rules 29 to 46 General Safety Precautions • Chapter V – Rules 47 to 59 General conditions relating to supply and use of energy • Chapter VI – Rules 60 to 62 Electric supply lines, systems and apparatus for low and medium voltages
  • 6. INDIAN ELECTRICITY RULES 1956 • Chapter VII – Rules 63 to 73 Electric supply lines, systems and apparatus for high and extra high voltages. • Chapter VIII – Rules 74 to 93 Overhead lines • ChapterIX–Rules 94 to 108Electric Traction • Chapter X – Rules 109 to 132 Additional precautions to be adopted in Mines and oil fields • Chapter XI – Rules 133 to 143 Miscellaneous • Annexures XIV
  • 7. INDIAN ELECTRICITY RULES 1956 Rule 1, 2 & 3 comes under the heading of preliminary. Rule1–Short title and commencement. Rule 2 – Definition – Act, ampere, authorised person, danger, earthing system, cable, span, supplier, system, lighting arrester. Ampere – means a unit of electric current Bare – means not covered with insulating material Cable – means a length of insulated single conductor (solid / standard) or of two more such conductors each provided with its own insulation which are laid up together, such insulated conductors may or may not be provided with an overall mechanical protective covering. Danger – means danger to health or danger to life or any part of body from shock, burn or other injury to persons or property or from fire or explosion, attendant upon the generation, transmission, transformations, conversion, distribution or use of energy.
  • 8. RULE 3 AUTHORISATION Sub rule 2A – No person shall be authorised to operate or undertake operation and maintenance of any part or whole of generating station of capacity 100MWand above together with the associated substation unless he is adequately qualified and has successfully undergone the type of training specified in Annexure XVI. 1. Training may be arranged in his own institute. 2. This deals with details of training for skilled employees and fresh engineers. CREATION OF INSTITUTE Every training institute shall be established adjacent to a power station so as to facilitate familiarization and provide in plant training.
  • 9. INDIAN ELECTRICITY RULES 1956 Chapter III – deals with qualifications of inspectors, powers to the electrical inspectors. Rule 5 Entry and Inspection. Any Inspector may enter, inspect and examine any place.
  • 10. INDIAN ELECTRICITY RULES 1956 Chapter IV – General safety requirements Rule 29 Construction, installation, protection, operation and maintenance of electric supply lines and apparatus.
  • 11. INDIAN ELECTRICITY RULES 1956 •All electric supply lines and apparatus shall be of sufficient ratings for powers, insulation and estimated fault current and sufficient mechanical strength for the duty which they may be required to perform under the environmental conditions of installations and shall be constructed, installed, protected, worked and maintained in such a manner as to ensure safety of personnel and property. •The relevant code of practice of the BIS may be followed to carry out the purpose of this rule and in the event of any inconsistency the provisions of these rules shall prevail .
  • 12. INDIAN ELECTRICITY RULES 1956 Rule 29 Where death is caused by electrocution on account of defective insulation of an electric pump and the earthing system, the principal of the Institution, its secretary and Chief Executive of the governing body of the institution where the accident takes place are all liable to prosecution.
  • 13. INDIAN ELECTRICITY RULES 1956 Rule 30 (4) The customer shall also ensure that the insulation under his control is maintained in a safe condition.
  • 14. Accidents & Main Reasons Unauthorized persons working on lines / equipment Working without using safety appliances Working without obtaining proper line clear Working without proper instructions from superiors Wrong instructions from person who received the line clear Negligence, carelessness, haste and overconfidence Lack of knowledge on feeding arrangements
  • 15. Precautions to avoid accidents • Obtaining proper line clear from all possible sources of supply shall be taken and the following precautions are to be taken. • 1. Till a L.C. is received from all sources every line or equipment shall be treated as live. • 2. Hang “Danger” boards at all strategic places to ensure safety at work spot • 3. Explain the area which is safe to work and ensure that every employee in your team has understood the same. •
  • 16. Precautions to avoid accidents(Contd.) • 4. Nominate one among the team exclusively to reap a close watch and ensure that every person in the team is safe. • 5. Earthing is to be provided on both sides of the work spot before proceeding with the work. • 6. All safety rules are to be followed till entire work is completed. • 7. Insulated earth rods with clamps shall be used and the person using the earth rods shall keep safe distance from earthing wires. • 8. Examine earth rods and every safety appliance before using • 9. No person shall be allowed work if he is under the influence of alcoholic drinks under inebriated condition.
  • 17. INDIAN ELECTRICITY RULES 1956 Rule 32 An indication of a permanent nature shall be provided by the owner of the earth neutral conductor to enable such conductor to be distinguished from any live conductor.
  • 18. INDIAN ELECTRICITY RULES 1956 Rule 33 Earthed terminal on consumer’s premises. The consumer shall take all reasonable precautions to prevent mechanical damage to the earthed terminal and its lead belonging to the supplier.
  • 19. INDIAN ELECTRICITY RULES 1956 Rule 34 Accessibility of bare conductors where bare conductors are used in a building The owner of such conductors shall *Ensure that they are inaccessible * Provide in readily accessibility position switches for rendering them dead whenever necessary.
  • 20. INDIAN ELECTRICITY RULES 1956 Rule 35 Danger Notices The owner of every medium, high and extra high voltage installation shall affix permanently a Danger Notice in Hindi or English and the local language of the district with a sign of skull and bones (design as per ISS No.2551) on a. Every motor, generator, transformer and other electrical plant and equipment together with apparatus used for controlling or regulating the same. b. All supports of high and extra high voltage overhead lines which can be easily climbed upon without the aid of ladder or special apparatus.
  • 21. INDIAN ELECTRICITY RULES 1956 Rule 36 1. Handling of electric supply lines and apparatus Before any conductor or apparatus is handled adequate precaution shall be taken by earthing or other suitable means to discharge. Every person who is working on an electric supply line or apparatus or both shall be provided with tools and devices such as gloves, rubber shoes, safety belts, ladders, earthing devices, helmets for protection him from mechanical or electrical injury. Such tools and devices shall always be maintained in sound and efficient working condition. 2. No person shall work on any live electric supply line or apparatus and no person shall assist such person on such work, unless he is authorised in that behalf and takes the safety measures approved by the Inspector.
  • 22. INDIAN ELECTRICITY RULES 1956 Rule 37 supply to vehicles, cranes, etc. Every person owning a vehicle, traveling crane or the like to which is energy supplied from an external source shall ensure that it is efficiently controlled by a suitable switch enabling all voltage to be cut off in one operation and the owner shall ensure rails if used are electrically continuous and earthed.
  • 23. INDIAN ELECTRICITY RULES 1956 Rule 38 cables for portable or transportable apparatus 1. Flexible cables shall not be used for portable or transportable motors, generators, transformers, electric drills, electric sprays, welding sets, unless they are heavily insulated and adequately protected. 2. The cable shall be three core type and four core type for portable and transportable apparatus working on single phase and three phase supply respectively and wire meant for ground connection shall be easily identifiable.
  • 24. INDIAN ELECTRICITY RULES 1956 Rule 42 Accidental charge The owners of all circuits and apparatus shall so arrange them that there shall be no danger of any part thereof becoming accidentally charged to any voltage beyond the limits of voltage for which they are intended When AC and DC circuits are installed on the same support they shall be so arranged and protected that they shall not come into contact with each other when live.
  • 25. INDIAN ELECTRICITY RULES 1956 Rule 43 Provisions applicable to protective equipment. 1. Fire buckets filled with clean dry sand ready for immediate use for extinguishing fire in addition to fire extinguishers (in all generating station, sub station and switching station). 2. The fire extinguishers shall be tested for satisfactory operation at least once in a year and record of such tests shall be maintained. 3. First aid boxes or cup boards marked and equipped with such contents as the State Government may specify shall be provided and maintained in every generating station, sub station and switching station so as to be readily accessible during all working hours.
  • 26. INDIAN ELECTRICITY RULES 1956 Rule 44 Instructions for restoration of persons suffering from electric shock. Instructions in English or Hindi and local language for the restoration of persons suffering from electric shock.
  • 27. INDIAN ELECTRICITY RULES 1956 Rule 44A Intimation of Accident If any accident occurs in connection with the generation, transmission, supply or use of energy in or in connection with any part of the electric supply lines or other works of any person and the accident results is or is likely to have resulted is loss of human or animal, such person or any authorised person of the electricity board not below the rank of a J.E or equivalent shall send a telegraphic report to Inspector within 24 hours.
  • 28. INDIAN ELECTRICITY RULES 1956 Rule 46A Periodical Inspection and testing of consumers’ installation Where an installation is already connected to the supply system of the supplier, every such installation shall be periodically inspected and tested at intervals not exceeding five years either by the Inspector or by the supplier, in the case of installation in mines, oil fields and railways by the Central Government.
  • 29. INDIAN ELECTRICITY RULES 1956 Chapter V – General condition relating to supply and use of energy Rule 48 Precautions against leakage before connection The supplier shall not connect supply unless he is reasonably satisfied that the connection will not at any time cause a leakage from that installation or apparatus of a magnitude detrimental to safety. Compliance with this rule shall be checked by measuring the insulating resistance as provided below: High voltage equipments shall have the IR value as stipulated in the relevant Indian Standard.
  • 30. INDIAN ELECTRICITY RULES 1956 Rule 50 supply and use of energy The following controls of requisite capacity to carry and break the current after the point of commencement of supply as defined in Rule 58. 1. A linked switch with fuse or a CB for low and medium volt consumers. 2. CB for EHV consumer
  • 31. INDIAN ELECTRICITY RULES 1956 3. The supply of energy to each motor or a group of motors or other apparatus meant for operating one particular machine in controlled by a suitable linked switch or a CB or an emergency tripping device placed in such a position as to cut off supply by the person incharge. 5.Adequate precautions shall be taken to ensure that no live parts are so exposed as to cause danger.
  • 32. INDIAN ELECTRICITY RULES 1956 Rule 54 Declared voltage of supply to consumer. The variation shall not vary 1. Low and medium voltage by more than 6% 2. High voltage more than 6% on higher side, 9% on lower side 3. EHV, 10% on higher side and 12.5% on lower side .
  • 33. INDIAN ELECTRICITY RULES 1956 Rule 55 Declared frequency A supplier shall not permit the frequency of an alternating current supply to vary from the declared frequency by more than 3%.
  • 34. INDIAN ELECTRICITY RULES 1956 Chapter – VI Electric supply line, systems and apparatus for low and medium voltage. Rule 61 connecting with earth The following provisions shall apply to the connection with earth of systems 1. Neutral conductor of a 3Ø 4 wire 2. Middle conductor of a 2Ø 3 wire system shall be earthed by not less than two separate and distant connections with a minimum of two different earth electrode. The earth electrodes may be inter connected to reduce earth resistance 1. All earthing systems belonging to the supplier shall be tested for resistance on dry day during dry season not less than once every two years.
  • 35. INDIAN ELECTRICITY RULES 1956 Rule 61 Earth leakage protective devices. The supply of energy to every electrical installation shall be controlled by an earth leakage protective device as to disconnect the supply instantly on the occurrence of earth fault or leakage of current (>5KW loads).
  • 36. INDIAN ELECTRICITY RULES 1956 Chapter VII Electric supply line, system apparatus for high and extra high voltage
  • 37. INDIAN ELECTRICITY RULES 1956 Rule 64A Additional provisions for use of energy at high and extra high voltage 1. Inter locks a. Isolator and Circuit Breaker b. Isolator and earth switch 2. Protection : All the system and circuits shall be so protected as to automatically disconnect the supply under abnormal conditions. • Overcurrent, Earthfault for machines • Bucchholz relay 1000 KVA and above Tfrs • Differential protection 10 MVA and above Tfrs, 1000 KVA and above generators with differential
  • 38. INDIAN ELECTRICITY RULES 1956 Rule 67 connection with earth All non-current carrying metal parts associated with HV / EHV installations shall be effectively earthed to a grounding system or mat.
  • 39. INDIAN ELECTRICITY RULES 1956 Chapter VIII-OVERHEAD LINES Rule 77 Clearance above ground of the lowest conductor 1. Over head line across the street a. Low and medium voltage 5.8 mtr. b. High voltage 6.1 mtr 2. Along the street a. Low and medium voltage 5.5 mtr. b. High voltage 5.8 mtr
  • 40. INDIAN ELECTRICITY RULES 1956 Rule 78 clearance from building Low voltage, medium voltage, above roof 2.5 mtrs. Horizontal clearance 1.2 mtrs. High voltage upto 33 KV above roof 3.7 mtrs. Extra high voltage above roof 3.7 mtr + 0.3 mtr for every addition of 33KV.
  • 41. CLEARANCE BETWEEN POWER AND TELECOM LINES Minimum clearances between, lines of various voltages LT lines (400 / 230 V) - 4 feet - 1.22 meter 11 kV lines - 6 feet - 1.83 meter 33 / 66 kV lines - 8 feet - 2.44 meter 132 kV lines - 10 feet - 3.05 meter 220 kV lines - 15 feet 4.88 meter Note:- Guard rings are to be provided at crossings of telecom lines with power lines upto 33 kV
  • 42. INDIAN ELECTRICITY RULES 1956 Rule 88 Guarding When overhead line crosses or is in proximity to another overhead line, guarding arrangements shall be provided so as to guard against the possibility of their coming in to contact with each other. Every guard wire shall be actual breaking strength of not less than 635 kg.
  • 43. CASE STUDIES 01. Water tap giving shock • One end of heater (neutral) is connected to the pipe as return path. Pipe is not earthed. Say : 1000W heater, 200 Volts, R x 10 Ohm (Pipe line) • voltage produced across the pipe 50V. Remedy : heater must be connected to neutral and pipe should be earthed.
  • 44. 02. Shock from wet wall • The insulation of phase lines found damaged and surrounded by water spumes or moisture. This led to electrical leakage due to wall wet. Remedy : Damaged wire to be replaced by healthy ones.
  • 45. 03. Fan giving shock • The flexible wire supplying electricity to a table fan in the house had cracked. The wire was touching the body of the fan. Remedy : Proper inspection of cable and adequately insulate the wire or replace the wire.
  • 46. 04. Fire in multi-storied Buildings • In a multi-storied office building, paper files were stocked which were touching the wires in junction-box. Some local heat adequate to burn one paper was generated which resulted in fire which burnt the whole building. Remedy : Proper stocking of the inflammable material away from the fire / heat. • Fire detecting system should have been checked from time to time.
  • 47. 05. Shock from motor pump • No bush was in the terminal box • with the result that wires were touching the edge of the terminal box hole • after some time the insulation of wires were got damaged and bare conductor came in touch with the metallic cover of the box • an operator accidentally touched the motor got fatal electric shock • no earthing was provided for the motor remedy • proper earthing of the motor could have saved the life as earthing could have isolated the motor from supply in case of fault.
  • 48. 6 steps safety methods 1. Think - Be aware(thinking of personal, job oriented problems while working-ticket to an accident) 2. Understand the procedure(thoroughly familiar with all safety procedures, knowledge of required steps and reasons) 3. Follow the procedure 4. Use appropriate safety equipment(nothing sadder than an accident report which explains that the dead or injured worker was not wearing safety equipment. 5. Ask if you are unsure and do not assume(ignorance kills and injuries many people, encourage to ask questions and should be answered by a qualified person) 6. Do not answer if you do not know