SlideShare a Scribd company logo
1 of 25
ISO-9001:2015
Where we have been and where we are going
Transition – Key to success
1) Understand the requirements
2) Conduct a gap analysis
3) Don’t let concerns with auditability and documented
information drive bureaucracy into your quality
management system.
4) Implement changes that add maximum value to your
organization.
Agenda
•Context of the Organization
•Process Approach and Risk Based Thinking
Context of the Organization
Context of the Organization
• The new requirement reads: “The organization shall determine
external and internal issues that are relevant to its purpose and its
strategic direction and that affect its ability to achieve the intended
result(s) of its quality management system.”
Decision making and ISO-9001:2015
• The first is a quality principle quoted from ISO 9000:2015, namely “evidence-
based decision making.” It is not hard to understand that better decisions are
made when they are based on evidence rather than by conjecture.
• The second is found in Clause 0.1, “Addressing risks and opportunities
associated with its context and objectives.” Addressing risks means proactively
managing uncertainties. The simple meaning of “managing uncertainties” is that
decisions should be made with consideration of the possible positive and
negative consequences that the uncertain future may bring.
• Finally, in Clause 5.1, entitled Leadership and Commitment, there is a
requirement for top management: “Ensuring that the quality policy and quality
objectives are established for the quality management system and are
compatible with the context and strategic direction of the organization.” Top
management’s most basic role is strategic decision-making for the organization.
Decisions are to be made based
on evidence. Evidence is found
in the CONTEXT of the
organization.
Internal Context
• Vision
• Mission
• Strategic objectives and direction
• Organizational Chart
• SOPs
• Resources
• Culture
External Context
• Legal
• Social
• Political
• Regulatory
• Financial
• Economic
• Market Trends
Examples
• Customer pressures and complaints can force organizations to change policies such as
product returns and customer and technical support .
• Technological changes can provide new and more effective ways to handle
communications, operations, shipping and logistics.
• Governments regulatory and trade policies can play a significant role in determining how
businesses operate, especially in regard to international trade, taxation, and regulations
• The media, including social media, can have a huge impact on a company’s image and
public relations. A bad news video or news report can go viral pretty fast, and if your
organization doesn’t provide an acceptable response, the negative publicity and effects
can last a long time.
• Sociological forces often drive what, where and how consumers buy product and
services. There is an increasing trend in the number of consumers purchasing products
online and reading reviews before making a purchase.
• The multinational and multicultural trend in workforce composition can cause significant
changes in hiring and retention of competent human resources.
Risk Based Thinking
Examples and Ideas
•Purchasing
•Design and Development
•Process
Purchasing
Supplier Approval and Re-Evaluation
•Do all raw materials create the same risk for your
final product?
•Do all suppliers bring the same risk to your
business?
Does your current QMS account for these differences?
Design and Development
Design FMEA – for actual design
Risk Registers – for project risks
The Process Approach and Risk
Based Thinking
• Assign a Process Owner
• Define the process
• Identify the inputs and outputs
• Define measures of effectiveness and efficiency
• Identify risks and opportunities
• Report on the status of each process
PROCESS
Materials Measures
Manpower
(Training/Skills)
Inputs
Suppliers
(By whom)
Outputs
Customer
(For Whom)
Methods
(How)
Machine
(With what)
Environment
(Conditions)
RISK!
Process Definition
Should include: Process Owner, Inputs and
Outputs, Process, Process Metrics and RISK
Process Review
Should include: Inputs and Outputs, Process,
Process Metrics and RISK
Process Owner’s Meetings
• Owner/Co-Owner Reporting
• Process Metrics
• Current State
• Recent Updates
• Plans moving forward
• Audit Nonconformance's (Internal and External)
• Dashboard
•RISK
Purchasing
Measurable: # Supplier Nonconformance's
Process Owner:
Goals 2016: 10% Reduction from ’15
Risk: Production interruptions due to material shortages
Risks and Opportunities:
Risk – This rate of supplier rejects has resulted in 280 hours of line
shut downs in 2015, and the trend is not improvement
moving into 2016.
Opportunity: IF the shipping damage issues could be solved, we
could eliminate 24 % of the nonconforamnces and 20% of
the hours of line interruption
Corrective Action Plans:
Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Series1 32 78 45 36 64 24 56 20 66 43 26 47
0
10
20
30
40
50
60
70
80
90
Supplier Nonconformances - 2015
0
50
100
150
200
250
Dimensional Damaged Functional Aesthetics Wrong Product
Supplier Nonconformances - 2015 Task Responsibility Target Date
Quarterly Business Reviews
(Management Representative and Process Owners)
•Review of identified risk within each key process
•Has the risk changed?
•Have high risk issues been addressed?
•Does performance to objectives reflect risk
mitigation?
Integrated Systems and RISK
ISO-9001
ISO-14000
FSSC- 22000, SQF, BRC (Food Standards)
Hazard Analysis for food safety
Hazard Analysis - Food Safety
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
ProcessStep
List each
process step
from the
Process Flow
Diagram
Does this process step
INTRODUCE or INTENSIFY a
potential food safety hazard? If
YES identify the hazard(s). Assess
probability, severity and risk per
columns 4, 5 and 6.
Likelihood
Severity
Risk
Justification of Risk Level
Assessment
List the support programs that CONTROL
or ELLIMINATE this hazard. Do the
support program(s) control the hazard to
an acceptable level? If yes, proceed to
the next process step. If no, proceed to
column 9.
Is this hazard CONTROLLED or
ELIMINATED (or reduced to an acceptable
level) at a subsequent process step? If
YES, this step is not a CCP. Identify the
subsequent process step and proceed to
the next process step. If the hazard is not
controlled at this process step, go to
column 10 and assign a CCP number.
CCP or oPRP
1
Receive raw
materials
B- Pathogen contamination due
to uncontrolled transportation
L M 2
Raw materials are received covered
and/or packaged, Trailer Checks,
Sealed Truck
Purchasing Program
Shipping and Receiving Program
Yes No
C- Chemical contamination due
to uncontrolled transportation
L M 2
Raw materials are received covered
and/or packaged, Trailer Checks,
Sealed Truck
Purchasing Program
Shipping and Receiving program
Chemical Control Program
Yes No
P- Physical contamination with
extraneous material due to
uncontrolled transpiration
L L 1
Raw materials are received covered
and/or packaged, Trailer Checks,
Sealed Truck
Purchasing Program
Shipping and Receiving Program
Glass and Brittle Plastics Program
Metal and Blade Control Program
Yes No
ISO-14000 Aspects and ImpactsProcessStep
Aspects
Likelihood
Severity
Risk
Impact (Use notes to insert further
analysis)
legaland
OtherRequirements
Significant
environmentalaspect
(Yes),(No)or(NA)
B - none NO NO
C - none NO NO
P- Potential for Scrap L L 2 NO NO
Receiving
Aspect and Impacts Risk Assessment - ISO-14000
Air Land WaterAir Land Water
Air Land WaterAir Land Water
Air Land WaterAir Land Water
Quality Risk Assessment
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
ProcessStep
List each
process
step from
the
Process
Flow
Diagram
Does this process step
INTRODUCE or
INTENSIFY a potential
quality issue?Assess
Likelihood and severity
and risk per columns 4, 5
and 6.
Likelihood
Severity
Risk
Justification of Risk
Level Assessment
List the support programs
that CONTROL or
ELLIMINATE this risk.
Do the support program(s)
control the risk to an
acceptable level? If yes,
proceed to the next process
step. If no, proceed to
column 9.
Is this hazard CONTROLLED
or ELIMINATED (or reduced to
an acceptable level) at a
subsequent process step? If
YES, this step is not a QCP.
Identify the subsequent process
step and proceed to the next
process step. If the risk is
controlled at this process step,
go to column 10 and assign a
QCP number.
QCP
1
Receive
raw
materials
Q - L M 2 No
Risk Assessment - Quality
What should you do?
• Identify what the risks and opportunities are in your organization – it
depends on context
• Analyze and prioritize the risks and opportunities in your organization
• what is acceptable?
• what is unacceptable?
• Plan actions to address the risks
• how can I avoid or eliminate the risk?
• how can I mitigate the risk?
• Implement the plan – take action
• Check the effectiveness of the actions – does it work?
• Learn from experience – continual improvement

More Related Content

What's hot

Quality Course 1
Quality Course 1Quality Course 1
Quality Course 1Fin1
 
Maximizing Use of Your Supplier Scorecard - OMTEC 2018
Maximizing Use of Your Supplier Scorecard - OMTEC 2018Maximizing Use of Your Supplier Scorecard - OMTEC 2018
Maximizing Use of Your Supplier Scorecard - OMTEC 2018April Bright
 
Brief About IMS, QMS, ISO 9001, 14001, 18001
Brief About IMS, QMS, ISO 9001, 14001, 18001Brief About IMS, QMS, ISO 9001, 14001, 18001
Brief About IMS, QMS, ISO 9001, 14001, 18001Chetan Rathi
 
Risk Management in QMS and New Products Design (NPD)
Risk Management in QMS and New Products Design (NPD)Risk Management in QMS and New Products Design (NPD)
Risk Management in QMS and New Products Design (NPD)Sanjay Dhal , MS, MBA
 
Quality planning
Quality planningQuality planning
Quality planningRahul Hada
 
Quality Course 3, Including Iso9001
Quality Course 3, Including Iso9001Quality Course 3, Including Iso9001
Quality Course 3, Including Iso9001Fin1
 
PECB Webinar: Process based auditing
PECB Webinar: Process based auditingPECB Webinar: Process based auditing
PECB Webinar: Process based auditingPECB
 
Quality assurance
Quality assuranceQuality assurance
Quality assuranceRajThakuri
 
Packaging Solutions that Improve Time to Market
Packaging Solutions that Improve Time to MarketPackaging Solutions that Improve Time to Market
Packaging Solutions that Improve Time to MarketApril Bright
 
IA Inspections & Quick-Checks Resuming ... Are You Ready?
IA Inspections & Quick-Checks Resuming ... Are You Ready?IA Inspections & Quick-Checks Resuming ... Are You Ready?
IA Inspections & Quick-Checks Resuming ... Are You Ready?SafetyChain Software
 
Pharmaceutical Deviation SOP
Pharmaceutical Deviation SOPPharmaceutical Deviation SOP
Pharmaceutical Deviation SOPMohamed Wallash
 
Proactive Internal Auditing -- The Key to Improving Your Quality System
Proactive Internal Auditing -- The Key to Improving Your Quality SystemProactive Internal Auditing -- The Key to Improving Your Quality System
Proactive Internal Auditing -- The Key to Improving Your Quality SystemSafetyChain Software
 
7Epsilon Risk Based Thinking - ASQ International Conference on Quality Stand...
7Epsilon Risk Based Thinking  - ASQ International Conference on Quality Stand...7Epsilon Risk Based Thinking  - ASQ International Conference on Quality Stand...
7Epsilon Risk Based Thinking - ASQ International Conference on Quality Stand...Meghana Ransing
 
Strategy Deployment in an Organization
Strategy Deployment in an OrganizationStrategy Deployment in an Organization
Strategy Deployment in an OrganizationPraneet Surti
 
FDA Focus on Design Controls
FDA Focus on Design Controls FDA Focus on Design Controls
FDA Focus on Design Controls April Bright
 

What's hot (19)

Quality Course 1
Quality Course 1Quality Course 1
Quality Course 1
 
Maximizing Use of Your Supplier Scorecard - OMTEC 2018
Maximizing Use of Your Supplier Scorecard - OMTEC 2018Maximizing Use of Your Supplier Scorecard - OMTEC 2018
Maximizing Use of Your Supplier Scorecard - OMTEC 2018
 
Brief About IMS, QMS, ISO 9001, 14001, 18001
Brief About IMS, QMS, ISO 9001, 14001, 18001Brief About IMS, QMS, ISO 9001, 14001, 18001
Brief About IMS, QMS, ISO 9001, 14001, 18001
 
Quality management
Quality managementQuality management
Quality management
 
Risk Management in QMS and New Products Design (NPD)
Risk Management in QMS and New Products Design (NPD)Risk Management in QMS and New Products Design (NPD)
Risk Management in QMS and New Products Design (NPD)
 
Quality planning
Quality planningQuality planning
Quality planning
 
Quality Course 3, Including Iso9001
Quality Course 3, Including Iso9001Quality Course 3, Including Iso9001
Quality Course 3, Including Iso9001
 
Risk Management in QMS Processes - examples
Risk Management in QMS Processes - examplesRisk Management in QMS Processes - examples
Risk Management in QMS Processes - examples
 
PECB Webinar: Process based auditing
PECB Webinar: Process based auditingPECB Webinar: Process based auditing
PECB Webinar: Process based auditing
 
Quality assurance
Quality assuranceQuality assurance
Quality assurance
 
Packaging Solutions that Improve Time to Market
Packaging Solutions that Improve Time to MarketPackaging Solutions that Improve Time to Market
Packaging Solutions that Improve Time to Market
 
IA Inspections & Quick-Checks Resuming ... Are You Ready?
IA Inspections & Quick-Checks Resuming ... Are You Ready?IA Inspections & Quick-Checks Resuming ... Are You Ready?
IA Inspections & Quick-Checks Resuming ... Are You Ready?
 
Process and product inspection
Process and product inspectionProcess and product inspection
Process and product inspection
 
Ch8 total+qlty+mgt
Ch8 total+qlty+mgtCh8 total+qlty+mgt
Ch8 total+qlty+mgt
 
Pharmaceutical Deviation SOP
Pharmaceutical Deviation SOPPharmaceutical Deviation SOP
Pharmaceutical Deviation SOP
 
Proactive Internal Auditing -- The Key to Improving Your Quality System
Proactive Internal Auditing -- The Key to Improving Your Quality SystemProactive Internal Auditing -- The Key to Improving Your Quality System
Proactive Internal Auditing -- The Key to Improving Your Quality System
 
7Epsilon Risk Based Thinking - ASQ International Conference on Quality Stand...
7Epsilon Risk Based Thinking  - ASQ International Conference on Quality Stand...7Epsilon Risk Based Thinking  - ASQ International Conference on Quality Stand...
7Epsilon Risk Based Thinking - ASQ International Conference on Quality Stand...
 
Strategy Deployment in an Organization
Strategy Deployment in an OrganizationStrategy Deployment in an Organization
Strategy Deployment in an Organization
 
FDA Focus on Design Controls
FDA Focus on Design Controls FDA Focus on Design Controls
FDA Focus on Design Controls
 

Similar to Iso 9001-2015-training

Topic 1 - Risk Auditing 1-17.pdf
Topic 1 - Risk Auditing 1-17.pdfTopic 1 - Risk Auditing 1-17.pdf
Topic 1 - Risk Auditing 1-17.pdfJavier138365
 
Risk Based Thinking ISO 9001 Presentation.pdf
Risk Based Thinking ISO 9001 Presentation.pdfRisk Based Thinking ISO 9001 Presentation.pdf
Risk Based Thinking ISO 9001 Presentation.pdfHimanshuMishra203021
 
Implementing Risk Based Thinking in HLS OF ISO 9001:2015 - Praneet Surti
Implementing Risk Based Thinking in HLS OF ISO 9001:2015 - Praneet SurtiImplementing Risk Based Thinking in HLS OF ISO 9001:2015 - Praneet Surti
Implementing Risk Based Thinking in HLS OF ISO 9001:2015 - Praneet SurtiPraneet Surti
 
Risk Assessments Best Practice and Practical Approaches Webinar
Risk Assessments Best Practice and Practical Approaches WebinarRisk Assessments Best Practice and Practical Approaches Webinar
Risk Assessments Best Practice and Practical Approaches WebinarAviva Spectrum™
 
Internal Audit Best Practices for Safety, Environment, and Quality Audits
Internal Audit Best Practices for Safety, Environment, and Quality AuditsInternal Audit Best Practices for Safety, Environment, and Quality Audits
Internal Audit Best Practices for Safety, Environment, and Quality AuditsNimonik
 
PECB Webinar: QMS Risk Assessment
PECB Webinar: QMS Risk AssessmentPECB Webinar: QMS Risk Assessment
PECB Webinar: QMS Risk AssessmentPECB
 
Thorough Compliance Lac Megantic
Thorough Compliance Lac MeganticThorough Compliance Lac Megantic
Thorough Compliance Lac Meganticssuser1246df
 
7QC Tools Study Materials - LSSGB - Quality Control.pptx
7QC Tools Study Materials - LSSGB - Quality Control.pptx7QC Tools Study Materials - LSSGB - Quality Control.pptx
7QC Tools Study Materials - LSSGB - Quality Control.pptxsboral2
 
A brief Introduction to ISO 9001 2015-Quality Management System
A brief Introduction to ISO 9001 2015-Quality Management SystemA brief Introduction to ISO 9001 2015-Quality Management System
A brief Introduction to ISO 9001 2015-Quality Management SystemSARWAR SALAM
 
QM-026-Quality Management
QM-026-Quality ManagementQM-026-Quality Management
QM-026-Quality Managementhandbook
 
Ad Monsters Kaizen - Mark Verone
Ad Monsters Kaizen - Mark VeroneAd Monsters Kaizen - Mark Verone
Ad Monsters Kaizen - Mark VeroneMark Verone
 
Comprehensive Compliance for Environmental, Safety, Quality Requirements in C...
Comprehensive Compliance for Environmental, Safety, Quality Requirements in C...Comprehensive Compliance for Environmental, Safety, Quality Requirements in C...
Comprehensive Compliance for Environmental, Safety, Quality Requirements in C...Nimonik
 
part Chem- industrial quality management
part Chem- industrial quality managementpart Chem- industrial quality management
part Chem- industrial quality managementannechloeartangochlo
 
L07 quality management
L07 quality managementL07 quality management
L07 quality managementAsa Chan
 
simplifying-capa-seven-steps.pdf
simplifying-capa-seven-steps.pdfsimplifying-capa-seven-steps.pdf
simplifying-capa-seven-steps.pdfqcsasib
 

Similar to Iso 9001-2015-training (20)

Topic 1 - Risk Auditing 1-17.pdf
Topic 1 - Risk Auditing 1-17.pdfTopic 1 - Risk Auditing 1-17.pdf
Topic 1 - Risk Auditing 1-17.pdf
 
Risk Based Thinking ISO 9001 Presentation.pdf
Risk Based Thinking ISO 9001 Presentation.pdfRisk Based Thinking ISO 9001 Presentation.pdf
Risk Based Thinking ISO 9001 Presentation.pdf
 
Implementing Risk Based Thinking in HLS OF ISO 9001:2015 - Praneet Surti
Implementing Risk Based Thinking in HLS OF ISO 9001:2015 - Praneet SurtiImplementing Risk Based Thinking in HLS OF ISO 9001:2015 - Praneet Surti
Implementing Risk Based Thinking in HLS OF ISO 9001:2015 - Praneet Surti
 
Risk Management Training
Risk Management TrainingRisk Management Training
Risk Management Training
 
Risk Assessments Best Practice and Practical Approaches Webinar
Risk Assessments Best Practice and Practical Approaches WebinarRisk Assessments Best Practice and Practical Approaches Webinar
Risk Assessments Best Practice and Practical Approaches Webinar
 
Internal Audit Best Practices for Safety, Environment, and Quality Audits
Internal Audit Best Practices for Safety, Environment, and Quality AuditsInternal Audit Best Practices for Safety, Environment, and Quality Audits
Internal Audit Best Practices for Safety, Environment, and Quality Audits
 
PECB Webinar: QMS Risk Assessment
PECB Webinar: QMS Risk AssessmentPECB Webinar: QMS Risk Assessment
PECB Webinar: QMS Risk Assessment
 
Thorough Compliance Lac Megantic
Thorough Compliance Lac MeganticThorough Compliance Lac Megantic
Thorough Compliance Lac Megantic
 
7QC Tools Study Materials - LSSGB - Quality Control.pptx
7QC Tools Study Materials - LSSGB - Quality Control.pptx7QC Tools Study Materials - LSSGB - Quality Control.pptx
7QC Tools Study Materials - LSSGB - Quality Control.pptx
 
A brief Introduction to ISO 9001 2015-Quality Management System
A brief Introduction to ISO 9001 2015-Quality Management SystemA brief Introduction to ISO 9001 2015-Quality Management System
A brief Introduction to ISO 9001 2015-Quality Management System
 
QM-026-Quality Management
QM-026-Quality ManagementQM-026-Quality Management
QM-026-Quality Management
 
Haccpplan (2)
Haccpplan (2)Haccpplan (2)
Haccpplan (2)
 
2. Risk Management.pptx
2.  Risk Management.pptx2.  Risk Management.pptx
2. Risk Management.pptx
 
Ad Monsters Kaizen - Mark Verone
Ad Monsters Kaizen - Mark VeroneAd Monsters Kaizen - Mark Verone
Ad Monsters Kaizen - Mark Verone
 
Quality risk management
Quality risk managementQuality risk management
Quality risk management
 
Comprehensive Compliance for Environmental, Safety, Quality Requirements in C...
Comprehensive Compliance for Environmental, Safety, Quality Requirements in C...Comprehensive Compliance for Environmental, Safety, Quality Requirements in C...
Comprehensive Compliance for Environmental, Safety, Quality Requirements in C...
 
part Chem- industrial quality management
part Chem- industrial quality managementpart Chem- industrial quality management
part Chem- industrial quality management
 
L07 quality management
L07 quality managementL07 quality management
L07 quality management
 
National Postal Forum 2011 - Quality Control In Mail Center Operations
National Postal Forum 2011 - Quality Control In Mail Center OperationsNational Postal Forum 2011 - Quality Control In Mail Center Operations
National Postal Forum 2011 - Quality Control In Mail Center Operations
 
simplifying-capa-seven-steps.pdf
simplifying-capa-seven-steps.pdfsimplifying-capa-seven-steps.pdf
simplifying-capa-seven-steps.pdf
 

Recently uploaded

Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Mark Reed
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Celine George
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...Nguyen Thanh Tu Collection
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomnelietumpap1
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceSamikshaHamane
 
Atmosphere science 7 quarter 4 .........
Atmosphere science 7 quarter 4 .........Atmosphere science 7 quarter 4 .........
Atmosphere science 7 quarter 4 .........LeaCamillePacle
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for BeginnersSabitha Banu
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17Celine George
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
Quarter 4 Peace-education.pptx Catch Up Friday
Quarter 4 Peace-education.pptx Catch Up FridayQuarter 4 Peace-education.pptx Catch Up Friday
Quarter 4 Peace-education.pptx Catch Up FridayMakMakNepo
 
Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Jisc
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersSabitha Banu
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxAnupkumar Sharma
 

Recently uploaded (20)

Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choom
 
9953330565 Low Rate Call Girls In Rohini Delhi NCR
9953330565 Low Rate Call Girls In Rohini  Delhi NCR9953330565 Low Rate Call Girls In Rohini  Delhi NCR
9953330565 Low Rate Call Girls In Rohini Delhi NCR
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in Pharmacovigilance
 
Raw materials used in Herbal Cosmetics.pptx
Raw materials used in Herbal Cosmetics.pptxRaw materials used in Herbal Cosmetics.pptx
Raw materials used in Herbal Cosmetics.pptx
 
Atmosphere science 7 quarter 4 .........
Atmosphere science 7 quarter 4 .........Atmosphere science 7 quarter 4 .........
Atmosphere science 7 quarter 4 .........
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for Beginners
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
Quarter 4 Peace-education.pptx Catch Up Friday
Quarter 4 Peace-education.pptx Catch Up FridayQuarter 4 Peace-education.pptx Catch Up Friday
Quarter 4 Peace-education.pptx Catch Up Friday
 
OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginners
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
 

Iso 9001-2015-training

  • 1. ISO-9001:2015 Where we have been and where we are going
  • 2. Transition – Key to success 1) Understand the requirements 2) Conduct a gap analysis 3) Don’t let concerns with auditability and documented information drive bureaucracy into your quality management system. 4) Implement changes that add maximum value to your organization.
  • 3. Agenda •Context of the Organization •Process Approach and Risk Based Thinking
  • 4. Context of the Organization
  • 5. Context of the Organization • The new requirement reads: “The organization shall determine external and internal issues that are relevant to its purpose and its strategic direction and that affect its ability to achieve the intended result(s) of its quality management system.”
  • 6. Decision making and ISO-9001:2015 • The first is a quality principle quoted from ISO 9000:2015, namely “evidence- based decision making.” It is not hard to understand that better decisions are made when they are based on evidence rather than by conjecture. • The second is found in Clause 0.1, “Addressing risks and opportunities associated with its context and objectives.” Addressing risks means proactively managing uncertainties. The simple meaning of “managing uncertainties” is that decisions should be made with consideration of the possible positive and negative consequences that the uncertain future may bring. • Finally, in Clause 5.1, entitled Leadership and Commitment, there is a requirement for top management: “Ensuring that the quality policy and quality objectives are established for the quality management system and are compatible with the context and strategic direction of the organization.” Top management’s most basic role is strategic decision-making for the organization.
  • 7. Decisions are to be made based on evidence. Evidence is found in the CONTEXT of the organization.
  • 8. Internal Context • Vision • Mission • Strategic objectives and direction • Organizational Chart • SOPs • Resources • Culture
  • 9. External Context • Legal • Social • Political • Regulatory • Financial • Economic • Market Trends
  • 10. Examples • Customer pressures and complaints can force organizations to change policies such as product returns and customer and technical support . • Technological changes can provide new and more effective ways to handle communications, operations, shipping and logistics. • Governments regulatory and trade policies can play a significant role in determining how businesses operate, especially in regard to international trade, taxation, and regulations • The media, including social media, can have a huge impact on a company’s image and public relations. A bad news video or news report can go viral pretty fast, and if your organization doesn’t provide an acceptable response, the negative publicity and effects can last a long time. • Sociological forces often drive what, where and how consumers buy product and services. There is an increasing trend in the number of consumers purchasing products online and reading reviews before making a purchase. • The multinational and multicultural trend in workforce composition can cause significant changes in hiring and retention of competent human resources.
  • 11. Risk Based Thinking Examples and Ideas •Purchasing •Design and Development •Process
  • 12. Purchasing Supplier Approval and Re-Evaluation •Do all raw materials create the same risk for your final product? •Do all suppliers bring the same risk to your business? Does your current QMS account for these differences?
  • 13. Design and Development Design FMEA – for actual design Risk Registers – for project risks
  • 14. The Process Approach and Risk Based Thinking • Assign a Process Owner • Define the process • Identify the inputs and outputs • Define measures of effectiveness and efficiency • Identify risks and opportunities • Report on the status of each process
  • 15. PROCESS Materials Measures Manpower (Training/Skills) Inputs Suppliers (By whom) Outputs Customer (For Whom) Methods (How) Machine (With what) Environment (Conditions) RISK!
  • 16. Process Definition Should include: Process Owner, Inputs and Outputs, Process, Process Metrics and RISK
  • 17. Process Review Should include: Inputs and Outputs, Process, Process Metrics and RISK
  • 18. Process Owner’s Meetings • Owner/Co-Owner Reporting • Process Metrics • Current State • Recent Updates • Plans moving forward • Audit Nonconformance's (Internal and External) • Dashboard •RISK
  • 19. Purchasing Measurable: # Supplier Nonconformance's Process Owner: Goals 2016: 10% Reduction from ’15 Risk: Production interruptions due to material shortages Risks and Opportunities: Risk – This rate of supplier rejects has resulted in 280 hours of line shut downs in 2015, and the trend is not improvement moving into 2016. Opportunity: IF the shipping damage issues could be solved, we could eliminate 24 % of the nonconforamnces and 20% of the hours of line interruption Corrective Action Plans: Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Series1 32 78 45 36 64 24 56 20 66 43 26 47 0 10 20 30 40 50 60 70 80 90 Supplier Nonconformances - 2015 0 50 100 150 200 250 Dimensional Damaged Functional Aesthetics Wrong Product Supplier Nonconformances - 2015 Task Responsibility Target Date
  • 20. Quarterly Business Reviews (Management Representative and Process Owners) •Review of identified risk within each key process •Has the risk changed? •Have high risk issues been addressed? •Does performance to objectives reflect risk mitigation?
  • 21. Integrated Systems and RISK ISO-9001 ISO-14000 FSSC- 22000, SQF, BRC (Food Standards)
  • 22. Hazard Analysis for food safety Hazard Analysis - Food Safety (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) ProcessStep List each process step from the Process Flow Diagram Does this process step INTRODUCE or INTENSIFY a potential food safety hazard? If YES identify the hazard(s). Assess probability, severity and risk per columns 4, 5 and 6. Likelihood Severity Risk Justification of Risk Level Assessment List the support programs that CONTROL or ELLIMINATE this hazard. Do the support program(s) control the hazard to an acceptable level? If yes, proceed to the next process step. If no, proceed to column 9. Is this hazard CONTROLLED or ELIMINATED (or reduced to an acceptable level) at a subsequent process step? If YES, this step is not a CCP. Identify the subsequent process step and proceed to the next process step. If the hazard is not controlled at this process step, go to column 10 and assign a CCP number. CCP or oPRP 1 Receive raw materials B- Pathogen contamination due to uncontrolled transportation L M 2 Raw materials are received covered and/or packaged, Trailer Checks, Sealed Truck Purchasing Program Shipping and Receiving Program Yes No C- Chemical contamination due to uncontrolled transportation L M 2 Raw materials are received covered and/or packaged, Trailer Checks, Sealed Truck Purchasing Program Shipping and Receiving program Chemical Control Program Yes No P- Physical contamination with extraneous material due to uncontrolled transpiration L L 1 Raw materials are received covered and/or packaged, Trailer Checks, Sealed Truck Purchasing Program Shipping and Receiving Program Glass and Brittle Plastics Program Metal and Blade Control Program Yes No
  • 23. ISO-14000 Aspects and ImpactsProcessStep Aspects Likelihood Severity Risk Impact (Use notes to insert further analysis) legaland OtherRequirements Significant environmentalaspect (Yes),(No)or(NA) B - none NO NO C - none NO NO P- Potential for Scrap L L 2 NO NO Receiving Aspect and Impacts Risk Assessment - ISO-14000 Air Land WaterAir Land Water Air Land WaterAir Land Water Air Land WaterAir Land Water
  • 24. Quality Risk Assessment (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) ProcessStep List each process step from the Process Flow Diagram Does this process step INTRODUCE or INTENSIFY a potential quality issue?Assess Likelihood and severity and risk per columns 4, 5 and 6. Likelihood Severity Risk Justification of Risk Level Assessment List the support programs that CONTROL or ELLIMINATE this risk. Do the support program(s) control the risk to an acceptable level? If yes, proceed to the next process step. If no, proceed to column 9. Is this hazard CONTROLLED or ELIMINATED (or reduced to an acceptable level) at a subsequent process step? If YES, this step is not a QCP. Identify the subsequent process step and proceed to the next process step. If the risk is controlled at this process step, go to column 10 and assign a QCP number. QCP 1 Receive raw materials Q - L M 2 No Risk Assessment - Quality
  • 25. What should you do? • Identify what the risks and opportunities are in your organization – it depends on context • Analyze and prioritize the risks and opportunities in your organization • what is acceptable? • what is unacceptable? • Plan actions to address the risks • how can I avoid or eliminate the risk? • how can I mitigate the risk? • Implement the plan – take action • Check the effectiveness of the actions – does it work? • Learn from experience – continual improvement