DEVELOPMENT OF
MONGOLIA'S WORLD-CLASS MINING:
OT AND TT PROJECTS
ABOUT ERDENES MGL
• Established in 2007
• Represents government interests in development of strategically important deposits
• Participates in the Government Working Group’s work and in preparing investment
agreements and contracts and conducting studies of deposits in collaboration with
international advisers/consultants
2
OYU TOLGOI LLC
34 %
Mongolia’s
Government
“Erdenes MGL”
66%
Rio Tinto
Ivanhoe Mines
 World-class copper-gold deposit
 Investment Agreement concluded on October 6, 2009.
 Agreement effective since March 31, 2010.
OYU TOLGOI PROJECT OVERVIEW
Oyu Tolgoi Project:
• First largest mining project in Mongolia since 1990
• Starting point of Mongolian’s mining development
• Intensive construction work of the project has commenced
3
OYU TOLGOI PROJECT
There are total 45 million tons of copper, 1800
tons of gold and 6450 million tons of ore
reserve contained at Oyu Tolgoi (OT) based
on a 0.3 equivalent to each metal.
According to the Implementation Plan, Oyu
Tolgoi LLC will extract a maximum of 56
million tons, and a minimum of 26 million tons
of ore per year.
Planning to built concentrator by 2012.
• Phase I - 35 million tons per year for the
five-years.
• Phase II - Oyu Tolgoi LLC will transport
minerals by railway and will advance the
concentrator’s production capacity to 58
million tons of ore.
Ouy Tolgoi progress
4
TAVAN TOLGOI COKING COAL DEPOSIT
Tavan Tolgoi is one of the largest coking coal deposits in the world
5
TAVAN TOLGOI DEPOSIT OVERVIEW
• Total over 6.0 billion tons of coal, out of which:
• 1.4 billion tons of coking coal
• 4.6 billion tons of thermal coal
Reserves*
• Gobi Region in southern part of Mongolia
• 540 km south of Ulaanbaatar, capital city
• 270 km from the Chinese border
Location
• All infrastructures (electricity supply, railroads,
roads, water, supply etc.) need to be developedInfrastructure
6
*- Conversion of coal resource into JORC standard increases coal resource, in particular,
coking coal
COAL MINING BLOCKS
West Tsankhi Block
East Tsankhi block
1204 M tons*
65 % coking coal
1078 M tons*
78 % coking coal
Eastern Coalfield
Borteeg
Coalfield
South-western
Coalfield
Resource estimated by JORC code
7
Bor tolgoi
Measured
Indicated
Inferred
* In-Situ Coal Resources at 200m Depth Limit
392.9 M tons
1203 M tons*
48 % coking coal
765 M tons*
62,5 % coking coal
As Norwest’s preliminarily estimated TT In-Situ coal resources according to the JORC code, there are 7.5 billion tons of
thermal and coking coal within 300m depth range limit .
Norwest’s preliminary resource estimate
ERDENES-TT MINE (EARTERN TSANKHI)
8
Tavan Tolgoi Project
Bid Coal Block
Erdenes-TT Mine
15 Mtpy ROM
Bidding of the Contract Miner for Tavan Tolgoi Coal Deposit (Eastern Tsankhi)
 Bidders submitted their proposals
 Final stage of the selection process is going on
PARLIAMENTARY RESOLUTION NO.39
9
1) To ensure that a state-owned company conducts mining operations at the Tavan Tolgoi coal deposit, and subsidiary
Erdenes Tavan Tolgoi is established in compliance with corresponding laws and undivided mining licenses for the deposit –
transferred to it and investment agreement – entered into with it, and operator, corporate entity, – allowed to conduct
mining operations for a specific period;
2) To take the following measures to allow Mongolian citizens and national corporate entities to own and sell up to 50
percent of the shares of Erdenes Tavan Tolgoi company, mining licensee of the Tavan Tolgoi coal deposit, on domestic and
international stock changes, according to corresponding laws at different phases:
a) To allow all Mongolian citizens to own 10 percent of the shares free of charge in the first place in equal
amounts;
b) To sell 10 percent of the shares to national corporate entities, that are registered with state registration
on or before June 30, 2010, that conduct operations, and that have paid taxes in equal amounts and at
nominal price;
c) To sell up to 30 percent of the shares on international and domestic stock exchanges and raise
necessary investment;
A working group consisted of representatives from corresponding 9 institutions such as the State Property
Committee, General Taxation Authority, and General Agency for State Registration, mandated to do
preparation and organization of offerings for citizens and national corporate entities, is in operation.
STRATEGIC INVESTORS SELECTION
Prequalification of the Company/Consortium to Invest and Cooperate in the
Tavan Tolgoi Coal Deposit (Western Tsankhi)
 Announcement of the open prequalification, December 8, 2010
 Bid submission deadline January 31, 2011
 Evaluate bid proposal, create shortlist
Currently, Government’s Working group are holding negotiations with shortlisted
company/consortium
• Coal Work Contract with Erdenes Tavan Tolgoi JSC
• Peabody Energy, USA;
• Consortium of Shenhua Energy, PRC, and Mitsui Co Ltd, Japan;
• Consortium of Russia’s Railway, Japanese Consortium, and Korean Consortium;
• Vale (former CVRD), Brazil;
• Xstrata Coal, Australia;
• ArcelorMittal Limited, Luxembuorg.
Shortlisted bidders
CONSULTANTS
Companies to provide consulting services on IPO execution of part of the shares of
Erdenes Tavan Tolgoi on stock exchanges
• International investment banks:
- Goldman Sachs, USA
- Deutsche Bank, Germany
- BNP Paribas, France
- Macquarie, Australia
1-2 additional banks
• International Audit Firm/Consultant
• Legal Consultant
• Technical and Resource’s Consultant
11
Preparation* Erdenes-TT Details
Resource (reserve) Report in accordance to
JORC standard
 6 billion tons resource. Convert to International
JORC standard
Contract miner (operator)  Tender is in process
Coal quality
 Coal quality study has been done on Tavan
Tolgoi coal deposit
Sale of production  Initial stage
Production level
 Mine box-cut has been started on site and
uncovered the coal seam
Financing  In stage of preliminary discussion
Road
 Utilization of the currently constructed road
 Build new road
Railway
 Resolution on State Policy on Railway
Transportation
Power plant  Research, Feasibility study
Wash plant  Research, Feasibility study
Water supply  Research, Feasibility study
*Preparation work can be done and commenced within 1 year by Erdenes-TT
ERDENES-TT: IPO
12
12
Tavan Tolgoi Project
CHPP AND WATER SUPPLY
Construction of the Coal Handling and Processing Plant
Coal processing plant:
• Three 900 ton/hour modules
• 15 Mtpy capacity
Coal handling and blending
• 5000 ton/hour
• Refuse handling
• Loadout conveyer facilities
13
Production:
• At least 7 million tons of clean coking coal
• 4 million tons of thermal coal
• 1 million tons of middling
Tavan Tolgoi Project
Dalanzadgad
Sainshand
Zuunbayan
Tavan Tolgoi
Оюу толгой
Gashuun
sukhait
Zamiin-Uud
Khangi
Balgasiin Ulaan
Nuur
Balgasiin Ulaan Nuur underground water
deposit:
• 70 km from Tavan Tolgoi deposit
• Resources of 465 l/sec
• Additional water exploration in
the region
Construction of the integrated water supply system to support mine operations
POWER SUPPLY AND SITE DEVELOPMENT
Up to 600 MW installed capacity power plant:
• Mine operations
• Coal Handling & Processing Plant
• Camp and local miners’ town
• Water supply system
• Support infrastructures
• Other local users
14
Tavan Tolgoi Project
Construction of the mine camp and
development of the town
Miners town development:
• Permanent resident housing
• Support in town infrastructure development
• Medical center, daycare, schools and other social
support facilities
Mine camp:
• 600 miners accommodation
• Office, warehouse and support
• Workshops
MASTER PLAN
Bid Coal Block
(WesternTsankhi)
Eastern Tsankhi
Eastern
coalfieldBor teeg coalfield
Ukhaa khudag coalfield
Tsogttsetsii Town
15
Erdenes-TT Mine
Tavan Tolgoi Project
MONGOLIAN RAILWAY DEVELOPMENT STRATEGY
• Construction of new railway to connect with Trans Mongolian railway
• TT-Sainshand, Sainshand-Choibalsan
16
Tavan Tolgoi Project
ASIA PACIFIC MARKET
Marketing of the Tavan Tolgoi coal
Unit 37, Diplomat Bldg. 95
khoroo 5, Chingeltei district
Ulaanbaatar, Mongolia
Tel: (976) 7011-0735
Fax: (976) 7011-0725
www.erdenesmgl.mn
Erdenes MGL LLC

More Related Content

What's hot

Hydrocarbon Exploration and Production in Turkey; Ozer Balkas, Sept 26, 1996,...
Hydrocarbon Exploration and Production in Turkey; Ozer Balkas, Sept 26, 1996,...Hydrocarbon Exploration and Production in Turkey; Ozer Balkas, Sept 26, 1996,...
Hydrocarbon Exploration and Production in Turkey; Ozer Balkas, Sept 26, 1996,...Ozer Balkas
 
30.10.2012 Erdenes Tavan Tolgoi – a world class coking coal project going to ...
30.10.2012 Erdenes Tavan Tolgoi – a world class coking coal project going to ...30.10.2012 Erdenes Tavan Tolgoi – a world class coking coal project going to ...
30.10.2012 Erdenes Tavan Tolgoi – a world class coking coal project going to ...The Business Council of Mongolia
 
Konkraftrapport_eng_fullversjon
Konkraftrapport_eng_fullversjonKonkraftrapport_eng_fullversjon
Konkraftrapport_eng_fullversjonGeorg Oftedal
 
03.22.2010, REPORT, SouthGobi Energy Resources Announces 2009 Financial Resul...
03.22.2010, REPORT, SouthGobi Energy Resources Announces 2009 Financial Resul...03.22.2010, REPORT, SouthGobi Energy Resources Announces 2009 Financial Resul...
03.22.2010, REPORT, SouthGobi Energy Resources Announces 2009 Financial Resul...The Business Council of Mongolia
 
Petroleum licensing
Petroleum licensingPetroleum licensing
Petroleum licensingasfawm
 
Albpetrol status update in the era of privatisation
Albpetrol status update in the era of privatisationAlbpetrol status update in the era of privatisation
Albpetrol status update in the era of privatisationAlbania Energy Association
 

What's hot (9)

Fuel and energy final
Fuel and energy finalFuel and energy final
Fuel and energy final
 
Hydrocarbon Exploration and Production in Turkey; Ozer Balkas, Sept 26, 1996,...
Hydrocarbon Exploration and Production in Turkey; Ozer Balkas, Sept 26, 1996,...Hydrocarbon Exploration and Production in Turkey; Ozer Balkas, Sept 26, 1996,...
Hydrocarbon Exploration and Production in Turkey; Ozer Balkas, Sept 26, 1996,...
 
30.10.2012 Erdenes Tavan Tolgoi – a world class coking coal project going to ...
30.10.2012 Erdenes Tavan Tolgoi – a world class coking coal project going to ...30.10.2012 Erdenes Tavan Tolgoi – a world class coking coal project going to ...
30.10.2012 Erdenes Tavan Tolgoi – a world class coking coal project going to ...
 
Konkraftrapport_eng_fullversjon
Konkraftrapport_eng_fullversjonKonkraftrapport_eng_fullversjon
Konkraftrapport_eng_fullversjon
 
09.07.2010, NEWSWIRE, Issue 126
09.07.2010, NEWSWIRE, Issue 12609.07.2010, NEWSWIRE, Issue 126
09.07.2010, NEWSWIRE, Issue 126
 
03.22.2010, REPORT, SouthGobi Energy Resources Announces 2009 Financial Resul...
03.22.2010, REPORT, SouthGobi Energy Resources Announces 2009 Financial Resul...03.22.2010, REPORT, SouthGobi Energy Resources Announces 2009 Financial Resul...
03.22.2010, REPORT, SouthGobi Energy Resources Announces 2009 Financial Resul...
 
Petroleum licensing
Petroleum licensingPetroleum licensing
Petroleum licensing
 
Albpetrol status update in the era of privatisation
Albpetrol status update in the era of privatisationAlbpetrol status update in the era of privatisation
Albpetrol status update in the era of privatisation
 
04.06.2010, NEWSWIRE, Issue 121
04.06.2010, NEWSWIRE, Issue 12104.06.2010, NEWSWIRE, Issue 121
04.06.2010, NEWSWIRE, Issue 121
 

Viewers also liked

22.03.2011 Roles and opportunities for local banks, Mr. Zagal Badamgerel
22.03.2011 Roles and opportunities for local banks, Mr. Zagal Badamgerel22.03.2011 Roles and opportunities for local banks, Mr. Zagal Badamgerel
22.03.2011 Roles and opportunities for local banks, Mr. Zagal BadamgerelThe Business Council of Mongolia
 
17.04.2013 Exploring and developing copper in Mongolia, Joe Burke
17.04.2013 Exploring and developing copper in Mongolia, Joe Burke17.04.2013 Exploring and developing copper in Mongolia, Joe Burke
17.04.2013 Exploring and developing copper in Mongolia, Joe BurkeThe Business Council of Mongolia
 
Atif Umair Resume pdf
Atif Umair Resume pdfAtif Umair Resume pdf
Atif Umair Resume pdfAtif Umair
 
Sampling of the Gallery of Events that have been managed
Sampling of the Gallery of Events that have been managedSampling of the Gallery of Events that have been managed
Sampling of the Gallery of Events that have been managedPam Parker
 
11.16-17.2015, PRESENTATION, The new equilibrium- reforms to sustainable grow...
11.16-17.2015, PRESENTATION, The new equilibrium- reforms to sustainable grow...11.16-17.2015, PRESENTATION, The new equilibrium- reforms to sustainable grow...
11.16-17.2015, PRESENTATION, The new equilibrium- reforms to sustainable grow...The Business Council of Mongolia
 
09.10.2011 Understanding Mongolia’s current situation what do investors need ...
09.10.2011 Understanding Mongolia’s current situation what do investors need ...09.10.2011 Understanding Mongolia’s current situation what do investors need ...
09.10.2011 Understanding Mongolia’s current situation what do investors need ...The Business Council of Mongolia
 
08.05.2013 Draft National Policy of Minerals Development, Bayar B. & Algaa O.
08.05.2013 Draft National Policy of Minerals Development, Bayar B. & Algaa O.08.05.2013 Draft National Policy of Minerals Development, Bayar B. & Algaa O.
08.05.2013 Draft National Policy of Minerals Development, Bayar B. & Algaa O.The Business Council of Mongolia
 
31.08.2012 Financing infrastructure in Mongolia, Development Bank of Mongolia
31.08.2012 Financing infrastructure in Mongolia, Development Bank of Mongolia31.08.2012 Financing infrastructure in Mongolia, Development Bank of Mongolia
31.08.2012 Financing infrastructure in Mongolia, Development Bank of MongoliaThe Business Council of Mongolia
 

Viewers also liked (19)

19.04.2013 About regulation on FDI, S. Javkhlanbaatar
19.04.2013 About regulation on FDI, S. Javkhlanbaatar19.04.2013 About regulation on FDI, S. Javkhlanbaatar
19.04.2013 About regulation on FDI, S. Javkhlanbaatar
 
13.03.2009, NEWSWIRE, Issue 60
13.03.2009, NEWSWIRE, Issue 6013.03.2009, NEWSWIRE, Issue 60
13.03.2009, NEWSWIRE, Issue 60
 
29.05.2009, NEWSWIRE, Issue 71
29.05.2009, NEWSWIRE, Issue 7129.05.2009, NEWSWIRE, Issue 71
29.05.2009, NEWSWIRE, Issue 71
 
22.03.2011 Roles and opportunities for local banks, Mr. Zagal Badamgerel
22.03.2011 Roles and opportunities for local banks, Mr. Zagal Badamgerel22.03.2011 Roles and opportunities for local banks, Mr. Zagal Badamgerel
22.03.2011 Roles and opportunities for local banks, Mr. Zagal Badamgerel
 
31.10.2014, NEWSWIRE, Issue 349
31.10.2014, NEWSWIRE, Issue 34931.10.2014, NEWSWIRE, Issue 349
31.10.2014, NEWSWIRE, Issue 349
 
17.04.2013 Exploring and developing copper in Mongolia, Joe Burke
17.04.2013 Exploring and developing copper in Mongolia, Joe Burke17.04.2013 Exploring and developing copper in Mongolia, Joe Burke
17.04.2013 Exploring and developing copper in Mongolia, Joe Burke
 
Atif Umair Resume pdf
Atif Umair Resume pdfAtif Umair Resume pdf
Atif Umair Resume pdf
 
22.08.2014, NEWSWIRE, Issue 339
22.08.2014, NEWSWIRE, Issue 33922.08.2014, NEWSWIRE, Issue 339
22.08.2014, NEWSWIRE, Issue 339
 
OACUHO
OACUHOOACUHO
OACUHO
 
Sampling of the Gallery of Events that have been managed
Sampling of the Gallery of Events that have been managedSampling of the Gallery of Events that have been managed
Sampling of the Gallery of Events that have been managed
 
05.10.2012, NEWSWIRE, Issue 242
05.10.2012, NEWSWIRE, Issue 24205.10.2012, NEWSWIRE, Issue 242
05.10.2012, NEWSWIRE, Issue 242
 
16.11.2015, What is think urban, Ariunaa Norovsambuu
16.11.2015, What is think urban, Ariunaa Norovsambuu16.11.2015, What is think urban, Ariunaa Norovsambuu
16.11.2015, What is think urban, Ariunaa Norovsambuu
 
11.16-17.2015, PRESENTATION, The new equilibrium- reforms to sustainable grow...
11.16-17.2015, PRESENTATION, The new equilibrium- reforms to sustainable grow...11.16-17.2015, PRESENTATION, The new equilibrium- reforms to sustainable grow...
11.16-17.2015, PRESENTATION, The new equilibrium- reforms to sustainable grow...
 
23.09.2011, NEWSWIRE, Issue 186
23.09.2011, NEWSWIRE, Issue 18623.09.2011, NEWSWIRE, Issue 186
23.09.2011, NEWSWIRE, Issue 186
 
09.10.2011 Understanding Mongolia’s current situation what do investors need ...
09.10.2011 Understanding Mongolia’s current situation what do investors need ...09.10.2011 Understanding Mongolia’s current situation what do investors need ...
09.10.2011 Understanding Mongolia’s current situation what do investors need ...
 
08.05.2013 Draft National Policy of Minerals Development, Bayar B. & Algaa O.
08.05.2013 Draft National Policy of Minerals Development, Bayar B. & Algaa O.08.05.2013 Draft National Policy of Minerals Development, Bayar B. & Algaa O.
08.05.2013 Draft National Policy of Minerals Development, Bayar B. & Algaa O.
 
31.08.2012 Financing infrastructure in Mongolia, Development Bank of Mongolia
31.08.2012 Financing infrastructure in Mongolia, Development Bank of Mongolia31.08.2012 Financing infrastructure in Mongolia, Development Bank of Mongolia
31.08.2012 Financing infrastructure in Mongolia, Development Bank of Mongolia
 
Samir Mekhtiyev VM
Samir Mekhtiyev VMSamir Mekhtiyev VM
Samir Mekhtiyev VM
 
28.09.2015 competitiveness in central asia
28.09.2015 competitiveness in central asia28.09.2015 competitiveness in central asia
28.09.2015 competitiveness in central asia
 

Similar to Developing Mongolia's Mining Industry

2013, PRESENTATION, Tavan Tolgoi how should the market evaluate the long term...
2013, PRESENTATION, Tavan Tolgoi how should the market evaluate the long term...2013, PRESENTATION, Tavan Tolgoi how should the market evaluate the long term...
2013, PRESENTATION, Tavan Tolgoi how should the market evaluate the long term...The Business Council of Mongolia
 
17.04.2013 Tavan Tolgoi how should the market evaluate the long term future f...
17.04.2013 Tavan Tolgoi how should the market evaluate the long term future f...17.04.2013 Tavan Tolgoi how should the market evaluate the long term future f...
17.04.2013 Tavan Tolgoi how should the market evaluate the long term future f...The Business Council of Mongolia
 
10.14.2010, PRESENTATION, South gobi resources, Dave Bartel
10.14.2010, PRESENTATION, South gobi resources, Dave Bartel10.14.2010, PRESENTATION, South gobi resources, Dave Bartel
10.14.2010, PRESENTATION, South gobi resources, Dave BartelThe Business Council of Mongolia
 
01.05.2014 Mining infrastructure case study - examining the development of in...
01.05.2014 Mining infrastructure case study - examining the development of in...01.05.2014 Mining infrastructure case study - examining the development of in...
01.05.2014 Mining infrastructure case study - examining the development of in...The Business Council of Mongolia
 
23.05.2012 Introducing Tavan Tolgoi to the international markets, Graeme Hancock
23.05.2012 Introducing Tavan Tolgoi to the international markets, Graeme Hancock23.05.2012 Introducing Tavan Tolgoi to the international markets, Graeme Hancock
23.05.2012 Introducing Tavan Tolgoi to the international markets, Graeme HancockThe Business Council of Mongolia
 

Similar to Developing Mongolia's Mining Industry (20)

2013, PRESENTATION, Tavan Tolgoi how should the market evaluate the long term...
2013, PRESENTATION, Tavan Tolgoi how should the market evaluate the long term...2013, PRESENTATION, Tavan Tolgoi how should the market evaluate the long term...
2013, PRESENTATION, Tavan Tolgoi how should the market evaluate the long term...
 
17.04.2013 Tavan Tolgoi how should the market evaluate the long term future f...
17.04.2013 Tavan Tolgoi how should the market evaluate the long term future f...17.04.2013 Tavan Tolgoi how should the market evaluate the long term future f...
17.04.2013 Tavan Tolgoi how should the market evaluate the long term future f...
 
28.07.2010 Khushuut Coal Project Update, Dennis Price
28.07.2010 Khushuut Coal Project Update, Dennis Price28.07.2010 Khushuut Coal Project Update, Dennis Price
28.07.2010 Khushuut Coal Project Update, Dennis Price
 
BCM NewsWire Issue 450
BCM NewsWire Issue 450BCM NewsWire Issue 450
BCM NewsWire Issue 450
 
01.08.2014, NEWSWIRE, Issue 336
01.08.2014, NEWSWIRE, Issue 33601.08.2014, NEWSWIRE, Issue 336
01.08.2014, NEWSWIRE, Issue 336
 
21.01.2011, NEWSWIRE, Issue 152
21.01.2011, NEWSWIRE, Issue 15221.01.2011, NEWSWIRE, Issue 152
21.01.2011, NEWSWIRE, Issue 152
 
10.14.2010, PRESENTATION, South gobi resources, Dave Bartel
10.14.2010, PRESENTATION, South gobi resources, Dave Bartel10.14.2010, PRESENTATION, South gobi resources, Dave Bartel
10.14.2010, PRESENTATION, South gobi resources, Dave Bartel
 
14.10.2010 South Gobi Resources, Dave Bartel
14.10.2010 South Gobi Resources, Dave Bartel14.10.2010 South Gobi Resources, Dave Bartel
14.10.2010 South Gobi Resources, Dave Bartel
 
01.04.2011, NEWSWIRE, Issue 161
01.04.2011, NEWSWIRE, Issue 16101.04.2011, NEWSWIRE, Issue 161
01.04.2011, NEWSWIRE, Issue 161
 
01.05.2014 Mining infrastructure case study - examining the development of in...
01.05.2014 Mining infrastructure case study - examining the development of in...01.05.2014 Mining infrastructure case study - examining the development of in...
01.05.2014 Mining infrastructure case study - examining the development of in...
 
02.08.2013, NEWSWIRE, Issue 285
02.08.2013, NEWSWIRE, Issue 28502.08.2013, NEWSWIRE, Issue 285
02.08.2013, NEWSWIRE, Issue 285
 
14.10.2010 Mongolia invest in opportunity, B. Zagal
14.10.2010 Mongolia invest in opportunity, B. Zagal14.10.2010 Mongolia invest in opportunity, B. Zagal
14.10.2010 Mongolia invest in opportunity, B. Zagal
 
Thar coal hurdle&solution
Thar coal hurdle&solutionThar coal hurdle&solution
Thar coal hurdle&solution
 
08.10.2010, NEWSWIRE, Issue 139
08.10.2010, NEWSWIRE, Issue 13908.10.2010, NEWSWIRE, Issue 139
08.10.2010, NEWSWIRE, Issue 139
 
23.05.2012 Introducing Tavan Tolgoi to the international markets, Graeme Hancock
23.05.2012 Introducing Tavan Tolgoi to the international markets, Graeme Hancock23.05.2012 Introducing Tavan Tolgoi to the international markets, Graeme Hancock
23.05.2012 Introducing Tavan Tolgoi to the international markets, Graeme Hancock
 
Astur Gold Corp
Astur Gold CorpAstur Gold Corp
Astur Gold Corp
 
15.10.2010, NEWSWIRE, Issue 140
15.10.2010, NEWSWIRE, Issue 14015.10.2010, NEWSWIRE, Issue 140
15.10.2010, NEWSWIRE, Issue 140
 
08.01.2010, NEWSWIRE, Issue 100
08.01.2010, NEWSWIRE, Issue 10008.01.2010, NEWSWIRE, Issue 100
08.01.2010, NEWSWIRE, Issue 100
 
03.08.2012, NEWSWIRE, Issue 233
03.08.2012, NEWSWIRE, Issue 23303.08.2012, NEWSWIRE, Issue 233
03.08.2012, NEWSWIRE, Issue 233
 
05.08.2011, NEWSWIRE, Issue 179
05.08.2011, NEWSWIRE, Issue 17905.08.2011, NEWSWIRE, Issue 179
05.08.2011, NEWSWIRE, Issue 179
 

More from The Business Council of Mongolia

N. Chimguundari economic corridor and investment research center Nov 12
N. Chimguundari economic corridor and investment research center Nov 12N. Chimguundari economic corridor and investment research center Nov 12
N. Chimguundari economic corridor and investment research center Nov 12The Business Council of Mongolia
 

More from The Business Council of Mongolia (20)

Three Camel Lodge 3 days itinerary
Three Camel Lodge 3 days itineraryThree Camel Lodge 3 days itinerary
Three Camel Lodge 3 days itinerary
 
Three Camel Lodge 4 days itinerary
Three Camel Lodge 4 days itineraryThree Camel Lodge 4 days itinerary
Three Camel Lodge 4 days itinerary
 
BCM Macroeconomic Updates January 2020
BCM Macroeconomic Updates January 2020BCM Macroeconomic Updates January 2020
BCM Macroeconomic Updates January 2020
 
Digital Enterprise 2019
Digital Enterprise 2019Digital Enterprise 2019
Digital Enterprise 2019
 
Faro Foundation presentation
Faro Foundation presentationFaro Foundation presentation
Faro Foundation presentation
 
Business Council of Mongolia presentation
Business Council of Mongolia presentationBusiness Council of Mongolia presentation
Business Council of Mongolia presentation
 
National Development Association of Mongolia presentation
National Development Association of Mongolia presentationNational Development Association of Mongolia presentation
National Development Association of Mongolia presentation
 
Gobi Green Energy Gankhuyag
Gobi Green Energy GankhuyagGobi Green Energy Gankhuyag
Gobi Green Energy Gankhuyag
 
Ch.Anar Competitiveness of the fintech sector
Ch.Anar Competitiveness of the fintech sectorCh.Anar Competitiveness of the fintech sector
Ch.Anar Competitiveness of the fintech sector
 
A.Bilguun Competitiveness of Mongolia's resource sector
A.Bilguun Competitiveness of Mongolia's resource sectorA.Bilguun Competitiveness of Mongolia's resource sector
A.Bilguun Competitiveness of Mongolia's resource sector
 
B.Lakshmi EPCRC Competitiveness of Mongolia
B.Lakshmi EPCRC Competitiveness of MongoliaB.Lakshmi EPCRC Competitiveness of Mongolia
B.Lakshmi EPCRC Competitiveness of Mongolia
 
Munkhzorig - Digital Transformation
Munkhzorig - Digital TransformationMunkhzorig - Digital Transformation
Munkhzorig - Digital Transformation
 
Tseesuren - Data is the Key for Innovation
Tseesuren - Data is the Key for InnovationTseesuren - Data is the Key for Innovation
Tseesuren - Data is the Key for Innovation
 
System analysis study on the Constitution of Mongolia
System analysis study on the Constitution of MongoliaSystem analysis study on the Constitution of Mongolia
System analysis study on the Constitution of Mongolia
 
Kincora Copper March 2019
Kincora Copper March 2019Kincora Copper March 2019
Kincora Copper March 2019
 
Erdenes Mongol presentation
Erdenes Mongol presentationErdenes Mongol presentation
Erdenes Mongol presentation
 
Tatsuya Hamada presentation
Tatsuya Hamada presentationTatsuya Hamada presentation
Tatsuya Hamada presentation
 
BCM Monthly Meeting BCM updates January 30, 2019
BCM Monthly Meeting BCM updates January 30, 2019BCM Monthly Meeting BCM updates January 30, 2019
BCM Monthly Meeting BCM updates January 30, 2019
 
N. Chimguundari economic corridor and investment research center Nov 12
N. Chimguundari economic corridor and investment research center Nov 12N. Chimguundari economic corridor and investment research center Nov 12
N. Chimguundari economic corridor and investment research center Nov 12
 
Procurement mca-compact-ii-presentation-bcm
Procurement mca-compact-ii-presentation-bcmProcurement mca-compact-ii-presentation-bcm
Procurement mca-compact-ii-presentation-bcm
 

Recently uploaded

VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Roomdivyansh0kumar0
 
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedLean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedKaiNexus
 
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCRsoniya singh
 
(8264348440) 🔝 Call Girls In Hauz Khas 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Hauz Khas 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Hauz Khas 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Hauz Khas 🔝 Delhi NCRsoniya singh
 
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝soniya singh
 
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdfCatalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdfOrient Homes
 
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | Delhi
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | DelhiFULL ENJOY - 9953040155 Call Girls in Chhatarpur | Delhi
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | DelhiMalviyaNagarCallGirl
 
Islamabad Escorts | Call 03274100048 | Escort Service in Islamabad
Islamabad Escorts | Call 03274100048 | Escort Service in IslamabadIslamabad Escorts | Call 03274100048 | Escort Service in Islamabad
Islamabad Escorts | Call 03274100048 | Escort Service in IslamabadAyesha Khan
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Timedelhimodelshub1
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Call Girls In ⇛⇛Chhatarpur⇚⇚. Brings Offer Delhi Contact Us 8377877756
Call Girls In ⇛⇛Chhatarpur⇚⇚. Brings Offer Delhi Contact Us 8377877756Call Girls In ⇛⇛Chhatarpur⇚⇚. Brings Offer Delhi Contact Us 8377877756
Call Girls In ⇛⇛Chhatarpur⇚⇚. Brings Offer Delhi Contact Us 8377877756dollysharma2066
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurSuhani Kapoor
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
Marketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet CreationsMarketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet Creationsnakalysalcedo61
 
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewasmakika9823
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts ServiceVip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Serviceankitnayak356677
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 

Recently uploaded (20)

Best Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting PartnershipBest Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting Partnership
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
 
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedLean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
 
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
 
(8264348440) 🔝 Call Girls In Hauz Khas 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Hauz Khas 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Hauz Khas 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Hauz Khas 🔝 Delhi NCR
 
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
 
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdfCatalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
 
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | Delhi
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | DelhiFULL ENJOY - 9953040155 Call Girls in Chhatarpur | Delhi
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | Delhi
 
Islamabad Escorts | Call 03274100048 | Escort Service in Islamabad
Islamabad Escorts | Call 03274100048 | Escort Service in IslamabadIslamabad Escorts | Call 03274100048 | Escort Service in Islamabad
Islamabad Escorts | Call 03274100048 | Escort Service in Islamabad
 
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCREnjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Time
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Call Girls In ⇛⇛Chhatarpur⇚⇚. Brings Offer Delhi Contact Us 8377877756
Call Girls In ⇛⇛Chhatarpur⇚⇚. Brings Offer Delhi Contact Us 8377877756Call Girls In ⇛⇛Chhatarpur⇚⇚. Brings Offer Delhi Contact Us 8377877756
Call Girls In ⇛⇛Chhatarpur⇚⇚. Brings Offer Delhi Contact Us 8377877756
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
Marketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet CreationsMarketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet Creations
 
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts ServiceVip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 

Developing Mongolia's Mining Industry

  • 1. Таван толгой төслийн Ажлын хэсэг Erdenes MGL LLC March 2011 DEVELOPMENT OF MONGOLIA'S WORLD-CLASS MINING: OT AND TT PROJECTS
  • 2. ABOUT ERDENES MGL • Established in 2007 • Represents government interests in development of strategically important deposits • Participates in the Government Working Group’s work and in preparing investment agreements and contracts and conducting studies of deposits in collaboration with international advisers/consultants 2
  • 3. OYU TOLGOI LLC 34 % Mongolia’s Government “Erdenes MGL” 66% Rio Tinto Ivanhoe Mines  World-class copper-gold deposit  Investment Agreement concluded on October 6, 2009.  Agreement effective since March 31, 2010. OYU TOLGOI PROJECT OVERVIEW Oyu Tolgoi Project: • First largest mining project in Mongolia since 1990 • Starting point of Mongolian’s mining development • Intensive construction work of the project has commenced 3
  • 4. OYU TOLGOI PROJECT There are total 45 million tons of copper, 1800 tons of gold and 6450 million tons of ore reserve contained at Oyu Tolgoi (OT) based on a 0.3 equivalent to each metal. According to the Implementation Plan, Oyu Tolgoi LLC will extract a maximum of 56 million tons, and a minimum of 26 million tons of ore per year. Planning to built concentrator by 2012. • Phase I - 35 million tons per year for the five-years. • Phase II - Oyu Tolgoi LLC will transport minerals by railway and will advance the concentrator’s production capacity to 58 million tons of ore. Ouy Tolgoi progress 4
  • 5. TAVAN TOLGOI COKING COAL DEPOSIT Tavan Tolgoi is one of the largest coking coal deposits in the world 5
  • 6. TAVAN TOLGOI DEPOSIT OVERVIEW • Total over 6.0 billion tons of coal, out of which: • 1.4 billion tons of coking coal • 4.6 billion tons of thermal coal Reserves* • Gobi Region in southern part of Mongolia • 540 km south of Ulaanbaatar, capital city • 270 km from the Chinese border Location • All infrastructures (electricity supply, railroads, roads, water, supply etc.) need to be developedInfrastructure 6 *- Conversion of coal resource into JORC standard increases coal resource, in particular, coking coal
  • 7. COAL MINING BLOCKS West Tsankhi Block East Tsankhi block 1204 M tons* 65 % coking coal 1078 M tons* 78 % coking coal Eastern Coalfield Borteeg Coalfield South-western Coalfield Resource estimated by JORC code 7 Bor tolgoi Measured Indicated Inferred * In-Situ Coal Resources at 200m Depth Limit 392.9 M tons 1203 M tons* 48 % coking coal 765 M tons* 62,5 % coking coal As Norwest’s preliminarily estimated TT In-Situ coal resources according to the JORC code, there are 7.5 billion tons of thermal and coking coal within 300m depth range limit . Norwest’s preliminary resource estimate
  • 8. ERDENES-TT MINE (EARTERN TSANKHI) 8 Tavan Tolgoi Project Bid Coal Block Erdenes-TT Mine 15 Mtpy ROM Bidding of the Contract Miner for Tavan Tolgoi Coal Deposit (Eastern Tsankhi)  Bidders submitted their proposals  Final stage of the selection process is going on
  • 9. PARLIAMENTARY RESOLUTION NO.39 9 1) To ensure that a state-owned company conducts mining operations at the Tavan Tolgoi coal deposit, and subsidiary Erdenes Tavan Tolgoi is established in compliance with corresponding laws and undivided mining licenses for the deposit – transferred to it and investment agreement – entered into with it, and operator, corporate entity, – allowed to conduct mining operations for a specific period; 2) To take the following measures to allow Mongolian citizens and national corporate entities to own and sell up to 50 percent of the shares of Erdenes Tavan Tolgoi company, mining licensee of the Tavan Tolgoi coal deposit, on domestic and international stock changes, according to corresponding laws at different phases: a) To allow all Mongolian citizens to own 10 percent of the shares free of charge in the first place in equal amounts; b) To sell 10 percent of the shares to national corporate entities, that are registered with state registration on or before June 30, 2010, that conduct operations, and that have paid taxes in equal amounts and at nominal price; c) To sell up to 30 percent of the shares on international and domestic stock exchanges and raise necessary investment; A working group consisted of representatives from corresponding 9 institutions such as the State Property Committee, General Taxation Authority, and General Agency for State Registration, mandated to do preparation and organization of offerings for citizens and national corporate entities, is in operation.
  • 10. STRATEGIC INVESTORS SELECTION Prequalification of the Company/Consortium to Invest and Cooperate in the Tavan Tolgoi Coal Deposit (Western Tsankhi)  Announcement of the open prequalification, December 8, 2010  Bid submission deadline January 31, 2011  Evaluate bid proposal, create shortlist Currently, Government’s Working group are holding negotiations with shortlisted company/consortium • Coal Work Contract with Erdenes Tavan Tolgoi JSC • Peabody Energy, USA; • Consortium of Shenhua Energy, PRC, and Mitsui Co Ltd, Japan; • Consortium of Russia’s Railway, Japanese Consortium, and Korean Consortium; • Vale (former CVRD), Brazil; • Xstrata Coal, Australia; • ArcelorMittal Limited, Luxembuorg. Shortlisted bidders
  • 11. CONSULTANTS Companies to provide consulting services on IPO execution of part of the shares of Erdenes Tavan Tolgoi on stock exchanges • International investment banks: - Goldman Sachs, USA - Deutsche Bank, Germany - BNP Paribas, France - Macquarie, Australia 1-2 additional banks • International Audit Firm/Consultant • Legal Consultant • Technical and Resource’s Consultant 11
  • 12. Preparation* Erdenes-TT Details Resource (reserve) Report in accordance to JORC standard  6 billion tons resource. Convert to International JORC standard Contract miner (operator)  Tender is in process Coal quality  Coal quality study has been done on Tavan Tolgoi coal deposit Sale of production  Initial stage Production level  Mine box-cut has been started on site and uncovered the coal seam Financing  In stage of preliminary discussion Road  Utilization of the currently constructed road  Build new road Railway  Resolution on State Policy on Railway Transportation Power plant  Research, Feasibility study Wash plant  Research, Feasibility study Water supply  Research, Feasibility study *Preparation work can be done and commenced within 1 year by Erdenes-TT ERDENES-TT: IPO 12 12 Tavan Tolgoi Project
  • 13. CHPP AND WATER SUPPLY Construction of the Coal Handling and Processing Plant Coal processing plant: • Three 900 ton/hour modules • 15 Mtpy capacity Coal handling and blending • 5000 ton/hour • Refuse handling • Loadout conveyer facilities 13 Production: • At least 7 million tons of clean coking coal • 4 million tons of thermal coal • 1 million tons of middling Tavan Tolgoi Project Dalanzadgad Sainshand Zuunbayan Tavan Tolgoi Оюу толгой Gashuun sukhait Zamiin-Uud Khangi Balgasiin Ulaan Nuur Balgasiin Ulaan Nuur underground water deposit: • 70 km from Tavan Tolgoi deposit • Resources of 465 l/sec • Additional water exploration in the region Construction of the integrated water supply system to support mine operations
  • 14. POWER SUPPLY AND SITE DEVELOPMENT Up to 600 MW installed capacity power plant: • Mine operations • Coal Handling & Processing Plant • Camp and local miners’ town • Water supply system • Support infrastructures • Other local users 14 Tavan Tolgoi Project Construction of the mine camp and development of the town Miners town development: • Permanent resident housing • Support in town infrastructure development • Medical center, daycare, schools and other social support facilities Mine camp: • 600 miners accommodation • Office, warehouse and support • Workshops
  • 15. MASTER PLAN Bid Coal Block (WesternTsankhi) Eastern Tsankhi Eastern coalfieldBor teeg coalfield Ukhaa khudag coalfield Tsogttsetsii Town 15 Erdenes-TT Mine Tavan Tolgoi Project
  • 16. MONGOLIAN RAILWAY DEVELOPMENT STRATEGY • Construction of new railway to connect with Trans Mongolian railway • TT-Sainshand, Sainshand-Choibalsan 16 Tavan Tolgoi Project
  • 17. ASIA PACIFIC MARKET Marketing of the Tavan Tolgoi coal
  • 18. Unit 37, Diplomat Bldg. 95 khoroo 5, Chingeltei district Ulaanbaatar, Mongolia Tel: (976) 7011-0735 Fax: (976) 7011-0725 www.erdenesmgl.mn Erdenes MGL LLC