AREVA’s offer for Mongolia
Remy AUTEBERT
President
AREVA Asia
November 2014
Mongolia Projects & Investment Summit - AREVA presentation – November 2014 p.2
Contents
AREVA at a glance
AREVA Mines
AREVA – Responsible company
Mongolia Projects & Investment Summit - AREVA presentation – November 2014 p.3
Contents
AREVA at a glance
AREVA Mines
AREVA – Responsible company
Mongolia Projects & Investment Summit - AREVA presentation – November 2014 p.4
AREVA is a global leader
in low carbon solutions for power generation
AREVA’s share ownership
is particularly stable.
The French governement
holds 86.52% of AREVA’s
share capital directly or
indirectly at Dec. 31, 2013
Mongolia Projects & Investment Summit - AREVA presentation – November 2014 p.5
Reference year: 2013
334 reactors
for O&M and BE
Services
Europe, CIS and Africa
188 reactors in operation
132 reactors servedby AREVA
O&M and BE Services
M&FE
132
115 Asia
124 reactors in operation
99 reactors servedby AREVA
O&M and BE Services
M&FE
93
99
North & South America
125 reactors in operation
115 reactors servedby AREVA
O&M and BE Services
M&FE
109
106
AREVA provided services to 346 reactors worldwide in 2013:
334 for O&M, 320 for M&FE
Over 90% of all nuclear utilities
are AREVA customers
Mongolia Projects & Investment Summit - AREVA presentation – November 2014 p.6
Contents
AREVA at a glance
AREVA Mines
AREVA – Responsible company
Mongolia Projects & Investment Summit - AREVA presentation – November 2014 p.7
Mining Business Group
Mining
• Mining: Uranium
mines exploration
and operation
activities
Reactors
& Services
• Design and
construction of
nuclear reactors
• Maintenance and
modernization of
the nuclear power
plants
Back-End
• Recycling of the
used fuel and
provider of clean-
up and dismantling
services
Renewable
Energies
• Development of
wind energy,
bioenergy, solar
power and
hydrogen power
solutions via
partnership
Front-End
• Conversion and
enrichment of the
uranium
• Design of the fuel
for the nuclear
reactors
€1,756M revenue in 2013
19% of AREVA’s revenue
€9.6bn in backlog
(11 years of production)
5,280* employees
Accross the globe, on the 5 continents
* Global workforce managed by AREVA (regardless of AREVA’s stake in mining joint ventures)
Mongolia Projects & Investment Summit - AREVA presentation – November 2014 p.8
MINE
DEVELOPMENT
MINING
OPERATIONS
ORE
PROCESSING
Discovering new ore bodies for future
mining (geophysics,airborne
surveys, drilling campaigns)
Design and construction ofmining
infrastructure through a staged
process (concept,pre-feasibility,
feasibilitystudy)
Ore extraction using various
methods and techniques (open pit,
underground,in situ recovery)
Concentration ofuranium contained in
ore using chemical processes (acid /
alkaline leach,heap / dynamic leach)
MINERAL
EXPLORATION
Restoration ofmine sites in
accordance with applicable
environmental standards.
SITE
RECLAMATION
AREVA is active throughout
the whole uranium mining cycle
TRADING
Purchase and
sales of
uranium
products
Services
related to
uranium
(swaps,
loans)
~15years10–50years10+years
Mongolia Projects & Investment Summit - AREVA presentation – November 2014 p.9
Market demand for uranium
New mines will be needed to meet demand in 2020
100
80
60
40
20
0
202520202015
Supply / Demand balance
(‘000 tU/yr)
Demand to be covered
by new mining projects
Mines under construction
Production from
existing mines
Secondary* sources
of supply
Demand
*Secondary resources: Uranium from dismantled Russian and US weapons put on the civilian market (HEU) ,
materials recovered from used fuel, and sale of uranium stocks by the DOE.
Source : WNA
Mongolia Projects & Investment Summit - AREVA presentation – November 2014 p.10
AREVA adapts its portfolio
to market conditions
Depends on marketconditions
Project portfolios remains “active” (investment
limited to studies) so they are ready for
sustainable marketrecovery
Sites in operation
Continue exploration
Launch new projects
Niger
SOMAÏR
COMINAK
Canada
Cigar Lake / McClean Lake
Mine: Cameco
Mill: AREVA
McArthur
Operator: Cameco
Kazakhstan
KATCO
Niger
Imouraren
CanadaNamibia
Mongolia
Gabon
Australia
Mongolia Projects & Investment Summit - AREVA presentation – November 2014 p.11
AREVA adapts its portfolio
to market conditions
Exploration, production sites and projects
Kazakhstan
Katco
Niger
Somaïr
Cominak
Imouraren (project)
Canada
McArthur
Cigar Lake
McClean (JEB mill)
Namibia
Exploration only
Australia
Mongolia
Gabon
Mongolia Projects & Investment Summit - AREVA presentation – November 2014 p.12
AREVA and Mongolia,
18 years of partnership
Creation of COGEGOBI with activities focused on Uranium exploration
First significant results around Dulaan Uul and confirmation of
its potential
First discovery of Zoovch Ovo deposit
Signature of a cooperation agreement with Mitsubsihi Corporation
Classification of the Dulaan Uul deposit resources by the Mongolia Authority of
Minerals Resources (6,259 tU)
ISR test performed for checking the technical feasibility to recover
Uranium on the Umnut deposit
Classification of the Zoovch Ovoo deposit resources by
the Mongolia Authority of Minerals Resources (57,700 tU)
Signature of a Shareholders Agreement between AREVA MONGOL
and MonAtom for the mining development of the deposits
Mitsubishi became 34% shareholder of AREVA MONGOL
1996
2009
2011
2013
2003
Mongolia Projects & Investment Summit - AREVA presentation – November 2014 p.13
Mongolia Projects & Investment Summit - AREVA presentation – November 2014 p.14
AREVA in Mongolia
and the future
The AREVA exploration company is present in Mongolia for 18 years
preparing to develop its project for more than 30 years
Local drilling companies: Ordgeo, Gobigeo, Uran Drilling, …
AREVA gives priority to local contractors
Investment already made of more than 150 MUSD
Actual staff of 122 people will be considerably increased in the coming
years during the development and operating phases.
90% of the staff are Mongolian citizens, this level will be maintained
during the further AREVA presence in Mongolia
Social responsibility expressed by financing of social projects and
employment creation in surrounding provinces
Mongolia Projects & Investment Summit - AREVA presentation – November 2014 p.15
Contents
AREVA at a glance
AREVA Mines
AREVA – Responsible company
Mongolia Projects & Investment Summit - AREVA presentation – November 2014 p.16
Our priority: health & safety
At the end of 2013, the highest dose recorded at
AREVA Mines over a period of 12 months was less
than 16 mSv, the rate required byAREVA’s mining
activity standards.
[International standards:annual maximum cumulative dose
less than 100 mSv over 5 years, not exceeding 50 mSv in
any given year]
Radiation protection
Sanitary monitoring of former employees and local
populations:
- Gabon 2010
- Niger 2011
- 900 medical consultations between 2010 & 2013
Health Watch
Mongolia Projects & Investment Summit - AREVA presentation – November 2014 p.17
Respecting people and land
Mines as catalysts to improve the local, social and economic fabric
Some examples …
Kazakhstan
KATCO supports various
and major projects in the
District of Suzak like the
construction of a
secondary school in
Sholakorgan city and a
kindergarten in Tasty
Village
Niger
AREVA supports local
economic development in
Arlit via a micro-credit
project (AREVA financed
the opening of an Arlit
Crédit Mutuel agency in
Arlit).
Gabon
AREVA is financing
initiatives in the
Mounana rehabilitated
site area.
Namibia
AREVA helped improve
the Spitzkoppe water
access and
management system.
Canada
AREVA funded the
renovation of the Ice
Arena and the Youth
Center, to allow the local
community to socialize in
a safe environment
(Baker Lake Hamlet).
Health, education, economic & social development initiatives
Mongolia Projects & Investment Summit - AREVA presentation – November 2014 p.18
International expertise
in site reclamation
Dismantling of facilities
236 sites in France,
sites also in Canada,
the USA and Gabon
Before After
Management of project to convert
land
Radiological and environmental
monitoring
Reclamation and replanting of
former sites
Bellezane (France)
Cluff Lake (Canada)
Mounana (Gabon)
Mongolia Projects & Investment Summit - AREVA presentation – November 2014 p.19
A strong commitment in Mongolia
with successful projects
Community Liaison Committees started in 2013
in Shanshand and Ulaanbadrakh sums –
Dornogobi Province
Regular visit to 54 families living on AREVA
exploration licenses in Dornogobi Province
More than 220,00 USD invested in 2014 for
local development projects in Dornogobi and
Sukhbaatar provinces
Trip to Kazakhstan in September for herders of
Ulaanbadrakh sum
Livestock reconstitution project implemented
since 2007 : today over 450 families in total
and 55 out of them are herding families with
over 12.1 thousand heads of livestock
Participatory environmental monitoring with
local herders launched in 2014 with monthly
sampling campaign
Purchase of local livestock slaughtered in UB
for long term supply the COGEGOBI camp
Launch in November of a 2 years veterinary
project in Ulaanbadrakh sum with permanent
presence of a team of 3 veterinarians (1
French, 2 Mongolians)
Trip of herders in KATCO,AREVA-Kazatomprom
mine in Kazakhstan
Mongolia Projects & Investment Summit - AREVA presentation – November 2014 p.20Bogd Khan National Park-25 Septembre
11.18-19.2014, PRESENTATION, Areva's offer for Mongolia, Remy Autebert

More Related Content

Viewers also liked

13.05.2014 Utilising international partnerships to extend access to trade fin...
13.05.2014 Utilising international partnerships to extend access to trade fin...13.05.2014 Utilising international partnerships to extend access to trade fin...
13.05.2014 Utilising international partnerships to extend access to trade fin...The Business Council of Mongolia
 
22.06.2010 Mongolia: The Big Tomorrow of mining, Brian Thornton
22.06.2010 Mongolia: The Big Tomorrow of mining, Brian Thornton22.06.2010 Mongolia: The Big Tomorrow of mining, Brian Thornton
22.06.2010 Mongolia: The Big Tomorrow of mining, Brian ThorntonThe Business Council of Mongolia
 
18.11.2014 Macroeconomic policies during balance of payments shock and after ...
18.11.2014 Macroeconomic policies during balance of payments shock and after ...18.11.2014 Macroeconomic policies during balance of payments shock and after ...
18.11.2014 Macroeconomic policies during balance of payments shock and after ...The Business Council of Mongolia
 
14.10.2010 Privatizing Mongolia's state owned assets and what this means for ...
14.10.2010 Privatizing Mongolia's state owned assets and what this means for ...14.10.2010 Privatizing Mongolia's state owned assets and what this means for ...
14.10.2010 Privatizing Mongolia's state owned assets and what this means for ...The Business Council of Mongolia
 
25.04.2013, Mongolia`s forests opportunities for profits & preservation, Greg...
25.04.2013, Mongolia`s forests opportunities for profits & preservation, Greg...25.04.2013, Mongolia`s forests opportunities for profits & preservation, Greg...
25.04.2013, Mongolia`s forests opportunities for profits & preservation, Greg...The Business Council of Mongolia
 
09.22.2014, Business Risks in the Mining and Metal Sector, Peter Markey
 09.22.2014, Business Risks in the Mining and Metal Sector, Peter Markey 09.22.2014, Business Risks in the Mining and Metal Sector, Peter Markey
09.22.2014, Business Risks in the Mining and Metal Sector, Peter MarkeyThe Business Council of Mongolia
 
09.02.2012 Mongolian economic outlook, Dr. D. Khashchuluun
09.02.2012 Mongolian economic outlook, Dr. D. Khashchuluun09.02.2012 Mongolian economic outlook, Dr. D. Khashchuluun
09.02.2012 Mongolian economic outlook, Dr. D. KhashchuluunThe Business Council of Mongolia
 
2012, PRESENTATION, Emerging copper explorer, James Passin
2012, PRESENTATION, Emerging copper explorer, James Passin2012, PRESENTATION, Emerging copper explorer, James Passin
2012, PRESENTATION, Emerging copper explorer, James PassinThe Business Council of Mongolia
 
22.01.2014, JICA Two Step-Loan Project, Bayarlkham Byambaa
22.01.2014, JICA Two Step-Loan Project, Bayarlkham Byambaa22.01.2014, JICA Two Step-Loan Project, Bayarlkham Byambaa
22.01.2014, JICA Two Step-Loan Project, Bayarlkham ByambaaThe Business Council of Mongolia
 
30.10.2012 Showcasing Mongolian investment opportunities, James Polson
30.10.2012 Showcasing Mongolian investment opportunities, James Polson30.10.2012 Showcasing Mongolian investment opportunities, James Polson
30.10.2012 Showcasing Mongolian investment opportunities, James PolsonThe Business Council of Mongolia
 
20.02.2014 Oil shale opportunities in Mongolia, Ts. Gantsog
20.02.2014 Oil shale opportunities in Mongolia, Ts. Gantsog20.02.2014 Oil shale opportunities in Mongolia, Ts. Gantsog
20.02.2014 Oil shale opportunities in Mongolia, Ts. GantsogThe Business Council of Mongolia
 

Viewers also liked (20)

21.03.2014, NEWSWIRE, Issue 317
21.03.2014, NEWSWIRE, Issue 31721.03.2014, NEWSWIRE, Issue 317
21.03.2014, NEWSWIRE, Issue 317
 
30.10.2012 Company introduction, Timothy O'Neill
30.10.2012 Company introduction, Timothy O'Neill30.10.2012 Company introduction, Timothy O'Neill
30.10.2012 Company introduction, Timothy O'Neill
 
10.06.2011, NEWSWIRE, Issue 171
10.06.2011, NEWSWIRE, Issue 17110.06.2011, NEWSWIRE, Issue 171
10.06.2011, NEWSWIRE, Issue 171
 
13.05.2014 Utilising international partnerships to extend access to trade fin...
13.05.2014 Utilising international partnerships to extend access to trade fin...13.05.2014 Utilising international partnerships to extend access to trade fin...
13.05.2014 Utilising international partnerships to extend access to trade fin...
 
22.06.2010 Mongolia: The Big Tomorrow of mining, Brian Thornton
22.06.2010 Mongolia: The Big Tomorrow of mining, Brian Thornton22.06.2010 Mongolia: The Big Tomorrow of mining, Brian Thornton
22.06.2010 Mongolia: The Big Tomorrow of mining, Brian Thornton
 
18.11.2014 Macroeconomic policies during balance of payments shock and after ...
18.11.2014 Macroeconomic policies during balance of payments shock and after ...18.11.2014 Macroeconomic policies during balance of payments shock and after ...
18.11.2014 Macroeconomic policies during balance of payments shock and after ...
 
14.03.2008, NEWSWIRE, Issue 17
14.03.2008, NEWSWIRE, Issue 1714.03.2008, NEWSWIRE, Issue 17
14.03.2008, NEWSWIRE, Issue 17
 
14.10.2010 Privatizing Mongolia's state owned assets and what this means for ...
14.10.2010 Privatizing Mongolia's state owned assets and what this means for ...14.10.2010 Privatizing Mongolia's state owned assets and what this means for ...
14.10.2010 Privatizing Mongolia's state owned assets and what this means for ...
 
BCM NewsWire Issue 451
BCM NewsWire Issue 451BCM NewsWire Issue 451
BCM NewsWire Issue 451
 
25.04.2013, Mongolia`s forests opportunities for profits & preservation, Greg...
25.04.2013, Mongolia`s forests opportunities for profits & preservation, Greg...25.04.2013, Mongolia`s forests opportunities for profits & preservation, Greg...
25.04.2013, Mongolia`s forests opportunities for profits & preservation, Greg...
 
23.05.2013, Mercy Corps activity, Jennifer Bielmen
23.05.2013, Mercy Corps activity, Jennifer Bielmen 23.05.2013, Mercy Corps activity, Jennifer Bielmen
23.05.2013, Mercy Corps activity, Jennifer Bielmen
 
16.05.2014, NEWSWIRE, Issue325
16.05.2014, NEWSWIRE, Issue32516.05.2014, NEWSWIRE, Issue325
16.05.2014, NEWSWIRE, Issue325
 
09.22.2014, Business Risks in the Mining and Metal Sector, Peter Markey
 09.22.2014, Business Risks in the Mining and Metal Sector, Peter Markey 09.22.2014, Business Risks in the Mining and Metal Sector, Peter Markey
09.22.2014, Business Risks in the Mining and Metal Sector, Peter Markey
 
09.02.2012 Mongolian economic outlook, Dr. D. Khashchuluun
09.02.2012 Mongolian economic outlook, Dr. D. Khashchuluun09.02.2012 Mongolian economic outlook, Dr. D. Khashchuluun
09.02.2012 Mongolian economic outlook, Dr. D. Khashchuluun
 
2012, PRESENTATION, Emerging copper explorer, James Passin
2012, PRESENTATION, Emerging copper explorer, James Passin2012, PRESENTATION, Emerging copper explorer, James Passin
2012, PRESENTATION, Emerging copper explorer, James Passin
 
22.01.2014, JICA Two Step-Loan Project, Bayarlkham Byambaa
22.01.2014, JICA Two Step-Loan Project, Bayarlkham Byambaa22.01.2014, JICA Two Step-Loan Project, Bayarlkham Byambaa
22.01.2014, JICA Two Step-Loan Project, Bayarlkham Byambaa
 
30.10.2012 Showcasing Mongolian investment opportunities, James Polson
30.10.2012 Showcasing Mongolian investment opportunities, James Polson30.10.2012 Showcasing Mongolian investment opportunities, James Polson
30.10.2012 Showcasing Mongolian investment opportunities, James Polson
 
04.2013, REPORT, Mongolia Economic Update, World Bank
04.2013, REPORT, Mongolia Economic Update, World Bank  04.2013, REPORT, Mongolia Economic Update, World Bank
04.2013, REPORT, Mongolia Economic Update, World Bank
 
20.02.2014 Oil shale opportunities in Mongolia, Ts. Gantsog
20.02.2014 Oil shale opportunities in Mongolia, Ts. Gantsog20.02.2014 Oil shale opportunities in Mongolia, Ts. Gantsog
20.02.2014 Oil shale opportunities in Mongolia, Ts. Gantsog
 
04.2013, REPORT, Polit Barometer, Sant Maral Foundation
04.2013, REPORT, Polit Barometer, Sant Maral Foundation 04.2013, REPORT, Polit Barometer, Sant Maral Foundation
04.2013, REPORT, Polit Barometer, Sant Maral Foundation
 

Similar to 11.18-19.2014, PRESENTATION, Areva's offer for Mongolia, Remy Autebert

24.03.2014, AREVA in Mongolia: 15 years of presence – New perspectives in ura...
24.03.2014, AREVA in Mongolia: 15 years of presence – New perspectives in ura...24.03.2014, AREVA in Mongolia: 15 years of presence – New perspectives in ura...
24.03.2014, AREVA in Mongolia: 15 years of presence – New perspectives in ura...The Business Council of Mongolia
 
The multiplier effect of infrastructure - Marcio Senne de Moraes, Vale
The multiplier effect of infrastructure - Marcio Senne de Moraes, ValeThe multiplier effect of infrastructure - Marcio Senne de Moraes, Vale
The multiplier effect of infrastructure - Marcio Senne de Moraes, ValeMining On Top
 
The Mediterranean Leadership Summit - Tell Group - April 2016 v2
The Mediterranean Leadership Summit - Tell Group - April 2016 v2The Mediterranean Leadership Summit - Tell Group - April 2016 v2
The Mediterranean Leadership Summit - Tell Group - April 2016 v2Yassine Bouhara
 
Syrah presentation for graphite conference November 2013
Syrah presentation for graphite conference November 2013Syrah presentation for graphite conference November 2013
Syrah presentation for graphite conference November 2013saituysal
 
NTG-Oil-Gas-Analysis-FINAL
NTG-Oil-Gas-Analysis-FINALNTG-Oil-Gas-Analysis-FINAL
NTG-Oil-Gas-Analysis-FINALRichard Exley
 
2014 Transmission Annual Planning Report - NSW system planning
2014 Transmission Annual Planning Report - NSW system planning2014 Transmission Annual Planning Report - NSW system planning
2014 Transmission Annual Planning Report - NSW system planningTransGrid AU
 
2nd Annual FSRU International 2014 Summit - LNG Floating Storage Regasificati...
2nd Annual FSRU International 2014 Summit - LNG Floating Storage Regasificati...2nd Annual FSRU International 2014 Summit - LNG Floating Storage Regasificati...
2nd Annual FSRU International 2014 Summit - LNG Floating Storage Regasificati...Ali Zeeshan
 
Upstream Seminar
Upstream SeminarUpstream Seminar
Upstream SeminarEni
 
3.2. awco roshdy bekir - alexandria pilot
3.2. awco   roshdy bekir - alexandria pilot3.2. awco   roshdy bekir - alexandria pilot
3.2. awco roshdy bekir - alexandria pilotmalshafey
 
Uganda investment benefits from the nile basin cooperation
Uganda investment benefits from the nile basin cooperationUganda investment benefits from the nile basin cooperation
Uganda investment benefits from the nile basin cooperationPolycarp Otieno Onyango
 
CV - Glynn Morris - 2016_06_18
CV - Glynn Morris - 2016_06_18CV - Glynn Morris - 2016_06_18
CV - Glynn Morris - 2016_06_18Glynn Morris
 
World’s largest undeveloped tin deposit in Kazakhstan
World’s largest undeveloped tin deposit in KazakhstanWorld’s largest undeveloped tin deposit in Kazakhstan
World’s largest undeveloped tin deposit in KazakhstanSyrymbet JSC
 
Cma visitas analistas teck-glencore 2017
Cma   visitas analistas teck-glencore 2017Cma   visitas analistas teck-glencore 2017
Cma visitas analistas teck-glencore 2017silverwheaton2016
 
MEY Investor Presentation
MEY Investor Presentation MEY Investor Presentation
MEY Investor Presentation Corey Hulls
 
Forsys Investor Presentation October 2013
Forsys Investor Presentation   October 2013Forsys Investor Presentation   October 2013
Forsys Investor Presentation October 2013TMX Equicom
 

Similar to 11.18-19.2014, PRESENTATION, Areva's offer for Mongolia, Remy Autebert (20)

24.03.2014, AREVA in Mongolia: 15 years of presence – New perspectives in ura...
24.03.2014, AREVA in Mongolia: 15 years of presence – New perspectives in ura...24.03.2014, AREVA in Mongolia: 15 years of presence – New perspectives in ura...
24.03.2014, AREVA in Mongolia: 15 years of presence – New perspectives in ura...
 
Trekkopje Stakeholder Report 2012-2013
Trekkopje Stakeholder Report 2012-2013Trekkopje Stakeholder Report 2012-2013
Trekkopje Stakeholder Report 2012-2013
 
Environmental Affairs Forum - 15 June
Environmental Affairs Forum - 15 June Environmental Affairs Forum - 15 June
Environmental Affairs Forum - 15 June
 
ENERGY WORKSHOP_SG (BLAI)
ENERGY WORKSHOP_SG (BLAI)ENERGY WORKSHOP_SG (BLAI)
ENERGY WORKSHOP_SG (BLAI)
 
The multiplier effect of infrastructure - Marcio Senne de Moraes, Vale
The multiplier effect of infrastructure - Marcio Senne de Moraes, ValeThe multiplier effect of infrastructure - Marcio Senne de Moraes, Vale
The multiplier effect of infrastructure - Marcio Senne de Moraes, Vale
 
The Mediterranean Leadership Summit - Tell Group - April 2016 v2
The Mediterranean Leadership Summit - Tell Group - April 2016 v2The Mediterranean Leadership Summit - Tell Group - April 2016 v2
The Mediterranean Leadership Summit - Tell Group - April 2016 v2
 
Syrah presentation for graphite conference November 2013
Syrah presentation for graphite conference November 2013Syrah presentation for graphite conference November 2013
Syrah presentation for graphite conference November 2013
 
NTG-Oil-Gas-Analysis-FINAL
NTG-Oil-Gas-Analysis-FINALNTG-Oil-Gas-Analysis-FINAL
NTG-Oil-Gas-Analysis-FINAL
 
2014 Transmission Annual Planning Report - NSW system planning
2014 Transmission Annual Planning Report - NSW system planning2014 Transmission Annual Planning Report - NSW system planning
2014 Transmission Annual Planning Report - NSW system planning
 
2nd Annual FSRU International 2014 Summit - LNG Floating Storage Regasificati...
2nd Annual FSRU International 2014 Summit - LNG Floating Storage Regasificati...2nd Annual FSRU International 2014 Summit - LNG Floating Storage Regasificati...
2nd Annual FSRU International 2014 Summit - LNG Floating Storage Regasificati...
 
Upstream Seminar
Upstream SeminarUpstream Seminar
Upstream Seminar
 
3.2. awco roshdy bekir - alexandria pilot
3.2. awco   roshdy bekir - alexandria pilot3.2. awco   roshdy bekir - alexandria pilot
3.2. awco roshdy bekir - alexandria pilot
 
Uganda investment benefits from the nile basin cooperation
Uganda investment benefits from the nile basin cooperationUganda investment benefits from the nile basin cooperation
Uganda investment benefits from the nile basin cooperation
 
CV - Glynn Morris - 2016_06_18
CV - Glynn Morris - 2016_06_18CV - Glynn Morris - 2016_06_18
CV - Glynn Morris - 2016_06_18
 
SNCL brochure 2015
SNCL brochure 2015SNCL brochure 2015
SNCL brochure 2015
 
World’s largest undeveloped tin deposit in Kazakhstan
World’s largest undeveloped tin deposit in KazakhstanWorld’s largest undeveloped tin deposit in Kazakhstan
World’s largest undeveloped tin deposit in Kazakhstan
 
Cma visitas analistas teck-glencore 2017
Cma   visitas analistas teck-glencore 2017Cma   visitas analistas teck-glencore 2017
Cma visitas analistas teck-glencore 2017
 
MEY Investor Presentation
MEY Investor Presentation MEY Investor Presentation
MEY Investor Presentation
 
Forsys Investor Presentation October 2013
Forsys Investor Presentation   October 2013Forsys Investor Presentation   October 2013
Forsys Investor Presentation October 2013
 
AYLA OASIS PROJECT CONSTRUCTION
AYLA OASIS PROJECT CONSTRUCTIONAYLA OASIS PROJECT CONSTRUCTION
AYLA OASIS PROJECT CONSTRUCTION
 

More from The Business Council of Mongolia

N. Chimguundari economic corridor and investment research center Nov 12
N. Chimguundari economic corridor and investment research center Nov 12N. Chimguundari economic corridor and investment research center Nov 12
N. Chimguundari economic corridor and investment research center Nov 12The Business Council of Mongolia
 

More from The Business Council of Mongolia (20)

Three Camel Lodge 3 days itinerary
Three Camel Lodge 3 days itineraryThree Camel Lodge 3 days itinerary
Three Camel Lodge 3 days itinerary
 
Three Camel Lodge 4 days itinerary
Three Camel Lodge 4 days itineraryThree Camel Lodge 4 days itinerary
Three Camel Lodge 4 days itinerary
 
BCM Macroeconomic Updates January 2020
BCM Macroeconomic Updates January 2020BCM Macroeconomic Updates January 2020
BCM Macroeconomic Updates January 2020
 
Digital Enterprise 2019
Digital Enterprise 2019Digital Enterprise 2019
Digital Enterprise 2019
 
Faro Foundation presentation
Faro Foundation presentationFaro Foundation presentation
Faro Foundation presentation
 
Business Council of Mongolia presentation
Business Council of Mongolia presentationBusiness Council of Mongolia presentation
Business Council of Mongolia presentation
 
National Development Association of Mongolia presentation
National Development Association of Mongolia presentationNational Development Association of Mongolia presentation
National Development Association of Mongolia presentation
 
Gobi Green Energy Gankhuyag
Gobi Green Energy GankhuyagGobi Green Energy Gankhuyag
Gobi Green Energy Gankhuyag
 
Ch.Anar Competitiveness of the fintech sector
Ch.Anar Competitiveness of the fintech sectorCh.Anar Competitiveness of the fintech sector
Ch.Anar Competitiveness of the fintech sector
 
A.Bilguun Competitiveness of Mongolia's resource sector
A.Bilguun Competitiveness of Mongolia's resource sectorA.Bilguun Competitiveness of Mongolia's resource sector
A.Bilguun Competitiveness of Mongolia's resource sector
 
B.Lakshmi EPCRC Competitiveness of Mongolia
B.Lakshmi EPCRC Competitiveness of MongoliaB.Lakshmi EPCRC Competitiveness of Mongolia
B.Lakshmi EPCRC Competitiveness of Mongolia
 
Munkhzorig - Digital Transformation
Munkhzorig - Digital TransformationMunkhzorig - Digital Transformation
Munkhzorig - Digital Transformation
 
Tseesuren - Data is the Key for Innovation
Tseesuren - Data is the Key for InnovationTseesuren - Data is the Key for Innovation
Tseesuren - Data is the Key for Innovation
 
System analysis study on the Constitution of Mongolia
System analysis study on the Constitution of MongoliaSystem analysis study on the Constitution of Mongolia
System analysis study on the Constitution of Mongolia
 
Kincora Copper March 2019
Kincora Copper March 2019Kincora Copper March 2019
Kincora Copper March 2019
 
Erdenes Mongol presentation
Erdenes Mongol presentationErdenes Mongol presentation
Erdenes Mongol presentation
 
Tatsuya Hamada presentation
Tatsuya Hamada presentationTatsuya Hamada presentation
Tatsuya Hamada presentation
 
BCM Monthly Meeting BCM updates January 30, 2019
BCM Monthly Meeting BCM updates January 30, 2019BCM Monthly Meeting BCM updates January 30, 2019
BCM Monthly Meeting BCM updates January 30, 2019
 
N. Chimguundari economic corridor and investment research center Nov 12
N. Chimguundari economic corridor and investment research center Nov 12N. Chimguundari economic corridor and investment research center Nov 12
N. Chimguundari economic corridor and investment research center Nov 12
 
Procurement mca-compact-ii-presentation-bcm
Procurement mca-compact-ii-presentation-bcmProcurement mca-compact-ii-presentation-bcm
Procurement mca-compact-ii-presentation-bcm
 

Recently uploaded

Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedLean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedKaiNexus
 
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewasmakika9823
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailAriel592675
 
CATALOG cáp điện Goldcup (bảng giá) 1.4.2024.PDF
CATALOG cáp điện Goldcup (bảng giá) 1.4.2024.PDFCATALOG cáp điện Goldcup (bảng giá) 1.4.2024.PDF
CATALOG cáp điện Goldcup (bảng giá) 1.4.2024.PDFOrient Homes
 
NewBase 22 April 2024 Energy News issue - 1718 by Khaled Al Awadi (AutoRe...
NewBase  22 April  2024  Energy News issue - 1718 by Khaled Al Awadi  (AutoRe...NewBase  22 April  2024  Energy News issue - 1718 by Khaled Al Awadi  (AutoRe...
NewBase 22 April 2024 Energy News issue - 1718 by Khaled Al Awadi (AutoRe...Khaled Al Awadi
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts ServiceVip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Serviceankitnayak356677
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Marketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet CreationsMarketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet Creationsnakalysalcedo61
 
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCRsoniya singh
 
BEST Call Girls In BELLMONT HOTEL ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In BELLMONT HOTEL ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In BELLMONT HOTEL ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In BELLMONT HOTEL ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...lizamodels9
 
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdfCatalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdfOrient Homes
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Timedelhimodelshub1
 
Investment analysis and portfolio management
Investment analysis and portfolio managementInvestment analysis and portfolio management
Investment analysis and portfolio managementJunaidKhan750825
 

Recently uploaded (20)

Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedLean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
 
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detail
 
KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)
 
CATALOG cáp điện Goldcup (bảng giá) 1.4.2024.PDF
CATALOG cáp điện Goldcup (bảng giá) 1.4.2024.PDFCATALOG cáp điện Goldcup (bảng giá) 1.4.2024.PDF
CATALOG cáp điện Goldcup (bảng giá) 1.4.2024.PDF
 
NewBase 22 April 2024 Energy News issue - 1718 by Khaled Al Awadi (AutoRe...
NewBase  22 April  2024  Energy News issue - 1718 by Khaled Al Awadi  (AutoRe...NewBase  22 April  2024  Energy News issue - 1718 by Khaled Al Awadi  (AutoRe...
NewBase 22 April 2024 Energy News issue - 1718 by Khaled Al Awadi (AutoRe...
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts ServiceVip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Marketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet CreationsMarketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet Creations
 
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
 
BEST Call Girls In BELLMONT HOTEL ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In BELLMONT HOTEL ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In BELLMONT HOTEL ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In BELLMONT HOTEL ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
 
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdfCatalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Time
 
Investment analysis and portfolio management
Investment analysis and portfolio managementInvestment analysis and portfolio management
Investment analysis and portfolio management
 

11.18-19.2014, PRESENTATION, Areva's offer for Mongolia, Remy Autebert

  • 1. AREVA’s offer for Mongolia Remy AUTEBERT President AREVA Asia November 2014
  • 2. Mongolia Projects & Investment Summit - AREVA presentation – November 2014 p.2 Contents AREVA at a glance AREVA Mines AREVA – Responsible company
  • 3. Mongolia Projects & Investment Summit - AREVA presentation – November 2014 p.3 Contents AREVA at a glance AREVA Mines AREVA – Responsible company
  • 4. Mongolia Projects & Investment Summit - AREVA presentation – November 2014 p.4 AREVA is a global leader in low carbon solutions for power generation AREVA’s share ownership is particularly stable. The French governement holds 86.52% of AREVA’s share capital directly or indirectly at Dec. 31, 2013
  • 5. Mongolia Projects & Investment Summit - AREVA presentation – November 2014 p.5 Reference year: 2013 334 reactors for O&M and BE Services Europe, CIS and Africa 188 reactors in operation 132 reactors servedby AREVA O&M and BE Services M&FE 132 115 Asia 124 reactors in operation 99 reactors servedby AREVA O&M and BE Services M&FE 93 99 North & South America 125 reactors in operation 115 reactors servedby AREVA O&M and BE Services M&FE 109 106 AREVA provided services to 346 reactors worldwide in 2013: 334 for O&M, 320 for M&FE Over 90% of all nuclear utilities are AREVA customers
  • 6. Mongolia Projects & Investment Summit - AREVA presentation – November 2014 p.6 Contents AREVA at a glance AREVA Mines AREVA – Responsible company
  • 7. Mongolia Projects & Investment Summit - AREVA presentation – November 2014 p.7 Mining Business Group Mining • Mining: Uranium mines exploration and operation activities Reactors & Services • Design and construction of nuclear reactors • Maintenance and modernization of the nuclear power plants Back-End • Recycling of the used fuel and provider of clean- up and dismantling services Renewable Energies • Development of wind energy, bioenergy, solar power and hydrogen power solutions via partnership Front-End • Conversion and enrichment of the uranium • Design of the fuel for the nuclear reactors €1,756M revenue in 2013 19% of AREVA’s revenue €9.6bn in backlog (11 years of production) 5,280* employees Accross the globe, on the 5 continents * Global workforce managed by AREVA (regardless of AREVA’s stake in mining joint ventures)
  • 8. Mongolia Projects & Investment Summit - AREVA presentation – November 2014 p.8 MINE DEVELOPMENT MINING OPERATIONS ORE PROCESSING Discovering new ore bodies for future mining (geophysics,airborne surveys, drilling campaigns) Design and construction ofmining infrastructure through a staged process (concept,pre-feasibility, feasibilitystudy) Ore extraction using various methods and techniques (open pit, underground,in situ recovery) Concentration ofuranium contained in ore using chemical processes (acid / alkaline leach,heap / dynamic leach) MINERAL EXPLORATION Restoration ofmine sites in accordance with applicable environmental standards. SITE RECLAMATION AREVA is active throughout the whole uranium mining cycle TRADING Purchase and sales of uranium products Services related to uranium (swaps, loans) ~15years10–50years10+years
  • 9. Mongolia Projects & Investment Summit - AREVA presentation – November 2014 p.9 Market demand for uranium New mines will be needed to meet demand in 2020 100 80 60 40 20 0 202520202015 Supply / Demand balance (‘000 tU/yr) Demand to be covered by new mining projects Mines under construction Production from existing mines Secondary* sources of supply Demand *Secondary resources: Uranium from dismantled Russian and US weapons put on the civilian market (HEU) , materials recovered from used fuel, and sale of uranium stocks by the DOE. Source : WNA
  • 10. Mongolia Projects & Investment Summit - AREVA presentation – November 2014 p.10 AREVA adapts its portfolio to market conditions Depends on marketconditions Project portfolios remains “active” (investment limited to studies) so they are ready for sustainable marketrecovery Sites in operation Continue exploration Launch new projects Niger SOMAÏR COMINAK Canada Cigar Lake / McClean Lake Mine: Cameco Mill: AREVA McArthur Operator: Cameco Kazakhstan KATCO Niger Imouraren CanadaNamibia Mongolia Gabon Australia
  • 11. Mongolia Projects & Investment Summit - AREVA presentation – November 2014 p.11 AREVA adapts its portfolio to market conditions Exploration, production sites and projects Kazakhstan Katco Niger Somaïr Cominak Imouraren (project) Canada McArthur Cigar Lake McClean (JEB mill) Namibia Exploration only Australia Mongolia Gabon
  • 12. Mongolia Projects & Investment Summit - AREVA presentation – November 2014 p.12 AREVA and Mongolia, 18 years of partnership Creation of COGEGOBI with activities focused on Uranium exploration First significant results around Dulaan Uul and confirmation of its potential First discovery of Zoovch Ovo deposit Signature of a cooperation agreement with Mitsubsihi Corporation Classification of the Dulaan Uul deposit resources by the Mongolia Authority of Minerals Resources (6,259 tU) ISR test performed for checking the technical feasibility to recover Uranium on the Umnut deposit Classification of the Zoovch Ovoo deposit resources by the Mongolia Authority of Minerals Resources (57,700 tU) Signature of a Shareholders Agreement between AREVA MONGOL and MonAtom for the mining development of the deposits Mitsubishi became 34% shareholder of AREVA MONGOL 1996 2009 2011 2013 2003
  • 13. Mongolia Projects & Investment Summit - AREVA presentation – November 2014 p.13
  • 14. Mongolia Projects & Investment Summit - AREVA presentation – November 2014 p.14 AREVA in Mongolia and the future The AREVA exploration company is present in Mongolia for 18 years preparing to develop its project for more than 30 years Local drilling companies: Ordgeo, Gobigeo, Uran Drilling, … AREVA gives priority to local contractors Investment already made of more than 150 MUSD Actual staff of 122 people will be considerably increased in the coming years during the development and operating phases. 90% of the staff are Mongolian citizens, this level will be maintained during the further AREVA presence in Mongolia Social responsibility expressed by financing of social projects and employment creation in surrounding provinces
  • 15. Mongolia Projects & Investment Summit - AREVA presentation – November 2014 p.15 Contents AREVA at a glance AREVA Mines AREVA – Responsible company
  • 16. Mongolia Projects & Investment Summit - AREVA presentation – November 2014 p.16 Our priority: health & safety At the end of 2013, the highest dose recorded at AREVA Mines over a period of 12 months was less than 16 mSv, the rate required byAREVA’s mining activity standards. [International standards:annual maximum cumulative dose less than 100 mSv over 5 years, not exceeding 50 mSv in any given year] Radiation protection Sanitary monitoring of former employees and local populations: - Gabon 2010 - Niger 2011 - 900 medical consultations between 2010 & 2013 Health Watch
  • 17. Mongolia Projects & Investment Summit - AREVA presentation – November 2014 p.17 Respecting people and land Mines as catalysts to improve the local, social and economic fabric Some examples … Kazakhstan KATCO supports various and major projects in the District of Suzak like the construction of a secondary school in Sholakorgan city and a kindergarten in Tasty Village Niger AREVA supports local economic development in Arlit via a micro-credit project (AREVA financed the opening of an Arlit Crédit Mutuel agency in Arlit). Gabon AREVA is financing initiatives in the Mounana rehabilitated site area. Namibia AREVA helped improve the Spitzkoppe water access and management system. Canada AREVA funded the renovation of the Ice Arena and the Youth Center, to allow the local community to socialize in a safe environment (Baker Lake Hamlet). Health, education, economic & social development initiatives
  • 18. Mongolia Projects & Investment Summit - AREVA presentation – November 2014 p.18 International expertise in site reclamation Dismantling of facilities 236 sites in France, sites also in Canada, the USA and Gabon Before After Management of project to convert land Radiological and environmental monitoring Reclamation and replanting of former sites Bellezane (France) Cluff Lake (Canada) Mounana (Gabon)
  • 19. Mongolia Projects & Investment Summit - AREVA presentation – November 2014 p.19 A strong commitment in Mongolia with successful projects Community Liaison Committees started in 2013 in Shanshand and Ulaanbadrakh sums – Dornogobi Province Regular visit to 54 families living on AREVA exploration licenses in Dornogobi Province More than 220,00 USD invested in 2014 for local development projects in Dornogobi and Sukhbaatar provinces Trip to Kazakhstan in September for herders of Ulaanbadrakh sum Livestock reconstitution project implemented since 2007 : today over 450 families in total and 55 out of them are herding families with over 12.1 thousand heads of livestock Participatory environmental monitoring with local herders launched in 2014 with monthly sampling campaign Purchase of local livestock slaughtered in UB for long term supply the COGEGOBI camp Launch in November of a 2 years veterinary project in Ulaanbadrakh sum with permanent presence of a team of 3 veterinarians (1 French, 2 Mongolians) Trip of herders in KATCO,AREVA-Kazatomprom mine in Kazakhstan
  • 20. Mongolia Projects & Investment Summit - AREVA presentation – November 2014 p.20Bogd Khan National Park-25 Septembre