SlideShare a Scribd company logo
1 of 8
OPS 571 Week 6 Quiz. 100%. UOP. There are a total of 15 questions.
Note: The questions might be in a different order. Please use the find feature in
word to locate your questions faster.
For customized tutorial service or if you have any questions/concerns, please contact me at
tutoruop@gmail.com. Thank you :)
Please purchase to see answers. Thank you 
1The DMAIC cycle of Six Sigma is similar to which of the following quality management topics?
2The Shingo approach to quality control depends on which of the following?
3According to the theory of constraints which of the following can be a CCR?
4Identifying critical-to-quality characteristics (CTQs) takes place in which step of the DMAIC methodology?
5The idea that statisticalmethods of quality control, including six-sigma, does not prevent defects,is central to what
alternative quality system?
6Goldratt’s theory of constraints (TOC) could be restated using which of the following?
7The Shingo systemof quality control relies heavily on fail-safe procedures or devices called what?
8According to the theory of constraints,which of the following is an OPERATIONAL measurement that can be
used to measure the firm's ability to make money?
9Which of the following are examples of Goldratt’s Rules of Production Scheduling?
10Statistical Process Control (SPC) and data from the actual process to statistically monitor the process overtime
are employed during which step of the DMAIC cycle?
11According to Goldratt, which of the following is defined as “any resource whose capacity is less than the demand
placed on it”?
12 A bottleneck in a manufacturing process may be targeted and eliminated by employing which of the following?
13According to the theory of constraints which of the following is a FINANCIAL measurement that can be used to
measure the firm's ability to make money?
14According to the theory of constraints,which of the following would be included in the Throughput operational
measurement?
15Which of the following is a focusing step of Dr. Eli Goldratt's theory of constraints?
1
The DMAIC cycle of Six Sigma is similar to which of the following quality management topics?

SERQUAL

ISO 9000

Continuous improvement

External benchmarking
2
The Shingo approach to quality control depends on which of the following?

Use of statistically based approaches to quality control

Use of source inspection on 100% of the items produced

Extensive use of control charts

Use of a sophisticated method of acceptance sampling
3
According to the theory of constraints which of the following can be a CCR?

Factory layout

Product design

A customer

An employee
4
Identifying critical-to-quality characteristics (CTQs) takes place in which step of the DMAIC methodology?

Define

Improve

Analyze

Measure
5
The idea that statistical methods of quality control, including six-sigma, does not prevent defects, is
central to what alternative quality system?

Deming PDCA cycle

Shingo System

DMAIC cycle

SQC methods
6
Goldratt’s theory of constraints (TOC) could be restated using which of the following?

Continuous adjustments after a constraint problem is solved will cause more problems

A system constraint cannot be identified and thus cannot be improved

Any system is limited in achieving more of its goals by a very small number of constraints

A system with constraints will not be able to achieve its goals
7
The Shingo system of quality control relies heavily on fail-safe procedures or devices called what?

DPMO’s

Poka-yokes

CTQs

Checklists
8
According to the theory of constraints, which of the following is an OPERATIONAL measurement that can
be used to measure the firm's ability to make money?

Inventory

Operating revenue

Net Profit

Unit cost
9
Which of the following are examples of Goldratt’s Rules of Production Scheduling?

Utilization and activation are the same

Nonbottlenecks govern throughput

An hour saved at a bottleneck is a mirage

Balance flow, not capacity
10
Statistical Process Control (SPC) and data from the actual process to statistically monitor the process
over time are employed during which step of the DMAIC cycle?

Improve

Control

Measure

Define
11
According to Goldratt, which of the following is defined as “any resource whose capacity is less than the
demand placed on it”?

Nonbottleneck resource

Capacity-constrained resource

Bottleneck resource

Buffer resource
12
A bottleneck in a manufacturing process may be targeted and eliminated by employing which of the
following?

Install more efficient equipment where capacity is less than the demand.

Increase the idle time of a capacity-constrained resource in the system.

Increase the capacity of a nonbottleneck resource.

Increase labor equally throughout the system.
13
According to the theory of constraints which of the following is a FINANCIAL measurement that can be
used to measure the firm's ability to make money?

Sales

Operating expenses

Cash flow

Inventory
14
According to the theory of constraints, which of the following would be included in the Throughput
operational measurement?

Goods sold

Raw materials

Finished goods

Work in process
15
Which of the following is a focusing step of Dr. Eli Goldratt's theory of constraints?

Align the whole system to support processes prior to the constraint.

Do not modify a process after improvement of a constraint is achieved.

Identify system constraints that prevent the system from achieving its goal.

Isolate constraints to reduce the constraint’s capacity.

More Related Content

What's hot

Ops 571 final exam mcq`s correct answers 100%
Ops 571 final exam mcq`s correct answers 100%Ops 571 final exam mcq`s correct answers 100%
Ops 571 final exam mcq`s correct answers 100%Austing_3
 
What Is Lean Manufacturing
What Is Lean ManufacturingWhat Is Lean Manufacturing
What Is Lean Manufacturingahmad bassiouny
 
Basics of Product and Process Design Management
Basics of Product and Process Design ManagementBasics of Product and Process Design Management
Basics of Product and Process Design Managementi4VC
 
You have been called in as a consultant to set up a kanban control system
You have been called in as a consultant to set up a kanban control systemYou have been called in as a consultant to set up a kanban control system
You have been called in as a consultant to set up a kanban control systemjohann11374
 
Tuning the planning and control system to product and process design: G3
Tuning the planning and control system to product and process design: G3Tuning the planning and control system to product and process design: G3
Tuning the planning and control system to product and process design: G3i4VC
 
Getting an autograph from a famous person might involve standing in which typ...
Getting an autograph from a famous person might involve standing in which typ...Getting an autograph from a famous person might involve standing in which typ...
Getting an autograph from a famous person might involve standing in which typ...johann11371
 
Advanced Manufacturing Technology, Adoption and Benefits
Advanced Manufacturing Technology, Adoption and BenefitsAdvanced Manufacturing Technology, Adoption and Benefits
Advanced Manufacturing Technology, Adoption and Benefitsi4VC
 
For an infinite queuing situation
For an infinite queuing situationFor an infinite queuing situation
For an infinite queuing situationjohann11370
 
An assumption of learning curve theory is which of the following
An assumption of learning curve theory is which of the followingAn assumption of learning curve theory is which of the following
An assumption of learning curve theory is which of the followingjohann11370
 
Product design and process selection
Product design and process selectionProduct design and process selection
Product design and process selectionSujan Oli
 
Production Managment
Production ManagmentProduction Managment
Production ManagmentGoogle
 
An activity system map is which of the following
An activity system map is which of the followingAn activity system map is which of the following
An activity system map is which of the followingyearstart2
 
A p chart to monitor process quality
A p chart to monitor process qualityA p chart to monitor process quality
A p chart to monitor process qualityjohann11369
 
Operations management
Operations managementOperations management
Operations managementChandu Kolli
 
Om0017 advanced production planning and control
Om0017 advanced production planning and controlOm0017 advanced production planning and control
Om0017 advanced production planning and controlsmumbahelp
 

What's hot (20)

Ops 571 final exam mcq`s correct answers 100%
Ops 571 final exam mcq`s correct answers 100%Ops 571 final exam mcq`s correct answers 100%
Ops 571 final exam mcq`s correct answers 100%
 
What Is Lean Manufacturing
What Is Lean ManufacturingWhat Is Lean Manufacturing
What Is Lean Manufacturing
 
Basics of Product and Process Design Management
Basics of Product and Process Design ManagementBasics of Product and Process Design Management
Basics of Product and Process Design Management
 
You have been called in as a consultant to set up a kanban control system
You have been called in as a consultant to set up a kanban control systemYou have been called in as a consultant to set up a kanban control system
You have been called in as a consultant to set up a kanban control system
 
Value analysis
Value analysisValue analysis
Value analysis
 
Tuning the planning and control system to product and process design: G3
Tuning the planning and control system to product and process design: G3Tuning the planning and control system to product and process design: G3
Tuning the planning and control system to product and process design: G3
 
Om ibs-2
Om ibs-2Om ibs-2
Om ibs-2
 
Getting an autograph from a famous person might involve standing in which typ...
Getting an autograph from a famous person might involve standing in which typ...Getting an autograph from a famous person might involve standing in which typ...
Getting an autograph from a famous person might involve standing in which typ...
 
Operations management
Operations managementOperations management
Operations management
 
Advanced Manufacturing Technology, Adoption and Benefits
Advanced Manufacturing Technology, Adoption and BenefitsAdvanced Manufacturing Technology, Adoption and Benefits
Advanced Manufacturing Technology, Adoption and Benefits
 
For an infinite queuing situation
For an infinite queuing situationFor an infinite queuing situation
For an infinite queuing situation
 
An assumption of learning curve theory is which of the following
An assumption of learning curve theory is which of the followingAn assumption of learning curve theory is which of the following
An assumption of learning curve theory is which of the following
 
Product design and process selection
Product design and process selectionProduct design and process selection
Product design and process selection
 
Production Managment
Production ManagmentProduction Managment
Production Managment
 
An activity system map is which of the following
An activity system map is which of the followingAn activity system map is which of the following
An activity system map is which of the following
 
PRODUCTION CYCLE
PRODUCTION CYCLE PRODUCTION CYCLE
PRODUCTION CYCLE
 
A p chart to monitor process quality
A p chart to monitor process qualityA p chart to monitor process quality
A p chart to monitor process quality
 
Operations management
Operations managementOperations management
Operations management
 
Capacity Planning
Capacity PlanningCapacity Planning
Capacity Planning
 
Om0017 advanced production planning and control
Om0017 advanced production planning and controlOm0017 advanced production planning and control
Om0017 advanced production planning and control
 

Similar to OPS 571 Week 6 Quiz 100% UOP

Applying Lean Sigma Into Validation
Applying Lean Sigma Into ValidationApplying Lean Sigma Into Validation
Applying Lean Sigma Into Validationtjcornish
 
QMS Effectiveness: Tracking and Trending Quality Data - OMTEC 2017
QMS Effectiveness: Tracking and Trending Quality Data - OMTEC 2017QMS Effectiveness: Tracking and Trending Quality Data - OMTEC 2017
QMS Effectiveness: Tracking and Trending Quality Data - OMTEC 2017April Bright
 
Leveraging Gap Analysis for Continuous Improvement
Leveraging Gap Analysis for Continuous ImprovementLeveraging Gap Analysis for Continuous Improvement
Leveraging Gap Analysis for Continuous ImprovementCIToolkit
 
Leveraging Gap Analysis for Continuous Improvement
Leveraging Gap Analysis for Continuous ImprovementLeveraging Gap Analysis for Continuous Improvement
Leveraging Gap Analysis for Continuous ImprovementCIToolkit
 
6 sigma assignment
6 sigma assignment6 sigma assignment
6 sigma assignmentstudent
 
E Rev Max The Sigma Way
E Rev Max The Sigma WayE Rev Max The Sigma Way
E Rev Max The Sigma Waysanjay389
 
‘Six Sigma Technique’ A Journey Through its Implementation
‘Six Sigma Technique’ A Journey Through its Implementation‘Six Sigma Technique’ A Journey Through its Implementation
‘Six Sigma Technique’ A Journey Through its Implementationijtsrd
 
Six Sigma - A Presentation by Akshay Anand
Six Sigma - A Presentation by Akshay AnandSix Sigma - A Presentation by Akshay Anand
Six Sigma - A Presentation by Akshay AnandAkshay Anand
 
Running head SIX SIGMA .docx
Running head SIX SIGMA                                         .docxRunning head SIX SIGMA                                         .docx
Running head SIX SIGMA .docxtoltonkendal
 
7 Best Practices of Highly Effective Teams
7 Best Practices of Highly Effective Teams7 Best Practices of Highly Effective Teams
7 Best Practices of Highly Effective TeamsParsec_Automation_Corp
 
Six Sigma in clinical laboratory
Six Sigma in clinical laboratorySix Sigma in clinical laboratory
Six Sigma in clinical laboratoryAhmed Al-Abadlah
 
Six Sigma Implementation to reduce rejection rate of Pump Casings at local Ma...
Six Sigma Implementation to reduce rejection rate of Pump Casings at local Ma...Six Sigma Implementation to reduce rejection rate of Pump Casings at local Ma...
Six Sigma Implementation to reduce rejection rate of Pump Casings at local Ma...IOSR Journals
 
P_IRP Lean Six Sigma.ppt
P_IRP Lean Six Sigma.pptP_IRP Lean Six Sigma.ppt
P_IRP Lean Six Sigma.pptMuhammad Nafea
 
P_IRP Lean Six Sigma.ppt
P_IRP Lean Six Sigma.pptP_IRP Lean Six Sigma.ppt
P_IRP Lean Six Sigma.pptponyking86
 

Similar to OPS 571 Week 6 Quiz 100% UOP (20)

Week six quiz answers
Week six quiz answersWeek six quiz answers
Week six quiz answers
 
Ops 571 week 6 quiz new
Ops 571 week 6 quiz   newOps 571 week 6 quiz   new
Ops 571 week 6 quiz new
 
Applying Lean Sigma Into Validation
Applying Lean Sigma Into ValidationApplying Lean Sigma Into Validation
Applying Lean Sigma Into Validation
 
QMS Effectiveness: Tracking and Trending Quality Data - OMTEC 2017
QMS Effectiveness: Tracking and Trending Quality Data - OMTEC 2017QMS Effectiveness: Tracking and Trending Quality Data - OMTEC 2017
QMS Effectiveness: Tracking and Trending Quality Data - OMTEC 2017
 
Leveraging Gap Analysis for Continuous Improvement
Leveraging Gap Analysis for Continuous ImprovementLeveraging Gap Analysis for Continuous Improvement
Leveraging Gap Analysis for Continuous Improvement
 
Leveraging Gap Analysis for Continuous Improvement
Leveraging Gap Analysis for Continuous ImprovementLeveraging Gap Analysis for Continuous Improvement
Leveraging Gap Analysis for Continuous Improvement
 
6 sigma assignment
6 sigma assignment6 sigma assignment
6 sigma assignment
 
E Rev Max The Sigma Way
E Rev Max The Sigma WayE Rev Max The Sigma Way
E Rev Max The Sigma Way
 
‘Six Sigma Technique’ A Journey Through its Implementation
‘Six Sigma Technique’ A Journey Through its Implementation‘Six Sigma Technique’ A Journey Through its Implementation
‘Six Sigma Technique’ A Journey Through its Implementation
 
Six Sigma - A Presentation by Akshay Anand
Six Sigma - A Presentation by Akshay AnandSix Sigma - A Presentation by Akshay Anand
Six Sigma - A Presentation by Akshay Anand
 
Running head SIX SIGMA .docx
Running head SIX SIGMA                                         .docxRunning head SIX SIGMA                                         .docx
Running head SIX SIGMA .docx
 
Six sigma
Six sigmaSix sigma
Six sigma
 
sixsigma-
sixsigma-sixsigma-
sixsigma-
 
Total quality control
Total quality controlTotal quality control
Total quality control
 
7 Best Practices of Highly Effective Teams
7 Best Practices of Highly Effective Teams7 Best Practices of Highly Effective Teams
7 Best Practices of Highly Effective Teams
 
RAJ QMS 1.pptx
RAJ QMS 1.pptxRAJ QMS 1.pptx
RAJ QMS 1.pptx
 
Six Sigma in clinical laboratory
Six Sigma in clinical laboratorySix Sigma in clinical laboratory
Six Sigma in clinical laboratory
 
Six Sigma Implementation to reduce rejection rate of Pump Casings at local Ma...
Six Sigma Implementation to reduce rejection rate of Pump Casings at local Ma...Six Sigma Implementation to reduce rejection rate of Pump Casings at local Ma...
Six Sigma Implementation to reduce rejection rate of Pump Casings at local Ma...
 
P_IRP Lean Six Sigma.ppt
P_IRP Lean Six Sigma.pptP_IRP Lean Six Sigma.ppt
P_IRP Lean Six Sigma.ppt
 
P_IRP Lean Six Sigma.ppt
P_IRP Lean Six Sigma.pptP_IRP Lean Six Sigma.ppt
P_IRP Lean Six Sigma.ppt
 

OPS 571 Week 6 Quiz 100% UOP

  • 1. OPS 571 Week 6 Quiz. 100%. UOP. There are a total of 15 questions. Note: The questions might be in a different order. Please use the find feature in word to locate your questions faster. For customized tutorial service or if you have any questions/concerns, please contact me at tutoruop@gmail.com. Thank you :) Please purchase to see answers. Thank you  1The DMAIC cycle of Six Sigma is similar to which of the following quality management topics? 2The Shingo approach to quality control depends on which of the following? 3According to the theory of constraints which of the following can be a CCR? 4Identifying critical-to-quality characteristics (CTQs) takes place in which step of the DMAIC methodology? 5The idea that statisticalmethods of quality control, including six-sigma, does not prevent defects,is central to what alternative quality system? 6Goldratt’s theory of constraints (TOC) could be restated using which of the following? 7The Shingo systemof quality control relies heavily on fail-safe procedures or devices called what? 8According to the theory of constraints,which of the following is an OPERATIONAL measurement that can be used to measure the firm's ability to make money? 9Which of the following are examples of Goldratt’s Rules of Production Scheduling? 10Statistical Process Control (SPC) and data from the actual process to statistically monitor the process overtime are employed during which step of the DMAIC cycle? 11According to Goldratt, which of the following is defined as “any resource whose capacity is less than the demand placed on it”? 12 A bottleneck in a manufacturing process may be targeted and eliminated by employing which of the following? 13According to the theory of constraints which of the following is a FINANCIAL measurement that can be used to measure the firm's ability to make money? 14According to the theory of constraints,which of the following would be included in the Throughput operational measurement? 15Which of the following is a focusing step of Dr. Eli Goldratt's theory of constraints?
  • 2. 1 The DMAIC cycle of Six Sigma is similar to which of the following quality management topics?  SERQUAL  ISO 9000  Continuous improvement  External benchmarking 2 The Shingo approach to quality control depends on which of the following?  Use of statistically based approaches to quality control  Use of source inspection on 100% of the items produced  Extensive use of control charts  Use of a sophisticated method of acceptance sampling 3 According to the theory of constraints which of the following can be a CCR? 
  • 3. Factory layout  Product design  A customer  An employee 4 Identifying critical-to-quality characteristics (CTQs) takes place in which step of the DMAIC methodology?  Define  Improve  Analyze  Measure 5 The idea that statistical methods of quality control, including six-sigma, does not prevent defects, is central to what alternative quality system?  Deming PDCA cycle  Shingo System
  • 4.  DMAIC cycle  SQC methods 6 Goldratt’s theory of constraints (TOC) could be restated using which of the following?  Continuous adjustments after a constraint problem is solved will cause more problems  A system constraint cannot be identified and thus cannot be improved  Any system is limited in achieving more of its goals by a very small number of constraints  A system with constraints will not be able to achieve its goals 7 The Shingo system of quality control relies heavily on fail-safe procedures or devices called what?  DPMO’s  Poka-yokes  CTQs 
  • 5. Checklists 8 According to the theory of constraints, which of the following is an OPERATIONAL measurement that can be used to measure the firm's ability to make money?  Inventory  Operating revenue  Net Profit  Unit cost 9 Which of the following are examples of Goldratt’s Rules of Production Scheduling?  Utilization and activation are the same  Nonbottlenecks govern throughput  An hour saved at a bottleneck is a mirage  Balance flow, not capacity 10 Statistical Process Control (SPC) and data from the actual process to statistically monitor the process over time are employed during which step of the DMAIC cycle? 
  • 6. Improve  Control  Measure  Define 11 According to Goldratt, which of the following is defined as “any resource whose capacity is less than the demand placed on it”?  Nonbottleneck resource  Capacity-constrained resource  Bottleneck resource  Buffer resource 12 A bottleneck in a manufacturing process may be targeted and eliminated by employing which of the following?  Install more efficient equipment where capacity is less than the demand. 
  • 7. Increase the idle time of a capacity-constrained resource in the system.  Increase the capacity of a nonbottleneck resource.  Increase labor equally throughout the system. 13 According to the theory of constraints which of the following is a FINANCIAL measurement that can be used to measure the firm's ability to make money?  Sales  Operating expenses  Cash flow  Inventory 14 According to the theory of constraints, which of the following would be included in the Throughput operational measurement?  Goods sold  Raw materials 
  • 8. Finished goods  Work in process 15 Which of the following is a focusing step of Dr. Eli Goldratt's theory of constraints?  Align the whole system to support processes prior to the constraint.  Do not modify a process after improvement of a constraint is achieved.  Identify system constraints that prevent the system from achieving its goal.  Isolate constraints to reduce the constraint’s capacity.