SlideShare a Scribd company logo
1 of 7
OPS 571 Final Exam Guide (New, 2018)
You have been called in as a consultant to set up a Kanban control
system
FOR MORE CLASSES VISIT
www.ops571help.com
1. Which of the following is a measure of operations and supply
management efficiency used by Wall Street? Dividend payout ratio
Receivable turnover Current ratio Financial leverage Earnings per
share growth
2. An activity-system map is which of the following? A diagram
that shows how a company's strategy is delivered to customers A
timeline displaying major planned events A network guide to route
airlines A facility layout schematic noting what is done where A
listing of activities that make up a project
3. Which of the following is a total measure of productivity?
Output/Materials Output/Labor Output/(Labor + Capital + Energy)
All of these Output/Inputs
4. Which of the following approaches to service design is
characterized by having the customer take a greater role in the
production of the service? Quality approach Self-service approach
Production-line approach Do-it-yourself approach Personal-
attention approach
5. Which of the following basic types of production layout formats
is one that has similar equipment or functions are grouped together?
Workcenter layout Production line layout Group technology layout
Manufacturing cell layout Assembly line layout
6. Which of the following is a characteristic that can be used to
guide the design of service systems? Services are all similar.
Services cannot be inventoried. Services businesses are inherently
entrepreneurial. Even service businesses have internal services.
Quality work means quality service.
7. An advantage of a make-to-stock process is which of the
following? All units of output are unique. It features rapid delivery
of a standard product. It combines the best features of other
processes. It responds directly to customer orders. It allows the firm
to avoid inventory costs.
8. Getting an autograph from a famous person might involve
standing in which type of queuing line structure? Single channel,
single phase None of these Single channel, multiphase
Multichannel, multiphase Multichannel, single phase
9. For an infinite queuing situation, if the arrival rate for loading
trucks is 5 trucks per hour, what is the mean time between arrivals?
2.5 hours 5 hours 0.2 hour 0.1 hour None of these
10. An assumption of learning curve theory is which of the
following? Organizational learning is not included in learning
theory. The time required to do a task will vary randomly each time
the task is repeated. Unit time will decrease at an increasing rate.
Learning will not be transferred from one worker to the next. The
reduction in unit time will follow a predictable pattern.
11. A company's production process has an 80 percent learning
curve rate. The process has produced 1,000 units to date. A process
refinement is estimated to allow a future learning curve rate for the
identical product of 75 percent. However, the initial unit made using
the new process will take the same amount of time as the initial unit
produced using the old process. At what point, using the new
process, will the production rate exceed the production rate achieved
by the old process? Before the 100th unit Before the 120th unit
Before the 80th unit Before the 50th unit Before the 250th unit
12. For which of the following should we use a p-chart to monitor
process quality? Grades in a freshman "pass/fail" course
Temperatures in a classroom The dimensions of brick entering a
kiln The weight of fluid in a container Lengths of boards cut in a
mill
14. Which of the following is a fixed-time-period inventory model?
Just-in-time model The EOQ model Periodic system model The Q
model The least cost method
15. A company is planning for its financing needs and uses the basic
fixed-order-quantity inventory model. Which of the following is the
total cost (TC) of the inventory given an annual demand of 10,000,
setup cost of $32, a holding cost per unit per year of $4, an EOQ of
400 units, and a cost per unit of inventory of $150? None of these
$1,501,600 $1,498,200 $499,313 $500,687 A. $1,501,600 Q = 400.
Average Inventory = Q/2 = 200. Holding cost/year = $4. Thus,
annual holding cost = $800. Annual set-up cost = 10,000/400 = 25 x
$32 = 800. Demand x cost per unit = 10,000 x $150 = 1,500,000.
Hence, TC = $1,500,000 + 800 + 800 = $1,501,600.
16. Which of the following is a principle of work center scheduling?
Reschedule every day. Once started, a job can and should be
finished even if unavoidably interrupted. Assign the first worker to
all of the days that require staffing. Achieve certainty in standards
and routings. Give work centers less to do then their maximum.
17. Which of the following is a "focusing step" of Dr. Eli Goldratt's
theory of constraints? Identify system constraints. Support system
constraints. If you have no system constraints, make some. Reduce
system constraints. Reinforce system constraints.
18. In designing a lean production facility layout, a designer should
do which of the following? Locate flexible workstations offline.
Balance capacity using job shop analysis. Design for work flow
balance. Always keep operations on a single floor of the factory.
Link operations through a push system.
19. A simple project listing of five activities and their respective
time estimates are presented here: Using CPM, which activities
make up the critical path? None of these A, B, D, E A, D, E A, C, B,
D, E A, C, D, E
20. A company must perform a maintenance project consisting of
seven activities. The activities, their predecessors, and their
respective time estimates are presented here: Using CPM, which
activities make up the critical path? A, C, B, F, E None of these A,
B, D, F, G A, C, E, F, G A, D, E
21. Which of the following is not a problem definition tool from the
operations consulting tool kit? Issue trees Five forces model
Computer simulation Customer surveys Gap analysis
22. Which of the following is not one of the basic types of
forecasting? Simulation Causal relationships Qualitative Time series
analysis Force field analysis
23. A company has actual unit demand for three consecutive years
of 124, 126, and 135. The respective forecasts for the same three
years are 120, 120, and 130. Which of the following is the resulting
MAD value that can be computed from these data? 3 1 15 123 5 C
MAD = ABS[(124 - 120) + (126 - 120) + (135 - 130)]/3 = 15/3 = 5.
24. From an operational perspective, yield management is most
effective under which of the following circumstances? Inventory is
perishable. The firm doing yield management is very profitable.
Demand cannot be segmented by customer. Fixed costs are low, and
variable costs are high. The customer is a "captive" of the system.
25. What is transaction processing? The decision support system
used to efficiently handle multiple transactions The movement of
paperwork through a system using a decision tree The scheduling of
machinery to minimize time and scrap The posting and tracking of
the detailed activities of a business
26. If the actual output of a piece of equipment during an hour is
500 units and its best operating level is at a rate of 400 units per
hour, which of the following is the capacity utilization rate? 0.75
1.00 1.25 1.33 100
27. Which of the following is an input to the master production
schedule (MPS)? Planned order schedules The bill of materials The
aggregate plan The exception report Inventory records file
28. Which of the following is considered a primary report in an
MRP system? Cycle counting reports Performance reports Planned
order schedules Planning reports Exception reports
29. The centroid method for plant location uses which of the
following data? Probabilities and payoffs Correlation matrix of
existing facilities Volume of goods to be shipped between existing
points Inbound transportation costs Transport times between
facilities
30. In Hau Lee's uncertainty framework to classify supply chains, a
supply chain for functional products with an evolving supply
process is called which of the following? Responsive Forward
looking Efficient Risk hedging Agile
28. Which of the following is considered a primary report in an
MRP system? Cycle counting reports Performance reports Planned
order schedules Planning reports Exception reports
29. The centroid method for plant location uses which of the
following data? Probabilities and payoffs Correlation matrix of
existing facilities Volume of goods to be shipped between existing
points Inbound transportation costs Transport times between
facilities
30. In Hau Lee's uncertainty framework to classify supply chains, a
supply chain for functional products with an evolving supply
process is called which of the following? Responsive Forward
looking Efficient Risk hedging Agile

More Related Content

What's hot

In designing a lean production facility layout
In designing a lean production facility layoutIn designing a lean production facility layout
In designing a lean production facility layoutjohann11371
 
Ops 571 final exam guide (new, 2018) you have been called in as a consultant ...
Ops 571 final exam guide (new, 2018) you have been called in as a consultant ...Ops 571 final exam guide (new, 2018) you have been called in as a consultant ...
Ops 571 final exam guide (new, 2018) you have been called in as a consultant ...never1239
 
Which of the following is a focusing step
Which of the following is a focusing stepWhich of the following is a focusing step
Which of the following is a focusing stepjohann11373
 
You have been called in as a consultant to set up a kanban control system
You have been called in as a consultant to set up a kanban control systemYou have been called in as a consultant to set up a kanban control system
You have been called in as a consultant to set up a kanban control systemramuaa130
 
In hau lee's uncertainty framework to classify supply chains
In hau lee's uncertainty framework to classify supply chainsIn hau lee's uncertainty framework to classify supply chains
In hau lee's uncertainty framework to classify supply chainsjohann11371
 
If the actual output of a piece of equipment
If the actual output of a piece of equipmentIf the actual output of a piece of equipment
If the actual output of a piece of equipmentjohann11371
 
Which of the following is a total measure of productivity
Which of the following is a total measure of productivityWhich of the following is a total measure of productivity
Which of the following is a total measure of productivityjohann11373
 
Which of the following is an input to the master production schedule (mps)
Which of the following is an input to the master production schedule (mps)Which of the following is an input to the master production schedule (mps)
Which of the following is an input to the master production schedule (mps)johann11374
 
What is transaction processing
What is transaction processingWhat is transaction processing
What is transaction processingjohann11372
 
For an infinite queuing situation
For an infinite queuing situationFor an infinite queuing situation
For an infinite queuing situationjohann11370
 
From an operational perspective, yield management is most effective under whi...
From an operational perspective, yield management is most effective under whi...From an operational perspective, yield management is most effective under whi...
From an operational perspective, yield management is most effective under whi...johann11371
 
Which of the following is not a problem definition tool
Which of the following is not a problem definition toolWhich of the following is not a problem definition tool
Which of the following is not a problem definition tooljohann11374
 
Which of the following is not one of the basic types of forecasting
Which of the following is not one of the basic types of forecastingWhich of the following is not one of the basic types of forecasting
Which of the following is not one of the basic types of forecastingramuaa130
 
A company has actual unit demand for three consecutive years of 124, 126, and...
A company has actual unit demand for three consecutive years of 124, 126, and...A company has actual unit demand for three consecutive years of 124, 126, and...
A company has actual unit demand for three consecutive years of 124, 126, and...yearstart1
 
Which of the following is not a problem definition tool from the operations c...
Which of the following is not a problem definition tool from the operations c...Which of the following is not a problem definition tool from the operations c...
Which of the following is not a problem definition tool from the operations c...ramuaa130
 
A company must perform a maintenance project consisting
A company must perform a maintenance project consistingA company must perform a maintenance project consisting
A company must perform a maintenance project consistingjohann11369
 
An advantage of a make to-stock process is which of the following
An advantage of a make to-stock process is which of the followingAn advantage of a make to-stock process is which of the following
An advantage of a make to-stock process is which of the followingyearstart2
 
Which of the following is a total measure of productivity
Which of the following is a total measure of productivityWhich of the following is a total measure of productivity
Which of the following is a total measure of productivityramuaa129
 

What's hot (18)

In designing a lean production facility layout
In designing a lean production facility layoutIn designing a lean production facility layout
In designing a lean production facility layout
 
Ops 571 final exam guide (new, 2018) you have been called in as a consultant ...
Ops 571 final exam guide (new, 2018) you have been called in as a consultant ...Ops 571 final exam guide (new, 2018) you have been called in as a consultant ...
Ops 571 final exam guide (new, 2018) you have been called in as a consultant ...
 
Which of the following is a focusing step
Which of the following is a focusing stepWhich of the following is a focusing step
Which of the following is a focusing step
 
You have been called in as a consultant to set up a kanban control system
You have been called in as a consultant to set up a kanban control systemYou have been called in as a consultant to set up a kanban control system
You have been called in as a consultant to set up a kanban control system
 
In hau lee's uncertainty framework to classify supply chains
In hau lee's uncertainty framework to classify supply chainsIn hau lee's uncertainty framework to classify supply chains
In hau lee's uncertainty framework to classify supply chains
 
If the actual output of a piece of equipment
If the actual output of a piece of equipmentIf the actual output of a piece of equipment
If the actual output of a piece of equipment
 
Which of the following is a total measure of productivity
Which of the following is a total measure of productivityWhich of the following is a total measure of productivity
Which of the following is a total measure of productivity
 
Which of the following is an input to the master production schedule (mps)
Which of the following is an input to the master production schedule (mps)Which of the following is an input to the master production schedule (mps)
Which of the following is an input to the master production schedule (mps)
 
What is transaction processing
What is transaction processingWhat is transaction processing
What is transaction processing
 
For an infinite queuing situation
For an infinite queuing situationFor an infinite queuing situation
For an infinite queuing situation
 
From an operational perspective, yield management is most effective under whi...
From an operational perspective, yield management is most effective under whi...From an operational perspective, yield management is most effective under whi...
From an operational perspective, yield management is most effective under whi...
 
Which of the following is not a problem definition tool
Which of the following is not a problem definition toolWhich of the following is not a problem definition tool
Which of the following is not a problem definition tool
 
Which of the following is not one of the basic types of forecasting
Which of the following is not one of the basic types of forecastingWhich of the following is not one of the basic types of forecasting
Which of the following is not one of the basic types of forecasting
 
A company has actual unit demand for three consecutive years of 124, 126, and...
A company has actual unit demand for three consecutive years of 124, 126, and...A company has actual unit demand for three consecutive years of 124, 126, and...
A company has actual unit demand for three consecutive years of 124, 126, and...
 
Which of the following is not a problem definition tool from the operations c...
Which of the following is not a problem definition tool from the operations c...Which of the following is not a problem definition tool from the operations c...
Which of the following is not a problem definition tool from the operations c...
 
A company must perform a maintenance project consisting
A company must perform a maintenance project consistingA company must perform a maintenance project consisting
A company must perform a maintenance project consisting
 
An advantage of a make to-stock process is which of the following
An advantage of a make to-stock process is which of the followingAn advantage of a make to-stock process is which of the following
An advantage of a make to-stock process is which of the following
 
Which of the following is a total measure of productivity
Which of the following is a total measure of productivityWhich of the following is a total measure of productivity
Which of the following is a total measure of productivity
 

Similar to You have been called in as a consultant to set up a kanban control system

Which of the following basic types of production layout
Which of the following basic types of production layoutWhich of the following basic types of production layout
Which of the following basic types of production layoutjohann11372
 
Which of the following approaches to service design
Which of the following approaches to service designWhich of the following approaches to service design
Which of the following approaches to service designjohann11372
 
A company is planning for its financing needs and uses the basic fixed order-...
A company is planning for its financing needs and uses the basic fixed order-...A company is planning for its financing needs and uses the basic fixed order-...
A company is planning for its financing needs and uses the basic fixed order-...ramuaa124
 
UOPOPS 571 Expect Success /uopops571.com
UOPOPS 571 Expect Success /uopops571.comUOPOPS 571 Expect Success /uopops571.com
UOPOPS 571 Expect Success /uopops571.commyrealit
 
Ops 571 final exam guide (new, 2018)
Ops 571 final exam guide (new, 2018)Ops 571 final exam guide (new, 2018)
Ops 571 final exam guide (new, 2018)michaelkelinger2
 
Uop ops 571 final exam guide (new, 2018)
Uop ops 571 final exam guide (new, 2018)Uop ops 571 final exam guide (new, 2018)
Uop ops 571 final exam guide (new, 2018)shyaminfo06
 
Uop ops 571 final exam guide (new, 2018)
Uop ops 571 final exam guide (new, 2018)Uop ops 571 final exam guide (new, 2018)
Uop ops 571 final exam guide (new, 2018)eshwaryyyy
 
Ops 571 final exam guide (new, 2018)
Ops 571 final exam guide (new, 2018)Ops 571 final exam guide (new, 2018)
Ops 571 final exam guide (new, 2018)beauti123157
 
Which of the following is a principle of work center scheduling
Which of the following is a principle of work center schedulingWhich of the following is a principle of work center scheduling
Which of the following is a principle of work center schedulingramuaa129
 
Uop ops 571 final exam guide (new, 2018)
Uop ops 571 final exam guide (new, 2018)Uop ops 571 final exam guide (new, 2018)
Uop ops 571 final exam guide (new, 2018)shyaminfo00
 
For which of the following should we use a p chart to monitor process quality
For which of the following should we use a p chart to monitor process qualityFor which of the following should we use a p chart to monitor process quality
For which of the following should we use a p chart to monitor process qualityyearstart2
 
For which of the following should we use a p chart to monitor process quality
For which of the following should we use a p chart to monitor process qualityFor which of the following should we use a p chart to monitor process quality
For which of the following should we use a p chart to monitor process qualityramuaa126
 
Uop ops 571 final exam guide (new, 2018)
Uop ops 571 final exam guide (new, 2018)Uop ops 571 final exam guide (new, 2018)
Uop ops 571 final exam guide (new, 2018)shyaminfo00
 
Ops 571 final exam guide (new, 2018) which of the following is a principle of...
Ops 571 final exam guide (new, 2018) which of the following is a principle of...Ops 571 final exam guide (new, 2018) which of the following is a principle of...
Ops 571 final exam guide (new, 2018) which of the following is a principle of...ramuq12345
 
Which of the following is considered a primary report in an mrp system
Which of the following is considered a primary report in an mrp systemWhich of the following is considered a primary report in an mrp system
Which of the following is considered a primary report in an mrp systemramuaa130
 

Similar to You have been called in as a consultant to set up a kanban control system (15)

Which of the following basic types of production layout
Which of the following basic types of production layoutWhich of the following basic types of production layout
Which of the following basic types of production layout
 
Which of the following approaches to service design
Which of the following approaches to service designWhich of the following approaches to service design
Which of the following approaches to service design
 
A company is planning for its financing needs and uses the basic fixed order-...
A company is planning for its financing needs and uses the basic fixed order-...A company is planning for its financing needs and uses the basic fixed order-...
A company is planning for its financing needs and uses the basic fixed order-...
 
UOPOPS 571 Expect Success /uopops571.com
UOPOPS 571 Expect Success /uopops571.comUOPOPS 571 Expect Success /uopops571.com
UOPOPS 571 Expect Success /uopops571.com
 
Ops 571 final exam guide (new, 2018)
Ops 571 final exam guide (new, 2018)Ops 571 final exam guide (new, 2018)
Ops 571 final exam guide (new, 2018)
 
Uop ops 571 final exam guide (new, 2018)
Uop ops 571 final exam guide (new, 2018)Uop ops 571 final exam guide (new, 2018)
Uop ops 571 final exam guide (new, 2018)
 
Uop ops 571 final exam guide (new, 2018)
Uop ops 571 final exam guide (new, 2018)Uop ops 571 final exam guide (new, 2018)
Uop ops 571 final exam guide (new, 2018)
 
Ops 571 final exam guide (new, 2018)
Ops 571 final exam guide (new, 2018)Ops 571 final exam guide (new, 2018)
Ops 571 final exam guide (new, 2018)
 
Which of the following is a principle of work center scheduling
Which of the following is a principle of work center schedulingWhich of the following is a principle of work center scheduling
Which of the following is a principle of work center scheduling
 
Uop ops 571 final exam guide (new, 2018)
Uop ops 571 final exam guide (new, 2018)Uop ops 571 final exam guide (new, 2018)
Uop ops 571 final exam guide (new, 2018)
 
For which of the following should we use a p chart to monitor process quality
For which of the following should we use a p chart to monitor process qualityFor which of the following should we use a p chart to monitor process quality
For which of the following should we use a p chart to monitor process quality
 
For which of the following should we use a p chart to monitor process quality
For which of the following should we use a p chart to monitor process qualityFor which of the following should we use a p chart to monitor process quality
For which of the following should we use a p chart to monitor process quality
 
Uop ops 571 final exam guide (new, 2018)
Uop ops 571 final exam guide (new, 2018)Uop ops 571 final exam guide (new, 2018)
Uop ops 571 final exam guide (new, 2018)
 
Ops 571 final exam guide (new, 2018) which of the following is a principle of...
Ops 571 final exam guide (new, 2018) which of the following is a principle of...Ops 571 final exam guide (new, 2018) which of the following is a principle of...
Ops 571 final exam guide (new, 2018) which of the following is a principle of...
 
Which of the following is considered a primary report in an mrp system
Which of the following is considered a primary report in an mrp systemWhich of the following is considered a primary report in an mrp system
Which of the following is considered a primary report in an mrp system
 

Recently uploaded

Meghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media ComponentMeghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media ComponentInMediaRes1
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfSumit Tiwari
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentInMediaRes1
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Celine George
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersSabitha Banu
 
Capitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptxCapitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptxCapitolTechU
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatYousafMalik24
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Celine George
 
Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfPharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfMahmoud M. Sallam
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon AUnboundStockton
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for BeginnersSabitha Banu
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceSamikshaHamane
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTiammrhaywood
 
भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,Virag Sontakke
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
Painted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaPainted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaVirag Sontakke
 
Biting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdfBiting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdfadityarao40181
 

Recently uploaded (20)

Meghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media ComponentMeghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media Component
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media Component
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginners
 
Capitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptxCapitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptx
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice great
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
 
Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfPharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdf
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon A
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for Beginners
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in Pharmacovigilance
 
9953330565 Low Rate Call Girls In Rohini Delhi NCR
9953330565 Low Rate Call Girls In Rohini  Delhi NCR9953330565 Low Rate Call Girls In Rohini  Delhi NCR
9953330565 Low Rate Call Girls In Rohini Delhi NCR
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
 
भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
Painted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaPainted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of India
 
Biting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdfBiting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdf
 

You have been called in as a consultant to set up a kanban control system

  • 1. OPS 571 Final Exam Guide (New, 2018) You have been called in as a consultant to set up a Kanban control system FOR MORE CLASSES VISIT www.ops571help.com 1. Which of the following is a measure of operations and supply management efficiency used by Wall Street? Dividend payout ratio Receivable turnover Current ratio Financial leverage Earnings per share growth 2. An activity-system map is which of the following? A diagram that shows how a company's strategy is delivered to customers A timeline displaying major planned events A network guide to route airlines A facility layout schematic noting what is done where A listing of activities that make up a project 3. Which of the following is a total measure of productivity? Output/Materials Output/Labor Output/(Labor + Capital + Energy) All of these Output/Inputs 4. Which of the following approaches to service design is characterized by having the customer take a greater role in the production of the service? Quality approach Self-service approach Production-line approach Do-it-yourself approach Personal- attention approach 5. Which of the following basic types of production layout formats is one that has similar equipment or functions are grouped together?
  • 2. Workcenter layout Production line layout Group technology layout Manufacturing cell layout Assembly line layout 6. Which of the following is a characteristic that can be used to guide the design of service systems? Services are all similar. Services cannot be inventoried. Services businesses are inherently entrepreneurial. Even service businesses have internal services. Quality work means quality service. 7. An advantage of a make-to-stock process is which of the following? All units of output are unique. It features rapid delivery of a standard product. It combines the best features of other processes. It responds directly to customer orders. It allows the firm to avoid inventory costs. 8. Getting an autograph from a famous person might involve standing in which type of queuing line structure? Single channel, single phase None of these Single channel, multiphase Multichannel, multiphase Multichannel, single phase 9. For an infinite queuing situation, if the arrival rate for loading trucks is 5 trucks per hour, what is the mean time between arrivals? 2.5 hours 5 hours 0.2 hour 0.1 hour None of these 10. An assumption of learning curve theory is which of the following? Organizational learning is not included in learning theory. The time required to do a task will vary randomly each time the task is repeated. Unit time will decrease at an increasing rate. Learning will not be transferred from one worker to the next. The reduction in unit time will follow a predictable pattern.
  • 3. 11. A company's production process has an 80 percent learning curve rate. The process has produced 1,000 units to date. A process refinement is estimated to allow a future learning curve rate for the identical product of 75 percent. However, the initial unit made using the new process will take the same amount of time as the initial unit produced using the old process. At what point, using the new process, will the production rate exceed the production rate achieved by the old process? Before the 100th unit Before the 120th unit Before the 80th unit Before the 50th unit Before the 250th unit 12. For which of the following should we use a p-chart to monitor process quality? Grades in a freshman "pass/fail" course Temperatures in a classroom The dimensions of brick entering a kiln The weight of fluid in a container Lengths of boards cut in a mill 14. Which of the following is a fixed-time-period inventory model? Just-in-time model The EOQ model Periodic system model The Q model The least cost method 15. A company is planning for its financing needs and uses the basic fixed-order-quantity inventory model. Which of the following is the total cost (TC) of the inventory given an annual demand of 10,000, setup cost of $32, a holding cost per unit per year of $4, an EOQ of 400 units, and a cost per unit of inventory of $150? None of these $1,501,600 $1,498,200 $499,313 $500,687 A. $1,501,600 Q = 400. Average Inventory = Q/2 = 200. Holding cost/year = $4. Thus, annual holding cost = $800. Annual set-up cost = 10,000/400 = 25 x $32 = 800. Demand x cost per unit = 10,000 x $150 = 1,500,000. Hence, TC = $1,500,000 + 800 + 800 = $1,501,600.
  • 4. 16. Which of the following is a principle of work center scheduling? Reschedule every day. Once started, a job can and should be finished even if unavoidably interrupted. Assign the first worker to all of the days that require staffing. Achieve certainty in standards and routings. Give work centers less to do then their maximum. 17. Which of the following is a "focusing step" of Dr. Eli Goldratt's theory of constraints? Identify system constraints. Support system constraints. If you have no system constraints, make some. Reduce system constraints. Reinforce system constraints. 18. In designing a lean production facility layout, a designer should do which of the following? Locate flexible workstations offline. Balance capacity using job shop analysis. Design for work flow balance. Always keep operations on a single floor of the factory. Link operations through a push system. 19. A simple project listing of five activities and their respective time estimates are presented here: Using CPM, which activities make up the critical path? None of these A, B, D, E A, D, E A, C, B, D, E A, C, D, E 20. A company must perform a maintenance project consisting of seven activities. The activities, their predecessors, and their respective time estimates are presented here: Using CPM, which activities make up the critical path? A, C, B, F, E None of these A, B, D, F, G A, C, E, F, G A, D, E 21. Which of the following is not a problem definition tool from the operations consulting tool kit? Issue trees Five forces model Computer simulation Customer surveys Gap analysis
  • 5. 22. Which of the following is not one of the basic types of forecasting? Simulation Causal relationships Qualitative Time series analysis Force field analysis 23. A company has actual unit demand for three consecutive years of 124, 126, and 135. The respective forecasts for the same three years are 120, 120, and 130. Which of the following is the resulting MAD value that can be computed from these data? 3 1 15 123 5 C MAD = ABS[(124 - 120) + (126 - 120) + (135 - 130)]/3 = 15/3 = 5. 24. From an operational perspective, yield management is most effective under which of the following circumstances? Inventory is perishable. The firm doing yield management is very profitable. Demand cannot be segmented by customer. Fixed costs are low, and variable costs are high. The customer is a "captive" of the system. 25. What is transaction processing? The decision support system used to efficiently handle multiple transactions The movement of paperwork through a system using a decision tree The scheduling of machinery to minimize time and scrap The posting and tracking of the detailed activities of a business 26. If the actual output of a piece of equipment during an hour is 500 units and its best operating level is at a rate of 400 units per hour, which of the following is the capacity utilization rate? 0.75 1.00 1.25 1.33 100 27. Which of the following is an input to the master production schedule (MPS)? Planned order schedules The bill of materials The aggregate plan The exception report Inventory records file
  • 6. 28. Which of the following is considered a primary report in an MRP system? Cycle counting reports Performance reports Planned order schedules Planning reports Exception reports 29. The centroid method for plant location uses which of the following data? Probabilities and payoffs Correlation matrix of existing facilities Volume of goods to be shipped between existing points Inbound transportation costs Transport times between facilities 30. In Hau Lee's uncertainty framework to classify supply chains, a supply chain for functional products with an evolving supply process is called which of the following? Responsive Forward looking Efficient Risk hedging Agile
  • 7. 28. Which of the following is considered a primary report in an MRP system? Cycle counting reports Performance reports Planned order schedules Planning reports Exception reports 29. The centroid method for plant location uses which of the following data? Probabilities and payoffs Correlation matrix of existing facilities Volume of goods to be shipped between existing points Inbound transportation costs Transport times between facilities 30. In Hau Lee's uncertainty framework to classify supply chains, a supply chain for functional products with an evolving supply process is called which of the following? Responsive Forward looking Efficient Risk hedging Agile