This instruction chart illustrates the safe isolation procedure to
be applied when working on electrical systems and equipment.
Isolation means the cutting off of the electrical supply to an electrical installation
for safety reasons.This is carried out by operating devices that have been provided
within the electrical installation for isolation to make the electrical system, or part
of it, DEAD.
Once the electrical supply has been isolated, the means of isolation must then be
secured so that the system/equipment cannot be inadvertently made live.
It is important that all sources of electrical supply are isolated and the system/
equipment proved to be DEAD before work is carried out.
The Electricity at Work Regulations requires the isolation of electrical equipment
and systems to prevent danger. All electrical systems or equipment must be
DEAD before installation or maintenance is carried out. A system is any part of
an electrical installation from the source of supply to the equipment installed.
The regulations also state that no person shall take part in any work activity
unless they possess the necessary technical knowledge and experience in order to
prevent danger, or is under suitable supervision.
An approved voltage indicator or test lamp must comply with the Health and
Safety Executive’s guidance note GS38. The approved voltage indicator or test
lamp must be “proved” using a known live supply or proving unit before and after
use to show it is working correctly.
NOTE: Both the Electricity atWork Regulations and the Health and Safety
Executive’s guidance note GS38 should be referred to with this guidance.
THE RULES OF SAFE ISOLATION ARE:
• 	Obtain permission to start work (a Permit may be required in
some situations)
• 	Identify the source(s) of supply using an approved voltage
indicator or test lamp
• 	Prove that the approved voltage indicator or test lamp is
functioning correctly
• 	Isolate the supply(s)
• 	Secure the isolation
• 	Prove the system/equipment is DEAD using an approved
voltage indicator or test lamp
• 	Prove that the approved voltage indicator or test lamp is
functioning correctly
• 	Put up warning signs to tell other people that the electrical
installation has been isolated
• 	Once the system/equipment is proved DEAD, work can begin

More Related Content

What's hot

Inspection, Testing and Commissioning of Electrical Switchboards, Circuit Bre...
Inspection, Testing and Commissioning of Electrical Switchboards, Circuit Bre...Inspection, Testing and Commissioning of Electrical Switchboards, Circuit Bre...
Inspection, Testing and Commissioning of Electrical Switchboards, Circuit Bre...
Living Online
 
LOTO Training
LOTO TrainingLOTO Training
LOTO Training
CM Tiwari
 
Lockout tagout refresher training
Lockout tagout refresher trainingLockout tagout refresher training
Lockout tagout refresher training
Jost2012
 

What's hot (20)

Lifting & Rigging Safety.pptx
Lifting & Rigging Safety.pptxLifting & Rigging Safety.pptx
Lifting & Rigging Safety.pptx
 
LOTO Training.ppt
LOTO Training.pptLOTO Training.ppt
LOTO Training.ppt
 
Lockout tagout
Lockout tagoutLockout tagout
Lockout tagout
 
Lockout tagout
Lockout tagoutLockout tagout
Lockout tagout
 
Lock-Out Tag-Out (LOTO) Training
Lock-Out Tag-Out (LOTO) TrainingLock-Out Tag-Out (LOTO) Training
Lock-Out Tag-Out (LOTO) Training
 
Electrical Commissioning and Arc-Flash Safety presentation
Electrical Commissioning and Arc-Flash Safety presentationElectrical Commissioning and Arc-Flash Safety presentation
Electrical Commissioning and Arc-Flash Safety presentation
 
Overhead Crane Safety by Pennslyvania L&I
Overhead Crane Safety by Pennslyvania L&IOverhead Crane Safety by Pennslyvania L&I
Overhead Crane Safety by Pennslyvania L&I
 
Crane Rigging Safety by HF & C
Crane Rigging Safety by HF & CCrane Rigging Safety by HF & C
Crane Rigging Safety by HF & C
 
Machine Safety
Machine Safety Machine Safety
Machine Safety
 
Electrical Safety and Risk Assessments
Electrical Safety and Risk AssessmentsElectrical Safety and Risk Assessments
Electrical Safety and Risk Assessments
 
Lock Out Tag Out Safe Work Procedure
Lock Out Tag Out Safe Work Procedure Lock Out Tag Out Safe Work Procedure
Lock Out Tag Out Safe Work Procedure
 
Vcb ppt.
Vcb ppt.Vcb ppt.
Vcb ppt.
 
Safety handbook Saudi Aramco BY Muhammad Fahad Ansari 12IEEM14
Safety handbook Saudi Aramco  BY Muhammad Fahad Ansari  12IEEM14Safety handbook Saudi Aramco  BY Muhammad Fahad Ansari  12IEEM14
Safety handbook Saudi Aramco BY Muhammad Fahad Ansari 12IEEM14
 
Inspection, Testing and Commissioning of Electrical Switchboards, Circuit Bre...
Inspection, Testing and Commissioning of Electrical Switchboards, Circuit Bre...Inspection, Testing and Commissioning of Electrical Switchboards, Circuit Bre...
Inspection, Testing and Commissioning of Electrical Switchboards, Circuit Bre...
 
Electrical installation wiring and panel board design
Electrical installation wiring and panel board designElectrical installation wiring and panel board design
Electrical installation wiring and panel board design
 
LOTO Training
LOTO TrainingLOTO Training
LOTO Training
 
Electrical overhead crane safety
Electrical overhead crane safetyElectrical overhead crane safety
Electrical overhead crane safety
 
Electrical safety in construction
Electrical safety in constructionElectrical safety in construction
Electrical safety in construction
 
Lockout tagout
Lockout tagoutLockout tagout
Lockout tagout
 
Lockout tagout refresher training
Lockout tagout refresher trainingLockout tagout refresher training
Lockout tagout refresher training
 

Similar to Isolation procedures for safe working on electrical systems and equipment by the jib

Unit 103 power_point_6_safe_isolation
Unit 103 power_point_6_safe_isolationUnit 103 power_point_6_safe_isolation
Unit 103 power_point_6_safe_isolation
wirethehouse
 
Electrical Safety1
Electrical Safety1Electrical Safety1
Electrical Safety1
jboullemet
 
Lockout Tag Out
Lockout Tag OutLockout Tag Out
Lockout Tag Out
sspuent
 
Construction Electrical Safety
Construction Electrical SafetyConstruction Electrical Safety
Construction Electrical Safety
DjCurrie
 
Lockout Tagout
Lockout TagoutLockout Tagout
Lockout Tagout
vtsiri
 

Similar to Isolation procedures for safe working on electrical systems and equipment by the jib (20)

Lockout Tagout by Snohomish County
Lockout Tagout by Snohomish CountyLockout Tagout by Snohomish County
Lockout Tagout by Snohomish County
 
lockout-tagout-training.ppt
lockout-tagout-training.pptlockout-tagout-training.ppt
lockout-tagout-training.ppt
 
shock_arc_flash
shock_arc_flashshock_arc_flash
shock_arc_flash
 
Unit 103 power_point_6_safe_isolation
Unit 103 power_point_6_safe_isolationUnit 103 power_point_6_safe_isolation
Unit 103 power_point_6_safe_isolation
 
5980 dual column floor frames system support
5980 dual column floor frames system support5980 dual column floor frames system support
5980 dual column floor frames system support
 
Electrical Safety1
Electrical Safety1Electrical Safety1
Electrical Safety1
 
Sistema de monitorització de mesures elèctriques
Sistema de monitorització de mesures elèctriques Sistema de monitorització de mesures elèctriques
Sistema de monitorització de mesures elèctriques
 
Lockout Tagout.ppt
Lockout Tagout.pptLockout Tagout.ppt
Lockout Tagout.ppt
 
SAFETY PRESENTATION 2.pptx
SAFETY PRESENTATION 2.pptxSAFETY PRESENTATION 2.pptx
SAFETY PRESENTATION 2.pptx
 
Electrical by osha
Electrical by oshaElectrical by osha
Electrical by osha
 
The complete procedure of Logout & tagout
The complete procedure of Logout & tagoutThe complete procedure of Logout & tagout
The complete procedure of Logout & tagout
 
Lockout Tag Out
Lockout Tag OutLockout Tag Out
Lockout Tag Out
 
Lock Out Tag Out
Lock Out Tag OutLock Out Tag Out
Lock Out Tag Out
 
Lockout-Tagout 2023.ppt
Lockout-Tagout 2023.pptLockout-Tagout 2023.ppt
Lockout-Tagout 2023.ppt
 
LOTO.pptx
LOTO.pptxLOTO.pptx
LOTO.pptx
 
Live wire testing lock out tag out safe work procedure
Live wire testing lock out tag out safe work procedureLive wire testing lock out tag out safe work procedure
Live wire testing lock out tag out safe work procedure
 
Electrical Safety in healthcare.
Electrical Safety in healthcare.Electrical Safety in healthcare.
Electrical Safety in healthcare.
 
Switchgear presentation
Switchgear presentationSwitchgear presentation
Switchgear presentation
 
Construction Electrical Safety
Construction Electrical SafetyConstruction Electrical Safety
Construction Electrical Safety
 
Lockout Tagout
Lockout TagoutLockout Tagout
Lockout Tagout
 

More from Thorne & Derrick International

More from Thorne & Derrick International (20)

THORNE & DERRICK LV MV HV Jointing, Earthing, Substation & Electrical Eqpt
THORNE & DERRICK LV MV HV Jointing, Earthing, Substation & Electrical EqptTHORNE & DERRICK LV MV HV Jointing, Earthing, Substation & Electrical Eqpt
THORNE & DERRICK LV MV HV Jointing, Earthing, Substation & Electrical Eqpt
 
The Children North East Annual Golf Day Wednesday 9th May 2018
The Children North East Annual Golf Day Wednesday 9th May 2018The Children North East Annual Golf Day Wednesday 9th May 2018
The Children North East Annual Golf Day Wednesday 9th May 2018
 
3M Electrical Products Stocked By Thorne & Derrick International
3M Electrical Products Stocked By Thorne & Derrick International3M Electrical Products Stocked By Thorne & Derrick International
3M Electrical Products Stocked By Thorne & Derrick International
 
CATU Electrical Safety Catalogue
CATU Electrical Safety CatalogueCATU Electrical Safety Catalogue
CATU Electrical Safety Catalogue
 
11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A
11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A
11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A
 
THORNE + DERRICK : LV, MV & HV Cable Installation, Jointing, Substation & Ele...
THORNE + DERRICK : LV, MV & HV Cable Installation, Jointing, Substation & Ele...THORNE + DERRICK : LV, MV & HV Cable Installation, Jointing, Substation & Ele...
THORNE + DERRICK : LV, MV & HV Cable Installation, Jointing, Substation & Ele...
 
Ex d Enclosures - Explosion Proof Hazardous Area Technor EJB Galvanised Steel...
Ex d Enclosures - Explosion Proof Hazardous Area Technor EJB Galvanised Steel...Ex d Enclosures - Explosion Proof Hazardous Area Technor EJB Galvanised Steel...
Ex d Enclosures - Explosion Proof Hazardous Area Technor EJB Galvanised Steel...
 
Roxtec Cable Transit - B Frame Dimensional Drawing
Roxtec Cable Transit - B Frame Dimensional DrawingRoxtec Cable Transit - B Frame Dimensional Drawing
Roxtec Cable Transit - B Frame Dimensional Drawing
 
Pepperl & Fuchs SIL Training Certificate - T&D Adam Rowe
Pepperl & Fuchs SIL Training Certificate - T&D Adam RowePepperl & Fuchs SIL Training Certificate - T&D Adam Rowe
Pepperl & Fuchs SIL Training Certificate - T&D Adam Rowe
 
T&D Experts In Equipment For Explosive Atmospheres
T&D Experts In Equipment For Explosive AtmospheresT&D Experts In Equipment For Explosive Atmospheres
T&D Experts In Equipment For Explosive Atmospheres
 
Ultrasonic Flow Meters - Customer Specification Demand
Ultrasonic Flow Meters - Customer Specification DemandUltrasonic Flow Meters - Customer Specification Demand
Ultrasonic Flow Meters - Customer Specification Demand
 
Emtelle Fibre Optic Cables - Product Catalogue 2016
Emtelle Fibre Optic Cables - Product Catalogue 2016Emtelle Fibre Optic Cables - Product Catalogue 2016
Emtelle Fibre Optic Cables - Product Catalogue 2016
 
Thorne & Derrick Process Heating Brochure 2016
Thorne & Derrick Process Heating Brochure 2016Thorne & Derrick Process Heating Brochure 2016
Thorne & Derrick Process Heating Brochure 2016
 
SIRAI ASCO Numatics Solenoid Valves WRAS Approved - SIRAI L182D L282D
SIRAI ASCO Numatics Solenoid Valves WRAS Approved - SIRAI L182D L282DSIRAI ASCO Numatics Solenoid Valves WRAS Approved - SIRAI L182D L282D
SIRAI ASCO Numatics Solenoid Valves WRAS Approved - SIRAI L182D L282D
 
Ripley Utility Tool Cable Preparation Tools
Ripley Utility Tool Cable Preparation ToolsRipley Utility Tool Cable Preparation Tools
Ripley Utility Tool Cable Preparation Tools
 
RIDGID micro CD100 Combustible Gas Detector
RIDGID micro CD100 Combustible Gas DetectorRIDGID micro CD100 Combustible Gas Detector
RIDGID micro CD100 Combustible Gas Detector
 
Itron Fact Sheet
Itron Fact SheetItron Fact Sheet
Itron Fact Sheet
 
United Nations Environment Programme (UNEP) ‘2006 Report of the Refrigeration...
United Nations Environment Programme (UNEP) ‘2006 Report of the Refrigeration...United Nations Environment Programme (UNEP) ‘2006 Report of the Refrigeration...
United Nations Environment Programme (UNEP) ‘2006 Report of the Refrigeration...
 
Filoform FiloSeal+HD Reenterable LV HV Power Cable Duct Seal System - Spec Sheet
Filoform FiloSeal+HD Reenterable LV HV Power Cable Duct Seal System - Spec SheetFiloform FiloSeal+HD Reenterable LV HV Power Cable Duct Seal System - Spec Sheet
Filoform FiloSeal+HD Reenterable LV HV Power Cable Duct Seal System - Spec Sheet
 
Eltherm Self-Regulating Trace Heating Cables
Eltherm Self-Regulating Trace Heating CablesEltherm Self-Regulating Trace Heating Cables
Eltherm Self-Regulating Trace Heating Cables
 

Recently uploaded

Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
HenryBriggs2
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
MayuraD1
 

Recently uploaded (20)

S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
Learn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic MarksLearn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic Marks
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
Rums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdfRums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdf
 

Isolation procedures for safe working on electrical systems and equipment by the jib

  • 1. Isolation Procedures for Safe Working on Electrical Systems and Equipment This instruction chart illustrates the safe isolation procedure to be applied when working on electrical systems and equipment. Isolation means the cutting off of the electrical supply to an electrical installation for safety reasons.This is carried out by operating devices that have been provided within the electrical installation for isolation to make the electrical system, or part of it, DEAD. Once the electrical supply has been isolated, the means of isolation must then be secured so that the system/equipment cannot be inadvertently made live. It is important that all sources of electrical supply are isolated and the system/ equipment proved to be DEAD before work is carried out. The Electricity at Work Regulations requires the isolation of electrical equipment and systems to prevent danger. All electrical systems or equipment must be DEAD before installation or maintenance is carried out. A system is any part of an electrical installation from the source of supply to the equipment installed. The regulations also state that no person shall take part in any work activity unless they possess the necessary technical knowledge and experience in order to prevent danger, or is under suitable supervision. An approved voltage indicator or test lamp must comply with the Health and Safety Executive’s guidance note GS38. The approved voltage indicator or test lamp must be “proved” using a known live supply or proving unit before and after use to show it is working correctly. NOTE: Both the Electricity atWork Regulations and the Health and Safety Executive’s guidance note GS38 should be referred to with this guidance. THE RULES OF SAFE ISOLATION ARE: • Obtain permission to start work (a Permit may be required in some situations) • Identify the source(s) of supply using an approved voltage indicator or test lamp • Prove that the approved voltage indicator or test lamp is functioning correctly • Isolate the supply(s) • Secure the isolation • Prove the system/equipment is DEAD using an approved voltage indicator or test lamp • Prove that the approved voltage indicator or test lamp is functioning correctly • Put up warning signs to tell other people that the electrical installation has been isolated • Once the system/equipment is proved DEAD, work can begin