1. ORGANIZATION CHART CUM RESPONSIBILITY
STRUCTURE OF ENGINEERING DEPARTMENT
MR. PANKAJ GUPTA
Director (Operations & Business Development)
NOTE :- 1) In case of Absenteeism / Non-availability of staff member, the next Sr. Person will take over.
DOC NO. F10/PA/HR/01-03 PREPARED BY CHECKED BY CONTROLLED BY APPROVED BY PAGE
REVISION NO. 08
H.O.D (ENGINEERING) D.G.M (MANUFACTURING & OPERATIONS) H.O.D (HR/ADMIN.) DIRECTOR
1 OF 1
REVISION DATE 01-04-17
LEGENDS :- RFQ – Request for Quote
TS - TS: 16949 Activities
MR.UDAI SHANKAR DWIVEDI
Dy. Manager- Engineering
MR.DALJEET SINGH
Sr. Engr.-Engineering
MR. PARDEEP KUMAR
Sr. Manager – Engineering
Implementation of departmental
Proceduresalign with TS 16949
Update Departmental objective
Proceduresalign with TS 16949
Review Feasibility for New RFQ’s &
make Process & Cost sheets
New Project Reports & Documents
Process Design for New Parts
Development of New Products as
per Timing Plan to meet customer’s
requirements.
Selection of M/c ’s/ Tooling &
Equipment for new Projects
Development of Tools/ jig/ Fixtures
& Testing Method.
Floor layouts for new Projects
Implementation of Low Cost
Automation, New Technology
Training to their subordinates
Update PFD, CP & FMEA of all
Current Production parts
Prepare APQP Timing plan for
NPD as per TS16949 & Update
development Progress
Prepare BOM of NPD in ERP
System
Update Tool, Fixture & Gauge
Drawings
Update Operation standards as
per Control plan
Identify & implementation of
Improvements projects in
current process
Control of drawing issue /ECN
Records
Submission of PPAP for annual
validation & N P D
JAGPREET SINGH
Engr.-Costing
MR.NARESH KUMAR
Dev.Engr.-Engineering Vacent
Asst. Engr.-Engineering
MR. ASHWANI KUMAR
Sr. Engr.-R & D
Develop & Implementation of Departmental Procedures
align with TS 16949
Review & Approval for Tool Designs of NPD & Production
parts
Validation of Feasibility of New Parts & Sub assemblies
for NPD
Validation of Tool Concepts & Process to Ensure Quality &
Safety Requirements
Selection of Equipment Utilities, Testing Methods.
Submission of PPAP Documents to Suppliers& Yearly Up
gradations.
Timely & Ist. Time Right Completion of Projects.
Standardization of Tooling.
RFQ for New Business.
Identify & Fulfill Training needsfor Subordinates
New RFQ –Review Feasiblity
Making Process, Packing ,Cost
Sheets,
Make Cost Comparison reports
of Production parts with Cost
Sheets
Vacent
Engr.-Engineering
Update PFD, CP & FMEA of all
Current production parts
Prepare BOM of NPD in ERP
System
Update Tool, Fixture & Gauge
Drawings
Update Operation standards as
per Control plan
Identify & implementation of
Improvements projects in
current process
Update plant layouts
Coordinate between Prod.,
Tool Room & Engineering
Making Tool /Fixture Trials as
per APQP Timing plan & making
Initial Samples
Identify modification reqd. in
Tooling /Process
Process setting at vendor End
for outsourcing part/operation
Prepare APQP Timing plan for
NPD as per TS16949 & Update
development Progress
Submission of PPAP
Prepare BOM of NPD in ERP
System
Designing of Tooling, Fixtures
Test Rigs & Gauges for NPD
Design component drawings on
TAL Format
Finalize PDI & Packing stds.
Make Operation standards
Floor layout for New projects.
Make PFD, CP, FMEA
Control of Drawing issue for
NPD
Prepare APQP Timing plan for
NPD as per TS16949 & Update
development Progress
Submission of PPAP
Designing of Tooling, Fixtures
Test Rigs & Gauges for NPD
Prepare BOM of NPD in ERP
System
Proto samples on 3D printer
Design component drawings on
TAL Format
Finalize PDI & Packing stds.
Make Operation standards
Floor layout for New projects.
Make PFD, CP, FMEA
Control of Drawing issue for
NPD