4. Business Strength
PACE, has YOY turnover of INR 600+ CR and ISO 14001:2015, ISO 27001:2013, ISO 9001:2015 & CMMi Level 3
certified company.
One of the largest comprehensive players in providing integrated Energy Management Solutions & Services in the
OPCOs & Tower cos domain & Power Infrastructure, also now actively into Master System Integration (MSI) work
for Smart Cities, Safe Cities, Surveillance, ITMS, HTMS, Data Centre, DR, MEP work, IoT Solution, Smart Parking,
Smart Lighting, Solid waste Management, e-Education, Agritech Projects.
PACE has its presence in India, Africa & Myanmar globally, with a strength of 4000+ personnel on-ground, 100,000+
product services, 35,000+ sites of O&M services & 600+ sites of energy services & 80,000+ Fiber O&M.
PACE has three (3) world class manufacturing facilities with scalable production capacity over 250,000 sqft.
Presence and Handling Fiber / Tower O&M Services in 14+ circles.
Associated with India’s biggest Towerco Company ~ RJIO in 14 circles for Fiber / Utility / OOS / Project Business
(direct/indirect). Also, supplying SMPS and providing after sales support @ PAN India level.
Selected at Airtel as L1 partner for PAN India / Region wise SP partner for Fiber/Utility/FTTH operations. Recently
started FTTH O&M in OR / TN / AP / TS circles.
Selected at Tata as L1 partner for PAN India / Region wise SP partner for Fiber operations. Recently started Fiber
O&M in AP / TS circles.
Associated with ITI under BBNL Project and O&M in various states and now in league with companies like Sterlite /
L&T.
5. Utilities
• O&M – Alarm and fault monitoring + L1/L2 services + OEM coordination + Diesel Filling + EB bill coordination +
Estate Management + Site housekeeping + Minor repairs / OOS jobs
• Super Comprehensive O&M – Normal O&M scope + Comprehensive Equipment Maintenance & Repairs + Site
Security + Infrastructure SPOC for Opcos
• RMS – Real time monitoring of site Infra management and energy parameters
• ESCO / Opex Model – Super Comprehensive O&M scope + Capex investment + P&F (Diesel/EB Cost) + Site
Solutioning + Equipment Optimisation / Replacement + Energy Management
Fiber
• OFC O&M – Route Surveillance / Patrolling + Preventive & Periodic Maintenance + Liaisoning / Local Body
Relationship + Cut Restoration / Splicing + Maintenance of Manholes / Handholes + Minor OFC Rerouting +
Planned Event Management + High Loss / Dark Fiber / Fiber Integrity Testing
Network
• Integrated network services including Fiber, NOC & Active components
Pace Power Capabilities in Telecom Infrastructure Services
6. • Across India, Africa & South East Asia
• 30+ established offices in above 3 regions
Global Footprint
29. Introduction – 4G Saturation Project
4G Saturation Projects: 4G provisioning at 24,680 Uncovered villages across India
Upgradation to 4G service of existing 2G/3G sites at 6,279 villages (5,461 BSNL + 818 other
TSP)
Provision of 20% extra sites so that villages which are uncovered through 4G services but are
not identified at present.
Additional villages are being added as received from VIP/VVIPs etc.
Total village count is 39,354 (as per latest on Cluster portal)
Project is to be completed within 500 days from cabinet approval i.e. by 09.12.2023
34. The bidder has to supply, install and commission 40/20 Meter GBT, Power Plant/CCU/Solar panels, Engine Alternator, CCTV Camera
for taking care of load for 24 hours backup time for new sites as well as existing sites.
IaaSP has to carry out the work of site development and Fencing, Civil work for making plinth at workable up to sufficient height to
get away from rain water and installation of BBU , batteries and CCU/Power plants.
IaaSP has to provide power infrastructure for the proposed power consumption mentioned in the scope of this tender. IaaSP has to
maintain the power supply to electronics equipment via Lithium ion battery at all sites in the respective cluster. IaaSP will supply,
install and commission 1X800 AH Lithium ion batteries at all the sites.
At IP-1 location , no upgradation of infrastructure is required at these sites, only 2 CCTV cameras are to be installed.
IaaSP is responsible for Diesel/ consumable items charges for sites where the infrastructure has been provided by IaaSP. No infra
and consumable items are to be supplied at IP sites by the IaaSP. The IaaSP will be paid Rs. 5000 per site per month of the IP sites.
IaaSP has to replace full battery sets with new Lithium ion battery sets after 4 years i.e. after 4 years of operations. The full battery
set replacement is proposed only in the first 5 year period.
IaaSP has to install CCTV Camera at all sites (2 camera at each site) with 360o view with 50 meter range. The Cameras shall have
Full HD quality (1920 x 1080 p) or better, with night vision. The Cameras shall be integrated with centralized NMS to facilitate
centralized monitoring. Necessary SIM cards with appropriate data plan (under BSNL service connection category) will be provided
by BSNL. Bidders have to ensure safety of SIM cards , so that there is no misuse of these SIM cards .
Supply & Installation
41. Scope of Work
1. Survey (SAQR & TSSR,EB Connectivity feasibility report)
2. Deployment Plan Material (Class A, Class B,Class C), Power systems (Powerplant,CCU,BBU,Solar PV Panels) Delivery to
Sites. Services (Civil Works for Tower Foundation, Equipment Platform, Fencing, Solar Structure and Tower Erection &
Installation of Power Systems) EB/GRID Connection
3. Site Detail Design & Drawing
4. Installation & Commissioning
5. Acceptance Test
• Provisional Acceptance Test
• Final Acceptance Test
• HOTO for O&M
6. GEO - Investigation Report
7. Ready for Service
8. Operations & Maintenance
42. 42
IaaSP site survey template
After the site handover is done to IaaSP, they are required to do a site survey and validate the below
information which is already gathered by BSNL during the initial survey procedure
Site type (new/ existing)
Soil bearing capacity/ Soil testing report
Proposed tower height based on soil testing reports
Any change is tower height proposed
Site Layout validation
Proposed Media type validation
Proposed Power type (first option i.e. solar/ DG based on suitability)
Proposed Power type (second option)
EB Feasibility
Nearest IP tower Site coordinates/ distance
Special assistance required for material transport
Land Possession Handover Date
RoW permission received date
Remarks, if any