PRE-COMMISSIONING &
TROUBLESHOOTING STEPS FOR
SITE ENGINEERS
1
Scope of Presentation:
• Commissioning of BTS CC card in Pre-swap
• Software Version up-gradation Methods
• Follow steps on Configuration Diagram in LMT
• Troubleshoot the alarms one-by-one
2
Commissioning of CC card
• First of all, confirm that you have required version of LMT(LMT_v12.13.43P02_GUL)
3
Commissioning of CC card
• After that you must apply setting to you laptop LAN IP like following.
4
Commissioning of CC card
• Now open “EOMS” file from LMT as mentioned below.
5
Commissioning of CC card
• EOMS will open a windows like below then select “Image and burn” and press “OK”
6
Commissioning of CC card
• It will ask for selection of RADIO MODE, select “MULTIMODE”
7
Commissioning of CC card
• Select PATCH Directory & Commissioning File then press “OK”
8
Commissioning of CC card
• After that LMT will start the process of image burning.
9
Commissioning of CC card
• It will take a while
10
Commissioning of CC card
Burning/MO file Succeeded
when it will be succeeded the display shows
11
12
Commissioning of CC card(2nd Method)
Select “Online Configuration” & press “Station”.
Fill the Station Name & Station IP field.
13
Commissioning of CC card (2nd Method)
Give User name “admin” and left password field blank. Then press OK to login.
14
Commissioning of CC card (2nd Method)
Go to “System” and select “Import”. After that select the MO file in xml format. Press OK.
Commissioning of CC Card
• After completed process & reset of CC board, you can login again in EOMS and
you can see the following window. It would show you the topology.
15
Expected Alarms in EFMS
• You can login to EFMS and you can see the alarms.
16
View the Topology and follow it
• Connect the boards & fiber cables according to the topology shown in LMT.
17
View the Topology and follow it
• Connect the boards & fiber cables according to the topology shown in LMT.
18
View the Topology and follow it
19
Confirming the Software Version
• Go to System and select Version Management to confirm the
Version
20
Confirming the Software Version
• Version must be 4.13.10.38P42. All versions must be in RUN condition. In case
of 3G site, UMTS package must also be available.
21
Confirming the Software Version
• In case software is not updated, just right click on Local window and add
the package files.
22
Confirming the Software Version
• In case software is not updated, just right click on Local window and add
the package files.
23
Confirming the Software Version
• It will take some time to upload.
24
Confirming the Software Version
• After that, right click on the package files on Local Window and select
“Download”. It will download the files.
25
Key Points for software downloading
• After commissioning, first confirm running the package version.
• Running package version must be 4.13.10.38P42
• If the running version is still old one we need to active the new one
again.
• In case, package files are corrupted or not active successfully, first
Delete the files by right click on it and then download again.
• If you download again without deleting it, it may cause capacity issue.
• In case, you don’t understand above points or you cannot resolve any
issue, contact concerned troubleshooting person on call.
26
Irrelative Alarms on Pre-Swap
• Antenna related alarms.(VSWR, Carrier uplink etc)
• SCTP alarm.
• Link broken between OMM and NE.
• SNTP time adjustment alarm.
• 1588 Clock source fault.
• The physical Ethernet link is broken.
27
Related Alarms in Pre-Swap
• Optical port receiving link failure(198098319)
• The RRU link is broken(198097605)
• Hardware type is different from the configuration(198092029)
• Device power down(198092295)
• Version package fault(198097567)
• Unavailable optical module(198098318)
• Software runs abnormally(198097604)
• Carrier downlink data problem(198098471)
• The board is not in position(198092072)
• Carrier uplink data is abnormal.(198093053)
• Disable PA(198098440)
• Initialization failure(198092070)
• The board is not configured(198092203)
• The board is powered off(198092057)
• Board communication link interrupted(198097060)
• Internal fault(198098467)
• Software loading is abnormal(198093056)
28
Alarms & Solution
29
Alarms & Solution
30
31
Alarms & Solution
32
Alarms & Solution
33
Alarms & Solution
34
Alarms & Solution
35
Alarms & Solution
36
Alarms & Solution
37
Alarms & Solution
Questions…
• In Live BTS, if GSM (2G) is down, UMTS (3G) will effect of not?
• In the worst scenario, if you have to edit the MO file on site, how you
will do it?
One More thing…
After pre-swap, the site engineer must feedback the snapshot of EFMS
to region management (Mr. Adeel and CC to us) as to confirm the pre-
swap is successful or not.
38
THANK YOU
39

More Related Content

Similar to Pre_Commissioning_steps_of_ZTE_SDR.pptx

UserGuide-DKAGPS-1_um_1v0.pdf
UserGuide-DKAGPS-1_um_1v0.pdfUserGuide-DKAGPS-1_um_1v0.pdf
UserGuide-DKAGPS-1_um_1v0.pdfMucussete Abudo
 
Why we didn't catch that
Why we didn't catch thatWhy we didn't catch that
Why we didn't catch thatgaoliang641
 
7106503678 td w8961-nd_qig
7106503678 td w8961-nd_qig7106503678 td w8961-nd_qig
7106503678 td w8961-nd_qigAkibo Davies
 
Snet+Pro+Service+Software_SNET+Pro+2+Instructions.pdf
Snet+Pro+Service+Software_SNET+Pro+2+Instructions.pdfSnet+Pro+Service+Software_SNET+Pro+2+Instructions.pdf
Snet+Pro+Service+Software_SNET+Pro+2+Instructions.pdffjero
 
Asia 14-garcia-illera-dude-wtf-in-my-can
Asia 14-garcia-illera-dude-wtf-in-my-canAsia 14-garcia-illera-dude-wtf-in-my-can
Asia 14-garcia-illera-dude-wtf-in-my-caninjenerzntu
 
BMW E60 CIPprogramming software update progcoding
BMW E60 CIPprogramming software update progcodingBMW E60 CIPprogramming software update progcoding
BMW E60 CIPprogramming software update progcodingbuyobdii
 
RISC-V 30907 summit 2020 joint picocom_mentor
RISC-V 30907 summit 2020 joint picocom_mentorRISC-V 30907 summit 2020 joint picocom_mentor
RISC-V 30907 summit 2020 joint picocom_mentorRISC-V International
 
Digital video recorder
Digital video recorderDigital video recorder
Digital video recorderVIKAS CHAUHAN
 
manual for WIM card programming
manual for WIM card programmingmanual for WIM card programming
manual for WIM card programmingGuriqbal Singh
 
시크 SICK Lector63x 2D DPM스캐너 고정식바코드스캐너 산업용바코드리더 이미지스캐너 매뉴얼
시크 SICK Lector63x 2D DPM스캐너 고정식바코드스캐너 산업용바코드리더 이미지스캐너 매뉴얼시크 SICK Lector63x 2D DPM스캐너 고정식바코드스캐너 산업용바코드리더 이미지스캐너 매뉴얼
시크 SICK Lector63x 2D DPM스캐너 고정식바코드스캐너 산업용바코드리더 이미지스캐너 매뉴얼HION IT
 
Final exam chapters 11 16
Final exam chapters 11 16Final exam chapters 11 16
Final exam chapters 11 16Icostyle
 
Bluetooth quick start_guide / Controlanything India
Bluetooth quick start_guide / Controlanything IndiaBluetooth quick start_guide / Controlanything India
Bluetooth quick start_guide / Controlanything IndiaDcube Tech Ventures
 
Network Management Card User Manual-en.pdf
Network Management Card User Manual-en.pdfNetwork Management Card User Manual-en.pdf
Network Management Card User Manual-en.pdfLuongVanLoi1
 
Template 8
Template 8Template 8
Template 8Icostyle
 
Template 3
Template 3Template 3
Template 3Icostyle
 
Installing and using the omni pcx enterprise pc installer v2.26 software
Installing and using the omni pcx enterprise pc installer v2.26 softwareInstalling and using the omni pcx enterprise pc installer v2.26 software
Installing and using the omni pcx enterprise pc installer v2.26 softwareNuno Torres
 

Similar to Pre_Commissioning_steps_of_ZTE_SDR.pptx (20)

UserGuide-DKAGPS-1_um_1v0.pdf
UserGuide-DKAGPS-1_um_1v0.pdfUserGuide-DKAGPS-1_um_1v0.pdf
UserGuide-DKAGPS-1_um_1v0.pdf
 
XLp Training V1.1.pdf
XLp Training  V1.1.pdfXLp Training  V1.1.pdf
XLp Training V1.1.pdf
 
Why we didn't catch that
Why we didn't catch thatWhy we didn't catch that
Why we didn't catch that
 
7106503678 td w8961-nd_qig
7106503678 td w8961-nd_qig7106503678 td w8961-nd_qig
7106503678 td w8961-nd_qig
 
Snet+Pro+Service+Software_SNET+Pro+2+Instructions.pdf
Snet+Pro+Service+Software_SNET+Pro+2+Instructions.pdfSnet+Pro+Service+Software_SNET+Pro+2+Instructions.pdf
Snet+Pro+Service+Software_SNET+Pro+2+Instructions.pdf
 
Asia 14-garcia-illera-dude-wtf-in-my-can
Asia 14-garcia-illera-dude-wtf-in-my-canAsia 14-garcia-illera-dude-wtf-in-my-can
Asia 14-garcia-illera-dude-wtf-in-my-can
 
BMW E60 CIPprogramming software update progcoding
BMW E60 CIPprogramming software update progcodingBMW E60 CIPprogramming software update progcoding
BMW E60 CIPprogramming software update progcoding
 
RISC-V 30907 summit 2020 joint picocom_mentor
RISC-V 30907 summit 2020 joint picocom_mentorRISC-V 30907 summit 2020 joint picocom_mentor
RISC-V 30907 summit 2020 joint picocom_mentor
 
Digital video recorder
Digital video recorderDigital video recorder
Digital video recorder
 
Procedure install cn510 step by step
Procedure install cn510 step by stepProcedure install cn510 step by step
Procedure install cn510 step by step
 
manual for WIM card programming
manual for WIM card programmingmanual for WIM card programming
manual for WIM card programming
 
시크 SICK Lector63x 2D DPM스캐너 고정식바코드스캐너 산업용바코드리더 이미지스캐너 매뉴얼
시크 SICK Lector63x 2D DPM스캐너 고정식바코드스캐너 산업용바코드리더 이미지스캐너 매뉴얼시크 SICK Lector63x 2D DPM스캐너 고정식바코드스캐너 산업용바코드리더 이미지스캐너 매뉴얼
시크 SICK Lector63x 2D DPM스캐너 고정식바코드스캐너 산업용바코드리더 이미지스캐너 매뉴얼
 
Wcdma bts-alarm-descriptions
Wcdma bts-alarm-descriptionsWcdma bts-alarm-descriptions
Wcdma bts-alarm-descriptions
 
Final exam chapters 11 16
Final exam chapters 11 16Final exam chapters 11 16
Final exam chapters 11 16
 
Bluetooth quick start_guide / Controlanything India
Bluetooth quick start_guide / Controlanything IndiaBluetooth quick start_guide / Controlanything India
Bluetooth quick start_guide / Controlanything India
 
Network Management Card User Manual-en.pdf
Network Management Card User Manual-en.pdfNetwork Management Card User Manual-en.pdf
Network Management Card User Manual-en.pdf
 
Template 8
Template 8Template 8
Template 8
 
Template 3
Template 3Template 3
Template 3
 
Lightspeed ii-manual-2012-jan
Lightspeed ii-manual-2012-janLightspeed ii-manual-2012-jan
Lightspeed ii-manual-2012-jan
 
Installing and using the omni pcx enterprise pc installer v2.26 software
Installing and using the omni pcx enterprise pc installer v2.26 softwareInstalling and using the omni pcx enterprise pc installer v2.26 software
Installing and using the omni pcx enterprise pc installer v2.26 software
 

Recently uploaded

Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...tanu pandey
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfRagavanV2
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdfSuman Jyoti
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfRagavanV2
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Standamitlee9823
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoordharasingh5698
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 

Recently uploaded (20)

Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 

Pre_Commissioning_steps_of_ZTE_SDR.pptx

  • 2. Scope of Presentation: • Commissioning of BTS CC card in Pre-swap • Software Version up-gradation Methods • Follow steps on Configuration Diagram in LMT • Troubleshoot the alarms one-by-one 2
  • 3. Commissioning of CC card • First of all, confirm that you have required version of LMT(LMT_v12.13.43P02_GUL) 3
  • 4. Commissioning of CC card • After that you must apply setting to you laptop LAN IP like following. 4
  • 5. Commissioning of CC card • Now open “EOMS” file from LMT as mentioned below. 5
  • 6. Commissioning of CC card • EOMS will open a windows like below then select “Image and burn” and press “OK” 6
  • 7. Commissioning of CC card • It will ask for selection of RADIO MODE, select “MULTIMODE” 7
  • 8. Commissioning of CC card • Select PATCH Directory & Commissioning File then press “OK” 8
  • 9. Commissioning of CC card • After that LMT will start the process of image burning. 9
  • 10. Commissioning of CC card • It will take a while 10
  • 11. Commissioning of CC card Burning/MO file Succeeded when it will be succeeded the display shows 11
  • 12. 12 Commissioning of CC card(2nd Method) Select “Online Configuration” & press “Station”. Fill the Station Name & Station IP field.
  • 13. 13 Commissioning of CC card (2nd Method) Give User name “admin” and left password field blank. Then press OK to login.
  • 14. 14 Commissioning of CC card (2nd Method) Go to “System” and select “Import”. After that select the MO file in xml format. Press OK.
  • 15. Commissioning of CC Card • After completed process & reset of CC board, you can login again in EOMS and you can see the following window. It would show you the topology. 15
  • 16. Expected Alarms in EFMS • You can login to EFMS and you can see the alarms. 16
  • 17. View the Topology and follow it • Connect the boards & fiber cables according to the topology shown in LMT. 17
  • 18. View the Topology and follow it • Connect the boards & fiber cables according to the topology shown in LMT. 18
  • 19. View the Topology and follow it 19
  • 20. Confirming the Software Version • Go to System and select Version Management to confirm the Version 20
  • 21. Confirming the Software Version • Version must be 4.13.10.38P42. All versions must be in RUN condition. In case of 3G site, UMTS package must also be available. 21
  • 22. Confirming the Software Version • In case software is not updated, just right click on Local window and add the package files. 22
  • 23. Confirming the Software Version • In case software is not updated, just right click on Local window and add the package files. 23
  • 24. Confirming the Software Version • It will take some time to upload. 24
  • 25. Confirming the Software Version • After that, right click on the package files on Local Window and select “Download”. It will download the files. 25
  • 26. Key Points for software downloading • After commissioning, first confirm running the package version. • Running package version must be 4.13.10.38P42 • If the running version is still old one we need to active the new one again. • In case, package files are corrupted or not active successfully, first Delete the files by right click on it and then download again. • If you download again without deleting it, it may cause capacity issue. • In case, you don’t understand above points or you cannot resolve any issue, contact concerned troubleshooting person on call. 26
  • 27. Irrelative Alarms on Pre-Swap • Antenna related alarms.(VSWR, Carrier uplink etc) • SCTP alarm. • Link broken between OMM and NE. • SNTP time adjustment alarm. • 1588 Clock source fault. • The physical Ethernet link is broken. 27
  • 28. Related Alarms in Pre-Swap • Optical port receiving link failure(198098319) • The RRU link is broken(198097605) • Hardware type is different from the configuration(198092029) • Device power down(198092295) • Version package fault(198097567) • Unavailable optical module(198098318) • Software runs abnormally(198097604) • Carrier downlink data problem(198098471) • The board is not in position(198092072) • Carrier uplink data is abnormal.(198093053) • Disable PA(198098440) • Initialization failure(198092070) • The board is not configured(198092203) • The board is powered off(198092057) • Board communication link interrupted(198097060) • Internal fault(198098467) • Software loading is abnormal(198093056) 28
  • 38. Questions… • In Live BTS, if GSM (2G) is down, UMTS (3G) will effect of not? • In the worst scenario, if you have to edit the MO file on site, how you will do it? One More thing… After pre-swap, the site engineer must feedback the snapshot of EFMS to region management (Mr. Adeel and CC to us) as to confirm the pre- swap is successful or not. 38