What do you see?
One more?
The last one?
The Toyota 3M
Model
Submitted by:
Snigdha Vashishth
16M909
MBA(II year)
Submitted To:
Dr. Vikas Thakur
3 Ms
MUDA MURI MURA
無駄 無理 斑 or ムラ
MUDA = WASTE
 Muda is any activity or process that does not add
value; a physical waste of your time, resources and
ultimately your money.
7 TYPES OF MUDA
These wastes were categorized by Taiichi Ohno within the
Toyota production system, they are;
 Transport; the movement of product between operations,
and locations.
 Inventory; the work in progress (WIP) and stocks of finished
goods and raw materials that a company holds.
 Motion; the physical movement of a person or machine
whilst conducting an operation.
 Waiting; the act of waiting for a machine to finish, for product
to arrive, or any other cause.
 Overproduction; Over producing product beyond what the
customer has ordered.
CONTD…
 Over-processing; conducting operations beyond those that
customer requires.
 Defects; product rejects and rework within your processes.
 Talent; failing to utilize the skills and knowledge of all of your
employees
 Resources; failing to turn off lights and unused machines
 By-Products; not making use of by-products of your process
There are numerous tools available to identify and
remove waste from your process, which include Poke
Yoke, Kanban, Takt Time, SMED and One-Piece flow.
MURA- UNEVENNESS
 Mura is the waste of unevenness or inconsistency.
 Mura creates many of the seven wastes that we
observe, Mura drives Muda! By failing to smooth our
demand we put unfair demands on our processes
and people and cause the creation of inventory and
other wastes.
Example
 One obvious example is production processes where the
manager is measured on monthly output, the
department rushes like mad in the final week of the
month to meet targets, using up components and
producing parts not actually required. The first week of
the month is then slow due to component shortages and
no focus on meeting targets. This gives us the hockey
stick graph of production as we see here on the right, far
better to smooth out production and work at the
demand of the customer.
VIDEO FOR MURA
MURI = OVERBURDEN
 Muri is to cause overburden, by this we mean to give
unnecessary stress to our employees and our
processes.
 This is caused by Mura and a host of other failures
in our system such as lack of training, unclear or no
defined ways of working, the wrong tools, and ill
thought out measures of performance.
 This means breakdowns when it comes to machines
and absenteeism when it comes to employees.
 Muri is a form of waste that actually creates much of
the Muda (non-value adding steps within your
processes).
EXAMPLE
Examples of Muri are;
 Working on processes you are not trained in
 Poorly laid out work places
 Unclear instructions
 Lack of proper tools and equipment
 Fluctuating demand (Mura)
 Lack of proper maintenance / unreliable equipment
 Unreliable processes
 Poor communication routes
 Muda is the direct obstacle of flow.
 There are 8 distinctive types of muda which all lead to
waiting times, and therefore longer lead times in a
process.
 Taking out the muda does not work. Usually, there is a
reason why the muda is there and this reason often has
to do with the other two enemies: muri and mura.
 This means the three enemies of Lean are interrelated
and should therefore be taken into account
simultaneously.
 The three enemies of lean can be found in both
production and office processes.
TOYOTA: OVERVIEW
 Toyota Motor Corporation is a
Japanese multinational automotive
manufacturer.
 Headquarters: Toyota, Aichi Prefecture,
Japan
 CEO: Akio Toyoda (23 Jun 2009-)
 Founder: Kiichiro Toyoda
TOYOTA PRODUCTION SYSTEM
 Founders of the Toyota Production System
(TPS)
Taiichi Ohno
(1912 †1990)
Shigeo Shingo
1909 †1990
7 Principles of Toyota
Production System
 Reduced setup time
 Small-lot production
 Employee Involvement and Empowerment
 Quality at the source
 Equipment maintenance
 Pull Production
 Supplier involvement
The Toyota Production System
Just In Time
 The manufacturing and conveyance of only what is needed, in
the amount needed. This enhances efficiency and enables
quick responses to change. Just-In-time presupposes Leveled
Production (Heijunka) and is build upon the three basic
operating principles of the pull system, continuous flow
processing and Takt Time.
 Continuous Flow Processing
One of the three basic requirements of Just-In-Time. This
means eliminating the stagnation of work in and between
processes and carrying out one-piece-at-a time production.
 In Lean, takt time is the rate at which a finished product
needs to be completed in order to meet customer demand.
JIT contd…
This is a small signboard that is the key control tool for
Just-in-Time production. Kanban serves:
 Instruction for production and conveyance
 A tool for visual control
 To check against over production
 To detect irregular processing speeds
 A tool to perform kaizen(continuous improvements)
JIDOKA
 Jidoka along with Just-In-Time, is one of the two main pillars
of the Toyota Production System.
 It refers to the ability of production lines to be stopped in the
event of such problems as equipment malfunctions, quality
problems or work being late either using machines which
have the ability to sense abnormalities or using workers who
push a line-stop button.
 This prevents passing on defects.
 Reoccurrence prevention becomes simpler as abnormalities
become more obvious making it possible to “build in quality
at the production process”.
 At the same time, since defects are prevented automatically,
inspectors become unnecessary, which in turn results in
significant labour savings.
Hey STOP!!
JIDOKA
Genchi Genbutsu
 Means go and see for yourself. Go see the problem. This is
the belief that practical experience is valued over theoretical
knowledge. You must see the problem to know the
problem.*Get your boots on; common phrase used at TMMK.
Andon Board
 A type of visual control that displays the current state of work
(i.e., abnormal conditions, work instructions, and job
progress information). It is one of the main tools of Jidoka.
who, what, where,
when why and how
JIDOKA
Poka Yoke
 Also referred to as mistake proofing or error proofing.
This refers to the low-cost, highly reliable devices or
innovations that either detect abnormal situations
before they occur at a production process; or once they
occur, will stop the machines or equipment and prevent
the production of defective products.
 Those which prevent errors by an operator and those
which detect errors by an operator and give a warning.
 Those which detect defects in a product and prevent
further processing on them.
HIJUNKA
 Production smoothing: A leveling technique to facilitate Just-In-Time
(JIT) production and to smooth out production in all departments, as
well as that of suppliers over a period of time.
 A vital technique for reducing waste and improving production
efficiency by leveling fluctuations in performance within the assembly
line.
 Fluctuation normally occurs through either customer demand or
within production itself.
 The Toyota Production System uses Heijunka to solve the former by
assembling a mix of models within each batch, and ensuring that
there is an inventory of product proportional to the variability in
demand.
 Furthermore, the disruption of production flow is minimised
by making sure that components are sequenced to be
available in the right quantity and at the right time, while
changeover periods for vital processes such as die changes
within the steel presses are as short as possible; often in as
little as three minutes.
 Muda (non-value added) exist everywhere related to
people, material and facilities, or the production set-up
itself.
 Kaizen refers to the series of activities whereby instances
of Muda are eliminated one by one at minimal cost, by
workers pooling their wisdom and increasing efficiency
in a timely manner.
 Kaizen activities typically emphasize manual work
operations rather than equipment.
 Also, Kaizen is not an activity to be performed by a
specialist, but can be – in fact should be – performed by
all employees at each job site.
KAIZEN
STANDARDISATION
 The Toyota Production System organizes all jobs
around human motion and creates an efficient
production sequence without muda. Work organized
in such a way is called standardized work. It is made
up of three elements: takt time, working sequence
and standard in-process stock.
 Standardization is a critical ingredient for Jidoka and
Just in Time. Consistency in methods is critical to
limiting variation in the process and achieving
efficient production in a timely manner.
History
 The most famous element of the TPS is no doubt the Just-in-Time
pillar of the production system. The phrase Just-in-Time was
coined by Kiichiro Toyota in 1937 after the start of Toyota Motor
Corporation.
 The company was quite poor and could not afford to waste money
on excess equipment or materials in production. Everything was
expected to be procured just in time and not too early or too late.
Later elements developed in the 1950’s including takt time,
standardized work, kanban, and supermarkets added to the basis
for JIT.
 After World War II Taiichi Ohno a promising engineer in the Toyoda
Spinning and Weaving Corporation was brought over to the
automotive side of the business.
 He was given the task of improving operational productivity and
driving in the concepts of Just-In-Time and Jidoka.
 He was eventually appointed machine shop manager of an
engine plant and experimented with many concepts in
production between the years of 1945-1955.
 His work and effort is largely what resulted in the formulation
of what is now acknowledged as the Toyota Production
System.
 There are numerous other people inside the company that
contributed to the overall development of the company and
the production system.
 There are also many other tools and techniques that were
developed in Toyota such as 7 Wastes, Standardized Work, 5S,
SMED, Visual Control, Error Proofing, as well as many others.
PERFORMANCE
PERFORMANCE
 80% increase in the per head production after
implementation of TPS, i.e., per head production
increased from 39.7 to 70.8 vehicles.
OPERATION INCOME
Lessons from Toyota’s Long Drive
 Toyota’s rise wasn’t quick or inevitable.
 Even in the early 1980s Ford and GM marketed bigger, better-
looking, and plusher cars than Toyota did—although its
soulless creations were more reliable and fuel efficient.
 The Japanese manufacturer closed the gap little by little,
improvement by improvement. In 1970 GM had a 40% chunk
of the U.S. car and light-trucks market, whereas Toyota had
only a 2% sliver.
 Toyota’s market share inched up to 3% in 1980, to 8% in 1990,
and to 9% in 2000, entering double digits for the first time
only in 2006, when it rose to 13% and GM’s fell to 26%.
Toyota’s ascension is best captured by the Japanese
word jojo: “slowly, gradually, and steadily.”
3mu
3mu

More Related Content

What's hot

History of Lean manufacturing & TPS 14 Principal
History of Lean manufacturing & TPS 14 PrincipalHistory of Lean manufacturing & TPS 14 Principal
History of Lean manufacturing & TPS 14 PrincipalSumon Kumar Kundu
 
8 WASTES IN LEAN MANUFACUTING & OVERVIEW OF VSM
8 WASTES IN LEAN MANUFACUTING & OVERVIEW OF VSM8 WASTES IN LEAN MANUFACUTING & OVERVIEW OF VSM
8 WASTES IN LEAN MANUFACUTING & OVERVIEW OF VSMSedhuSiddarth
 
Muri Mura Muda - 3Mus by Agilish Ganesh Chandrasekaran
Muri Mura Muda - 3Mus by Agilish Ganesh ChandrasekaranMuri Mura Muda - 3Mus by Agilish Ganesh Chandrasekaran
Muri Mura Muda - 3Mus by Agilish Ganesh Chandrasekarantcganesh
 
SMED - Quick Change Over
SMED - Quick Change OverSMED - Quick Change Over
SMED - Quick Change OverOskar Olofsson
 
"Visual management & 5S " in Lean T.P.S (Workshop slides)
"Visual management &  5S " in Lean T.P.S (Workshop slides)"Visual management &  5S " in Lean T.P.S (Workshop slides)
"Visual management & 5S " in Lean T.P.S (Workshop slides)Zeeshan Syed
 
The Seven Wastes
The Seven WastesThe Seven Wastes
The Seven WastesJorge Ros
 
8 muda waste_identifying_preview
8 muda waste_identifying_preview8 muda waste_identifying_preview
8 muda waste_identifying_previewJaroslaw Gadek, MBA
 
BASIC OF TOYOTA PRODUCTION SYSTEM
BASIC OF TOYOTA PRODUCTION SYSTEMBASIC OF TOYOTA PRODUCTION SYSTEM
BASIC OF TOYOTA PRODUCTION SYSTEMPrashant thakur
 

What's hot (20)

7 Types of Muda
7 Types of Muda7 Types of Muda
7 Types of Muda
 
History of Lean manufacturing & TPS 14 Principal
History of Lean manufacturing & TPS 14 PrincipalHistory of Lean manufacturing & TPS 14 Principal
History of Lean manufacturing & TPS 14 Principal
 
5 Steps to implementing Lean
5  Steps to implementing Lean5  Steps to implementing Lean
5 Steps to implementing Lean
 
Muri-Mura-Muda
Muri-Mura-MudaMuri-Mura-Muda
Muri-Mura-Muda
 
8 WASTES IN LEAN MANUFACUTING & OVERVIEW OF VSM
8 WASTES IN LEAN MANUFACUTING & OVERVIEW OF VSM8 WASTES IN LEAN MANUFACUTING & OVERVIEW OF VSM
8 WASTES IN LEAN MANUFACUTING & OVERVIEW OF VSM
 
How to reduce changeover loss
How to reduce changeover lossHow to reduce changeover loss
How to reduce changeover loss
 
13. value stream mapping
13. value stream mapping13. value stream mapping
13. value stream mapping
 
Muri Mura Muda - 3Mus by Agilish Ganesh Chandrasekaran
Muri Mura Muda - 3Mus by Agilish Ganesh ChandrasekaranMuri Mura Muda - 3Mus by Agilish Ganesh Chandrasekaran
Muri Mura Muda - 3Mus by Agilish Ganesh Chandrasekaran
 
Spaghetti Chart
Spaghetti ChartSpaghetti Chart
Spaghetti Chart
 
SMED - Quick Change Over
SMED - Quick Change OverSMED - Quick Change Over
SMED - Quick Change Over
 
"Visual management & 5S " in Lean T.P.S (Workshop slides)
"Visual management &  5S " in Lean T.P.S (Workshop slides)"Visual management &  5S " in Lean T.P.S (Workshop slides)
"Visual management & 5S " in Lean T.P.S (Workshop slides)
 
3 MU
3 MU3 MU
3 MU
 
7 waste in the production
7 waste in the production7 waste in the production
7 waste in the production
 
Identifying Lean Waste
Identifying Lean WasteIdentifying Lean Waste
Identifying Lean Waste
 
The Seven Wastes
The Seven WastesThe Seven Wastes
The Seven Wastes
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
8 muda waste_identifying_preview
8 muda waste_identifying_preview8 muda waste_identifying_preview
8 muda waste_identifying_preview
 
BASIC OF TOYOTA PRODUCTION SYSTEM
BASIC OF TOYOTA PRODUCTION SYSTEMBASIC OF TOYOTA PRODUCTION SYSTEM
BASIC OF TOYOTA PRODUCTION SYSTEM
 
Tools of lean mfg
Tools of lean mfgTools of lean mfg
Tools of lean mfg
 
16 major losses tng
16 major losses tng16 major losses tng
16 major losses tng
 

Similar to 3mu

Toyota Production System (broad)
Toyota Production System (broad)Toyota Production System (broad)
Toyota Production System (broad)Aysel Muradlı
 
Shigeo Shingo - The Master Of Lean
Shigeo Shingo - The Master Of LeanShigeo Shingo - The Master Of Lean
Shigeo Shingo - The Master Of LeanMohamed Helmy
 
Toyota production system
Toyota production systemToyota production system
Toyota production systemArya Kulang
 
Toyota Production System
Toyota Production SystemToyota Production System
Toyota Production SystemUdit Jain
 
Toyota's jit revolution ppt
Toyota's jit revolution pptToyota's jit revolution ppt
Toyota's jit revolution pptAkshay Jain
 
Toyota production system
Toyota production systemToyota production system
Toyota production systemDeepak25
 
PRODUCTION AND MATERIAL MANAGEMENT
PRODUCTION AND MATERIAL MANAGEMENTPRODUCTION AND MATERIAL MANAGEMENT
PRODUCTION AND MATERIAL MANAGEMENTAman Singh
 
Operation management toyota
Operation management toyotaOperation management toyota
Operation management toyotaAhmad Hirzi Azni
 
A Brief Overview on Toyota Production System (TPS.pdf
A Brief Overview on Toyota Production System (TPS.pdfA Brief Overview on Toyota Production System (TPS.pdf
A Brief Overview on Toyota Production System (TPS.pdfSarah Adams
 
JIT case study of Toyota
JIT case study of ToyotaJIT case study of Toyota
JIT case study of Toyotaaneela yousaf
 
Activities involved in succession process in uk 4
Activities involved in succession process in uk 4Activities involved in succession process in uk 4
Activities involved in succession process in uk 4John Johari
 
Toyota Production System Brochure
Toyota Production System BrochureToyota Production System Brochure
Toyota Production System BrochureRohan Thushara
 
Toyota Production System Brochure
Toyota Production System BrochureToyota Production System Brochure
Toyota Production System BrochureMauricio Veliz
 
Toyota Production System
Toyota Production SystemToyota Production System
Toyota Production SystemGurpreet Singh
 
The Toyota Company is the biggest auto-manufacture in the world. T.docx
The Toyota Company is the biggest auto-manufacture in the world. T.docxThe Toyota Company is the biggest auto-manufacture in the world. T.docx
The Toyota Company is the biggest auto-manufacture in the world. T.docxssusera34210
 
IRJET- Productivity Improvement by Implementing Lean Manufacturing Tools ...
IRJET-  	  Productivity Improvement by Implementing Lean Manufacturing Tools ...IRJET-  	  Productivity Improvement by Implementing Lean Manufacturing Tools ...
IRJET- Productivity Improvement by Implementing Lean Manufacturing Tools ...IRJET Journal
 

Similar to 3mu (20)

Toyota Production System
Toyota Production SystemToyota Production System
Toyota Production System
 
Toyota Production System (broad)
Toyota Production System (broad)Toyota Production System (broad)
Toyota Production System (broad)
 
Toyota production system
Toyota production systemToyota production system
Toyota production system
 
Shigeo Shingo - The Master Of Lean
Shigeo Shingo - The Master Of LeanShigeo Shingo - The Master Of Lean
Shigeo Shingo - The Master Of Lean
 
Introduction tps
Introduction tpsIntroduction tps
Introduction tps
 
Toyota production system
Toyota production systemToyota production system
Toyota production system
 
Toyota Production System
Toyota Production SystemToyota Production System
Toyota Production System
 
Toyota's jit revolution ppt
Toyota's jit revolution pptToyota's jit revolution ppt
Toyota's jit revolution ppt
 
Toyota
ToyotaToyota
Toyota
 
Toyota production system
Toyota production systemToyota production system
Toyota production system
 
PRODUCTION AND MATERIAL MANAGEMENT
PRODUCTION AND MATERIAL MANAGEMENTPRODUCTION AND MATERIAL MANAGEMENT
PRODUCTION AND MATERIAL MANAGEMENT
 
Operation management toyota
Operation management toyotaOperation management toyota
Operation management toyota
 
A Brief Overview on Toyota Production System (TPS.pdf
A Brief Overview on Toyota Production System (TPS.pdfA Brief Overview on Toyota Production System (TPS.pdf
A Brief Overview on Toyota Production System (TPS.pdf
 
JIT case study of Toyota
JIT case study of ToyotaJIT case study of Toyota
JIT case study of Toyota
 
Activities involved in succession process in uk 4
Activities involved in succession process in uk 4Activities involved in succession process in uk 4
Activities involved in succession process in uk 4
 
Toyota Production System Brochure
Toyota Production System BrochureToyota Production System Brochure
Toyota Production System Brochure
 
Toyota Production System Brochure
Toyota Production System BrochureToyota Production System Brochure
Toyota Production System Brochure
 
Toyota Production System
Toyota Production SystemToyota Production System
Toyota Production System
 
The Toyota Company is the biggest auto-manufacture in the world. T.docx
The Toyota Company is the biggest auto-manufacture in the world. T.docxThe Toyota Company is the biggest auto-manufacture in the world. T.docx
The Toyota Company is the biggest auto-manufacture in the world. T.docx
 
IRJET- Productivity Improvement by Implementing Lean Manufacturing Tools ...
IRJET-  	  Productivity Improvement by Implementing Lean Manufacturing Tools ...IRJET-  	  Productivity Improvement by Implementing Lean Manufacturing Tools ...
IRJET- Productivity Improvement by Implementing Lean Manufacturing Tools ...
 

Recently uploaded

Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...lizamodels9
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...lizamodels9
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...ictsugar
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?Olivia Kresic
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionMintel Group
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfJos Voskuil
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedLean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedKaiNexus
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCRashishs7044
 

Recently uploaded (20)

Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted Version
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdf
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)
 
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedLean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
 

3mu

  • 1. What do you see?
  • 4. The Toyota 3M Model Submitted by: Snigdha Vashishth 16M909 MBA(II year) Submitted To: Dr. Vikas Thakur
  • 5. 3 Ms MUDA MURI MURA 無駄 無理 斑 or ムラ
  • 6. MUDA = WASTE  Muda is any activity or process that does not add value; a physical waste of your time, resources and ultimately your money.
  • 7.
  • 8. 7 TYPES OF MUDA These wastes were categorized by Taiichi Ohno within the Toyota production system, they are;  Transport; the movement of product between operations, and locations.  Inventory; the work in progress (WIP) and stocks of finished goods and raw materials that a company holds.  Motion; the physical movement of a person or machine whilst conducting an operation.  Waiting; the act of waiting for a machine to finish, for product to arrive, or any other cause.  Overproduction; Over producing product beyond what the customer has ordered.
  • 9. CONTD…  Over-processing; conducting operations beyond those that customer requires.  Defects; product rejects and rework within your processes.  Talent; failing to utilize the skills and knowledge of all of your employees  Resources; failing to turn off lights and unused machines  By-Products; not making use of by-products of your process There are numerous tools available to identify and remove waste from your process, which include Poke Yoke, Kanban, Takt Time, SMED and One-Piece flow.
  • 10.
  • 11.
  • 12.
  • 13. MURA- UNEVENNESS  Mura is the waste of unevenness or inconsistency.  Mura creates many of the seven wastes that we observe, Mura drives Muda! By failing to smooth our demand we put unfair demands on our processes and people and cause the creation of inventory and other wastes.
  • 14. Example  One obvious example is production processes where the manager is measured on monthly output, the department rushes like mad in the final week of the month to meet targets, using up components and producing parts not actually required. The first week of the month is then slow due to component shortages and no focus on meeting targets. This gives us the hockey stick graph of production as we see here on the right, far better to smooth out production and work at the demand of the customer.
  • 15.
  • 17. MURI = OVERBURDEN  Muri is to cause overburden, by this we mean to give unnecessary stress to our employees and our processes.  This is caused by Mura and a host of other failures in our system such as lack of training, unclear or no defined ways of working, the wrong tools, and ill thought out measures of performance.  This means breakdowns when it comes to machines and absenteeism when it comes to employees.  Muri is a form of waste that actually creates much of the Muda (non-value adding steps within your processes).
  • 18. EXAMPLE Examples of Muri are;  Working on processes you are not trained in  Poorly laid out work places  Unclear instructions  Lack of proper tools and equipment  Fluctuating demand (Mura)  Lack of proper maintenance / unreliable equipment  Unreliable processes  Poor communication routes
  • 19.
  • 20.  Muda is the direct obstacle of flow.  There are 8 distinctive types of muda which all lead to waiting times, and therefore longer lead times in a process.  Taking out the muda does not work. Usually, there is a reason why the muda is there and this reason often has to do with the other two enemies: muri and mura.  This means the three enemies of Lean are interrelated and should therefore be taken into account simultaneously.  The three enemies of lean can be found in both production and office processes.
  • 21. TOYOTA: OVERVIEW  Toyota Motor Corporation is a Japanese multinational automotive manufacturer.  Headquarters: Toyota, Aichi Prefecture, Japan  CEO: Akio Toyoda (23 Jun 2009-)  Founder: Kiichiro Toyoda
  • 22. TOYOTA PRODUCTION SYSTEM  Founders of the Toyota Production System (TPS) Taiichi Ohno (1912 †1990) Shigeo Shingo 1909 †1990
  • 23. 7 Principles of Toyota Production System  Reduced setup time  Small-lot production  Employee Involvement and Empowerment  Quality at the source  Equipment maintenance  Pull Production  Supplier involvement
  • 25. Just In Time  The manufacturing and conveyance of only what is needed, in the amount needed. This enhances efficiency and enables quick responses to change. Just-In-time presupposes Leveled Production (Heijunka) and is build upon the three basic operating principles of the pull system, continuous flow processing and Takt Time.  Continuous Flow Processing One of the three basic requirements of Just-In-Time. This means eliminating the stagnation of work in and between processes and carrying out one-piece-at-a time production.  In Lean, takt time is the rate at which a finished product needs to be completed in order to meet customer demand.
  • 26.
  • 27.
  • 28. JIT contd… This is a small signboard that is the key control tool for Just-in-Time production. Kanban serves:  Instruction for production and conveyance  A tool for visual control  To check against over production  To detect irregular processing speeds  A tool to perform kaizen(continuous improvements)
  • 29. JIDOKA  Jidoka along with Just-In-Time, is one of the two main pillars of the Toyota Production System.  It refers to the ability of production lines to be stopped in the event of such problems as equipment malfunctions, quality problems or work being late either using machines which have the ability to sense abnormalities or using workers who push a line-stop button.  This prevents passing on defects.  Reoccurrence prevention becomes simpler as abnormalities become more obvious making it possible to “build in quality at the production process”.  At the same time, since defects are prevented automatically, inspectors become unnecessary, which in turn results in significant labour savings.
  • 31. JIDOKA Genchi Genbutsu  Means go and see for yourself. Go see the problem. This is the belief that practical experience is valued over theoretical knowledge. You must see the problem to know the problem.*Get your boots on; common phrase used at TMMK. Andon Board  A type of visual control that displays the current state of work (i.e., abnormal conditions, work instructions, and job progress information). It is one of the main tools of Jidoka.
  • 32. who, what, where, when why and how
  • 33. JIDOKA Poka Yoke  Also referred to as mistake proofing or error proofing. This refers to the low-cost, highly reliable devices or innovations that either detect abnormal situations before they occur at a production process; or once they occur, will stop the machines or equipment and prevent the production of defective products.  Those which prevent errors by an operator and those which detect errors by an operator and give a warning.  Those which detect defects in a product and prevent further processing on them.
  • 34. HIJUNKA  Production smoothing: A leveling technique to facilitate Just-In-Time (JIT) production and to smooth out production in all departments, as well as that of suppliers over a period of time.  A vital technique for reducing waste and improving production efficiency by leveling fluctuations in performance within the assembly line.  Fluctuation normally occurs through either customer demand or within production itself.  The Toyota Production System uses Heijunka to solve the former by assembling a mix of models within each batch, and ensuring that there is an inventory of product proportional to the variability in demand.
  • 35.  Furthermore, the disruption of production flow is minimised by making sure that components are sequenced to be available in the right quantity and at the right time, while changeover periods for vital processes such as die changes within the steel presses are as short as possible; often in as little as three minutes.
  • 36.  Muda (non-value added) exist everywhere related to people, material and facilities, or the production set-up itself.  Kaizen refers to the series of activities whereby instances of Muda are eliminated one by one at minimal cost, by workers pooling their wisdom and increasing efficiency in a timely manner.  Kaizen activities typically emphasize manual work operations rather than equipment.  Also, Kaizen is not an activity to be performed by a specialist, but can be – in fact should be – performed by all employees at each job site. KAIZEN
  • 37.
  • 38. STANDARDISATION  The Toyota Production System organizes all jobs around human motion and creates an efficient production sequence without muda. Work organized in such a way is called standardized work. It is made up of three elements: takt time, working sequence and standard in-process stock.  Standardization is a critical ingredient for Jidoka and Just in Time. Consistency in methods is critical to limiting variation in the process and achieving efficient production in a timely manner.
  • 39. History  The most famous element of the TPS is no doubt the Just-in-Time pillar of the production system. The phrase Just-in-Time was coined by Kiichiro Toyota in 1937 after the start of Toyota Motor Corporation.  The company was quite poor and could not afford to waste money on excess equipment or materials in production. Everything was expected to be procured just in time and not too early or too late. Later elements developed in the 1950’s including takt time, standardized work, kanban, and supermarkets added to the basis for JIT.  After World War II Taiichi Ohno a promising engineer in the Toyoda Spinning and Weaving Corporation was brought over to the automotive side of the business.  He was given the task of improving operational productivity and driving in the concepts of Just-In-Time and Jidoka.
  • 40.  He was eventually appointed machine shop manager of an engine plant and experimented with many concepts in production between the years of 1945-1955.  His work and effort is largely what resulted in the formulation of what is now acknowledged as the Toyota Production System.  There are numerous other people inside the company that contributed to the overall development of the company and the production system.  There are also many other tools and techniques that were developed in Toyota such as 7 Wastes, Standardized Work, 5S, SMED, Visual Control, Error Proofing, as well as many others.
  • 42. PERFORMANCE  80% increase in the per head production after implementation of TPS, i.e., per head production increased from 39.7 to 70.8 vehicles.
  • 44. Lessons from Toyota’s Long Drive  Toyota’s rise wasn’t quick or inevitable.  Even in the early 1980s Ford and GM marketed bigger, better- looking, and plusher cars than Toyota did—although its soulless creations were more reliable and fuel efficient.  The Japanese manufacturer closed the gap little by little, improvement by improvement. In 1970 GM had a 40% chunk of the U.S. car and light-trucks market, whereas Toyota had only a 2% sliver.  Toyota’s market share inched up to 3% in 1980, to 8% in 1990, and to 9% in 2000, entering double digits for the first time only in 2006, when it rose to 13% and GM’s fell to 26%. Toyota’s ascension is best captured by the Japanese word jojo: “slowly, gradually, and steadily.”