RISK ASSESSMENT RECORD - WITH ALL CONTROL
                                                   MEASURES IN PLACE


             Each assessment must take into account and record any specific hazards arising from the activity, before the assessment is complete.


                                                                                     Principal of College

                                                                                                                         Assessment Date: 26/02/13
Accommodation Assessed: field and woods location                                     Assessor.


                                                                                                                              RISK (with controls)       Additional
                                    Who might be
          HAZARD                                                         PRECAUTIONS/CONTROLS                                                            Controls
                                    harmed and
      potential for harm                                     already in place to remove hazard, reduce risk level              L       S        R        Needed.
                                    how ?
                                                                                                                                                        Details Over
Hygiene And Comfort                  Actors + film           •   Bring water and food for long periods of filming
                                    crew                                                                                       1       2        2

Trips, Slips and Falls              Actors + film            •   Wet grass could cause falling, take care where grass          1       1        3
[ Workplace Regs ]                  crew                         is involved
                                                             •   Could trip on un seen mounds or roots, stay where
                                                                 the grass is fairly short and most things can be seen
                                                             •   Look out for holes in the ground that cause falling
                                                                 or tripping
Fire Hazards                        Actors + film            •   Avoid using things such as lighters because grass
                                    crew                         catches fire quite easily
                                                                                                                               1       1        3
Accident                            Actors + film            •   Bring first aid kit just in case of injury
                                    crew
                                                                                                                               1       2        2
Electrical                          Actors + film            •   Be careful not to drop the filming equipment or
                                    crew, camera                 camera
                                    equipment
                                                                                                                               1       2        2
                                                             •   Film only when it is not raining to avoid getting
                                    could be
                                                                 camera or equipment wet
                                    damaged

The three columns (L,S,R) are for assessing the level or degree of risk. The first (L) is for an assessment of the likelihood of the hazard taking place, the second (S) for
the severity of the hazard, both based on the following:-

(L)   LIKELIHOOD                                             (S)   SEVERITY OF HAZARD                       (R) RISK LEVEL is product of Likelihood and Severity
                                                                                                                 (LxS).
1. Hazard exists very infrequently; limited numbers           1.   Could cause minor injury only
exposed                                                       2.   Could cause major injury/3 day or more       Very high risks score 6 or 9
2. Likely to occur; hazard exists intermittently or occurs            absence                                   Moderate risks score 3 or 4
    occasionally                                              3.   Could cause fatality/severe injury           Low priority risks score       1 or 2
3. Likely to occur soon; permanent hazard or occurs
    daily / repeatedly; many may be exposed                                                                     VERY HIGH RISKS NEED IMMEDIATE ACTION

More Related Content

What's hot

Risk assessment sheet
 Risk assessment sheet  Risk assessment sheet
Risk assessment sheet Jordan
 
Risk assessment
Risk assessmentRisk assessment
Risk assessmentxworldwide
 
Film production risk Assessment
Film production risk Assessment Film production risk Assessment
Film production risk Assessment Jordan
 
Risk Assessment .real
Risk Assessment .realRisk Assessment .real
Risk Assessment .realLarelleShay
 
Risk assessment template media
Risk assessment template mediaRisk assessment template media
Risk assessment template mediaLewisHodson1412
 
Risk assessment by daniel
Risk assessment by danielRisk assessment by daniel
Risk assessment by danielarfa4739
 
Film production risk assessment
Film production risk assessmentFilm production risk assessment
Film production risk assessmentLuke Finlay
 
Risk assessment[1]
Risk assessment[1]Risk assessment[1]
Risk assessment[1]ClaySkorski
 
Risk assessment[ 2outside
Risk assessment[ 2outsideRisk assessment[ 2outside
Risk assessment[ 2outsideDenniHepburn96
 
Music video riskassesment
Music video riskassesmentMusic video riskassesment
Music video riskassesmentPaigeward96
 
Music video riskassesment
Music video riskassesmentMusic video riskassesment
Music video riskassesmentPaigeward96
 

What's hot (17)

Risk assessment sheet
 Risk assessment sheet  Risk assessment sheet
Risk assessment sheet
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Film production risk Assessment
Film production risk Assessment Film production risk Assessment
Film production risk Assessment
 
Risk assesment
Risk assesmentRisk assesment
Risk assesment
 
Risk Assessment .real
Risk Assessment .realRisk Assessment .real
Risk Assessment .real
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Risk assessment template media
Risk assessment template mediaRisk assessment template media
Risk assessment template media
 
Risk assessment by daniel
Risk assessment by danielRisk assessment by daniel
Risk assessment by daniel
 
Film production risk assessment
Film production risk assessmentFilm production risk assessment
Film production risk assessment
 
Risk ass
Risk assRisk ass
Risk ass
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Risk assessment[1]
Risk assessment[1]Risk assessment[1]
Risk assessment[1]
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Risk assessment[ 2outside
Risk assessment[ 2outsideRisk assessment[ 2outside
Risk assessment[ 2outside
 
Music video riskassesment
Music video riskassesmentMusic video riskassesment
Music video riskassesment
 
Music video riskassesment
Music video riskassesmentMusic video riskassesment
Music video riskassesment
 

Viewers also liked

Relatoio contas sgu 2
Relatoio contas sgu 2Relatoio contas sgu 2
Relatoio contas sgu 2macoesapo
 
MOSSORÓ – Eleições 2014 | PESQUISA DE OPINIÃO PÚBLICA | Diagnóstico qu...
MOSSORÓ – Eleições 2014 | PESQUISA DE OPINIÃO PÚBLICA | Diagnóstico qu...MOSSORÓ – Eleições 2014 | PESQUISA DE OPINIÃO PÚBLICA | Diagnóstico qu...
MOSSORÓ – Eleições 2014 | PESQUISA DE OPINIÃO PÚBLICA | Diagnóstico qu...Consult Pesquisa
 
Actividad numero 2
Actividad numero 2Actividad numero 2
Actividad numero 2ColmenaresJJ
 
Coverage - Business Line - Admisi Forex - 28th October 14
Coverage - Business Line - Admisi Forex - 28th October 14Coverage - Business Line - Admisi Forex - 28th October 14
Coverage - Business Line - Admisi Forex - 28th October 14SURESH NAIR
 
αγαπημενεσ μου ιστοσελιδεσ
αγαπημενεσ μου ιστοσελιδεσαγαπημενεσ μου ιστοσελιδεσ
αγαπημενεσ μου ιστοσελιδεσVaggelis2
 
G1 clustering - content convergence v2 jve
G1 clustering - content convergence v2 jveG1 clustering - content convergence v2 jve
G1 clustering - content convergence v2 jveJuan V. Vidagany Espert
 
The nervous system
The nervous systemThe nervous system
The nervous systemMukul Kumar
 
Jayne Moore Model
Jayne Moore ModelJayne Moore Model
Jayne Moore ModelAlanaaliff
 
The effect of implementation of iso 9001 2008 qms organizational
The effect of implementation of iso 9001 2008 qms  organizationalThe effect of implementation of iso 9001 2008 qms  organizational
The effect of implementation of iso 9001 2008 qms organizationalIAEME Publication
 
Presentasi ekonomi (kredit)
Presentasi ekonomi (kredit)Presentasi ekonomi (kredit)
Presentasi ekonomi (kredit)kawidian_putri
 
Compromiso innovador260913 (2)
Compromiso innovador260913 (2)Compromiso innovador260913 (2)
Compromiso innovador260913 (2)Encarna Lago
 
Econ research report
Econ research reportEcon research report
Econ research reporthingnian
 

Viewers also liked (18)

Relatoio contas sgu 2
Relatoio contas sgu 2Relatoio contas sgu 2
Relatoio contas sgu 2
 
MOSSORÓ – Eleições 2014 | PESQUISA DE OPINIÃO PÚBLICA | Diagnóstico qu...
MOSSORÓ – Eleições 2014 | PESQUISA DE OPINIÃO PÚBLICA | Diagnóstico qu...MOSSORÓ – Eleições 2014 | PESQUISA DE OPINIÃO PÚBLICA | Diagnóstico qu...
MOSSORÓ – Eleições 2014 | PESQUISA DE OPINIÃO PÚBLICA | Diagnóstico qu...
 
Actividad numero 2
Actividad numero 2Actividad numero 2
Actividad numero 2
 
Coverage - Business Line - Admisi Forex - 28th October 14
Coverage - Business Line - Admisi Forex - 28th October 14Coverage - Business Line - Admisi Forex - 28th October 14
Coverage - Business Line - Admisi Forex - 28th October 14
 
αγαπημενεσ μου ιστοσελιδεσ
αγαπημενεσ μου ιστοσελιδεσαγαπημενεσ μου ιστοσελιδεσ
αγαπημενεσ μου ιστοσελιδεσ
 
eduClipper
eduClippereduClipper
eduClipper
 
Mapa coninformacion
Mapa coninformacionMapa coninformacion
Mapa coninformacion
 
G1 clustering - content convergence v2 jve
G1 clustering - content convergence v2 jveG1 clustering - content convergence v2 jve
G1 clustering - content convergence v2 jve
 
La arquitectura de Grecia
La arquitectura de GreciaLa arquitectura de Grecia
La arquitectura de Grecia
 
The nervous system
The nervous systemThe nervous system
The nervous system
 
Jayne Moore Model
Jayne Moore ModelJayne Moore Model
Jayne Moore Model
 
The effect of implementation of iso 9001 2008 qms organizational
The effect of implementation of iso 9001 2008 qms  organizationalThe effect of implementation of iso 9001 2008 qms  organizational
The effect of implementation of iso 9001 2008 qms organizational
 
presentatie gc
presentatie gcpresentatie gc
presentatie gc
 
Reloj secretin
Reloj secretinReloj secretin
Reloj secretin
 
Presentasi ekonomi (kredit)
Presentasi ekonomi (kredit)Presentasi ekonomi (kredit)
Presentasi ekonomi (kredit)
 
Compromiso innovador260913 (2)
Compromiso innovador260913 (2)Compromiso innovador260913 (2)
Compromiso innovador260913 (2)
 
Gc5
Gc5Gc5
Gc5
 
Econ research report
Econ research reportEcon research report
Econ research report
 

Similar to Risk assessment

Film production risk assessment form
Film production risk assessment formFilm production risk assessment form
Film production risk assessment formcembitmead
 
Risk assessment
Risk assessmentRisk assessment
Risk assessmentSam Benzie
 
Risk assessment
Risk assessmentRisk assessment
Risk assessmentSamHill129
 
Risk assessment regent street final
Risk assessment regent street finalRisk assessment regent street final
Risk assessment regent street finalDmeeThriller
 
Film production risk assessment
Film production risk assessmentFilm production risk assessment
Film production risk assessmentmulligan1
 
Outdoor Risk Assessment
Outdoor Risk AssessmentOutdoor Risk Assessment
Outdoor Risk Assessmentelleryanx
 
Risk assessment[ 2
Risk assessment[ 2Risk assessment[ 2
Risk assessment[ 2ClaySkorski
 
Indoor Risk Assessment
Indoor Risk AssessmentIndoor Risk Assessment
Indoor Risk Assessmentelleryanx
 
Group Risk Assessment Form
Group Risk Assessment FormGroup Risk Assessment Form
Group Risk Assessment Formt012588
 
Film production risk_assessment_ig2_
Film production risk_assessment_ig2_Film production risk_assessment_ig2_
Film production risk_assessment_ig2_rogernator1996
 
Film production risk_assessment_ig2_
Film production risk_assessment_ig2_Film production risk_assessment_ig2_
Film production risk_assessment_ig2_dannywatt1995
 

Similar to Risk assessment (20)

Risk assessment townhall
Risk assessment townhallRisk assessment townhall
Risk assessment townhall
 
Risk assessment classroom
Risk assessment classroomRisk assessment classroom
Risk assessment classroom
 
Film production risk assessment form
Film production risk assessment formFilm production risk assessment form
Film production risk assessment form
 
Risk Assessment
Risk AssessmentRisk Assessment
Risk Assessment
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Risk assessment regent street final
Risk assessment regent street finalRisk assessment regent street final
Risk assessment regent street final
 
Film production risk assessment
Film production risk assessmentFilm production risk assessment
Film production risk assessment
 
Film production risk assessment
Film production risk assessmentFilm production risk assessment
Film production risk assessment
 
Risk assesment
Risk assesmentRisk assesment
Risk assesment
 
Musicvideorisk
MusicvideoriskMusicvideorisk
Musicvideorisk
 
Outdoor Risk Assessment
Outdoor Risk AssessmentOutdoor Risk Assessment
Outdoor Risk Assessment
 
Risk assessment[ 2
Risk assessment[ 2Risk assessment[ 2
Risk assessment[ 2
 
Indoor Risk Assessment
Indoor Risk AssessmentIndoor Risk Assessment
Indoor Risk Assessment
 
Group Risk Assessment Form
Group Risk Assessment FormGroup Risk Assessment Form
Group Risk Assessment Form
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Film production risk_assessment_ig2_
Film production risk_assessment_ig2_Film production risk_assessment_ig2_
Film production risk_assessment_ig2_
 
Film production risk_assessment_ig2_
Film production risk_assessment_ig2_Film production risk_assessment_ig2_
Film production risk_assessment_ig2_
 

More from smashingentertainment (20)

Evaluation 2
Evaluation 2Evaluation 2
Evaluation 2
 
Me and my movies presentation
Me and my movies presentationMe and my movies presentation
Me and my movies presentation
 
Final major project production diary by james fox 08.4.13
Final major project production diary by james fox 08.4.13Final major project production diary by james fox 08.4.13
Final major project production diary by james fox 08.4.13
 
Final major project production diary by james fox 25.2.13
Final major project production diary by james fox 25.2.13Final major project production diary by james fox 25.2.13
Final major project production diary by james fox 25.2.13
 
Iron man 3 article
Iron man 3 articleIron man 3 article
Iron man 3 article
 
Production schedule 25.02.13
Production schedule 25.02.13Production schedule 25.02.13
Production schedule 25.02.13
 
Production diary
Production diaryProduction diary
Production diary
 
Production schedule 15.04.13
Production schedule 15.04.13Production schedule 15.04.13
Production schedule 15.04.13
 
Production diary
Production diaryProduction diary
Production diary
 
57proposal
57proposal57proposal
57proposal
 
Iron man 3 article
Iron man 3 articleIron man 3 article
Iron man 3 article
 
Magazine design evaluation
Magazine design evaluationMagazine design evaluation
Magazine design evaluation
 
Evaluation
EvaluationEvaluation
Evaluation
 
Me and my movies presentation
Me and my movies presentationMe and my movies presentation
Me and my movies presentation
 
Results
ResultsResults
Results
 
Music magazine questionnaire
Music magazine questionnaireMusic magazine questionnaire
Music magazine questionnaire
 
Logo designs
Logo designsLogo designs
Logo designs
 
Contents page analysis
Contents page analysisContents page analysis
Contents page analysis
 
Contents page analysis
Contents page analysisContents page analysis
Contents page analysis
 
Screenshots of edits 2
Screenshots of edits 2Screenshots of edits 2
Screenshots of edits 2
 

Risk assessment

  • 1. RISK ASSESSMENT RECORD - WITH ALL CONTROL MEASURES IN PLACE Each assessment must take into account and record any specific hazards arising from the activity, before the assessment is complete. Principal of College Assessment Date: 26/02/13 Accommodation Assessed: field and woods location Assessor. RISK (with controls)  Additional Who might be HAZARD PRECAUTIONS/CONTROLS Controls harmed and potential for harm already in place to remove hazard, reduce risk level L S R Needed. how ? Details Over Hygiene And Comfort Actors + film • Bring water and food for long periods of filming crew 1 2 2 Trips, Slips and Falls Actors + film • Wet grass could cause falling, take care where grass 1 1 3 [ Workplace Regs ] crew is involved • Could trip on un seen mounds or roots, stay where the grass is fairly short and most things can be seen • Look out for holes in the ground that cause falling or tripping Fire Hazards Actors + film • Avoid using things such as lighters because grass crew catches fire quite easily 1 1 3 Accident Actors + film • Bring first aid kit just in case of injury crew 1 2 2 Electrical Actors + film • Be careful not to drop the filming equipment or crew, camera camera equipment 1 2 2 • Film only when it is not raining to avoid getting could be camera or equipment wet damaged The three columns (L,S,R) are for assessing the level or degree of risk. The first (L) is for an assessment of the likelihood of the hazard taking place, the second (S) for
  • 2. the severity of the hazard, both based on the following:- (L) LIKELIHOOD (S) SEVERITY OF HAZARD (R) RISK LEVEL is product of Likelihood and Severity (LxS). 1. Hazard exists very infrequently; limited numbers 1. Could cause minor injury only exposed 2. Could cause major injury/3 day or more Very high risks score 6 or 9 2. Likely to occur; hazard exists intermittently or occurs absence Moderate risks score 3 or 4 occasionally 3. Could cause fatality/severe injury Low priority risks score 1 or 2 3. Likely to occur soon; permanent hazard or occurs daily / repeatedly; many may be exposed VERY HIGH RISKS NEED IMMEDIATE ACTION