SlideShare a Scribd company logo
1 of 3
Dear students get fully solved assignments
Send your semester & Specialization name to our mail id :
“ help.mbaassignments@gmail.com ”
or
Call us at : 08263069601
ASSIGNMENT
DRIVE SPRING 2015
PROGRAM MBADS (SEM 4/SEM 6)MBAFLEX/ MBA (SEM 4) PGDISMN (SEM
2)
SUBJECT CODE & NAME OM0018– TECHNOLOGY MANAGEMENT
BK ID B1979
CREDITS 4
MARKS 60
Note: Answer all questions. Kindly note that answers for 10 marks questions should be approximately
of 400 words. Each questionis followedbyevaluation scheme.
Q.1: What are the differentline balancingmethods?
Answer:The manual methodstobe presentedare :
 Largest-candidate rule
 Kilbridge andWester’smethod
 Rankedpositional weightsmethod
We considersome computerproceduresforsolvingthe line balancingproblem.
Largest-candidate rule
Thisis the easiestmethodtounderstand.The
Q.2: What are the various techniquesof costing?
Answer: The methods of costing, following are the types of costing techniques which are used by
management only for controlling costs and making some important managerial decisions. As a matter of
fact, they are not independent methods of cost finding such as job or process costing but are basically
costingtechniqueswhichcanbe usedas an advantage withanyof the methodsdiscussedabove.
 Marginal Costing:Marginal costingisa
Q.3: What are the differentapproachesto salesand operationsplanning?
Answer: A strategic approach to sales and operational planning uses the major activities of the company
to support overall company goals in an integrated fashion. Sales and operations coordinate initiatives to
ensure that sales results transfer to operational efforts in a way that supports company objectives. You
can achieve better overall company performance through strategic integration of sales and operational
plansand witha highlevel of coordinationbetweenthe
Q.4: What are the rules for schedulingKanban production?
Answer: We use thisfunction when you process your in-house production with production orders. When
the demand source sets the kanban to EMPTY, the system creates a production order for the kanban
quantityforthe supplysource.
Prerequisites
 We have determinedthe masterdata,BOM,routingand workcenter.
 If necessary, We have assigned an applicable production scheduling profile to the material to
make sure that the productionorderis
Q.5: What are factors must be considered while implementing a production planning and control
system?
Answer: There are many factors in an application implementation-related project that over time have
proved to be key contributors to the success of such projects. This includes items that may seem
obvious, such as solid testing, communication, and involvement by key staff members, but these are
often underutilized in favor of saving time. When projects skimp on these key items, it is likely to result
in:
 delaysinmeetingprojectdates,
 disagreementsonwhatthe projectis
Q.6: Mention the reasons why manufacturing organizations choose Excel and Visual Basic prototype
as planning and schedulingtools.
Answer: Microsoft Excel is one of the greatest, most powerful, most important software applications of
all time. Many in the industry will no doubt object. But it provides enormous capacity to do quantitative
analysis, letting you do anything from statistical analyses of databases with hundreds of thousands of
records to complex estimation tools with user-friendly front ends. And unlike traditional statistical
programs, it provides an intuitive interface that lets you see what happens to the data as you
manipulate them.
As a consequence, Excel is everywhere you look in the business world—especially in areas where people
are adding up numbers a lot, like marketing, business development, sales, and, yes, finance. For all the
talkabout end-to-endfinancial suiteslike SAP, Oracle,
Dear students get fully solved assignments
Send your semester & Specialization name to our mail id :
“ help.mbaassignments@gmail.com ”
or
Call us at : 08263069601

More Related Content

What's hot

Mark\'s work history
Mark\'s work historyMark\'s work history
Mark\'s work historymsislo
 
Employer final review_GM
Employer final review_GMEmployer final review_GM
Employer final review_GMHuzefa Mikail
 
Mb 0049 project management winter 2014
Mb 0049 project management winter 2014Mb 0049 project management winter 2014
Mb 0049 project management winter 2014Mba Assignments
 
Spitzig Slide Show
Spitzig Slide ShowSpitzig Slide Show
Spitzig Slide ShowJoe Spitzig
 
Is Your Software Working For You
Is Your Software Working For YouIs Your Software Working For You
Is Your Software Working For YouIan Shufflebotham
 
Value engineering _2_
Value engineering _2_Value engineering _2_
Value engineering _2_Swetlina .
 
4th om sem nmims june 2021 solved assignments
4th om sem nmims june 2021 solved assignments 4th om sem nmims june 2021 solved assignments
4th om sem nmims june 2021 solved assignments rachitvishnoi1
 
Krishna Prasad Consulting PPT
Krishna Prasad Consulting PPTKrishna Prasad Consulting PPT
Krishna Prasad Consulting PPTkrishnap2000
 
Mb0049 project management
Mb0049   project managementMb0049   project management
Mb0049 project managementsmumbahelp
 
3 fatal-flaws-of-a-b-testing
3 fatal-flaws-of-a-b-testing3 fatal-flaws-of-a-b-testing
3 fatal-flaws-of-a-b-testingAndrew Buxo
 
Getting from EA to Implemented Processes
Getting from EA to Implemented ProcessesGetting from EA to Implemented Processes
Getting from EA to Implemented ProcessesNathaniel Palmer
 
Omni – construction erp addressing pain areas | www.aspirtek.com
Omni – construction erp   addressing pain areas | www.aspirtek.comOmni – construction erp   addressing pain areas | www.aspirtek.com
Omni – construction erp addressing pain areas | www.aspirtek.comdevangk
 
What is VAVE
What is VAVE What is VAVE
What is VAVE Reff Ren
 
Resume-Hongyi Liu
Resume-Hongyi LiuResume-Hongyi Liu
Resume-Hongyi LiuHongyi Liu
 
VA/VE Presentation
VA/VE PresentationVA/VE Presentation
VA/VE Presentationjonschofield
 

What's hot (19)

MBA Question Papers
MBA Question PapersMBA Question Papers
MBA Question Papers
 
Mark\'s work history
Mark\'s work historyMark\'s work history
Mark\'s work history
 
Employer final review_GM
Employer final review_GMEmployer final review_GM
Employer final review_GM
 
Mb 0049 project management winter 2014
Mb 0049 project management winter 2014Mb 0049 project management winter 2014
Mb 0049 project management winter 2014
 
Value Engineering
Value EngineeringValue Engineering
Value Engineering
 
Chapter 9
Chapter 9Chapter 9
Chapter 9
 
Spitzig Slide Show
Spitzig Slide ShowSpitzig Slide Show
Spitzig Slide Show
 
Is Your Software Working For You
Is Your Software Working For YouIs Your Software Working For You
Is Your Software Working For You
 
Value engineering _2_
Value engineering _2_Value engineering _2_
Value engineering _2_
 
hershey foods-failure and success with it CS
hershey foods-failure and success with it CShershey foods-failure and success with it CS
hershey foods-failure and success with it CS
 
4th om sem nmims june 2021 solved assignments
4th om sem nmims june 2021 solved assignments 4th om sem nmims june 2021 solved assignments
4th om sem nmims june 2021 solved assignments
 
Krishna Prasad Consulting PPT
Krishna Prasad Consulting PPTKrishna Prasad Consulting PPT
Krishna Prasad Consulting PPT
 
Mb0049 project management
Mb0049   project managementMb0049   project management
Mb0049 project management
 
3 fatal-flaws-of-a-b-testing
3 fatal-flaws-of-a-b-testing3 fatal-flaws-of-a-b-testing
3 fatal-flaws-of-a-b-testing
 
Getting from EA to Implemented Processes
Getting from EA to Implemented ProcessesGetting from EA to Implemented Processes
Getting from EA to Implemented Processes
 
Omni – construction erp addressing pain areas | www.aspirtek.com
Omni – construction erp   addressing pain areas | www.aspirtek.comOmni – construction erp   addressing pain areas | www.aspirtek.com
Omni – construction erp addressing pain areas | www.aspirtek.com
 
What is VAVE
What is VAVE What is VAVE
What is VAVE
 
Resume-Hongyi Liu
Resume-Hongyi LiuResume-Hongyi Liu
Resume-Hongyi Liu
 
VA/VE Presentation
VA/VE PresentationVA/VE Presentation
VA/VE Presentation
 

Viewers also liked

Students: How to get started in the tech world
Students: How to get started in the tech worldStudents: How to get started in the tech world
Students: How to get started in the tech worldDavid Voyles
 
Stratton Creber Customer Testimonial
Stratton Creber Customer TestimonialStratton Creber Customer Testimonial
Stratton Creber Customer TestimonialTrevor Vare
 
Ma0044 institutional banking
Ma0044   institutional bankingMa0044   institutional banking
Ma0044 institutional bankingsmumbahelp
 
Bb0028 – entrepreneurship development
Bb0028 – entrepreneurship developmentBb0028 – entrepreneurship development
Bb0028 – entrepreneurship developmentsmumbahelp
 
LOS 5 SENTIDOS
LOS 5 SENTIDOSLOS 5 SENTIDOS
LOS 5 SENTIDOSEli MM
 
Roof Top Water Proofing Using Yalahanka Tiles
Roof Top Water Proofing Using Yalahanka TilesRoof Top Water Proofing Using Yalahanka Tiles
Roof Top Water Proofing Using Yalahanka TilesD K Associates
 
Grow talks presentation final
Grow talks presentation finalGrow talks presentation final
Grow talks presentation finalMark Organ
 
Mi0038 enterprise resource planning
Mi0038  enterprise resource planningMi0038  enterprise resource planning
Mi0038 enterprise resource planningsmumbahelp
 

Viewers also liked (13)

Students: How to get started in the tech world
Students: How to get started in the tech worldStudents: How to get started in the tech world
Students: How to get started in the tech world
 
Stratton Creber Customer Testimonial
Stratton Creber Customer TestimonialStratton Creber Customer Testimonial
Stratton Creber Customer Testimonial
 
Presentation_NEW.PPTX
Presentation_NEW.PPTXPresentation_NEW.PPTX
Presentation_NEW.PPTX
 
Cocina española
Cocina españolaCocina española
Cocina española
 
Siddhartha
SiddharthaSiddhartha
Siddhartha
 
Facebook
FacebookFacebook
Facebook
 
Ma0044 institutional banking
Ma0044   institutional bankingMa0044   institutional banking
Ma0044 institutional banking
 
Bb0028 – entrepreneurship development
Bb0028 – entrepreneurship developmentBb0028 – entrepreneurship development
Bb0028 – entrepreneurship development
 
LOS 5 SENTIDOS
LOS 5 SENTIDOSLOS 5 SENTIDOS
LOS 5 SENTIDOS
 
Roof Top Water Proofing Using Yalahanka Tiles
Roof Top Water Proofing Using Yalahanka TilesRoof Top Water Proofing Using Yalahanka Tiles
Roof Top Water Proofing Using Yalahanka Tiles
 
Grow talks presentation final
Grow talks presentation finalGrow talks presentation final
Grow talks presentation final
 
Erfahrungen mit Ava Trade
Erfahrungen mit Ava TradeErfahrungen mit Ava Trade
Erfahrungen mit Ava Trade
 
Mi0038 enterprise resource planning
Mi0038  enterprise resource planningMi0038  enterprise resource planning
Mi0038 enterprise resource planning
 

Similar to Get fully solved MBA assignments

Mi0038 enterprise resource planning
Mi0038   enterprise resource planningMi0038   enterprise resource planning
Mi0038 enterprise resource planningsmumbahelp
 
Mb0044 production and operation management..
Mb0044   production and operation management..Mb0044   production and operation management..
Mb0044 production and operation management..smumbahelp
 
Mb0049 project management
Mb0049   project managementMb0049   project management
Mb0049 project managementsmumbahelp
 
Mb0049 project management
Mb0049   project managementMb0049   project management
Mb0049 project managementsmumbahelp
 
Pm0015 – quantitative methods in project
Pm0015 – quantitative methods in projectPm0015 – quantitative methods in project
Pm0015 – quantitative methods in projectsmumbahelp
 
Bba501 & production and operations management
Bba501 & production and operations managementBba501 & production and operations management
Bba501 & production and operations managementsmumbahelp
 
Pm0015 quantitative methods in project management
Pm0015   quantitative methods in project managementPm0015   quantitative methods in project management
Pm0015 quantitative methods in project managementsmumbahelp
 
Om0017 advanced production and planning control
Om0017 advanced production and planning controlOm0017 advanced production and planning control
Om0017 advanced production and planning controlconsult4solutions
 
Pm0017 –project quality management
Pm0017 –project quality managementPm0017 –project quality management
Pm0017 –project quality managementsmumbahelp
 
Mb0049 project management (2)
Mb0049   project management (2)Mb0049   project management (2)
Mb0049 project management (2)smumbahelp
 
Mb0049 project management (2)
Mb0049   project management (2)Mb0049   project management (2)
Mb0049 project management (2)Study Stuff
 
Mi0038 enterprise resource planning
Mi0038   enterprise resource planningMi0038   enterprise resource planning
Mi0038 enterprise resource planningStudy Stuff
 
Om0011 enterprises resource planning 2
Om0011  enterprises resource planning 2Om0011  enterprises resource planning 2
Om0011 enterprises resource planning 2Study Stuff
 
Ms – 05 management of machines and materials
Ms – 05 management of machines and materialsMs – 05 management of machines and materials
Ms – 05 management of machines and materialssmumbahelp
 
Pm0017 project quality management
Pm0017  project quality managementPm0017  project quality management
Pm0017 project quality managementsmumbahelp
 
Pm0017 project quality management
Pm0017  project quality managementPm0017  project quality management
Pm0017 project quality managementsmumbahelp
 
Pm0017 –project quality management
Pm0017 –project quality managementPm0017 –project quality management
Pm0017 –project quality managementsmumbahelp
 
Mi0038 enterprise resource planning
Mi0038   enterprise resource planningMi0038   enterprise resource planning
Mi0038 enterprise resource planningsmumbahelp
 
Mi0038 enterprise resource planning
Mi0038   enterprise resource planningMi0038   enterprise resource planning
Mi0038 enterprise resource planningsmumbahelp
 

Similar to Get fully solved MBA assignments (20)

Mi0038 enterprise resource planning
Mi0038   enterprise resource planningMi0038   enterprise resource planning
Mi0038 enterprise resource planning
 
Mb0044 production and operation management..
Mb0044   production and operation management..Mb0044   production and operation management..
Mb0044 production and operation management..
 
Chandrashekhar resume
Chandrashekhar resumeChandrashekhar resume
Chandrashekhar resume
 
Mb0049 project management
Mb0049   project managementMb0049   project management
Mb0049 project management
 
Mb0049 project management
Mb0049   project managementMb0049   project management
Mb0049 project management
 
Pm0015 – quantitative methods in project
Pm0015 – quantitative methods in projectPm0015 – quantitative methods in project
Pm0015 – quantitative methods in project
 
Bba501 & production and operations management
Bba501 & production and operations managementBba501 & production and operations management
Bba501 & production and operations management
 
Pm0015 quantitative methods in project management
Pm0015   quantitative methods in project managementPm0015   quantitative methods in project management
Pm0015 quantitative methods in project management
 
Om0017 advanced production and planning control
Om0017 advanced production and planning controlOm0017 advanced production and planning control
Om0017 advanced production and planning control
 
Pm0017 –project quality management
Pm0017 –project quality managementPm0017 –project quality management
Pm0017 –project quality management
 
Mb0049 project management (2)
Mb0049   project management (2)Mb0049   project management (2)
Mb0049 project management (2)
 
Mb0049 project management (2)
Mb0049   project management (2)Mb0049   project management (2)
Mb0049 project management (2)
 
Mi0038 enterprise resource planning
Mi0038   enterprise resource planningMi0038   enterprise resource planning
Mi0038 enterprise resource planning
 
Om0011 enterprises resource planning 2
Om0011  enterprises resource planning 2Om0011  enterprises resource planning 2
Om0011 enterprises resource planning 2
 
Ms – 05 management of machines and materials
Ms – 05 management of machines and materialsMs – 05 management of machines and materials
Ms – 05 management of machines and materials
 
Pm0017 project quality management
Pm0017  project quality managementPm0017  project quality management
Pm0017 project quality management
 
Pm0017 project quality management
Pm0017  project quality managementPm0017  project quality management
Pm0017 project quality management
 
Pm0017 –project quality management
Pm0017 –project quality managementPm0017 –project quality management
Pm0017 –project quality management
 
Mi0038 enterprise resource planning
Mi0038   enterprise resource planningMi0038   enterprise resource planning
Mi0038 enterprise resource planning
 
Mi0038 enterprise resource planning
Mi0038   enterprise resource planningMi0038   enterprise resource planning
Mi0038 enterprise resource planning
 

Get fully solved MBA assignments

  • 1. Dear students get fully solved assignments Send your semester & Specialization name to our mail id : “ help.mbaassignments@gmail.com ” or Call us at : 08263069601 ASSIGNMENT DRIVE SPRING 2015 PROGRAM MBADS (SEM 4/SEM 6)MBAFLEX/ MBA (SEM 4) PGDISMN (SEM 2) SUBJECT CODE & NAME OM0018– TECHNOLOGY MANAGEMENT BK ID B1979 CREDITS 4 MARKS 60 Note: Answer all questions. Kindly note that answers for 10 marks questions should be approximately of 400 words. Each questionis followedbyevaluation scheme. Q.1: What are the differentline balancingmethods? Answer:The manual methodstobe presentedare :  Largest-candidate rule  Kilbridge andWester’smethod  Rankedpositional weightsmethod We considersome computerproceduresforsolvingthe line balancingproblem. Largest-candidate rule Thisis the easiestmethodtounderstand.The Q.2: What are the various techniquesof costing? Answer: The methods of costing, following are the types of costing techniques which are used by management only for controlling costs and making some important managerial decisions. As a matter of fact, they are not independent methods of cost finding such as job or process costing but are basically costingtechniqueswhichcanbe usedas an advantage withanyof the methodsdiscussedabove.
  • 2.  Marginal Costing:Marginal costingisa Q.3: What are the differentapproachesto salesand operationsplanning? Answer: A strategic approach to sales and operational planning uses the major activities of the company to support overall company goals in an integrated fashion. Sales and operations coordinate initiatives to ensure that sales results transfer to operational efforts in a way that supports company objectives. You can achieve better overall company performance through strategic integration of sales and operational plansand witha highlevel of coordinationbetweenthe Q.4: What are the rules for schedulingKanban production? Answer: We use thisfunction when you process your in-house production with production orders. When the demand source sets the kanban to EMPTY, the system creates a production order for the kanban quantityforthe supplysource. Prerequisites  We have determinedthe masterdata,BOM,routingand workcenter.  If necessary, We have assigned an applicable production scheduling profile to the material to make sure that the productionorderis Q.5: What are factors must be considered while implementing a production planning and control system? Answer: There are many factors in an application implementation-related project that over time have proved to be key contributors to the success of such projects. This includes items that may seem obvious, such as solid testing, communication, and involvement by key staff members, but these are often underutilized in favor of saving time. When projects skimp on these key items, it is likely to result in:  delaysinmeetingprojectdates,  disagreementsonwhatthe projectis Q.6: Mention the reasons why manufacturing organizations choose Excel and Visual Basic prototype as planning and schedulingtools. Answer: Microsoft Excel is one of the greatest, most powerful, most important software applications of all time. Many in the industry will no doubt object. But it provides enormous capacity to do quantitative
  • 3. analysis, letting you do anything from statistical analyses of databases with hundreds of thousands of records to complex estimation tools with user-friendly front ends. And unlike traditional statistical programs, it provides an intuitive interface that lets you see what happens to the data as you manipulate them. As a consequence, Excel is everywhere you look in the business world—especially in areas where people are adding up numbers a lot, like marketing, business development, sales, and, yes, finance. For all the talkabout end-to-endfinancial suiteslike SAP, Oracle, Dear students get fully solved assignments Send your semester & Specialization name to our mail id : “ help.mbaassignments@gmail.com ” or Call us at : 08263069601