A Presentation by OASIS | Horizon2020 Insurance
www.h2020insurance.oasishub.co
Outline 1.Broad progress and results
2.Deliverables, milestones, mid-term review
3.Data creation and management
4.Meetings with end-users and stakeholders
5.Communications conducted and planned
6.Outlook
3
A Presentation by OASIS | Horizon2020 Insurance
www.h2020insurance.oasishub.co
1. Broad progress
• Improved fluvial hazard model setup with 25m DEM and OSM data
• First hazard maps (IMAGE 10ka > SWIM > CamaFlood)
• Completed pluvial hazard model for Novi Sad and started for Bratislava
• 2nd Novi Sad stakeholder workshop and 4th Technical Review Meeting
• Completed Oasis-LMF compliant cat model chain
4
A Presentation by OASIS | Horizon2020 Insurance
www.h2020insurance.oasishub.co
Fluvial flood model improvements
SWIM, CamaFlood
OpenStreeMap data
• River central lines
• River banks
• Residential /
industrial areas
• Lakes & reservoirs
90m
25m
5
A Presentation by OASIS | Horizon2020 Insurance
www.h2020insurance.oasishub.co
EOBS-IMAGE-SWIM CamaFlood
100-year flood hazard map
6
A Presentation by OASIS | Horizon2020 Insurance
www.h2020insurance.oasishub.co
100-year flooded area, reference vs current climate period
ICHEC-KNMI – IMAGE – SWIM – CamaFlood
Entire catchment OSM populated/industrial
7
A Presentation by OASIS | Horizon2020 Insurance
www.h2020insurance.oasishub.co
Pluvial flood simulations
Bratislava (25m DEM)Novi Sad (5m DEM)
100-year event, RP2 Sewer system 100-year rainfall event
8
A Presentation by OASIS | Horizon2020 Insurance
www.h2020insurance.oasishub.co
Planned WWTP Plant at Rokov Potok
RP100, conceptual drainage system, infiltrationPlanned WWTP plant at Novi Sad
9
A Presentation by OASIS | Horizon2020 Insurance
www.h2020insurance.oasishub.co
WRF simulations of select extremes
Results: 15/7 2016 (61 mm) & 24/5 2015 (122 mm)
10
A Presentation by OASIS | Horizon2020 Insurance
www.h2020insurance.oasishub.co
2. Deliverables, milestones, mid-term review
• M2.1.1.1 Risk mapping ready (M24)
• D2.1.1.1 OASIS LMF compliant hazard and risk mapping in the Danube basin uploaded to
the OASIS-Hub (M24) – final stages
• Mid-term review: few changes to narrative document, contributed to updates of WP2.1.3
11
A Presentation by OASIS | Horizon2020 Insurance
www.h2020insurance.oasishub.co
3. Data creation and management
• Updated version of the fluvial flood model (PIK servers)
• Started the creation of Oasis-LMF footprint files (large files, PIK servers)
• Novi Sad and Bratislava pluvial flood model output (DTU servers)
12
A Presentation by OASIS | Horizon2020 Insurance
www.h2020insurance.oasishub.co
• 2nd Novi Sad Stakeholder workshop
• Presentation of updated results, mainly pluvial and fluvial flooding
• Highlighted fluvial flood risk at selected site
• 4rd Technical Review Meeting
• Mid April in Munich, organised by Genillard & Co at the AllianceRe HQ
• 6-8 insurance experts, participants from WP2.1.1 and WP2.1.2
• Decided to provide full Oasis-LMF model setup for insurers to test
• Valuable input from insurance modelling experts (continuing)
• Series of calls with SwissRe and Generali
4. Meetings with end-users and stakeholders
M18 - 24
13
A Presentation by OASIS | Horizon2020 Insurance
www.h2020insurance.oasishub.co
• Presentation of the FDM to the Sava Commission (February, Zagreb)
• G&co best-practice NatCat workshop (April, Munich)
• Representation at the EGU (April, Vienna)
• Presentation of the FDM to the International Commission for the Protection
of the Danube River (ICPDR) (next week, Bucharest)
5. Communications
M18 - 24
14
A Presentation by OASIS | Horizon2020 Insurance
www.h2020insurance.oasishub.co
6. Outlook
M18 - 24
• Validation of Oasis-LMF model setup with
insurance partners
• Fluvial model improvements and validation with
input from TU Munich Interreg project (river cross
sections)
• Further validation using external risk maps
• Papers on the setup, calibration, validation of the
comprehensive models
• 6th Technical Review Meeting (October 2019)
Get in touch
PIK Potsdam: wortmann@pik-potsdam.de, hattermann@pik-potsdam.de
GFZ Potsdam: kai.schroeter@gfz-potsdam.de, max.steinhausen@gfz-potsdamd.de
DTU Copenhagen: mard@dtu.dk
ARIA: fvelay@aria.fr
Publication:
Hattermann et al. 2018. Simulation of flood hazard and risk in the Danube basin with the
Future Danube Model. Climate Services. https://doi.org/10.1016/j.cliser.2018.07.001
Oasis-HUB:
https://oasishub.co/organization/gfz-potsdam
https://oasishub.co/organization/pik
16
A Presentation by OASIS | Horizon2020 Insurance
www.h2020insurance.oasishub.co
OASIS LMF enabled
Event
Hazard Vulnerability
Damage Bin
Dictionary
Vulnerability
Dictionary
Intensity Bin
Dictionary
Exposure
(Item)
Area Peril
Dictionary
17
A Presentation by OASIS | Horizon2020 Insurance
www.h2020insurance.oasishub.co
Generation of stochastic meteorological event sets
• 4 regional climate
models
(CORDEX-EU)
• 2 climate scenarios
(RCP-4.5 & 8.5)
• Historical reference
climate (1971-2000),
current climate (2006-
35) and two future
periods (2020-49,
2070-99)
2006-2035

More Related Content

Similar to WP 2.1.1 Danube regional multi-hazard, multi-risk model suite

Links between science and insurance - The H2020 Insurance project within Oasi...
Links between science and insurance - The H2020 Insurance project within Oasi...Links between science and insurance - The H2020 Insurance project within Oasi...
Links between science and insurance - The H2020 Insurance project within Oasi...
Oasis Innovation Hub for Catastrophe and Climate
 
OGC Innovation Program and Maritime Limits and Boundary Pilot
OGC Innovation Program and Maritime Limits and Boundary PilotOGC Innovation Program and Maritime Limits and Boundary Pilot
OGC Innovation Program and Maritime Limits and Boundary Pilot
Luis Bermudez
 
EOSC-hub_OPENCoastS
EOSC-hub_OPENCoastSEOSC-hub_OPENCoastS
EOSC-hub_OPENCoastS
EOSC-hub project
 
DSD-INT 2022 Towards the General Establishment of 2D-Models for German Waterw...
DSD-INT 2022 Towards the General Establishment of 2D-Models for German Waterw...DSD-INT 2022 Towards the General Establishment of 2D-Models for German Waterw...
DSD-INT 2022 Towards the General Establishment of 2D-Models for German Waterw...
Deltares
 
Futuremed fvg region 11jul2012_a_rev3
Futuremed fvg region 11jul2012_a_rev3Futuremed fvg region 11jul2012_a_rev3
Futuremed fvg region 11jul2012_a_rev3
Andrea Campagna (Ph.D.)
 
Will combining sectors deliver blue growth
Will combining sectors deliver blue growthWill combining sectors deliver blue growth
Will combining sectors deliver blue growth
BVG Associates
 
DSD-INT 2020 DANUBIUS-RI Modelling Node Webinar
DSD-INT 2020 DANUBIUS-RI Modelling Node WebinarDSD-INT 2020 DANUBIUS-RI Modelling Node Webinar
DSD-INT 2020 DANUBIUS-RI Modelling Node Webinar
Deltares
 
Supporting MRV-able mitigation measures - BMU's IKI Project Portfolio on Clim...
Supporting MRV-able mitigation measures - BMU's IKI Project Portfolio on Clim...Supporting MRV-able mitigation measures - BMU's IKI Project Portfolio on Clim...
Supporting MRV-able mitigation measures - BMU's IKI Project Portfolio on Clim...
CIFOR-ICRAF
 
Project COLA - Cloud Orchestration at the Level of Application - Introductio...
Project COLA - Cloud Orchestration at the Level of Application -  Introductio...Project COLA - Cloud Orchestration at the Level of Application -  Introductio...
Project COLA - Cloud Orchestration at the Level of Application - Introductio...
Project COLA
 
Attachment_0.pdf
Attachment_0.pdfAttachment_0.pdf
Attachment_0.pdf
lolilociga
 
EDDY-IDRCDavos-RASORv1
EDDY-IDRCDavos-RASORv1EDDY-IDRCDavos-RASORv1
EDDY-IDRCDavos-RASORv1
Global Risk Forum GRFDavos
 
STINGS online mine tailings monitoring solution
STINGS online mine tailings monitoring solutionSTINGS online mine tailings monitoring solution
STINGS online mine tailings monitoring solution
DMT GROUP
 
H2020 Oasis project and its implications for the future of EU policy to promo...
H2020 Oasis project and its implications for the future of EU policy to promo...H2020 Oasis project and its implications for the future of EU policy to promo...
H2020 Oasis project and its implications for the future of EU policy to promo...
Oasis Innovation Hub for Catastrophe and Climate
 
H2020 Oasis project and its implications for the future of EU policy to promo...
H2020 Oasis project and its implications for the future of EU policy to promo...H2020 Oasis project and its implications for the future of EU policy to promo...
H2020 Oasis project and its implications for the future of EU policy to promo...
Oasis Innovation Hub for Catastrophe and Climate
 
Horizon 2020 Applicatons in Satellite Navigaton 2017
Horizon 2020 Applicatons in Satellite Navigaton 2017 Horizon 2020 Applicatons in Satellite Navigaton 2017
Horizon 2020 Applicatons in Satellite Navigaton 2017
The European GNSS Agency (GSA)
 
Arcadia \dissemination Activities 2nd project year
Arcadia \dissemination Activities 2nd project yearArcadia \dissemination Activities 2nd project year
Arcadia \dissemination Activities 2nd project year
EU ARCADIA PROJECT
 
H2020 space wp 2018 2020 call 2019
H2020 space wp 2018 2020 call 2019H2020 space wp 2018 2020 call 2019
H2020 space wp 2018 2020 call 2019
The European GNSS Agency (GSA)
 
Oasis Hub Ltd/Betterpoints Ltd
Oasis Hub Ltd/Betterpoints LtdOasis Hub Ltd/Betterpoints Ltd
Oasis Hub Ltd/Betterpoints Ltd
Oasis Innovation Hub for Catastrophe and Climate
 
2.2 L'information géographique pour une coopération transfrontalière efficace
2.2 L'information géographique pour une coopération transfrontalière efficace2.2 L'information géographique pour une coopération transfrontalière efficace
2.2 L'information géographique pour une coopération transfrontalière efficace
grisicap
 
KE4CAP Session 4 - Pres4 k li-vo_ke4cap_canada
KE4CAP Session 4 - Pres4 k li-vo_ke4cap_canadaKE4CAP Session 4 - Pres4 k li-vo_ke4cap_canada
KE4CAP Session 4 - Pres4 k li-vo_ke4cap_canada
weADAPT
 

Similar to WP 2.1.1 Danube regional multi-hazard, multi-risk model suite (20)

Links between science and insurance - The H2020 Insurance project within Oasi...
Links between science and insurance - The H2020 Insurance project within Oasi...Links between science and insurance - The H2020 Insurance project within Oasi...
Links between science and insurance - The H2020 Insurance project within Oasi...
 
OGC Innovation Program and Maritime Limits and Boundary Pilot
OGC Innovation Program and Maritime Limits and Boundary PilotOGC Innovation Program and Maritime Limits and Boundary Pilot
OGC Innovation Program and Maritime Limits and Boundary Pilot
 
EOSC-hub_OPENCoastS
EOSC-hub_OPENCoastSEOSC-hub_OPENCoastS
EOSC-hub_OPENCoastS
 
DSD-INT 2022 Towards the General Establishment of 2D-Models for German Waterw...
DSD-INT 2022 Towards the General Establishment of 2D-Models for German Waterw...DSD-INT 2022 Towards the General Establishment of 2D-Models for German Waterw...
DSD-INT 2022 Towards the General Establishment of 2D-Models for German Waterw...
 
Futuremed fvg region 11jul2012_a_rev3
Futuremed fvg region 11jul2012_a_rev3Futuremed fvg region 11jul2012_a_rev3
Futuremed fvg region 11jul2012_a_rev3
 
Will combining sectors deliver blue growth
Will combining sectors deliver blue growthWill combining sectors deliver blue growth
Will combining sectors deliver blue growth
 
DSD-INT 2020 DANUBIUS-RI Modelling Node Webinar
DSD-INT 2020 DANUBIUS-RI Modelling Node WebinarDSD-INT 2020 DANUBIUS-RI Modelling Node Webinar
DSD-INT 2020 DANUBIUS-RI Modelling Node Webinar
 
Supporting MRV-able mitigation measures - BMU's IKI Project Portfolio on Clim...
Supporting MRV-able mitigation measures - BMU's IKI Project Portfolio on Clim...Supporting MRV-able mitigation measures - BMU's IKI Project Portfolio on Clim...
Supporting MRV-able mitigation measures - BMU's IKI Project Portfolio on Clim...
 
Project COLA - Cloud Orchestration at the Level of Application - Introductio...
Project COLA - Cloud Orchestration at the Level of Application -  Introductio...Project COLA - Cloud Orchestration at the Level of Application -  Introductio...
Project COLA - Cloud Orchestration at the Level of Application - Introductio...
 
Attachment_0.pdf
Attachment_0.pdfAttachment_0.pdf
Attachment_0.pdf
 
EDDY-IDRCDavos-RASORv1
EDDY-IDRCDavos-RASORv1EDDY-IDRCDavos-RASORv1
EDDY-IDRCDavos-RASORv1
 
STINGS online mine tailings monitoring solution
STINGS online mine tailings monitoring solutionSTINGS online mine tailings monitoring solution
STINGS online mine tailings monitoring solution
 
H2020 Oasis project and its implications for the future of EU policy to promo...
H2020 Oasis project and its implications for the future of EU policy to promo...H2020 Oasis project and its implications for the future of EU policy to promo...
H2020 Oasis project and its implications for the future of EU policy to promo...
 
H2020 Oasis project and its implications for the future of EU policy to promo...
H2020 Oasis project and its implications for the future of EU policy to promo...H2020 Oasis project and its implications for the future of EU policy to promo...
H2020 Oasis project and its implications for the future of EU policy to promo...
 
Horizon 2020 Applicatons in Satellite Navigaton 2017
Horizon 2020 Applicatons in Satellite Navigaton 2017 Horizon 2020 Applicatons in Satellite Navigaton 2017
Horizon 2020 Applicatons in Satellite Navigaton 2017
 
Arcadia \dissemination Activities 2nd project year
Arcadia \dissemination Activities 2nd project yearArcadia \dissemination Activities 2nd project year
Arcadia \dissemination Activities 2nd project year
 
H2020 space wp 2018 2020 call 2019
H2020 space wp 2018 2020 call 2019H2020 space wp 2018 2020 call 2019
H2020 space wp 2018 2020 call 2019
 
Oasis Hub Ltd/Betterpoints Ltd
Oasis Hub Ltd/Betterpoints LtdOasis Hub Ltd/Betterpoints Ltd
Oasis Hub Ltd/Betterpoints Ltd
 
2.2 L'information géographique pour une coopération transfrontalière efficace
2.2 L'information géographique pour une coopération transfrontalière efficace2.2 L'information géographique pour une coopération transfrontalière efficace
2.2 L'information géographique pour une coopération transfrontalière efficace
 
KE4CAP Session 4 - Pres4 k li-vo_ke4cap_canada
KE4CAP Session 4 - Pres4 k li-vo_ke4cap_canadaKE4CAP Session 4 - Pres4 k li-vo_ke4cap_canada
KE4CAP Session 4 - Pres4 k li-vo_ke4cap_canada
 

Recently uploaded

Peatland Management in Indonesia, Science to Policy and Knowledge Education
Peatland Management in Indonesia, Science to Policy and Knowledge EducationPeatland Management in Indonesia, Science to Policy and Knowledge Education
Peatland Management in Indonesia, Science to Policy and Knowledge Education
Global Landscapes Forum (GLF)
 
Climate Change All over the World .pptx
Climate Change All over the World  .pptxClimate Change All over the World  .pptx
Climate Change All over the World .pptx
sairaanwer024
 
Global Peatlands Map and Hotspot Explanation Atlas
Global Peatlands Map and Hotspot Explanation AtlasGlobal Peatlands Map and Hotspot Explanation Atlas
Global Peatlands Map and Hotspot Explanation Atlas
Global Landscapes Forum (GLF)
 
原版制作(Newcastle毕业证书)纽卡斯尔大学毕业证在读证明一模一样
原版制作(Newcastle毕业证书)纽卡斯尔大学毕业证在读证明一模一样原版制作(Newcastle毕业证书)纽卡斯尔大学毕业证在读证明一模一样
原版制作(Newcastle毕业证书)纽卡斯尔大学毕业证在读证明一模一样
p2npnqp
 
Peatlands of Latin America and the Caribbean
Peatlands of Latin America and the CaribbeanPeatlands of Latin America and the Caribbean
Peatlands of Latin America and the Caribbean
Global Landscapes Forum (GLF)
 
Microbial characterisation and identification, and potability of River Kuywa ...
Microbial characterisation and identification, and potability of River Kuywa ...Microbial characterisation and identification, and potability of River Kuywa ...
Microbial characterisation and identification, and potability of River Kuywa ...
Open Access Research Paper
 
Overview of the Global Peatlands Assessment
Overview of the Global Peatlands AssessmentOverview of the Global Peatlands Assessment
Overview of the Global Peatlands Assessment
Global Landscapes Forum (GLF)
 
Evolving Lifecycles with High Resolution Site Characterization (HRSC) and 3-D...
Evolving Lifecycles with High Resolution Site Characterization (HRSC) and 3-D...Evolving Lifecycles with High Resolution Site Characterization (HRSC) and 3-D...
Evolving Lifecycles with High Resolution Site Characterization (HRSC) and 3-D...
Joshua Orris
 
Improving the viability of probiotics by encapsulation methods for developmen...
Improving the viability of probiotics by encapsulation methods for developmen...Improving the viability of probiotics by encapsulation methods for developmen...
Improving the viability of probiotics by encapsulation methods for developmen...
Open Access Research Paper
 
DENR-PENRO-Bulacan-Presentation Philippine EIS
DENR-PENRO-Bulacan-Presentation Philippine EISDENR-PENRO-Bulacan-Presentation Philippine EIS
DENR-PENRO-Bulacan-Presentation Philippine EIS
MarlonJayBayag
 
Enhanced action and stakeholder engagement for sustainable peatland management
Enhanced action and stakeholder engagement for sustainable peatland managementEnhanced action and stakeholder engagement for sustainable peatland management
Enhanced action and stakeholder engagement for sustainable peatland management
Global Landscapes Forum (GLF)
 
Epcon is One of the World's leading Manufacturing Companies.
Epcon is One of the World's leading Manufacturing Companies.Epcon is One of the World's leading Manufacturing Companies.
Epcon is One of the World's leading Manufacturing Companies.
EpconLP
 
Global Climate Change and global warming
Global Climate Change and global warmingGlobal Climate Change and global warming
Global Climate Change and global warming
ballkicker20
 
Kinetic studies on malachite green dye adsorption from aqueous solutions by A...
Kinetic studies on malachite green dye adsorption from aqueous solutions by A...Kinetic studies on malachite green dye adsorption from aqueous solutions by A...
Kinetic studies on malachite green dye adsorption from aqueous solutions by A...
Open Access Research Paper
 
Optimizing Post Remediation Groundwater Performance with Enhanced Microbiolog...
Optimizing Post Remediation Groundwater Performance with Enhanced Microbiolog...Optimizing Post Remediation Groundwater Performance with Enhanced Microbiolog...
Optimizing Post Remediation Groundwater Performance with Enhanced Microbiolog...
Joshua Orris
 
Promoting Multilateral Cooperation for Sustainable Peatland management
Promoting Multilateral Cooperation for Sustainable Peatland managementPromoting Multilateral Cooperation for Sustainable Peatland management
Promoting Multilateral Cooperation for Sustainable Peatland management
Global Landscapes Forum (GLF)
 
How about Huawei mobile phone-www.cfye-commerce.shop
How about Huawei mobile phone-www.cfye-commerce.shopHow about Huawei mobile phone-www.cfye-commerce.shop
How about Huawei mobile phone-www.cfye-commerce.shop
laozhuseo02
 
world-environment-day-2024-240601103559-14f4c0b4.pptx
world-environment-day-2024-240601103559-14f4c0b4.pptxworld-environment-day-2024-240601103559-14f4c0b4.pptx
world-environment-day-2024-240601103559-14f4c0b4.pptx
mfasna35
 
Improving the Management of Peatlands and the Capacities of Stakeholders in I...
Improving the Management of Peatlands and the Capacities of Stakeholders in I...Improving the Management of Peatlands and the Capacities of Stakeholders in I...
Improving the Management of Peatlands and the Capacities of Stakeholders in I...
Global Landscapes Forum (GLF)
 
在线办理(lboro毕业证书)拉夫堡大学毕业证学历证书一模一样
在线办理(lboro毕业证书)拉夫堡大学毕业证学历证书一模一样在线办理(lboro毕业证书)拉夫堡大学毕业证学历证书一模一样
在线办理(lboro毕业证书)拉夫堡大学毕业证学历证书一模一样
pjq9n1lk
 

Recently uploaded (20)

Peatland Management in Indonesia, Science to Policy and Knowledge Education
Peatland Management in Indonesia, Science to Policy and Knowledge EducationPeatland Management in Indonesia, Science to Policy and Knowledge Education
Peatland Management in Indonesia, Science to Policy and Knowledge Education
 
Climate Change All over the World .pptx
Climate Change All over the World  .pptxClimate Change All over the World  .pptx
Climate Change All over the World .pptx
 
Global Peatlands Map and Hotspot Explanation Atlas
Global Peatlands Map and Hotspot Explanation AtlasGlobal Peatlands Map and Hotspot Explanation Atlas
Global Peatlands Map and Hotspot Explanation Atlas
 
原版制作(Newcastle毕业证书)纽卡斯尔大学毕业证在读证明一模一样
原版制作(Newcastle毕业证书)纽卡斯尔大学毕业证在读证明一模一样原版制作(Newcastle毕业证书)纽卡斯尔大学毕业证在读证明一模一样
原版制作(Newcastle毕业证书)纽卡斯尔大学毕业证在读证明一模一样
 
Peatlands of Latin America and the Caribbean
Peatlands of Latin America and the CaribbeanPeatlands of Latin America and the Caribbean
Peatlands of Latin America and the Caribbean
 
Microbial characterisation and identification, and potability of River Kuywa ...
Microbial characterisation and identification, and potability of River Kuywa ...Microbial characterisation and identification, and potability of River Kuywa ...
Microbial characterisation and identification, and potability of River Kuywa ...
 
Overview of the Global Peatlands Assessment
Overview of the Global Peatlands AssessmentOverview of the Global Peatlands Assessment
Overview of the Global Peatlands Assessment
 
Evolving Lifecycles with High Resolution Site Characterization (HRSC) and 3-D...
Evolving Lifecycles with High Resolution Site Characterization (HRSC) and 3-D...Evolving Lifecycles with High Resolution Site Characterization (HRSC) and 3-D...
Evolving Lifecycles with High Resolution Site Characterization (HRSC) and 3-D...
 
Improving the viability of probiotics by encapsulation methods for developmen...
Improving the viability of probiotics by encapsulation methods for developmen...Improving the viability of probiotics by encapsulation methods for developmen...
Improving the viability of probiotics by encapsulation methods for developmen...
 
DENR-PENRO-Bulacan-Presentation Philippine EIS
DENR-PENRO-Bulacan-Presentation Philippine EISDENR-PENRO-Bulacan-Presentation Philippine EIS
DENR-PENRO-Bulacan-Presentation Philippine EIS
 
Enhanced action and stakeholder engagement for sustainable peatland management
Enhanced action and stakeholder engagement for sustainable peatland managementEnhanced action and stakeholder engagement for sustainable peatland management
Enhanced action and stakeholder engagement for sustainable peatland management
 
Epcon is One of the World's leading Manufacturing Companies.
Epcon is One of the World's leading Manufacturing Companies.Epcon is One of the World's leading Manufacturing Companies.
Epcon is One of the World's leading Manufacturing Companies.
 
Global Climate Change and global warming
Global Climate Change and global warmingGlobal Climate Change and global warming
Global Climate Change and global warming
 
Kinetic studies on malachite green dye adsorption from aqueous solutions by A...
Kinetic studies on malachite green dye adsorption from aqueous solutions by A...Kinetic studies on malachite green dye adsorption from aqueous solutions by A...
Kinetic studies on malachite green dye adsorption from aqueous solutions by A...
 
Optimizing Post Remediation Groundwater Performance with Enhanced Microbiolog...
Optimizing Post Remediation Groundwater Performance with Enhanced Microbiolog...Optimizing Post Remediation Groundwater Performance with Enhanced Microbiolog...
Optimizing Post Remediation Groundwater Performance with Enhanced Microbiolog...
 
Promoting Multilateral Cooperation for Sustainable Peatland management
Promoting Multilateral Cooperation for Sustainable Peatland managementPromoting Multilateral Cooperation for Sustainable Peatland management
Promoting Multilateral Cooperation for Sustainable Peatland management
 
How about Huawei mobile phone-www.cfye-commerce.shop
How about Huawei mobile phone-www.cfye-commerce.shopHow about Huawei mobile phone-www.cfye-commerce.shop
How about Huawei mobile phone-www.cfye-commerce.shop
 
world-environment-day-2024-240601103559-14f4c0b4.pptx
world-environment-day-2024-240601103559-14f4c0b4.pptxworld-environment-day-2024-240601103559-14f4c0b4.pptx
world-environment-day-2024-240601103559-14f4c0b4.pptx
 
Improving the Management of Peatlands and the Capacities of Stakeholders in I...
Improving the Management of Peatlands and the Capacities of Stakeholders in I...Improving the Management of Peatlands and the Capacities of Stakeholders in I...
Improving the Management of Peatlands and the Capacities of Stakeholders in I...
 
在线办理(lboro毕业证书)拉夫堡大学毕业证学历证书一模一样
在线办理(lboro毕业证书)拉夫堡大学毕业证学历证书一模一样在线办理(lboro毕业证书)拉夫堡大学毕业证学历证书一模一样
在线办理(lboro毕业证书)拉夫堡大学毕业证学历证书一模一样
 

WP 2.1.1 Danube regional multi-hazard, multi-risk model suite

  • 1. WP 2.1.1 Danube regional multi-hazard, multi- risk model suite Kai Schröter, Max Steinhausen, Stefan Lüdtke, Viktor Rözer, Heidi Kreibich May 7, 2019 4th H2020|Insurance project meeting, Budapest Michel Wortmann, Fred Hattermann Martin Drews, Per S. Kaspersen, Mads Dømgaard Céline Deandreis, Gwendoline Lacressonniere
  • 2. 2 A Presentation by OASIS | Horizon2020 Insurance www.h2020insurance.oasishub.co Outline 1.Broad progress and results 2.Deliverables, milestones, mid-term review 3.Data creation and management 4.Meetings with end-users and stakeholders 5.Communications conducted and planned 6.Outlook
  • 3. 3 A Presentation by OASIS | Horizon2020 Insurance www.h2020insurance.oasishub.co 1. Broad progress • Improved fluvial hazard model setup with 25m DEM and OSM data • First hazard maps (IMAGE 10ka > SWIM > CamaFlood) • Completed pluvial hazard model for Novi Sad and started for Bratislava • 2nd Novi Sad stakeholder workshop and 4th Technical Review Meeting • Completed Oasis-LMF compliant cat model chain
  • 4. 4 A Presentation by OASIS | Horizon2020 Insurance www.h2020insurance.oasishub.co Fluvial flood model improvements SWIM, CamaFlood OpenStreeMap data • River central lines • River banks • Residential / industrial areas • Lakes & reservoirs 90m 25m
  • 5. 5 A Presentation by OASIS | Horizon2020 Insurance www.h2020insurance.oasishub.co EOBS-IMAGE-SWIM CamaFlood 100-year flood hazard map
  • 6. 6 A Presentation by OASIS | Horizon2020 Insurance www.h2020insurance.oasishub.co 100-year flooded area, reference vs current climate period ICHEC-KNMI – IMAGE – SWIM – CamaFlood Entire catchment OSM populated/industrial
  • 7. 7 A Presentation by OASIS | Horizon2020 Insurance www.h2020insurance.oasishub.co Pluvial flood simulations Bratislava (25m DEM)Novi Sad (5m DEM) 100-year event, RP2 Sewer system 100-year rainfall event
  • 8. 8 A Presentation by OASIS | Horizon2020 Insurance www.h2020insurance.oasishub.co Planned WWTP Plant at Rokov Potok RP100, conceptual drainage system, infiltrationPlanned WWTP plant at Novi Sad
  • 9. 9 A Presentation by OASIS | Horizon2020 Insurance www.h2020insurance.oasishub.co WRF simulations of select extremes Results: 15/7 2016 (61 mm) & 24/5 2015 (122 mm)
  • 10. 10 A Presentation by OASIS | Horizon2020 Insurance www.h2020insurance.oasishub.co 2. Deliverables, milestones, mid-term review • M2.1.1.1 Risk mapping ready (M24) • D2.1.1.1 OASIS LMF compliant hazard and risk mapping in the Danube basin uploaded to the OASIS-Hub (M24) – final stages • Mid-term review: few changes to narrative document, contributed to updates of WP2.1.3
  • 11. 11 A Presentation by OASIS | Horizon2020 Insurance www.h2020insurance.oasishub.co 3. Data creation and management • Updated version of the fluvial flood model (PIK servers) • Started the creation of Oasis-LMF footprint files (large files, PIK servers) • Novi Sad and Bratislava pluvial flood model output (DTU servers)
  • 12. 12 A Presentation by OASIS | Horizon2020 Insurance www.h2020insurance.oasishub.co • 2nd Novi Sad Stakeholder workshop • Presentation of updated results, mainly pluvial and fluvial flooding • Highlighted fluvial flood risk at selected site • 4rd Technical Review Meeting • Mid April in Munich, organised by Genillard & Co at the AllianceRe HQ • 6-8 insurance experts, participants from WP2.1.1 and WP2.1.2 • Decided to provide full Oasis-LMF model setup for insurers to test • Valuable input from insurance modelling experts (continuing) • Series of calls with SwissRe and Generali 4. Meetings with end-users and stakeholders M18 - 24
  • 13. 13 A Presentation by OASIS | Horizon2020 Insurance www.h2020insurance.oasishub.co • Presentation of the FDM to the Sava Commission (February, Zagreb) • G&co best-practice NatCat workshop (April, Munich) • Representation at the EGU (April, Vienna) • Presentation of the FDM to the International Commission for the Protection of the Danube River (ICPDR) (next week, Bucharest) 5. Communications M18 - 24
  • 14. 14 A Presentation by OASIS | Horizon2020 Insurance www.h2020insurance.oasishub.co 6. Outlook M18 - 24 • Validation of Oasis-LMF model setup with insurance partners • Fluvial model improvements and validation with input from TU Munich Interreg project (river cross sections) • Further validation using external risk maps • Papers on the setup, calibration, validation of the comprehensive models • 6th Technical Review Meeting (October 2019)
  • 15. Get in touch PIK Potsdam: wortmann@pik-potsdam.de, hattermann@pik-potsdam.de GFZ Potsdam: kai.schroeter@gfz-potsdam.de, max.steinhausen@gfz-potsdamd.de DTU Copenhagen: mard@dtu.dk ARIA: fvelay@aria.fr Publication: Hattermann et al. 2018. Simulation of flood hazard and risk in the Danube basin with the Future Danube Model. Climate Services. https://doi.org/10.1016/j.cliser.2018.07.001 Oasis-HUB: https://oasishub.co/organization/gfz-potsdam https://oasishub.co/organization/pik
  • 16. 16 A Presentation by OASIS | Horizon2020 Insurance www.h2020insurance.oasishub.co OASIS LMF enabled Event Hazard Vulnerability Damage Bin Dictionary Vulnerability Dictionary Intensity Bin Dictionary Exposure (Item) Area Peril Dictionary
  • 17. 17 A Presentation by OASIS | Horizon2020 Insurance www.h2020insurance.oasishub.co Generation of stochastic meteorological event sets • 4 regional climate models (CORDEX-EU) • 2 climate scenarios (RCP-4.5 & 8.5) • Historical reference climate (1971-2000), current climate (2006- 35) and two future periods (2020-49, 2070-99) 2006-2035