Work Study
 Work study is one of the techniques for
improving the productivity
◦ It is a generic term for the techniques of
method study and work measurement.
 Method study is the technique of
systematic recording and critical
estimation of existing and proposed
ways of doing work and developing an
easier and economical method.
Work Study
 Work study is the term used in Great Britain
while in the USA it is called Time and Motion
Study.
 Both concerned with discovering the best ways of
doing jobs and with establishing time and output
standards based upon such methods.
 The time and motion study (or time-motion
study) is a business efficiency technique that
combines the Time Study work of Frederick
Winslow Taylor with the Motion Study work of
Frank and Lillian Gilbreth.
 It is a major part of scientific management
(Taylorism).
 Time study developed in the direction of establishing
standard times
Work Study
 Work study is a combination of two groups of
techniques, method study and work
measurement, which are used to examine
people's work and indicate the factors which
affect efficiency.
 Work study is normally used in an attempt to
increase output from given resources with little
or no additional capital investment.
◦ This is achieved by systematically analysing existing
operations, processes and work methods.
Work Study
The basic procedure of work study is as follows:
 Select the job or process to be studied.
 Record everything that happens during observation.
 Examine the recorded facts critically
 Develop the most economic methods, taking into
account all the circumstances.
 Measure the amount of work involved in the method
used and calculate a “standard time” for doing it.
 Define the new method and the related time.
 Install the new method and time as agreed standard
practice.
 Maintain the new standard practice by proper control
procedures.
Work Measurement
Work measurement establishes the time a
qualified worker needs to carry out a specified job
at a defined level of performance.
Standard Time: Amount of time it should take a
qualified worker to complete a specific task,
working at a sustainable rate, using given
methods, tools and equipment, raw material and
workplace arrangements.
Work measurement helps in investigating,
reducing and subsequently eliminating
ineffective time, during which useful work is not
being performed.
Method Analysis
 Job design often begins with a methods
analysis of an overall operation. It might be
called as a macro-view of the job.
 It then moves from the general to specific
details of the job, concentrating on
arrangement of the workplace and
movements of the worker.
 It can be a good source of productivity
enhancement.
 Method Study: Whereas method study
helps us eliminate unnecessary movement.
Method Study
 Method study is the systematic recording and
critical examination of existing and proposed
ways of doing work in order to develop and
apply easier and more effective methods and
to reduce costs.
◦ It is used to improve processes and
procedures, plant layout, design of plant and
equipment; to reduce human effort and
fatigue, use of materials, machines and
manpower, and to develop better physical and
working environments.
Drivers of Method Analysis
 Changes in tools and equipment.
 Changes in product design, or new products.
 Changes in materials or procedures.
 Government regulations.
 Other factors (e.g. Accidents, quality
problems)
Application of Method Analysis
Methods analysis is done both for existing
jobs and new jobs.
◦ For an existing job, the analyst observe the
job as it currently being done and then
devise improvements.
◦ For a new job, the analyst rely on a
description of the job and an ability to
visualize the operation in advance.
Procedure in method analysis
1. Identify operation to be studied and collect
all essential facts regarding tools,
equipment, materials, etc.
2. For existing job, discuss the job with
operator and supervisor to get their views/
inputs.
3. Study and document the present method
of an existing job with the help of process
chart.
4. Analyze the job.
5. Propose new methods.
6. Install the new method.
7. Follow up installation to ensure

More Related Content

Similar to Work-study.pptx

Work study-1223702337445335-9
Work study-1223702337445335-9Work study-1223702337445335-9
Work study-1223702337445335-9
Shweta Varshney
 
Work Study
Work StudyWork Study
Work Study
varsharocks
 
Work study-1223702337445335-9
Work study-1223702337445335-9Work study-1223702337445335-9
Work study-1223702337445335-9
varsharocks
 
Jivan work study
Jivan work studyJivan work study
Jivan work study
Jivan Jadhav
 
Work study
Work studyWork study
Improving the productivity_and_introducing_the_work_study
Improving the productivity_and_introducing_the_work_studyImproving the productivity_and_introducing_the_work_study
Improving the productivity_and_introducing_the_work_study
Shifas ibrahim MBA student @ ILAHIA SCHOOL OF MANAGEMENT STUDIES
 
Work Study & Productivity
Work Study & ProductivityWork Study & Productivity
Work Study & Productivity
ahmad bassiouny
 
Work Study & Productivity
Work Study & ProductivityWork Study & Productivity
Work Study & Productivity
ahmad bassiouny
 
Work study ......operational management presentation
Work study ......operational management presentationWork study ......operational management presentation
Work study ......operational management presentation
vish0110
 
Work study method study-work measurement
Work study method study-work measurementWork study method study-work measurement
Work study method study-work measurement
Er. Vaibhav Agarwal
 
Work Study and Method Study Presentation.pptx
Work Study and Method Study Presentation.pptxWork Study and Method Study Presentation.pptx
Work Study and Method Study Presentation.pptx
SHREYASHSHAHMSGSGKM0
 
Work Study
Work StudyWork Study
Work Study
Mandeep Raj
 
Work study
Work studyWork study
Work study
ramanjot sidhu
 
Garments
Garments Garments
Lecture9,10,11
Lecture9,10,11Lecture9,10,11
Lecture9,10,11
Tanya Mathur
 
Work study
Work studyWork study
Work Study
Work Study Work Study
Work Study
PraveenManickam2
 
Measurment techniques
Measurment techniquesMeasurment techniques
Measurment techniques
Dhruvit Lakhani
 
L 05- industrial management
L 05- industrial managementL 05- industrial management
L 05- industrial management
Tanya Mathur
 
1.1 Work study and method study -Industrial Engineering Basics
1.1 Work study and method study -Industrial Engineering Basics1.1 Work study and method study -Industrial Engineering Basics
1.1 Work study and method study -Industrial Engineering Basics
Dr. Surya Prakash
 

Similar to Work-study.pptx (20)

Work study-1223702337445335-9
Work study-1223702337445335-9Work study-1223702337445335-9
Work study-1223702337445335-9
 
Work Study
Work StudyWork Study
Work Study
 
Work study-1223702337445335-9
Work study-1223702337445335-9Work study-1223702337445335-9
Work study-1223702337445335-9
 
Jivan work study
Jivan work studyJivan work study
Jivan work study
 
Work study
Work studyWork study
Work study
 
Improving the productivity_and_introducing_the_work_study
Improving the productivity_and_introducing_the_work_studyImproving the productivity_and_introducing_the_work_study
Improving the productivity_and_introducing_the_work_study
 
Work Study & Productivity
Work Study & ProductivityWork Study & Productivity
Work Study & Productivity
 
Work Study & Productivity
Work Study & ProductivityWork Study & Productivity
Work Study & Productivity
 
Work study ......operational management presentation
Work study ......operational management presentationWork study ......operational management presentation
Work study ......operational management presentation
 
Work study method study-work measurement
Work study method study-work measurementWork study method study-work measurement
Work study method study-work measurement
 
Work Study and Method Study Presentation.pptx
Work Study and Method Study Presentation.pptxWork Study and Method Study Presentation.pptx
Work Study and Method Study Presentation.pptx
 
Work Study
Work StudyWork Study
Work Study
 
Work study
Work studyWork study
Work study
 
Garments
Garments Garments
Garments
 
Lecture9,10,11
Lecture9,10,11Lecture9,10,11
Lecture9,10,11
 
Work study
Work studyWork study
Work study
 
Work Study
Work Study Work Study
Work Study
 
Measurment techniques
Measurment techniquesMeasurment techniques
Measurment techniques
 
L 05- industrial management
L 05- industrial managementL 05- industrial management
L 05- industrial management
 
1.1 Work study and method study -Industrial Engineering Basics
1.1 Work study and method study -Industrial Engineering Basics1.1 Work study and method study -Industrial Engineering Basics
1.1 Work study and method study -Industrial Engineering Basics
 

Recently uploaded

5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
ihlasbinance2003
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
VICTOR MAESTRE RAMIREZ
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Sinan KOZAK
 
Question paper of renewable energy sources
Question paper of renewable energy sourcesQuestion paper of renewable energy sources
Question paper of renewable energy sources
mahammadsalmanmech
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
IJECEIAES
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
camseq
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
Madan Karki
 
Engineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdfEngineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdf
abbyasa1014
 
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdfIron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
RadiNasr
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
kandramariana6
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
171ticu
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
IJECEIAES
 
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have oneISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
Las Vegas Warehouse
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
bijceesjournal
 
Recycled Concrete Aggregate in Construction Part II
Recycled Concrete Aggregate in Construction Part IIRecycled Concrete Aggregate in Construction Part II
Recycled Concrete Aggregate in Construction Part II
Aditya Rajan Patra
 
Engine Lubrication performance System.pdf
Engine Lubrication performance System.pdfEngine Lubrication performance System.pdf
Engine Lubrication performance System.pdf
mamamaam477
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
Aditya Rajan Patra
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
Victor Morales
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Christina Lin
 
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
University of Maribor
 

Recently uploaded (20)

5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
 
Question paper of renewable energy sources
Question paper of renewable energy sourcesQuestion paper of renewable energy sources
Question paper of renewable energy sources
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
 
Engineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdfEngineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdf
 
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdfIron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
 
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have oneISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
 
Recycled Concrete Aggregate in Construction Part II
Recycled Concrete Aggregate in Construction Part IIRecycled Concrete Aggregate in Construction Part II
Recycled Concrete Aggregate in Construction Part II
 
Engine Lubrication performance System.pdf
Engine Lubrication performance System.pdfEngine Lubrication performance System.pdf
Engine Lubrication performance System.pdf
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
 
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
 

Work-study.pptx

  • 1. WORK STUDY AND METHOD STUDY
  • 2. Work Study  Work study is one of the techniques for improving the productivity ◦ It is a generic term for the techniques of method study and work measurement.  Method study is the technique of systematic recording and critical estimation of existing and proposed ways of doing work and developing an easier and economical method.
  • 3. Work Study  Work study is the term used in Great Britain while in the USA it is called Time and Motion Study.  Both concerned with discovering the best ways of doing jobs and with establishing time and output standards based upon such methods.  The time and motion study (or time-motion study) is a business efficiency technique that combines the Time Study work of Frederick Winslow Taylor with the Motion Study work of Frank and Lillian Gilbreth.  It is a major part of scientific management (Taylorism).  Time study developed in the direction of establishing standard times
  • 4. Work Study  Work study is a combination of two groups of techniques, method study and work measurement, which are used to examine people's work and indicate the factors which affect efficiency.  Work study is normally used in an attempt to increase output from given resources with little or no additional capital investment. ◦ This is achieved by systematically analysing existing operations, processes and work methods.
  • 5. Work Study The basic procedure of work study is as follows:  Select the job or process to be studied.  Record everything that happens during observation.  Examine the recorded facts critically  Develop the most economic methods, taking into account all the circumstances.  Measure the amount of work involved in the method used and calculate a “standard time” for doing it.  Define the new method and the related time.  Install the new method and time as agreed standard practice.  Maintain the new standard practice by proper control procedures.
  • 6. Work Measurement Work measurement establishes the time a qualified worker needs to carry out a specified job at a defined level of performance. Standard Time: Amount of time it should take a qualified worker to complete a specific task, working at a sustainable rate, using given methods, tools and equipment, raw material and workplace arrangements. Work measurement helps in investigating, reducing and subsequently eliminating ineffective time, during which useful work is not being performed.
  • 7. Method Analysis  Job design often begins with a methods analysis of an overall operation. It might be called as a macro-view of the job.  It then moves from the general to specific details of the job, concentrating on arrangement of the workplace and movements of the worker.  It can be a good source of productivity enhancement.  Method Study: Whereas method study helps us eliminate unnecessary movement.
  • 8. Method Study  Method study is the systematic recording and critical examination of existing and proposed ways of doing work in order to develop and apply easier and more effective methods and to reduce costs. ◦ It is used to improve processes and procedures, plant layout, design of plant and equipment; to reduce human effort and fatigue, use of materials, machines and manpower, and to develop better physical and working environments.
  • 9. Drivers of Method Analysis  Changes in tools and equipment.  Changes in product design, or new products.  Changes in materials or procedures.  Government regulations.  Other factors (e.g. Accidents, quality problems)
  • 10. Application of Method Analysis Methods analysis is done both for existing jobs and new jobs. ◦ For an existing job, the analyst observe the job as it currently being done and then devise improvements. ◦ For a new job, the analyst rely on a description of the job and an ability to visualize the operation in advance.
  • 11. Procedure in method analysis 1. Identify operation to be studied and collect all essential facts regarding tools, equipment, materials, etc. 2. For existing job, discuss the job with operator and supervisor to get their views/ inputs. 3. Study and document the present method of an existing job with the help of process chart. 4. Analyze the job. 5. Propose new methods. 6. Install the new method. 7. Follow up installation to ensure