Workface Planning With
Forge
Chehade Kassouf
VP Operations at BlackSmithSoft
Ahmad Khairat
AEC Technical Specialist - Autodesk
About the speaker
Chehade Kassouf
VP Operations At BlackSmithSoft
Experienced Project Manager with a demonstrated 22
years career history of working in the oil & gas industry.
Championing the workface planning operation at various
mega projects. Produce corporate workface planning
procedure and best practices. Developing a pioneer
workface planning web platform using forge that address
the construction needs.
Workface Planning
Workface Planning in A
Nutshell
• The Workface planning is a project management method
that ensures all project direct workers (Workface) always
have unconstraint work fronts, in-line with project
schedule.
• What do Workface Require
o Scope
o Drawings
o Material
o Report
o Access
o Safety
o Quality
Know your Responsibility
• Advanced Work Packaging (AWP) starts way before
construction.
o Engineering Work Package (EWP)
o Construction Work Package (CWP)
• Workface Planning (WFP) is Contractors’ responsibility
o Installation Work Package (IWP)
o No More than 2 Weeks of Work.
o From Cradle to Grave
Scope
• Clear with No Assumptions.
• Differentiate between what you needs as material and
you report as progress.
What You Get
What You Build
Drawings
• Get The right drawings no more no less
• Make sure it is the latest
You Get Hundreds
You Send One
Material Status
• Material in your store is Dynamic.
• Always have visibility on the status
10 Bolts can
stop all these
Spools
Be Ready
• Treat it like a shutdown you won’t go wrong.
Stake Holders
Checklists
Location and Access
Progress
• No Guessing in reporting.
• No Guessing in Planning
• Leverage previous
performances.
The Whole View
If a Tree Fell without an
Observer,
Did it really Fall?
4D for those who need it
• Know how everyone is
progress in your CWA.
• Mitigate Accordingly.
Reports
Reports show work, integrated reports show
visibility
How good you performing.:
With respect to Schedule.
With respect to Site needs.
DEMO
Contacts Information
• Chehade Kassouf
• Vice President Operations
• BlackSmithSoft LLC
• Mobile: +961 3 835326 | US: +1 (281) 509-9821
• Email: che@blacksmithsoft.com | Web: blacksmithsoft.com

Workface Planning (WFP) with Forge

  • 1.
    Workface Planning With Forge ChehadeKassouf VP Operations at BlackSmithSoft Ahmad Khairat AEC Technical Specialist - Autodesk
  • 2.
    About the speaker ChehadeKassouf VP Operations At BlackSmithSoft Experienced Project Manager with a demonstrated 22 years career history of working in the oil & gas industry. Championing the workface planning operation at various mega projects. Produce corporate workface planning procedure and best practices. Developing a pioneer workface planning web platform using forge that address the construction needs.
  • 3.
  • 4.
    Workface Planning inA Nutshell • The Workface planning is a project management method that ensures all project direct workers (Workface) always have unconstraint work fronts, in-line with project schedule. • What do Workface Require o Scope o Drawings o Material o Report o Access o Safety o Quality
  • 5.
    Know your Responsibility •Advanced Work Packaging (AWP) starts way before construction. o Engineering Work Package (EWP) o Construction Work Package (CWP) • Workface Planning (WFP) is Contractors’ responsibility o Installation Work Package (IWP) o No More than 2 Weeks of Work. o From Cradle to Grave
  • 6.
    Scope • Clear withNo Assumptions. • Differentiate between what you needs as material and you report as progress. What You Get What You Build
  • 7.
    Drawings • Get Theright drawings no more no less • Make sure it is the latest You Get Hundreds You Send One
  • 8.
    Material Status • Materialin your store is Dynamic. • Always have visibility on the status 10 Bolts can stop all these Spools
  • 9.
    Be Ready • Treatit like a shutdown you won’t go wrong. Stake Holders Checklists Location and Access
  • 10.
    Progress • No Guessingin reporting. • No Guessing in Planning • Leverage previous performances.
  • 11.
  • 12.
    If a TreeFell without an Observer, Did it really Fall?
  • 13.
    4D for thosewho need it • Know how everyone is progress in your CWA. • Mitigate Accordingly.
  • 14.
    Reports Reports show work,integrated reports show visibility How good you performing.: With respect to Schedule. With respect to Site needs.
  • 15.
  • 16.
    Contacts Information • ChehadeKassouf • Vice President Operations • BlackSmithSoft LLC • Mobile: +961 3 835326 | US: +1 (281) 509-9821 • Email: che@blacksmithsoft.com | Web: blacksmithsoft.com