LOCATION SELECTION :
A CASE STUDY
Location selection –
Manufacturing Unit
PRESENTED BY : SHASHANK SHEKHAR SINGH
(2015HB79013)
Our Firm -
 Despite being a new entrant in this domain, we are successfully offering
a comprehensive range of Extruded Aluminum Heat Sinks.
Established in 2013.
 Our firm is amongst the distinguished manufacturers and supplier of
an extensive range of Extruded Heatsinks.
 We have developed an advanced manufacturing unit which is well
equipped with all requisite tools and latest machinery which enable us to
meet the bulk requirements of our clients within specified time frame.
 Our entire unit is spread across a vast area of 25000 square feet. Our
team of professions work with the complete dedication to offer our
clients a quality range of product which is at par with their requirements.
 Our customers are Schneider and Luminous situated in Rudrapur and
Baddi respectively.
 Our RM suppliers –Valco and Indo are in Chandigarh and Bhiwadi.
• With time the demand of our customers
changes and due to this we sometimes feel that
we are lagging behind in fulfilling the
commitments and to satisfy their needs.
• To fulfill the commitments , we have decided
to establish a plant.
• The locations that we are thinking of
considering are RUDRAPUR,DEHRADUN,
BADDI.
Factors That Affect Location Decisions
 Country Decisions
• Government rules, attitudes, stability, incentives
• Cultural and economic issues
• Location of markets
• Labor availability, attitudes, productivity, costs
• Availability of supplies, communications, energy
• Exchange rates
 Region/Community Decisions
• Corporate desires
• Attractiveness of region (culture, taxes, climate, etc…)
• Labor availability, costs, attitudes towards unions
• Cost and availability of utilities
• Environmental regulations of state and town
• Government incentives
• Proximity to raw materials and customers
• Land/construction costs
Factors That Affect Location Decisions (cont.)
 Site Decisions
• Site size and cost
• Air, rail, waterway systems
• Zoning restrictions
• Nearness of services/supplies needed
• Environmental impact issues
Costs: Tangible Vs. Intangible
 Tangible costs – those that are readily identifiable and precisely measured
• Utilities
• Labor
• Material
• Taxes
• Depreciation
• Other costs that accounting can easily identify
 Intangible costs – not easily quantifiable
• Quality of education
• Public transportation facilities
• Community attitudes toward the industry and the company
• Quality and attitude of prospective employees
• Climate
Proximity To Markets
 Schneider Electric is located in Rudrapur (Uttarakhand) which is near to our existing
plant.
• Quicker transportation and lesser lead time in completing purchase orders.
 Luminous Power Technology is located in Baddi (Himachal Pradesh) 600km approx.
• Longer transit time leads greater lead time in completing purchase orders.
Proximity To Suppliers
 Raw material supplier is located in Chandigarh 500km from existing plant location.
 Perishability:- Aluminum is softer than other metals, there is a threat of getting
damaged while transporting from longer distance.
 Transportation costs:- Higher due to long travelling distance.
 Inventory:- Because of longer transit time we have to keep more inventories and
buffer stocks..
Proximity To Competitors
 Amset (KN interplast)-Bahadurgarh, Haryana-
Senior most in this field and well established.
 Saitech-Noida, UttarPradesh- Growing.
 Naaz Metal and components-Noida,
Uttarpradesh.
 V.P Electronics-New Delhi.
 Micrologic- Gurgaon,Haryana
Baby
Boomers
Factor Rating Method
 Identify important factors
 Weight factors (0.00 - 1.00)
 Subjectively score each factor (0 - 10)
 Sum weighted scores
Cost-Volume Analysis
 Determine fixed and variable costs for each location
 Plot total costs for each location
 Select location with lowest total cost for expected production volume
-must be above break-even
Center-of-Gravity Method
x - coordinate =
∑dixQi
∑Qi
i
i
∑diyQi
∑Qi
i
i
y - coordinate =
where dix = x-coordinate of location i
diy = y-coordinate of location i
Qi = Quantity of goods moved to or from
location i
Conclusion:
 We are selecting Baddi (Himachal Pradesh) as our new business
location reason being:-
1) Less labor cost.
2) Lesser lead time in procuring Raw material, as our supplier is located just
30km apart at Chandigarh.
3) Scope of making new business partners who manufacture UPS and Inverter
in Baddi named SUKAM and MICROTEK.
4) It will take minimum transportation time and cost in delivery of consignments
to our existing customer LUMINOUS POWER TECHNOLOGY.
5) JIT (Just In Time) can applicable easily and could be followed flawlessly.
6) Close proximity makes it far easier to travel to them for supplier
development and contract management purposes, as well as for site
inspections
WILe-2 Location selection.

More Related Content

Viewers also liked

Plant location
Plant locationPlant location
Plant location
Ravi Verma
 
Plant Location
Plant LocationPlant Location
Plant Location
learnito
 
Factor influence the selection of plant location
Factor influence the selection of  plant locationFactor influence the selection of  plant location
Factor influence the selection of plant location
shikha singh
 
Plant Location Decission
Plant Location DecissionPlant Location Decission
Plant Location Decission
Jay Sanghrajka
 
Plant location and layout
Plant location and layoutPlant location and layout
Plant location and layout
Abu Bashar
 
Project Scheduling, Planning and Risk Management
Project Scheduling, Planning and Risk ManagementProject Scheduling, Planning and Risk Management
Project Scheduling, Planning and Risk Management
university of education,Lahore
 
Plant location.
Plant location.Plant location.
Plant location.
Harshith Rathi
 
Plant location
Plant locationPlant location
Project organization
Project organizationProject organization
Project organization
Abdal Babar
 
Factors affecting plant location 07
Factors affecting plant location 07Factors affecting plant location 07
Factors affecting plant location 07
Shubham Tandel
 
Selection Criteria of a Plant
Selection Criteria of a PlantSelection Criteria of a Plant
Selection Criteria of a Plant
ankur19june
 
Layout Case Study
Layout Case StudyLayout Case Study
Layout Case Study
Nilam Kabra
 
Plant location & layout
Plant location & layoutPlant location & layout
Plant location & layout
OSM Club, IIM Kashipur
 
Plant Location
Plant  LocationPlant  Location
Plant Location
Bob Bin
 
Plant location
Plant locationPlant location
Plant location
Dheepak Rocking
 
Pricing Strategy
Pricing StrategyPricing Strategy
Pricing Strategy
KohJung An
 
Plant layout ppt by me
Plant layout ppt by mePlant layout ppt by me
Plant layout ppt by me
Ankit Walia
 
Pricing methods..
Pricing methods..Pricing methods..
Pricing methods..
Sujith Nair
 
PPT on pricing strategies
PPT on pricing strategiesPPT on pricing strategies
PPT on pricing strategies
ITC Limited
 
Pricing Ppt
Pricing PptPricing Ppt
Pricing Ppt
sid30
 

Viewers also liked (20)

Plant location
Plant locationPlant location
Plant location
 
Plant Location
Plant LocationPlant Location
Plant Location
 
Factor influence the selection of plant location
Factor influence the selection of  plant locationFactor influence the selection of  plant location
Factor influence the selection of plant location
 
Plant Location Decission
Plant Location DecissionPlant Location Decission
Plant Location Decission
 
Plant location and layout
Plant location and layoutPlant location and layout
Plant location and layout
 
Project Scheduling, Planning and Risk Management
Project Scheduling, Planning and Risk ManagementProject Scheduling, Planning and Risk Management
Project Scheduling, Planning and Risk Management
 
Plant location.
Plant location.Plant location.
Plant location.
 
Plant location
Plant locationPlant location
Plant location
 
Project organization
Project organizationProject organization
Project organization
 
Factors affecting plant location 07
Factors affecting plant location 07Factors affecting plant location 07
Factors affecting plant location 07
 
Selection Criteria of a Plant
Selection Criteria of a PlantSelection Criteria of a Plant
Selection Criteria of a Plant
 
Layout Case Study
Layout Case StudyLayout Case Study
Layout Case Study
 
Plant location & layout
Plant location & layoutPlant location & layout
Plant location & layout
 
Plant Location
Plant  LocationPlant  Location
Plant Location
 
Plant location
Plant locationPlant location
Plant location
 
Pricing Strategy
Pricing StrategyPricing Strategy
Pricing Strategy
 
Plant layout ppt by me
Plant layout ppt by mePlant layout ppt by me
Plant layout ppt by me
 
Pricing methods..
Pricing methods..Pricing methods..
Pricing methods..
 
PPT on pricing strategies
PPT on pricing strategiesPPT on pricing strategies
PPT on pricing strategies
 
Pricing Ppt
Pricing PptPricing Ppt
Pricing Ppt
 

Similar to WILe-2 Location selection.

How to choose a good business location
How to choose a good business locationHow to choose a good business location
How to choose a good business location
Yasmin Pyle
 
Resume New
Resume NewResume New
AUTOMATED PRODUCTION OF MCB REPORT (Repaired) (1)
AUTOMATED PRODUCTION OF MCB REPORT (Repaired) (1)AUTOMATED PRODUCTION OF MCB REPORT (Repaired) (1)
AUTOMATED PRODUCTION OF MCB REPORT (Repaired) (1)
Ankit Kumar
 
Anwar Khan Resume.
Anwar Khan Resume.Anwar Khan Resume.
Anwar Khan Resume.
Anwar Khan
 
vedprakash Resume
vedprakash Resumevedprakash Resume
vedprakash Resume
Vedprakash Kushwaha
 
Facility location Arpico
Facility location   ArpicoFacility location   Arpico
Facility location Arpico
Rashmi Dissanayake
 
Plant location
Plant locationPlant location
Plant location
Aakash Kulkarni
 
Work Profile-March 16
Work Profile-March 16Work Profile-March 16
Work Profile-March 16
Rakesh Sharma
 
PRATHMESH HIRVE RESUME
PRATHMESH HIRVE RESUMEPRATHMESH HIRVE RESUME
PRATHMESH HIRVE RESUME
Prathmesh Hirve
 
Operations management location strategies (lecture)
Operations management location strategies  (lecture)Operations management location strategies  (lecture)
Operations management location strategies (lecture)
Jun Gonzales
 
EPC | EPC Contract | EPC Companies | EPC Engineering | Ador Welding Ltd
EPC | EPC Contract | EPC Companies | EPC Engineering | Ador Welding LtdEPC | EPC Contract | EPC Companies | EPC Engineering | Ador Welding Ltd
EPC | EPC Contract | EPC Companies | EPC Engineering | Ador Welding Ltd
Nucleosys Tech
 
Yasin - Resume
Yasin - ResumeYasin - Resume
Yasin - Resume
MOHAMMED YASIN
 
Industrial Engineering unit 5. Facility Design Notes by badebhau.
Industrial Engineering unit 5. Facility Design Notes by badebhau.Industrial Engineering unit 5. Facility Design Notes by badebhau.
Industrial Engineering unit 5. Facility Design Notes by badebhau.
Er. Bade Bhausaheb
 
Operation managemet
Operation managemet Operation managemet
Operation managemet
Shree Bhargava and Associate
 
Company profile-Electrical Contractors
Company profile-Electrical ContractorsCompany profile-Electrical Contractors
Company profile-Electrical Contractors
Ankush Arora
 
2496_FastTech_Brochure_MAIN_4pp_WEB
2496_FastTech_Brochure_MAIN_4pp_WEB2496_FastTech_Brochure_MAIN_4pp_WEB
2496_FastTech_Brochure_MAIN_4pp_WEB
Colin Spence
 
Manufacturing process of a random company
Manufacturing process of a random companyManufacturing process of a random company
Manufacturing process of a random company
Saugata Palit
 
brochure
brochurebrochure
Supply Chain Management
Supply Chain ManagementSupply Chain Management
Supply Chain Management
Neeraj Kumar
 
CURRICULAM VITAE
CURRICULAM VITAECURRICULAM VITAE
CURRICULAM VITAE
Deepali Madhwal
 

Similar to WILe-2 Location selection. (20)

How to choose a good business location
How to choose a good business locationHow to choose a good business location
How to choose a good business location
 
Resume New
Resume NewResume New
Resume New
 
AUTOMATED PRODUCTION OF MCB REPORT (Repaired) (1)
AUTOMATED PRODUCTION OF MCB REPORT (Repaired) (1)AUTOMATED PRODUCTION OF MCB REPORT (Repaired) (1)
AUTOMATED PRODUCTION OF MCB REPORT (Repaired) (1)
 
Anwar Khan Resume.
Anwar Khan Resume.Anwar Khan Resume.
Anwar Khan Resume.
 
vedprakash Resume
vedprakash Resumevedprakash Resume
vedprakash Resume
 
Facility location Arpico
Facility location   ArpicoFacility location   Arpico
Facility location Arpico
 
Plant location
Plant locationPlant location
Plant location
 
Work Profile-March 16
Work Profile-March 16Work Profile-March 16
Work Profile-March 16
 
PRATHMESH HIRVE RESUME
PRATHMESH HIRVE RESUMEPRATHMESH HIRVE RESUME
PRATHMESH HIRVE RESUME
 
Operations management location strategies (lecture)
Operations management location strategies  (lecture)Operations management location strategies  (lecture)
Operations management location strategies (lecture)
 
EPC | EPC Contract | EPC Companies | EPC Engineering | Ador Welding Ltd
EPC | EPC Contract | EPC Companies | EPC Engineering | Ador Welding LtdEPC | EPC Contract | EPC Companies | EPC Engineering | Ador Welding Ltd
EPC | EPC Contract | EPC Companies | EPC Engineering | Ador Welding Ltd
 
Yasin - Resume
Yasin - ResumeYasin - Resume
Yasin - Resume
 
Industrial Engineering unit 5. Facility Design Notes by badebhau.
Industrial Engineering unit 5. Facility Design Notes by badebhau.Industrial Engineering unit 5. Facility Design Notes by badebhau.
Industrial Engineering unit 5. Facility Design Notes by badebhau.
 
Operation managemet
Operation managemet Operation managemet
Operation managemet
 
Company profile-Electrical Contractors
Company profile-Electrical ContractorsCompany profile-Electrical Contractors
Company profile-Electrical Contractors
 
2496_FastTech_Brochure_MAIN_4pp_WEB
2496_FastTech_Brochure_MAIN_4pp_WEB2496_FastTech_Brochure_MAIN_4pp_WEB
2496_FastTech_Brochure_MAIN_4pp_WEB
 
Manufacturing process of a random company
Manufacturing process of a random companyManufacturing process of a random company
Manufacturing process of a random company
 
brochure
brochurebrochure
brochure
 
Supply Chain Management
Supply Chain ManagementSupply Chain Management
Supply Chain Management
 
CURRICULAM VITAE
CURRICULAM VITAECURRICULAM VITAE
CURRICULAM VITAE
 

WILe-2 Location selection.

  • 2. Location selection – Manufacturing Unit PRESENTED BY : SHASHANK SHEKHAR SINGH (2015HB79013)
  • 3. Our Firm -  Despite being a new entrant in this domain, we are successfully offering a comprehensive range of Extruded Aluminum Heat Sinks. Established in 2013.  Our firm is amongst the distinguished manufacturers and supplier of an extensive range of Extruded Heatsinks.  We have developed an advanced manufacturing unit which is well equipped with all requisite tools and latest machinery which enable us to meet the bulk requirements of our clients within specified time frame.  Our entire unit is spread across a vast area of 25000 square feet. Our team of professions work with the complete dedication to offer our clients a quality range of product which is at par with their requirements.  Our customers are Schneider and Luminous situated in Rudrapur and Baddi respectively.  Our RM suppliers –Valco and Indo are in Chandigarh and Bhiwadi.
  • 4. • With time the demand of our customers changes and due to this we sometimes feel that we are lagging behind in fulfilling the commitments and to satisfy their needs. • To fulfill the commitments , we have decided to establish a plant. • The locations that we are thinking of considering are RUDRAPUR,DEHRADUN, BADDI.
  • 5. Factors That Affect Location Decisions  Country Decisions • Government rules, attitudes, stability, incentives • Cultural and economic issues • Location of markets • Labor availability, attitudes, productivity, costs • Availability of supplies, communications, energy • Exchange rates  Region/Community Decisions • Corporate desires • Attractiveness of region (culture, taxes, climate, etc…) • Labor availability, costs, attitudes towards unions • Cost and availability of utilities • Environmental regulations of state and town • Government incentives • Proximity to raw materials and customers • Land/construction costs
  • 6. Factors That Affect Location Decisions (cont.)  Site Decisions • Site size and cost • Air, rail, waterway systems • Zoning restrictions • Nearness of services/supplies needed • Environmental impact issues
  • 7. Costs: Tangible Vs. Intangible  Tangible costs – those that are readily identifiable and precisely measured • Utilities • Labor • Material • Taxes • Depreciation • Other costs that accounting can easily identify  Intangible costs – not easily quantifiable • Quality of education • Public transportation facilities • Community attitudes toward the industry and the company • Quality and attitude of prospective employees • Climate
  • 8. Proximity To Markets  Schneider Electric is located in Rudrapur (Uttarakhand) which is near to our existing plant. • Quicker transportation and lesser lead time in completing purchase orders.  Luminous Power Technology is located in Baddi (Himachal Pradesh) 600km approx. • Longer transit time leads greater lead time in completing purchase orders. Proximity To Suppliers  Raw material supplier is located in Chandigarh 500km from existing plant location.  Perishability:- Aluminum is softer than other metals, there is a threat of getting damaged while transporting from longer distance.  Transportation costs:- Higher due to long travelling distance.  Inventory:- Because of longer transit time we have to keep more inventories and buffer stocks..
  • 9. Proximity To Competitors  Amset (KN interplast)-Bahadurgarh, Haryana- Senior most in this field and well established.  Saitech-Noida, UttarPradesh- Growing.  Naaz Metal and components-Noida, Uttarpradesh.  V.P Electronics-New Delhi.  Micrologic- Gurgaon,Haryana Baby Boomers
  • 10. Factor Rating Method  Identify important factors  Weight factors (0.00 - 1.00)  Subjectively score each factor (0 - 10)  Sum weighted scores
  • 11.
  • 12. Cost-Volume Analysis  Determine fixed and variable costs for each location  Plot total costs for each location  Select location with lowest total cost for expected production volume -must be above break-even
  • 13.
  • 14.
  • 15. Center-of-Gravity Method x - coordinate = ∑dixQi ∑Qi i i ∑diyQi ∑Qi i i y - coordinate = where dix = x-coordinate of location i diy = y-coordinate of location i Qi = Quantity of goods moved to or from location i
  • 16.
  • 17.
  • 18. Conclusion:  We are selecting Baddi (Himachal Pradesh) as our new business location reason being:- 1) Less labor cost. 2) Lesser lead time in procuring Raw material, as our supplier is located just 30km apart at Chandigarh. 3) Scope of making new business partners who manufacture UPS and Inverter in Baddi named SUKAM and MICROTEK. 4) It will take minimum transportation time and cost in delivery of consignments to our existing customer LUMINOUS POWER TECHNOLOGY. 5) JIT (Just In Time) can applicable easily and could be followed flawlessly. 6) Close proximity makes it far easier to travel to them for supplier development and contract management purposes, as well as for site inspections