Summary:
Vedprakash Kushwaha
Nangloi, New Delhi-110092(India)
Mobile no.+91-8745006593
E-mail ID :ved3291@gmail.com
• MEP & Equipment Installation Projects: Panel Designing, Lighting layout, Circuiting, D.B. Selection, Sub-
Main wiring. Preparation of B.O.Q., Selection of Contractors.
• Testing of H.T/L.T. Panels at site, Reviewing & Evaluation of Bill, Maintenance of site, Automobile Plants Machine
Installation, Ducting, Water and Air Piping, Interaction with client, contractors.
• Internal Electrical Work: Lighting layout, Circuiting, D.B Selection, Sub-Main wiring. Preparation of B.O.Q.,
Tenders & Estimates.
• Testing of H.T/L.T. Panels at site, Reviewing & Evaluation of Bill Maintenance of site, Interaction with client,
contractors
Skills:
Window
MS Word
Excel
Power Point
Inter-Net Surfing
Auto CAD
Professional Experience:-
FUJI FURUKAWA E & C CO. (INDIA) PVT. LTD. MAY 2015 to Present
Engineer
• MEP & Equipment Installation Projects: Panel Designing, Lighting layout, Circuiting, D.B. Selection, Sub-Main
wiring. Preparation of B.O.Q., Selection of Contractors.
• Testing of H.T/L.T. Panels at site, Reviewing & Evaluation of Bill, Maintenance of site, Automobile Plants Machine
Installation, Ducting, Water and Air Piping, Interaction with client, contractors.
• Project Management – To manage project activity on site.
• Bill of Materials – Making the Bill of Materials for each running projects.
• Kaizen – Following Kaizen for improving the work efficiency & Quality.
• Quality Assurance – Assuring the quality of work by everyday inspection.
• Quality Improvement - Meeting with project team every day and improving
the quality of work.
• Denwacho – Preparation of Everyday work schedule, Pointing out each
work dangerous points & instructing the safety precautions for each work.
• Resource Management – To do the resource management to execute the
project successfully. Discussing on each Point before starting the Project
and Planning for execution of projects easily with quality.
• Route cause Analysis - Route Cause Analysis of defective materials & Assured the quality of materials for ever
project.
• Technical Documentation – All technical documentation to get the project and Project completion formalities.
• Vendor Management - Managing Vendors as per their work eligibility and selection of Vendors.
• Commissioning - Commissioning of machines with client after installation of each machines.
• Total Quality Management - Total Quality Management as per Japanese standard and trend the Vendors & CO-
Engineers for Japanese Standard quality.
• Material Management - Managing all Project materials & selecting the good and cheapest supplier & Vendors for
company profit % improvement.
• Drawing & Design – Design the lighting equipment’s as per client requirement & Making the drawing by Auto- CAD.
• Panel Selection – Selecting the Panel size and capacity of main MCCB as per load given by client. Load
Calculation – To do Load calculation for the project.
• Transformer Selection - To do Transformer selection as per calculated load.
• Planning for Machine Installation – Planning before installation of Machine. Giving the tanning to the Vendors and
Labors for using Safety belt if Height work available & Hydra or Forklift dead spot safety
precautions,Machineshifting,by,Hand,palate,instructions.
• Working Schedule - Making the working schedule Monthly, Weekly & Daily. Everyday making the Inazuma line on
the daily schedule & reporting to the Managing Director.
.
Projects :
Project Company
Move out work of Machines SHIROKI TECHNICO INDIA PVT. LTD.
Machine Removing & Shifting work TOYOTA TSUSHO INDIA PVT. LTD.
Expansion of Hub Line TOYOTA TSUSHO INDIA PVT. LTD.
Move out work of Lab SHIROKI TECHNICO INDIA PVT. LTD.
Cooling Water System & Drainage System
Work
NIPPO INDIA PVT. LTD.
M/S HST Enterprises. May 2013 to April 2015
Electrical Engineer
Internal Electrical Work: Lighting layout, Circuiting, D.B .Selection, Sub-Main wiring, Fire Fighting & Fire Alarm
Project execution.
Preparation of B.O.Q., Tenders & Estimates. Testing of H.T/L.T. Panels at site, Reviewing & Evaluation of Bill,
Maintenance of site, Interaction with client, contractors.
PROJECTS :-
Project Name Client Name Cost Main Client
IIT MANDI HIMACHAL PRADESH CPWD 2.5 Crore C.P.W.D
IIT DELHI CPWD 1.25 Crore C.P.W.D
M/S H.N TRADERS & ENGINEERS Aug 2012 to May 2013
Electrical Engineer.
Internal Electrical Work: Lighting layout, Circuiting, D.B Selection, Sub-Main wiring.
Testing of H.T/L.T. Panels at site, Reviewing & Evaluation of Bill ,Maintenance of site, Interaction with client
contractors.
Projects:
Project Name Client Name Cost Main
Client
DDU marg project (Minto Road) (New
Delhi)
Era infra engg. LTD. 10 Crore CPWD
Education Qualification:-
B.TECH.(ELECTRICAL & ELECTRONICS ENGINEERS). Passed out in June 2012 from UPTU Lucknow (BBIET &RC )
Course Institution Board/University Year of Passing
10th LMT HIGH
SCHOOL
BSEB,PATNA 2003
12th SDN COLLAGE UP
BOARD,ALLAHABAD
2005
Graduation BBIET&RC UPTU LUCKNOW 2012
Personal Details :
Date of Birth :10.11.1986
Father’s Name :Bhagwan Prasad
VEDPRAKASH KUSHWAHA

vedprakash Resume

  • 1.
    Summary: Vedprakash Kushwaha Nangloi, NewDelhi-110092(India) Mobile no.+91-8745006593 E-mail ID :ved3291@gmail.com • MEP & Equipment Installation Projects: Panel Designing, Lighting layout, Circuiting, D.B. Selection, Sub- Main wiring. Preparation of B.O.Q., Selection of Contractors. • Testing of H.T/L.T. Panels at site, Reviewing & Evaluation of Bill, Maintenance of site, Automobile Plants Machine Installation, Ducting, Water and Air Piping, Interaction with client, contractors. • Internal Electrical Work: Lighting layout, Circuiting, D.B Selection, Sub-Main wiring. Preparation of B.O.Q., Tenders & Estimates. • Testing of H.T/L.T. Panels at site, Reviewing & Evaluation of Bill Maintenance of site, Interaction with client, contractors Skills: Window MS Word Excel Power Point Inter-Net Surfing Auto CAD Professional Experience:- FUJI FURUKAWA E & C CO. (INDIA) PVT. LTD. MAY 2015 to Present Engineer • MEP & Equipment Installation Projects: Panel Designing, Lighting layout, Circuiting, D.B. Selection, Sub-Main wiring. Preparation of B.O.Q., Selection of Contractors. • Testing of H.T/L.T. Panels at site, Reviewing & Evaluation of Bill, Maintenance of site, Automobile Plants Machine Installation, Ducting, Water and Air Piping, Interaction with client, contractors. • Project Management – To manage project activity on site. • Bill of Materials – Making the Bill of Materials for each running projects. • Kaizen – Following Kaizen for improving the work efficiency & Quality. • Quality Assurance – Assuring the quality of work by everyday inspection. • Quality Improvement - Meeting with project team every day and improving the quality of work. • Denwacho – Preparation of Everyday work schedule, Pointing out each work dangerous points & instructing the safety precautions for each work. • Resource Management – To do the resource management to execute the project successfully. Discussing on each Point before starting the Project and Planning for execution of projects easily with quality. • Route cause Analysis - Route Cause Analysis of defective materials & Assured the quality of materials for ever project. • Technical Documentation – All technical documentation to get the project and Project completion formalities. • Vendor Management - Managing Vendors as per their work eligibility and selection of Vendors. • Commissioning - Commissioning of machines with client after installation of each machines. • Total Quality Management - Total Quality Management as per Japanese standard and trend the Vendors & CO- Engineers for Japanese Standard quality. • Material Management - Managing all Project materials & selecting the good and cheapest supplier & Vendors for company profit % improvement. • Drawing & Design – Design the lighting equipment’s as per client requirement & Making the drawing by Auto- CAD. • Panel Selection – Selecting the Panel size and capacity of main MCCB as per load given by client. Load Calculation – To do Load calculation for the project. • Transformer Selection - To do Transformer selection as per calculated load. • Planning for Machine Installation – Planning before installation of Machine. Giving the tanning to the Vendors and Labors for using Safety belt if Height work available & Hydra or Forklift dead spot safety precautions,Machineshifting,by,Hand,palate,instructions. • Working Schedule - Making the working schedule Monthly, Weekly & Daily. Everyday making the Inazuma line on the daily schedule & reporting to the Managing Director.
  • 2.
    . Projects : Project Company Moveout work of Machines SHIROKI TECHNICO INDIA PVT. LTD. Machine Removing & Shifting work TOYOTA TSUSHO INDIA PVT. LTD. Expansion of Hub Line TOYOTA TSUSHO INDIA PVT. LTD. Move out work of Lab SHIROKI TECHNICO INDIA PVT. LTD. Cooling Water System & Drainage System Work NIPPO INDIA PVT. LTD. M/S HST Enterprises. May 2013 to April 2015 Electrical Engineer Internal Electrical Work: Lighting layout, Circuiting, D.B .Selection, Sub-Main wiring, Fire Fighting & Fire Alarm Project execution. Preparation of B.O.Q., Tenders & Estimates. Testing of H.T/L.T. Panels at site, Reviewing & Evaluation of Bill, Maintenance of site, Interaction with client, contractors. PROJECTS :- Project Name Client Name Cost Main Client IIT MANDI HIMACHAL PRADESH CPWD 2.5 Crore C.P.W.D IIT DELHI CPWD 1.25 Crore C.P.W.D M/S H.N TRADERS & ENGINEERS Aug 2012 to May 2013 Electrical Engineer. Internal Electrical Work: Lighting layout, Circuiting, D.B Selection, Sub-Main wiring. Testing of H.T/L.T. Panels at site, Reviewing & Evaluation of Bill ,Maintenance of site, Interaction with client contractors. Projects: Project Name Client Name Cost Main Client DDU marg project (Minto Road) (New Delhi) Era infra engg. LTD. 10 Crore CPWD Education Qualification:- B.TECH.(ELECTRICAL & ELECTRONICS ENGINEERS). Passed out in June 2012 from UPTU Lucknow (BBIET &RC ) Course Institution Board/University Year of Passing 10th LMT HIGH SCHOOL BSEB,PATNA 2003 12th SDN COLLAGE UP BOARD,ALLAHABAD 2005 Graduation BBIET&RC UPTU LUCKNOW 2012 Personal Details : Date of Birth :10.11.1986 Father’s Name :Bhagwan Prasad VEDPRAKASH KUSHWAHA