2. Project Development Brief
Spaces Level Conditions
FOYER 2 Public
PUBLIC SPACE 2 Public (in from of building)
RECEPTION 2 Public
CENTRE MANAGEMENT 2 Private
AUDITORIUM (300 person) 2 (Entry via Level 4) Need access
BREAK OUT / LOUNGE SPACE (300 Person) 4 Public
CAFE (400) 2 Public
LOADING DOCK 1 Private
STORAGE 1 Private
ADMIN SPACE 1 Private
LIFT (IN BUILDING AN OUTSIDE) In building (all levels), outside to top of
cliff and from floors 4 – 2)
Public
TOILETS ( 1 – 4) Public (2 – 4)
OPEN FORUM SPACE 2 Public
COMPUTER RESAERCH LAB 2 Public
LARGE COLAB SPACES (2 – 3) 2 Need access
SMALL COLAB SPACES (3) 3 Need access
STUDIO 3 Need access
CENTRAL STAIR (FEATURE) (1-4) Public
SECOND STAIR (2 – 4) ? Mainly for fire escape
DAB510 - EMERGENCE WEEK 13 JOSH KIM 8304548
3. Project Development
- Designed auditorium (core of
building) first as it effects the
surrounding spaces
- Modelled outer volume for
particle test to generate the outer
shell / massing that would enclose
the theatre
DAB510 - EMERGENCE WEEK 13 JOSH KIM 8304548
8. Project Development
- Wanted to keep same idea of having walls adjacent to site solid walls and have
glazing alone the front and back of the building
DAB510 - EMERGENCE WEEK 13 JOSH KIM 8304548
9. Project Development
- started planning spaces around
massing and auditorium design
(entry etc)
- Found the building needed to
stretch out along the site with the
majority of occupied spaces
facing the view out over the river
DAB510 - EMERGENCE WEEK 13 JOSH KIM 8304548
10. Project Development
- Modelled the floors
surrounding massing
and imported back into
3ds max to generate
outer form
DAB510 - EMERGENCE WEEK 13 JOSH KIM 8304548
11. Project Development
- Modelled the floors
surrounding massing
and imported back into
3ds max to generate
outer form
DAB510 - EMERGENCE WEEK 13 JOSH KIM 8304548
12. Project Development
- Modelled the floors
surrounding massing
and imported back into
3ds max to generate
outer form
DAB510 - EMERGENCE WEEK 13 JOSH KIM 8304548
13. Project Development
- Created massing from importing the particle tracking back into revit
-Created overall form then removed faces according to building
DAB510 - EMERGENCE WEEK 13 JOSH KIM 8304548
16. Project Development
-Wanted to keep perforation
idea with large openings that
cover the panels facing the river,
and smaller openings that could
act as a type of sun shade over
the open atrium space in the
building
DAB510 - EMERGENCE WEEK 13 JOSH KIM 8304548
20. Drawings (Printed for presentation):
-1 x Construction Section
- Cross section
- 4 x Plans
-3 x Elevations
Renders (Printed for Presentation):
- 1 x Exterior Renders in context
- 2 x Interior Renders
Project 3 Output
Model (1:200?)
- 3d Printed Exterior Model in site
PowerPoint Presentation
-Animation process (compilation)
-Lumion walkthrough
DAB510 - EMERGENCE WEEK 13 JOSH KIM 8304548
21. Weekly Planner
WEEK SOFTWARE PROGRESS PROJECT PROGRESS READING OTHER
05
LYNDA CERTIFICATE – 3DS MAX
MODEL PASTA EXPERIMENT IN 3DS MAX
EXPERIMENT WITH PASTA MODEL (3DS
MAX) – CONCEPT WORK
SITE ANALYSIS
MODEL SITE – REVIT
RAHIM – TECHNIQUES
AND TECHNOLOGY
PROJECT PLAN
(CREATE)
06
CONTINUE TO WORK ON EXPERIMENTATION AND PROJECT DEVELOPMENT IN 3DS MAX
DEVELOPE CONCEPT – CONDUCT EXPERIMENT RELEVANT TO CONCEPT
EDNIE-BROWN – THE
WILL TO ANIMATION
07
• BEGIN TO CODUCT EXPERIMENTS
DIGITALLY WITH SITE MODEL IMPORTED INTO
3DS MAX
• CONDUCT 3rd PHYSICAL EXPERIMENT
WATANABE – SUN –
GOD CITY FROM
INDUCTION DESIGN
08
DE LUCA – INNOVATIVE
TECHNIQUES OF
GENERATING FORM
09 PREPARE FOR PRESENTATION
SPILLER – TOWARDS AN
ANIMATED
ARCHITECTURE
AGAINST ARCHITURAL
ANIMATION
10 BEGIN EXPERIMENTATION WORK / CONTINUE DEVELOPMENT FOR PROJECT 3 - PROJECT 2 DUE - PRESENT
11
• REFINE DESIGN
• DOWNLOAD LUMION
• WORK ON TECTONICS OF BUILDING –
PROBLEM SOLVING CONSTRUCTION WORK
RAHIM – MIGRATING
COASTLINES
12
• BUILD DESIGN IN REVIT
• EXPERIMENT WITH LUMION
KOLAREVIC – NON –
EUCLIDEAN
GEOMETRIES
• SITE MODEL – LASER CUT
13
• DETAIL OUT CONSTRUCTION SECTION
• EXTERIOR AND INTERIOR RENDERS
ALDERSEY – WILLIAMS
- THE CATALYST
• 3D MODEL
PLANS , SECTIONS, ELEVATIONS
FINAL LUMION WALKTHROUGH
GET EVERYTHING TOGEATHER AND PRINTED FOR PRESENTATION
14 -(PRESENT) PROJECT 3 DUE - PRESENT