The document summarizes updates to the 2010-2011 National Engineering Design Challenge involving building windmill devices to perform tasks. Key changes include measuring average electrical power output over time using automated equipment rather than lamps, requiring teams to measure and report the mass of their device, and extending devices over table edges and onto the floor. Teams must now submit a cost and labor summary as part of their academic display. The performance criteria for tasks raising a mass, powering a vehicle, and responding to wind direction changes remain the same.