Presentation
on
Progress Report
of
WASH4UP-DNCC, Phase-II
November-December 2023
1
Outcome 1: WASH deprivation reduced among target communities through increased WASH awareness and
access to climate resilient and inclusive WASH services
SL
No
Output Indicator Target
Nov-Dec ’23
Achi
Nov-Dec’23
As of
Target
As of
Achi
Remarks
Output 1.1 Target communities and institutions are mobilised and empowered to get access to and
sustain climate resilient and inclusive WASH services
1 Water facility installation
without reservoir /Stand post
1 1 3 3
User=515
2 Water facility installation
with reservoir (3000L-3200L)
1 1 1 1
3 Water facility installation
with reservoir (2100 L)
2 2 4 4
4 Water facility renovation 3 7 8 9 User=465
5 Renovation of water facilities
at school
1 1 1 1 User=741
6 Caretaker training on O&M
for water facility
2 2 5 batch 5 batch Participants=64
SL
No
Output Indicator Target
Nov-Dec’23
Achi
Nov-Dec’23
As of
Target
As of
Achi
Remarks
Output 1.1 Target communities and institutions are mobilised and empowered to get access to and
sustain climate resilient and inclusive WASH services
7 Water Quality Test 11 22 30 34
8 Water quality test at zone level 0 0 3 3
9 Installation of Community Toilet 6 7 6 7 User=525
10 Renovation of community
managed toilet
5 8 10 10 User=685
11 School toilet renovation 0 0 1 1 User=741
12 Hand Washing device 11 16 17 18 User=1951
13 Hand washing session at Community 108 109 117 118 User=1606
14 WSP Session at Community 18 19 27 27 User=372
15 MHM Session at Community 18 20 27 27 User=349
16 SSP Session at Community 18 18 18 18 User=244
SL
No
Output Indicator Target
Nov-Dec’23
Achi Nov-
Dec’23
As of
Target
As of
Achi
Remarks
Output 1.2 Target communities & local authorities are mobilised & sensitised to plan and implement
environmental sanitation
1 # of people covered under
health protection scheme for
waste and sanitation workers
310 148 4425 3525 User=3525
2 # of campaigns including day
observations organised on
environmental sanitation and
AMR
2 2 4 5 User=164
3 # of public toilet supported
for operation and
management
7 7 7 7
4 # of households
managing/disposing off child
faeces safely
135 81 225 229 User=235
Outcome 2: Local governance in gender transformative and inclusive pro-poor WASH service delivery and
coordination with other services in target cities and towns improved
SL
No
Output Indicator
Target
Nov-
Dec’23
Achi
Nov-
Dec’23
As of
Target
As of
Achi
Remarks
Output 2.1 Responses of the local authorities and service providers increased to deal with gender
transformative and inclusive pro-poor WASH services
1 WP Legalization 05 10 11 14 User=419
Out of 14, 3 are
Community own initiatives
2 Basic training to CBOs 0 0 13 batch 13 batch Participants=255
3 learning visits organised for
town/city authority and others
1 1 1 1 Participants=11
4 Orientation of CBO on community
based SWM
0 0 1 1 Participants=20
SL
No
Output Indicator
Target
Nov-Dec’23
Achi
Nov-Dec’23
As of
Target
As of
Achi
Remarks
Output 2.2 Coordination between WASH and other service delivery in slum/low-income settlements by
urban service providers improved
1 Planning meeting with SMC, teachers 0 0 1 1
2 Meeting with relevant stakeholders 1 1 4 4
3 Mother/Parent gathering on WASH at
School
0 0 4 4
4 Head Teachers' meeting at Thana level 0 0 2 2
5 Citizen Charter review and publish at
community level
3 3 3 3
6 Zonal Coordination Meeting at DWASA 1 1 3 3
7 Central Coordination Meeting at DWASA 0 0 1 1
8 Meeting with slum development
department of CC
0 0 1 1
Output 3.1 Gaps and opportunities for integration of climate resilient and
universal WASH in national and local level policy and programmes
identified (WAB)
Output 3.2 Relevant stakeholders and authorities are sensitised towards
pro-poor policies/issues around WASH and climate change (WAB)
Outcome-3: National policies and strategies strengthened for climate resilient and
universal WASH agenda through evidence and advocacy (WAB)
Summary of SNS Project
Phase Target Achievement
1-5 3,350 3,092
6-8 465 186
9-10 300 99
11-12 250 69
13-14 60 79
Total= 4,425 3,525
Death Statistics and Challenge of SNS
Challenge
 Many other Organizations like NGOs, Private
organization and Govt. Health department have been
providing free health services in the WASH4UP DNCC
project area.
 Sometimes Cardholders returning from hospital
without getting service.
 Lake of necessary cooperation from Zone and Ward
office of DNCC.
 Misconceptions of people in low income community
regarding insurance.
 Waste and sanitation workers and Low income
community peoples are less interested for taking the
SNS service by paying insurance premium of Taka
199.
Some Picture of SNS Activities
SL
No
Activity Name
Target Till
December 2023
Achi Till December
2023
Water Beneficiary (Community) 1250 1399
Water Beneficiary (School) 800 741
Water Beneficiary (Public Place) 0 0
Total Water 2050 2140
Sanitation Beneficiary (Community) 1145 1210
Sanitation Beneficiary (School) 800 741
Sanitation Beneficiary (Public Place) 0 0
Total Sanitation 1945 1951
Hygiene (Community) 1431 1606
Hygiene (School) 1400 1761
Total Hygiene 2831 3367
Plan vs Progress (User)
WASH Fund Information,WASH4UrbanPoor,DNCC Phase-II
SL
No
Name of Staffs Total WASH
fund Target
Achievement Expenditure/
Component
Sharing
Recoverable/Due
WASH Fund
Amount
Bank
Balance
1 Aleya Ferdushe 71422 46000 0 25422 46000
2 Rita Halder 9000 4500 3500 1000 4500
3 Afruja Akter 80500 59500 5000 16000 59500
4 Asma Chisim 4500 4500 0 0 4500
5 Shakila Akter Shanta 35934 15500 0 20434 15500
6 Nazim Uddin 54000 54000 0 0 54000
7 Monwara Begum 52000 46900 2100 3000 46900
8 Bidhan Sarker 23000 20000 0 3000 20000
9 Anjali Rani
76307 71307
0 5000 71307
Total 4,06,663 3,22,207 10,600 73,856 3,22,207
Source: mWater. Dashboard Link:
https://share.mwater.co/v3/console_link/a842b95b00bf49b299933c1927c2e28c?share=59cc1b73db5d468fa70510d283decba4&tab=f1983b27
-2258-48b8-a908-422ee814fa0c
WASH Fund Information,WASH4UrbanPoor,DNCC (Up to Dec’23)
SL
No
28
Project Total Target
Total
Achieve
Due
Expendit
ure
Cash in
CBO
Committ
ee
Bank
balance
01
WASH4UrbanPoor,DNCC
Project Phase-I
5147892 4014568 1436654 1438003 30000 2546565
WASH4UrbanPoor,DNCC
Project Phase-II
4,06,663 3,22,207 73,856 10,600 0 3,22,207
02 PEHUP Project 40,10645 33,32,147 678498 0 0 3332147
Sub Total 9565200 7668922 2189008 1448823 30000 6200919
FDR Information
01 FDR (Korail Bosti) 20,00000
02 FDR ( Staff Mohalla Bosti) 300000
03 FDR( Sattala Pora Bosti) 350000
04 Bank Interest 1536279
Grand Total 10387198
Challenges
• Political Unrest
• Land scarcity for hardware construction
• Water crisis at Mohakhali area (Especially Earshad Nagar Bosti)
• New Govt.VAT & TAX Rules
• Delay of finalization of different guidelines by WAB (Hygiene, WASH Fund etc)
• Less willingness of health card holders for renewal.
• Lack of willingness to get health card by BDT199 due to existing free health
services in working area.
• Targeted activities have been started in late due to delay of project agreement
signing.
• To achieve beneficiaries as per target for each facilities.
Monitoring Findings
bs gwbUwis dvBwÛsm M„wnZ c`‡ÿc
1 `yqvixcvov ew¯Íi Mdzi Gi Uq‡jU Gi Qv‡`i †`qv‡ji †Kvbvq
cøvmUvi Ges is Kiv nqwb|
eZ©gv‡b cøvmUvi Ges is Kiv ïiæ n‡q‡Q|
2 ch©‡eÿbK…Z `yqvixcvov Ges wSjcvo B-eøK ew¯Íi 4wU IqvUvi
c‡q›U wgUvi ¯’vcb bv K‡iB wi‡cv©U Kiv n‡q‡Q|
Iqvmv †_‡K wgUvi Avm‡Z †`ix nIqvq gv‡mi
†k‡l wi‡c©vU Kiv n‡q‡Q | eZ©gv‡b mKj
wgUvi ¯’vcb Kiv n‡q‡Q|
3 ch©‡eÿbK…Z `yqvixcvov Ges wSjcvo B-eøK ew¯Íi 4wU IqvUvi
c‡q›U GL‡bv ms‡hvM ¯’vcb Kiv nqwb|
eZ©gv‡b ms‡hvM †`qv n‡q‡Q|
4 wSjcvo B-eøK ew¯Íi wejøvj Gi Uq‡j‡Ui wmwoui cøvmUvi D‡V
†M‡Q Ges cv‡ki Lvwj Ask wmwoui mv‡_ hy³ bv Kiv‡Z RvqMv
A‡bK †QvU n‡q †M‡Q|
cøvmUvi wVK Kiv n‡q‡Q Ges Lvwj
RvqMv‡K wmwoui mv‡_ hy³ Kiv n‡q‡Q|
5 wSjcvo B-eøK ew¯Íi wejøvj Gi Uq‡j‡Ui nvZ †avqvi wWfvB‡mi
mv‡_ †mvc‡Km ‡`qv nqwb|
cieZx©‡Z †mvc‡Km jvMv‡bv n‡q‡Q|
Monitoring Findings
bs gwbUwis dvBwÛsm M„wnZ c`‡ÿc
6 ch©‡eÿbK…Z 3wU Uq‡jU ¯’vcbvi †KvbwU‡Z ivwbs IqvUv‡ii
ms‡hvM †`qv nqwb|
eZ©gv‡b mKj Uq‡j‡U ivwbs IqvUv‡ii
ms‡hvM †`qv n‡q‡Q|
7 wSjcvo B-eøK ew¯Íi weDwUi IqvUvi c‡q›U †iby‡fkb Gi
cøvUdi‡gi wmwoui avc A‡bK DPzu Kiv n‡q‡Q Ges cv‡ki Lvwj
Ask‡K wmwoui mv‡_ hy³ bv Kiv‡Z wmwou †QvU n‡q‡Q |
D³ mgm¨v mgvavb Kiv n‡q‡Q|
8 wW‡mÕ23 G wi‡cvU©K…Z nvW©Iq¨vi mgyn wWGm‡K
IqvUmvb WvUv‡e‡R GL‡bv Avc‡jvW Kiv nqwb|
kxNªB WvUv‡e‡R Avc‡jvW Kiv n‡e|
9 ch©‡eÿbK…Z 3 wU Uq‡jU Ges 5wU IqvUvi c‡q›U Gi mvB‡bR
Av‡Q wKš‘ GL‡bv mvBb‡evW© jvMv‡bv nqwb|
mvBb‡evW Ẑixi KvR Pjgvb Av‡Q|
10 ch©‡eÿbK…Z 3 wU Uq‡jU Ges 5wU IqvUvi c‡q›U Gi dvBj
GL‡bv cwic~Y© Avc‡WU K‡i KwgDwbwU‡K n¯ÍvšÍi Kiv nqwb|
Avc‡W‡Ui KvR Pjgvb Av‡Q Ges `ªæZ
KwgDwbwU‡K n¯ÍvšÍi Kiv n‡e|
Finance Dec 2023
Yearly Budget Budget
April-Dec”23
Expenditure
April-Dec”23
Burn
Rate
April-
Dec”23
Budget Dec
2023
Expenditure
Dec 2023
Burn Rate
Oct
Remarks
26083148 14449500 14463724 100% 3021736 2825687 94%
17
2/16/2024
Page heading
Photos of
Community Toilet
& Hand washing
device
Page heading
Photos of
Community Water
Points
Page heading
Photos of School
WASH Facilities
School WASH Block at Shalauddin Shikkaloy
Page heading
Photos of Hygiene
Session
Hygiene Session at Community
Page heading
Photos of
Observance of
World Toilet Day
2023
Discussion Meeting with CBO on WTD 2023
Page heading
Photos of
Observance of
World Toilet Day
2023
Toilet Cleaning Campaign at Community Level
Page heading
Photos of
Observance of
World Toilet Day
2023
Best performer on toilet maintenance to keep clean always
Page heading
Photos of
Advocacy Event
DWASA Zonal Coordination Meeting at Zone-10
Page heading
Photos of
Advocacy Event
Meet the LIC Consumer at Mohakhali Area
Page heading
Photos of
Advocacy Event
DWASA High Official Field visit Fire Hydrant, DAP Complex and PT
Page heading
Photos of Visitors
AFD Auditors
Thank You!

More Related Content

Similar to WASH4UP-DNCC December 2023 for download

KisumuSan Bseline Survey Final Report 2016
KisumuSan Bseline Survey Final Report 2016KisumuSan Bseline Survey Final Report 2016
KisumuSan Bseline Survey Final Report 2016
Martin Ombima
 
Edited apr 2015 final 29.02.2016-clean
Edited apr 2015 final 29.02.2016-cleanEdited apr 2015 final 29.02.2016-clean
Edited apr 2015 final 29.02.2016-clean
dtv19
 
Field study results PASC FINAL DRAFT
Field study results PASC FINAL DRAFTField study results PASC FINAL DRAFT
Field study results PASC FINAL DRAFT
Magdaline Agbor
 
Baseline survey final report-14 dec 2013
Baseline survey final report-14 dec 2013Baseline survey final report-14 dec 2013
Baseline survey final report-14 dec 2013
Pabitra Basu
 
Full Project Example
Full Project ExampleFull Project Example
Full Project Example
Darren Kidd
 
Overall Approach to Reducing Non Revenue Water
Overall Approach to Reducing Non Revenue WaterOverall Approach to Reducing Non Revenue Water
Overall Approach to Reducing Non Revenue Water
Mark French
 
1. Water Governance and Building Partnerships
1. Water Governance and Building Partnerships1. Water Governance and Building Partnerships
1. Water Governance and Building Partnerships
Environmental Protection Agency, Ireland
 

Similar to WASH4UP-DNCC December 2023 for download (20)

END OF PROJECT PRESENTATION 14 SEPTEMBER 2023.pptx
END OF PROJECT PRESENTATION 14 SEPTEMBER 2023.pptxEND OF PROJECT PRESENTATION 14 SEPTEMBER 2023.pptx
END OF PROJECT PRESENTATION 14 SEPTEMBER 2023.pptx
 
Support to strengthen institutional capacity to monitor poverty - environment...
Support to strengthen institutional capacity to monitor poverty - environment...Support to strengthen institutional capacity to monitor poverty - environment...
Support to strengthen institutional capacity to monitor poverty - environment...
 
Community development and participatory approach concept (phase 2)
Community development and participatory approach concept (phase 2)Community development and participatory approach concept (phase 2)
Community development and participatory approach concept (phase 2)
 
Community development and participatory approach concept (phase 2)
Community development and participatory approach concept (phase 2)Community development and participatory approach concept (phase 2)
Community development and participatory approach concept (phase 2)
 
Socio-economic Analysis of Haor (wetlands) in Bangladesh
Socio-economic Analysis of Haor (wetlands) in BangladeshSocio-economic Analysis of Haor (wetlands) in Bangladesh
Socio-economic Analysis of Haor (wetlands) in Bangladesh
 
3.1 WORKSHOP ON PARTNER COUNTRY PERSPECTIVES FOR TRACKING DOMESTIC AND INTERN...
3.1 WORKSHOP ON PARTNER COUNTRY PERSPECTIVES FOR TRACKING DOMESTIC AND INTERN...3.1 WORKSHOP ON PARTNER COUNTRY PERSPECTIVES FOR TRACKING DOMESTIC AND INTERN...
3.1 WORKSHOP ON PARTNER COUNTRY PERSPECTIVES FOR TRACKING DOMESTIC AND INTERN...
 
Regional Level Consultative Workshop of Western Region (LGCDP-II)
Regional Level Consultative Workshop of Western Region (LGCDP-II)Regional Level Consultative Workshop of Western Region (LGCDP-II)
Regional Level Consultative Workshop of Western Region (LGCDP-II)
 
KisumuSan Bseline Survey Final Report 2016
KisumuSan Bseline Survey Final Report 2016KisumuSan Bseline Survey Final Report 2016
KisumuSan Bseline Survey Final Report 2016
 
Edited apr 2015 final 29.02.2016-clean
Edited apr 2015 final 29.02.2016-cleanEdited apr 2015 final 29.02.2016-clean
Edited apr 2015 final 29.02.2016-clean
 
Field study results PASC FINAL DRAFT
Field study results PASC FINAL DRAFTField study results PASC FINAL DRAFT
Field study results PASC FINAL DRAFT
 
Hakan Tropp (SIWI) - 6th WGI Meeting (2-3 November 2015, Paris)
Hakan Tropp (SIWI) - 6th WGI Meeting (2-3 November 2015, Paris)Hakan Tropp (SIWI) - 6th WGI Meeting (2-3 November 2015, Paris)
Hakan Tropp (SIWI) - 6th WGI Meeting (2-3 November 2015, Paris)
 
Overview of GWP 3 Year Work Programme
Overview of GWP 3 Year Work ProgrammeOverview of GWP 3 Year Work Programme
Overview of GWP 3 Year Work Programme
 
Baseline survey final report-14 dec 2013
Baseline survey final report-14 dec 2013Baseline survey final report-14 dec 2013
Baseline survey final report-14 dec 2013
 
Solving the Two-Sided Challenge of "Going Beyond the Check"
Solving the Two-Sided Challenge of "Going Beyond the Check"Solving the Two-Sided Challenge of "Going Beyond the Check"
Solving the Two-Sided Challenge of "Going Beyond the Check"
 
Mukhya Mantri Gramin Peyjal Nishchay Yojana (MGPNY) – Bihar_Pankaj Kumar_AKRS...
Mukhya Mantri Gramin Peyjal Nishchay Yojana (MGPNY) – Bihar_Pankaj Kumar_AKRS...Mukhya Mantri Gramin Peyjal Nishchay Yojana (MGPNY) – Bihar_Pankaj Kumar_AKRS...
Mukhya Mantri Gramin Peyjal Nishchay Yojana (MGPNY) – Bihar_Pankaj Kumar_AKRS...
 
Full Project Example
Full Project ExampleFull Project Example
Full Project Example
 
Listening to the poor enabled through technology
Listening to the poor enabled through technologyListening to the poor enabled through technology
Listening to the poor enabled through technology
 
Overall Approach to Reducing Non Revenue Water
Overall Approach to Reducing Non Revenue WaterOverall Approach to Reducing Non Revenue Water
Overall Approach to Reducing Non Revenue Water
 
1. Water Governance and Building Partnerships
1. Water Governance and Building Partnerships1. Water Governance and Building Partnerships
1. Water Governance and Building Partnerships
 
Transitioning from reaching every district to reaching every community
Transitioning from reaching every district to reaching every communityTransitioning from reaching every district to reaching every community
Transitioning from reaching every district to reaching every community
 

Recently uploaded

notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
MsecMca
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
Health
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 

Recently uploaded (20)

notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086
 
Bridge Jacking Design Sample Calculation.pptx
Bridge Jacking Design Sample Calculation.pptxBridge Jacking Design Sample Calculation.pptx
Bridge Jacking Design Sample Calculation.pptx
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
 
Rums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdfRums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdf
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 

WASH4UP-DNCC December 2023 for download

  • 2. Outcome 1: WASH deprivation reduced among target communities through increased WASH awareness and access to climate resilient and inclusive WASH services SL No Output Indicator Target Nov-Dec ’23 Achi Nov-Dec’23 As of Target As of Achi Remarks Output 1.1 Target communities and institutions are mobilised and empowered to get access to and sustain climate resilient and inclusive WASH services 1 Water facility installation without reservoir /Stand post 1 1 3 3 User=515 2 Water facility installation with reservoir (3000L-3200L) 1 1 1 1 3 Water facility installation with reservoir (2100 L) 2 2 4 4 4 Water facility renovation 3 7 8 9 User=465 5 Renovation of water facilities at school 1 1 1 1 User=741 6 Caretaker training on O&M for water facility 2 2 5 batch 5 batch Participants=64
  • 3. SL No Output Indicator Target Nov-Dec’23 Achi Nov-Dec’23 As of Target As of Achi Remarks Output 1.1 Target communities and institutions are mobilised and empowered to get access to and sustain climate resilient and inclusive WASH services 7 Water Quality Test 11 22 30 34 8 Water quality test at zone level 0 0 3 3 9 Installation of Community Toilet 6 7 6 7 User=525 10 Renovation of community managed toilet 5 8 10 10 User=685 11 School toilet renovation 0 0 1 1 User=741 12 Hand Washing device 11 16 17 18 User=1951 13 Hand washing session at Community 108 109 117 118 User=1606 14 WSP Session at Community 18 19 27 27 User=372 15 MHM Session at Community 18 20 27 27 User=349 16 SSP Session at Community 18 18 18 18 User=244
  • 4. SL No Output Indicator Target Nov-Dec’23 Achi Nov- Dec’23 As of Target As of Achi Remarks Output 1.2 Target communities & local authorities are mobilised & sensitised to plan and implement environmental sanitation 1 # of people covered under health protection scheme for waste and sanitation workers 310 148 4425 3525 User=3525 2 # of campaigns including day observations organised on environmental sanitation and AMR 2 2 4 5 User=164 3 # of public toilet supported for operation and management 7 7 7 7 4 # of households managing/disposing off child faeces safely 135 81 225 229 User=235
  • 5. Outcome 2: Local governance in gender transformative and inclusive pro-poor WASH service delivery and coordination with other services in target cities and towns improved SL No Output Indicator Target Nov- Dec’23 Achi Nov- Dec’23 As of Target As of Achi Remarks Output 2.1 Responses of the local authorities and service providers increased to deal with gender transformative and inclusive pro-poor WASH services 1 WP Legalization 05 10 11 14 User=419 Out of 14, 3 are Community own initiatives 2 Basic training to CBOs 0 0 13 batch 13 batch Participants=255 3 learning visits organised for town/city authority and others 1 1 1 1 Participants=11 4 Orientation of CBO on community based SWM 0 0 1 1 Participants=20
  • 6. SL No Output Indicator Target Nov-Dec’23 Achi Nov-Dec’23 As of Target As of Achi Remarks Output 2.2 Coordination between WASH and other service delivery in slum/low-income settlements by urban service providers improved 1 Planning meeting with SMC, teachers 0 0 1 1 2 Meeting with relevant stakeholders 1 1 4 4 3 Mother/Parent gathering on WASH at School 0 0 4 4 4 Head Teachers' meeting at Thana level 0 0 2 2 5 Citizen Charter review and publish at community level 3 3 3 3 6 Zonal Coordination Meeting at DWASA 1 1 3 3 7 Central Coordination Meeting at DWASA 0 0 1 1 8 Meeting with slum development department of CC 0 0 1 1
  • 7. Output 3.1 Gaps and opportunities for integration of climate resilient and universal WASH in national and local level policy and programmes identified (WAB) Output 3.2 Relevant stakeholders and authorities are sensitised towards pro-poor policies/issues around WASH and climate change (WAB) Outcome-3: National policies and strategies strengthened for climate resilient and universal WASH agenda through evidence and advocacy (WAB)
  • 8. Summary of SNS Project Phase Target Achievement 1-5 3,350 3,092 6-8 465 186 9-10 300 99 11-12 250 69 13-14 60 79 Total= 4,425 3,525
  • 9. Death Statistics and Challenge of SNS Challenge  Many other Organizations like NGOs, Private organization and Govt. Health department have been providing free health services in the WASH4UP DNCC project area.  Sometimes Cardholders returning from hospital without getting service.  Lake of necessary cooperation from Zone and Ward office of DNCC.  Misconceptions of people in low income community regarding insurance.  Waste and sanitation workers and Low income community peoples are less interested for taking the SNS service by paying insurance premium of Taka 199.
  • 10. Some Picture of SNS Activities
  • 11. SL No Activity Name Target Till December 2023 Achi Till December 2023 Water Beneficiary (Community) 1250 1399 Water Beneficiary (School) 800 741 Water Beneficiary (Public Place) 0 0 Total Water 2050 2140 Sanitation Beneficiary (Community) 1145 1210 Sanitation Beneficiary (School) 800 741 Sanitation Beneficiary (Public Place) 0 0 Total Sanitation 1945 1951 Hygiene (Community) 1431 1606 Hygiene (School) 1400 1761 Total Hygiene 2831 3367 Plan vs Progress (User)
  • 12. WASH Fund Information,WASH4UrbanPoor,DNCC Phase-II SL No Name of Staffs Total WASH fund Target Achievement Expenditure/ Component Sharing Recoverable/Due WASH Fund Amount Bank Balance 1 Aleya Ferdushe 71422 46000 0 25422 46000 2 Rita Halder 9000 4500 3500 1000 4500 3 Afruja Akter 80500 59500 5000 16000 59500 4 Asma Chisim 4500 4500 0 0 4500 5 Shakila Akter Shanta 35934 15500 0 20434 15500 6 Nazim Uddin 54000 54000 0 0 54000 7 Monwara Begum 52000 46900 2100 3000 46900 8 Bidhan Sarker 23000 20000 0 3000 20000 9 Anjali Rani 76307 71307 0 5000 71307 Total 4,06,663 3,22,207 10,600 73,856 3,22,207 Source: mWater. Dashboard Link: https://share.mwater.co/v3/console_link/a842b95b00bf49b299933c1927c2e28c?share=59cc1b73db5d468fa70510d283decba4&tab=f1983b27 -2258-48b8-a908-422ee814fa0c
  • 13. WASH Fund Information,WASH4UrbanPoor,DNCC (Up to Dec’23) SL No 28 Project Total Target Total Achieve Due Expendit ure Cash in CBO Committ ee Bank balance 01 WASH4UrbanPoor,DNCC Project Phase-I 5147892 4014568 1436654 1438003 30000 2546565 WASH4UrbanPoor,DNCC Project Phase-II 4,06,663 3,22,207 73,856 10,600 0 3,22,207 02 PEHUP Project 40,10645 33,32,147 678498 0 0 3332147 Sub Total 9565200 7668922 2189008 1448823 30000 6200919 FDR Information 01 FDR (Korail Bosti) 20,00000 02 FDR ( Staff Mohalla Bosti) 300000 03 FDR( Sattala Pora Bosti) 350000 04 Bank Interest 1536279 Grand Total 10387198
  • 14. Challenges • Political Unrest • Land scarcity for hardware construction • Water crisis at Mohakhali area (Especially Earshad Nagar Bosti) • New Govt.VAT & TAX Rules • Delay of finalization of different guidelines by WAB (Hygiene, WASH Fund etc) • Less willingness of health card holders for renewal. • Lack of willingness to get health card by BDT199 due to existing free health services in working area. • Targeted activities have been started in late due to delay of project agreement signing. • To achieve beneficiaries as per target for each facilities.
  • 15. Monitoring Findings bs gwbUwis dvBwÛsm M„wnZ c`‡ÿc 1 `yqvixcvov ew¯Íi Mdzi Gi Uq‡jU Gi Qv‡`i †`qv‡ji †Kvbvq cøvmUvi Ges is Kiv nqwb| eZ©gv‡b cøvmUvi Ges is Kiv ïiæ n‡q‡Q| 2 ch©‡eÿbK…Z `yqvixcvov Ges wSjcvo B-eøK ew¯Íi 4wU IqvUvi c‡q›U wgUvi ¯’vcb bv K‡iB wi‡cv©U Kiv n‡q‡Q| Iqvmv †_‡K wgUvi Avm‡Z †`ix nIqvq gv‡mi †k‡l wi‡c©vU Kiv n‡q‡Q | eZ©gv‡b mKj wgUvi ¯’vcb Kiv n‡q‡Q| 3 ch©‡eÿbK…Z `yqvixcvov Ges wSjcvo B-eøK ew¯Íi 4wU IqvUvi c‡q›U GL‡bv ms‡hvM ¯’vcb Kiv nqwb| eZ©gv‡b ms‡hvM †`qv n‡q‡Q| 4 wSjcvo B-eøK ew¯Íi wejøvj Gi Uq‡j‡Ui wmwoui cøvmUvi D‡V †M‡Q Ges cv‡ki Lvwj Ask wmwoui mv‡_ hy³ bv Kiv‡Z RvqMv A‡bK †QvU n‡q †M‡Q| cøvmUvi wVK Kiv n‡q‡Q Ges Lvwj RvqMv‡K wmwoui mv‡_ hy³ Kiv n‡q‡Q| 5 wSjcvo B-eøK ew¯Íi wejøvj Gi Uq‡j‡Ui nvZ †avqvi wWfvB‡mi mv‡_ †mvc‡Km ‡`qv nqwb| cieZx©‡Z †mvc‡Km jvMv‡bv n‡q‡Q|
  • 16. Monitoring Findings bs gwbUwis dvBwÛsm M„wnZ c`‡ÿc 6 ch©‡eÿbK…Z 3wU Uq‡jU ¯’vcbvi †KvbwU‡Z ivwbs IqvUv‡ii ms‡hvM †`qv nqwb| eZ©gv‡b mKj Uq‡j‡U ivwbs IqvUv‡ii ms‡hvM †`qv n‡q‡Q| 7 wSjcvo B-eøK ew¯Íi weDwUi IqvUvi c‡q›U †iby‡fkb Gi cøvUdi‡gi wmwoui avc A‡bK DPzu Kiv n‡q‡Q Ges cv‡ki Lvwj Ask‡K wmwoui mv‡_ hy³ bv Kiv‡Z wmwou †QvU n‡q‡Q | D³ mgm¨v mgvavb Kiv n‡q‡Q| 8 wW‡mÕ23 G wi‡cvU©K…Z nvW©Iq¨vi mgyn wWGm‡K IqvUmvb WvUv‡e‡R GL‡bv Avc‡jvW Kiv nqwb| kxNªB WvUv‡e‡R Avc‡jvW Kiv n‡e| 9 ch©‡eÿbK…Z 3 wU Uq‡jU Ges 5wU IqvUvi c‡q›U Gi mvB‡bR Av‡Q wKš‘ GL‡bv mvBb‡evW© jvMv‡bv nqwb| mvBb‡evW Ẑixi KvR Pjgvb Av‡Q| 10 ch©‡eÿbK…Z 3 wU Uq‡jU Ges 5wU IqvUvi c‡q›U Gi dvBj GL‡bv cwic~Y© Avc‡WU K‡i KwgDwbwU‡K n¯ÍvšÍi Kiv nqwb| Avc‡W‡Ui KvR Pjgvb Av‡Q Ges `ªæZ KwgDwbwU‡K n¯ÍvšÍi Kiv n‡e|
  • 17. Finance Dec 2023 Yearly Budget Budget April-Dec”23 Expenditure April-Dec”23 Burn Rate April- Dec”23 Budget Dec 2023 Expenditure Dec 2023 Burn Rate Oct Remarks 26083148 14449500 14463724 100% 3021736 2825687 94% 17 2/16/2024
  • 18. Page heading Photos of Community Toilet & Hand washing device
  • 20. Page heading Photos of School WASH Facilities School WASH Block at Shalauddin Shikkaloy
  • 21. Page heading Photos of Hygiene Session Hygiene Session at Community
  • 22. Page heading Photos of Observance of World Toilet Day 2023 Discussion Meeting with CBO on WTD 2023
  • 23. Page heading Photos of Observance of World Toilet Day 2023 Toilet Cleaning Campaign at Community Level
  • 24. Page heading Photos of Observance of World Toilet Day 2023 Best performer on toilet maintenance to keep clean always
  • 25. Page heading Photos of Advocacy Event DWASA Zonal Coordination Meeting at Zone-10
  • 26. Page heading Photos of Advocacy Event Meet the LIC Consumer at Mohakhali Area
  • 27. Page heading Photos of Advocacy Event DWASA High Official Field visit Fire Hydrant, DAP Complex and PT
  • 28. Page heading Photos of Visitors AFD Auditors

Editor's Notes

  1. This slide is used for bullets. Please do not touch the left Icon Bars . You can update the Page Heading as per requirement. Duplicate this slide when you more slides with bullets and more Text based section.
  2. This slide is used for bullets. Please do not touch the left Icon Bars . You can update the Page Heading as per requirement. Duplicate this slide when you more slides with bullets and more Text based section.
  3. This slide is used for bullets. Please do not touch the left Icon Bars . You can update the Page Heading as per requirement. Duplicate this slide when you more slides with bullets and more Text based section.
  4. This slide is used for bullets. Please do not touch the left Icon Bars . You can update the Page Heading as per requirement. Duplicate this slide when you more slides with bullets and more Text based section.
  5. This slide is used for bullets. Please do not touch the left Icon Bars . You can update the Page Heading as per requirement. Duplicate this slide when you more slides with bullets and more Text based section.
  6. This slide is used for bullets. Please do not touch the left Icon Bars . You can update the Page Heading as per requirement. Duplicate this slide when you more slides with bullets and more Text based section.
  7. This slide is used for bullets. Please do not touch the left Icon Bars . You can update the Page Heading as per requirement. Duplicate this slide when you more slides with bullets and more Text based section.
  8. This slide is used for bullets. Please do not touch the left Icon Bars . You can update the Page Heading as per requirement. Duplicate this slide when you more slides with bullets and more Text based section.
  9. This slide is used for bullets. Please do not touch the left Icon Bars . You can update the Page Heading as per requirement. Duplicate this slide when you more slides with bullets and more Text based section.
  10. This slide is used for bullets. Please do not touch the left Icon Bars . You can update the Page Heading as per requirement. Duplicate this slide when you more slides with bullets and more Text based section.
  11. This slide is used for bullets. Please do not touch the left Icon Bars . You can update the Page Heading as per requirement. Duplicate this slide when you more slides with bullets and more Text based section.