The document is a report generated by ROADCALC detailing pavement volumes for a project called JORDAN ALTO - VELEZ. It provides information on end area, volume, pay units and cost for a material called ESTABILIZACION at 15 meter stations between 11+650 and 11+900. The total ESTABILIZACION volume is reported as 377.99 cubic meters at a total cost of 377.99 dollars.