SlideShare a Scribd company logo
1 of 40
Download to read offline
www.duanemorris.com
©2010 Duane Morris LLP. All Rights Reserved. Duane Morris is a registered service mark of Duane Morris LLP.
Duane Morris – Firm and Affiliate Offices | New York | London | Singapore | Los Angeles | Chicago | Houston | Hanoi | Philadelphia | San Diego | San Francisco | Baltimore | Boston | Washington, D.C.
Las Vegas | Atlanta | Miami | Pittsburgh | Newark | Boca Raton | Wilmington | Cherry Hill | Princeton | Lake Tahoe | Ho Chi Minh City | Duane Morris LLP – A Delaware limited liability partnership
DR. OLIVER MASSMANN
Partner, General Director
DUANE MORRIS VIETNAM LLC
VIETNAM’S SOLAR MARKET – MARKET STATUS,
POTENTIAL AND KEY TO SUCCESSFUL
PROJECTS
1
www.duanemorris.com
AGENDA
• OVERVIEW OF VIETNAM’S ECONOMY
• BACKGROUND OF SOLAR ENERGY
INDUSTRY IN VIETNAM
• REGULATORY FRAMEWORK ON SOLAR
ENERGY
• LATEST DEVELOPMENTS IN VIETNAM’S
SOLAR MARKET
• INVESTMENT GUIDELINES FOR FOREIGN
INVESTORS
2
www.duanemorris.com
Vietnam 2017 Economy at a glance
• GDP: US$220.3 billion
• GDP per capita: US$2,385
• GDP Growth: 6.81% (2017) and 7.08% (first 6
months of 2018) (record breaking in 10 years)
• Inflation: 1.41%
• Population: About 91.70 million
• Labor force aged 15 and above: 54.61 million
• Total export and import turnover: : >US$420
billion (7.1% increase)
• Regional Minimum wage (Region I): VND 3.980
million (US$ 175) per month (Jan 2018)
• Vietnam’s average age: 29 years old
3
www.duanemorris.com
Welcome to the most dynamic country on this
planet : Vietnam!
4
Growing middle-class
(doubled by 2020 to
33 million people
according to Boston
Consulting Group)
90 million people
Fastest-growing ASEAN economy
in 2018 and 2019, as in 2017 –
Standard Chartered Bank predicts
www.duanemorris.com
FOREIGN INVESTMENT IN VIETNAM
REGIONAL COMPARISON OF COMPETIVENESS
ON MARKET ACCESS
Vietnam ties in first place with Singapore
• *Typical restrictions: number of opened sectors, JV requirement,
limits on foreign-owned shares, permission requirement
5
Country Limitation of market
access*
Country Limitation of
market access*
Malaysia medium Myanmar high
Indonesia medium Cambodia medium
Philippines medium Laos medium
Singapore low India high
Thailand medium China medium
Brunei high Vietnam low
www.duanemorris.com
Increasing Foreign Direct Investment
6
www.duanemorris.com7
www.duanemorris.com
Vietnam’s super rich population is growing
faster than anywhere else….
8
… and is on track to continue leading
the growth in the next decade
www.duanemorris.com
Communist Vietnam Has More Millionaires
Than Capitalist Philippines
9
www.duanemorris.com
Female Business Ownership
10
11stst
in Asia,in Asia, 66thth
/53 surveyed/53 surveyed countriescountries
1818thth
in terms of women’s advancement outcomes,in terms of women’s advancement outcomes,
knowledge assets, financial access and supportingknowledge assets, financial access and supporting
entrepreneurial conditions*entrepreneurial conditions*
* Similar to Thailand, Hong Kong and Switzerland
Women hold 25% of CEO or board-level positionsWomen hold 25% of CEO or board-level positions
in Vietnam**in Vietnam**
** Far above Singapore, Myanmar and Indonesia
Source: Mastercard Index of Women Entrepreneurs 2018
www.duanemorris.com
Energy Sector Background
• Electricity demand is expected
to increase by up to 11.4 pct.
for the 2016-2020 period and
7 times to 800 billion Kwh in
2030
• Electricity consumption is
projected to increase from
85,932 gigawatt hours (GWh)
in 2010 to 251,763 GWh in
2020
11
www.duanemorris.com
POTENTIAL OF SOLAR ENERGY INDUSTRY
IN VIETNAM
• Total number of sunshine hours up to 1400 – 3000
hours/year
• Potential: 4-6 kWh/m2
• Current use: 5 MW
12
www.duanemorris.com
REGULATORY FRAMEWORK ON SOLAR
ENERGY
• Electricity Law 2004 and 2012
• The Revised Power Development Plan 2011-2020 (revised PDP
VII) approved by Prime Minister in Decision 428/QD-TTg dated
18 March 2016
• Decision 2068/QD-TTg dated 25 November 2015 on
development strategy and vision of RE to 2050.
• Decision 11/2017/QD-TTg dated 11 April 2017 by the PM on
support mechanism for development of solar power projects in
Vietnam
• Circular 16/2017/TT-BCT dated 12 September 2017 setting out
requirements on protect development and template PPA for solar
power projects13
www.duanemorris.com
Amended Power Master Plan VII
• State to keep monopoly on transmission
• Prioritize development of renewable energy
• Renewable energy target rate at 7 pct. of total energy
output by 2020 and more than 10 pct. by 2030.
• Increase the solar power output to 850 MW by 2020,
4,000 MW in 2025 and 12,000 MW in 2030.
14
www.duanemorris.com
Vietnam’s electrical energy mix
• Vietnam policy emphasises the need to diversify the country’s
energy mix whilst maximising the use of local energy reserves
• Currently Vietnam is developing an energy mix sector with
the mainstay of coal fired power
15
www.duanemorris.com
Coal production – World Bank no longer supports???
16
www.duanemorris.com
Latest developments in Vietnam’s solar market
• About 120 solar projects have been approved by the MOIT with
total capacity of over 4,700 MW (September 2018)
• 35 PPAs signed with the total capacity of approximately 2.271 MW
(September 2018)
• Vietnam would increase its electricity production from renewable
sources from about 58 billion kWh in 2015 to 101 billion kWh by
2020 and 186 billion kWh by 2030.
• Vietnam now plans to increase solar power consumption in
households by 26% by 2030.
17
www.duanemorris.com
Latest developments in Vietnam’s solar market
(cont.)
• The Government will issue NEW FIT price (estimated at 7 –
7.5US cents/kWh) and NEW PPA that can be used for projects
after 30 June 2019.
• The Government is now also working on a Competition Auction
System that may be completed at around the 2020. The NEW FIT
price is to be applied until this Competition Auction System is
completed.
18
www.duanemorris.com
Latest developments in Vietnam’s solar market
(cont.)
• Family households now can install the rooftop solar energy system
for family use and then can sell the unused amount of electricity of
EVN. EVN will install free electricity meter for family households.
• As for the time being, MOF still has not finalized the tax relevant
issues for the above structure, family households now still have to
pay their monthly electricity bill after installing the rooftop solar
energy system (that cost minimum of USD3,000) and then at the
end of the year EVN will calculate and make payment to the family
households.
19
www.duanemorris.com
Solar Decision
• FIT:
– On-grid projects: 9.35 US cents/kWh.
– No FIT for off-grid rooftop projects
– Only one off-taker (EVN) and No direct PPA (B2B)
– The FIT applies for projects which come into operation before 30 June 2019 and within 20
years from the commercially operational date (“COD”) (i.e., the date when the solar plant is
ready to sell electricity to the buyer – EVN)
– The FIT COD will likely be extended for another half a year or another year for solar
projects across Vietnam, except for projects in Ninh Thuan
– For solar projects in Ninh Thuan, the COD deadline extension will be longer (i.e. until end
of 2020).
• Net metering: applicable for rooftop projects. Oversupply amount will be
credited to the following month. At the end of the year or expiry of the PPA,
exceeded amount will be sold to EVN at 9.35 US cents/ kWh.
• MOIT is now working on revisions on Decision 11 on solar rooftop net-metering.
20
www.duanemorris.com
Solar power financial incentives
• Preferential CIT:
– Preferential corporate income tax (“CIT”) rate of 10% for fifteen (15) years,
applied from the first year in which the project company has revenue from
the new solar power project
– CIT exemption for four (4) years and 50% tax reduction for the next nine
(9) years applied from the first year in which the project company has
taxable income from the solar power project.
• Duty Exemption:
– Import duty exemption for imported goods used as fixed assets
– Import duty exemption for imported machinery, equipment, supplies that
cannot be domestically produced serving production of renewable energy
21
www.duanemorris.com
Solar power financial incentive (Cont.)
• Land and Water Surface:
– For solar power projects, transmission lines and transformer stations for
connecting to electricity grids
– Land and water surface rent shall be exempted during the fundamental
(capital) construction period. This exemption does not exceed three (3)
years from the effective date of competent state authorities’ decisions for
land lease / allocation
– After the above fundamental construction period, the land rents and water
surface rents shall be exempted for three (3) years
22
www.duanemorris.com
Solar PPA
• Non-negotiable PPA and compulsory application for grid connected
solar projects
• EVN has the obligation the buy all electricity generated from solar power
projects. However, in the Solar PPA, EVN may stop buying electricity in
certain circumstances beyond the reasonable control of the seller,
without any compensation or payments to the seller/project developer.
• The purchaser must pay the seller only for the electricity that is received
by the purchaser. The Solar PPA does not include any provision where
the purchaser is unable to take the electricity produced.
• Dispute resolution: by litigation before Vietnamese courts or mediation/
resolution at authorized energy state authorities of Vietnam. No
international arbitration is mentioned!
23
www.duanemorris.com
Back up from the Government re. the PPA
• In the recent concluded wind PPAs, the Government
subsidizes EVN 1 US cent/ kWh with regards to the
whole power output sold to EVN
• This subsidy no longer exists in the Solar Decision.
• Solar PPA: no provision on any form of government
guarantee to enhance the creditability of EVN
• No hint to make the solar PPA bankable.
24
www.duanemorris.com
The EVN
• PPA is required to follow a specific template, which is
not bankable.
• The PPA template is unclear whether it is a “take or pay”
agreement.
• No amendment of the PPA template is possible, except
the supplementation to clarify the rights and obligations
of the parties, PROVIDED that it does not change the
basic contents of the PPA template.
25
www.duanemorris.com
Direct solar PPA
• The Government in practice does not support off-grid projects.
• The Government is working on a pilot program for direct PPA.
However, it is still at the research and study stage.
• There is no final decisions on capacity, licensing process, participants,
location, wheeling fee, and contractual terms for the piloted DPPA
• DPPA pilot would be preferably designed for 110 KV or more system
(not 220 KV or 22-25 KV)
• ERAV is considering some models as below:
q Physical DPPA: (a) onsite DPPA where the power plants to be constructed
around the consumers, and / or (ii) offshore DPPA where power plants to be
constructed anywhere.
q Financial DPPA: this would be formed with competitive market for selling
power.
26
www.duanemorris.com
But don’t worry! We have the EU – Vietnam
FTA and CPTPP
• EU – Vietnam FTA (“EVFTA”) and the Investment Protection
Agreement (“IPA”):
– When EVFTA is ratified, Vietnam will have more legal certainty than even
Germany.
– IPA implements investor-to-state dispute settlement (ISDS) mechanisms –
investors can claim in case that an investor protection obligation has been
breached
– Domestic courts cannot question the legal validity of the decisions
• Comprehensive and Progressive Agreement for the Trans-Pacific
Partnership (CPTPP):
– TPP continues without the US, to be signed on 08 March 2018.
– New TPP accounts for 12.9% of global GDP and 14.9% of global trade.
– Vietnam to ratify the CPTPP in November, becoming the 4th country to
ratify the deal27
www.duanemorris.com
Non-recourse financing
• What is it? The Project can be financed with a loan secured by
a charge on specific assets or on the revenues generated from a specific
project or assets.
• How to obtain?
ü Option 1: To develop the project by way of entering into a BOT (Build-
Operate-Transfer) contract with the Government. As it is the
Government who will own the project at the end upon the expiration of
the BOT contract, the BOT contract will be more bankable  the non-
recourse/limited recourse financing arrangement can be achievable.
ü Option 2: To seek guarantee from the Multilateral Investment
Guarantee Agency (“MIGA”).
ü Option 3: To cooperate with a State-owned commercial bank for its
guarantee of the project and then, negotiate with lenders to eliminate all
recourses that lenders may ask from the sponsors and/or the borrowers.
28
www.duanemorris.com
Investment guideline for foreign investors
29
www.duanemorris.com
Market access and Forms of investment in power market
• No foreign ownership restriction
• Investment forms:
ü A wholly-owned foreign enterprise
ü A joint venture company between a foreign investor and domestic
investor
ü Investment pursuant to the BOT legal framework
ü Through the purchase of shares in either an EVN subsidiary being or
having been equitized or a private IPP holding power assets.
30
www.duanemorris.com
BOT – BEST INVESTMENT FORM
• Government’s Decree No. 63/2018/ND-CP on Public-
Private Partnership: making projects more bankable
• Easier to negotiate more favorable electricity rates.
• Easier to obtain more government guarantees, especially
in terms of EVN’s obligations to purchase all electricity
from the project.
• More fiscal and financial incentives.
• Precedent large-scaled BOT power projects in Vietnam:
Phu My, Vung Ang, Mong Duong 2
31
www.duanemorris.com
Project planning
• Investors has to obtain prior agreement of EVN on power purchase prior to
licensing procedure.
• Commitment of banks or credit institutions on financing the project must be
obtained prior to issuance of Investment Registration Certificate .
• In-principle approval of the local People’s Committee is required prior to
issuance of Investment Registration Certificate depending on the project size
• A solar power plant must obtain a power generation permit from the competent
State authorities in order to conduct power generation operations in Vietnam
• Term of the permit: maximum 20 years for large power plants with particularly
important meaning on economy, society, national defense and security as per the
list approved by the Prime Minister; and 10 years for other power plants projects.
• The permit cannot be renewed but the investor may apply for a new one within
60 days prior to the expiry date of the current permit.
32
www.duanemorris.com
Project licensing
• Step 1: The investor obtains approval from the competent authority [e.g., Prime
Minister, MOIT] approving the solar power plant as part of the power
development master plan (if required).
• Step 2: The investor obtains in-principle approval from the competent People’s
Committee (or other competent authorities subject to the details of the project)
approving the solar power plant project, land demand / location, environment,
construction plan, other terms of the project.
• Step 3: Application for issuance of the Investment Registration Certificate and
the Enterprise Registration Certificate
• Step 4: Preparation of construction / operations of the solar power plant (for
example, acquiring land area, site clearance, preparation, land investigation,
conducting environmental assessment)
• Step 5: The project company to obtain necessary permits (e.g. electricity
generating permit) and relevant agreements (e.g. PPA) for its and the power
plant’s operation.
• Step 6: Construction of solar power plant and operation
33
www.duanemorris.com
CONNECTIONS ARE BUSINESS
PLEASE CONNECT WITH ME ON
LINKEDIN:
OLIVER MASSMANN
34
www.duanemorris.com
WHEREVER YOU ARE - BE ALL THERE
Jim Elliot
35
www.duanemorris.com36
DUANE MORRIS VIETNAM LLC
Thank you very much!
HANOI OFFICE HO CHI MINH CITY OFFICE
Pacific Place, Unit V1307/08, 13th Floor, Suite 1503/04, Saigon Tower
83B Ly Thuong Kiet, Hoan Kiem District 29 Le Duan Street, District 1
Hanoi, Vietnam Ho Chi Minh City, Vietnam
Tel.: +84 4 39462200 Tel.: +84 8 3824 0240
Fax: +84 4 3946 1311 Fax: +84 8 3824 0241
Contact email:
omassmann@duanemorris.com
www.duanemorris.com
References (1)
37
www.duanemorris.com
References (2)
38
www.duanemorris.com
References (3)
39
www.duanemorris.com
References (4)
40

More Related Content

What's hot

INVESTING IN RENEWABLE ENERGY SECTOR Solar and Wind power projects – Getting ...
INVESTING IN RENEWABLE ENERGY SECTOR Solar and Wind power projects – Getting ...INVESTING IN RENEWABLE ENERGY SECTOR Solar and Wind power projects – Getting ...
INVESTING IN RENEWABLE ENERGY SECTOR Solar and Wind power projects – Getting ...Dr. Oliver Massmann
 
Lawyer in Myanmar Oliver Massmann Solar Power Projects - The Basics
Lawyer in Myanmar Oliver Massmann Solar Power Projects - The BasicsLawyer in Myanmar Oliver Massmann Solar Power Projects - The Basics
Lawyer in Myanmar Oliver Massmann Solar Power Projects - The BasicsDr. Oliver Massmann
 
VIETNAM—POWER, ENERGY, AND THE AFFECT OF RECENT TRADE AGREEMENTS EU VIETNAM F...
VIETNAM—POWER, ENERGY, AND THE AFFECT OF RECENT TRADE AGREEMENTS EU VIETNAM F...VIETNAM—POWER, ENERGY, AND THE AFFECT OF RECENT TRADE AGREEMENTS EU VIETNAM F...
VIETNAM—POWER, ENERGY, AND THE AFFECT OF RECENT TRADE AGREEMENTS EU VIETNAM F...Dr. Oliver Massmann
 
VIETNAM –SOLAR POWER PROJECTS: HOW TO GET DEALS DONE
VIETNAM –SOLAR POWER PROJECTS: HOW TO GET DEALS DONEVIETNAM –SOLAR POWER PROJECTS: HOW TO GET DEALS DONE
VIETNAM –SOLAR POWER PROJECTS: HOW TO GET DEALS DONEDr. Oliver Massmann
 
Lawyer in Vietnam Oliver Massmann SOLAR ROOFTOP PROJECT KEY DRIVERS
Lawyer in Vietnam Oliver Massmann  SOLAR ROOFTOP PROJECT KEY DRIVERSLawyer in Vietnam Oliver Massmann  SOLAR ROOFTOP PROJECT KEY DRIVERS
Lawyer in Vietnam Oliver Massmann SOLAR ROOFTOP PROJECT KEY DRIVERSDr. Oliver Massmann
 
Lawyer in Vietnam Dr. Oliver Massmann - POWER and ENERGY IN VIETNAM — How to ...
Lawyer in Vietnam Dr. Oliver Massmann - POWER and ENERGY IN VIETNAM — How to ...Lawyer in Vietnam Dr. Oliver Massmann - POWER and ENERGY IN VIETNAM — How to ...
Lawyer in Vietnam Dr. Oliver Massmann - POWER and ENERGY IN VIETNAM — How to ...Dr. Oliver Massmann
 
VIETNAM – MOIT PROPOSES NEW FIT RATE FOR WIND POWER PROJECTS
VIETNAM – MOIT PROPOSES NEW FIT RATE FOR WIND POWER PROJECTSVIETNAM – MOIT PROPOSES NEW FIT RATE FOR WIND POWER PROJECTS
VIETNAM – MOIT PROPOSES NEW FIT RATE FOR WIND POWER PROJECTSDr. Oliver Massmann
 
VIETNAM - ONSHORE AND OFFSHORE WIND ENERGY PROJECTS - GETTING DEALS DONE
VIETNAM - ONSHORE AND OFFSHORE WIND ENERGY PROJECTS - GETTING DEALS DONEVIETNAM - ONSHORE AND OFFSHORE WIND ENERGY PROJECTS - GETTING DEALS DONE
VIETNAM - ONSHORE AND OFFSHORE WIND ENERGY PROJECTS - GETTING DEALS DONEDr. Oliver Massmann
 
VIETNAM – THE GOVERNMENT ISSUES FAVORABLE POLICIES ON TAX AND FEES FOR BUSINE...
VIETNAM – THE GOVERNMENT ISSUES FAVORABLE POLICIES ON TAX AND FEES FOR BUSINE...VIETNAM – THE GOVERNMENT ISSUES FAVORABLE POLICIES ON TAX AND FEES FOR BUSINE...
VIETNAM – THE GOVERNMENT ISSUES FAVORABLE POLICIES ON TAX AND FEES FOR BUSINE...Dr. Oliver Massmann
 
VIETNAM TO IMPLEMENT DIRECT POWER PURCHASE MECHANISM AFTER 2021
VIETNAM TO IMPLEMENT DIRECT POWER PURCHASE MECHANISM AFTER 2021VIETNAM TO IMPLEMENT DIRECT POWER PURCHASE MECHANISM AFTER 2021
VIETNAM TO IMPLEMENT DIRECT POWER PURCHASE MECHANISM AFTER 2021Dr. Oliver Massmann
 
Lawyer in Vietnam Dr. Oliver Massmann Solar Power Investments - Latest upd...
   Lawyer in Vietnam Dr. Oliver Massmann Solar Power Investments - Latest upd...   Lawyer in Vietnam Dr. Oliver Massmann Solar Power Investments - Latest upd...
Lawyer in Vietnam Dr. Oliver Massmann Solar Power Investments - Latest upd...Dr. Oliver Massmann
 
Lawyer in Vietnam Dr. Oliver Massmann - Vietnam - Wind Investment Guide
Lawyer in Vietnam Dr. Oliver Massmann - Vietnam -  Wind Investment GuideLawyer in Vietnam Dr. Oliver Massmann - Vietnam -  Wind Investment Guide
Lawyer in Vietnam Dr. Oliver Massmann - Vietnam - Wind Investment GuideDr. Oliver Massmann
 
VIETNAM – WIND AND SOLAR PROJECTS: HOW TO GET DEALS DONE
VIETNAM – WIND AND SOLAR PROJECTS:  HOW TO GET DEALS DONEVIETNAM – WIND AND SOLAR PROJECTS:  HOW TO GET DEALS DONE
VIETNAM – WIND AND SOLAR PROJECTS: HOW TO GET DEALS DONEDr. Oliver Massmann
 
VIETNAM – MOIT IS REVIEWING NEW FEED IN TARIFFS (FiTs) FOR WIND POWER PROJECTS
VIETNAM – MOIT IS REVIEWING NEW FEED IN TARIFFS (FiTs) FOR WIND POWER PROJECTSVIETNAM – MOIT IS REVIEWING NEW FEED IN TARIFFS (FiTs) FOR WIND POWER PROJECTS
VIETNAM – MOIT IS REVIEWING NEW FEED IN TARIFFS (FiTs) FOR WIND POWER PROJECTSDr. Oliver Massmann
 
2017 Outlook for Vietnam Renewable Energy
2017 Outlook for Vietnam Renewable Energy2017 Outlook for Vietnam Renewable Energy
2017 Outlook for Vietnam Renewable EnergyHoang Le Hang
 
GIZ support mechanism for RE development in Vietnam
GIZ support mechanism for RE development in VietnamGIZ support mechanism for RE development in Vietnam
GIZ support mechanism for RE development in VietnamTuong Do
 
VIETNAM - ONSHORE AND OFFSHORE WIND ENERGY PROJECTS -GETTING DEALS DONE!
VIETNAM - ONSHORE AND OFFSHORE WIND ENERGY PROJECTS -GETTING DEALS DONE!VIETNAM - ONSHORE AND OFFSHORE WIND ENERGY PROJECTS -GETTING DEALS DONE!
VIETNAM - ONSHORE AND OFFSHORE WIND ENERGY PROJECTS -GETTING DEALS DONE!Dr. Oliver Massmann
 
Vietnam - Wind Power - Moving towards completion - With the newly-proposed w...
 Vietnam - Wind Power - Moving towards completion - With the newly-proposed w... Vietnam - Wind Power - Moving towards completion - With the newly-proposed w...
Vietnam - Wind Power - Moving towards completion - With the newly-proposed w...Dr. Oliver Massmann
 
VIETNAM – SOLAR POWER AUCTION SYSTEM: WHAT YOU MUST KNOW
VIETNAM – SOLAR POWER AUCTION SYSTEM: WHAT YOU MUST KNOWVIETNAM – SOLAR POWER AUCTION SYSTEM: WHAT YOU MUST KNOW
VIETNAM – SOLAR POWER AUCTION SYSTEM: WHAT YOU MUST KNOWDr. Oliver Massmann
 
TÜV Rheinland "Solar Investment Risk Mitigation Workshop"
TÜV Rheinland "Solar Investment Risk Mitigation Workshop"TÜV Rheinland "Solar Investment Risk Mitigation Workshop"
TÜV Rheinland "Solar Investment Risk Mitigation Workshop"seleven
 

What's hot (20)

INVESTING IN RENEWABLE ENERGY SECTOR Solar and Wind power projects – Getting ...
INVESTING IN RENEWABLE ENERGY SECTOR Solar and Wind power projects – Getting ...INVESTING IN RENEWABLE ENERGY SECTOR Solar and Wind power projects – Getting ...
INVESTING IN RENEWABLE ENERGY SECTOR Solar and Wind power projects – Getting ...
 
Lawyer in Myanmar Oliver Massmann Solar Power Projects - The Basics
Lawyer in Myanmar Oliver Massmann Solar Power Projects - The BasicsLawyer in Myanmar Oliver Massmann Solar Power Projects - The Basics
Lawyer in Myanmar Oliver Massmann Solar Power Projects - The Basics
 
VIETNAM—POWER, ENERGY, AND THE AFFECT OF RECENT TRADE AGREEMENTS EU VIETNAM F...
VIETNAM—POWER, ENERGY, AND THE AFFECT OF RECENT TRADE AGREEMENTS EU VIETNAM F...VIETNAM—POWER, ENERGY, AND THE AFFECT OF RECENT TRADE AGREEMENTS EU VIETNAM F...
VIETNAM—POWER, ENERGY, AND THE AFFECT OF RECENT TRADE AGREEMENTS EU VIETNAM F...
 
VIETNAM –SOLAR POWER PROJECTS: HOW TO GET DEALS DONE
VIETNAM –SOLAR POWER PROJECTS: HOW TO GET DEALS DONEVIETNAM –SOLAR POWER PROJECTS: HOW TO GET DEALS DONE
VIETNAM –SOLAR POWER PROJECTS: HOW TO GET DEALS DONE
 
Lawyer in Vietnam Oliver Massmann SOLAR ROOFTOP PROJECT KEY DRIVERS
Lawyer in Vietnam Oliver Massmann  SOLAR ROOFTOP PROJECT KEY DRIVERSLawyer in Vietnam Oliver Massmann  SOLAR ROOFTOP PROJECT KEY DRIVERS
Lawyer in Vietnam Oliver Massmann SOLAR ROOFTOP PROJECT KEY DRIVERS
 
Lawyer in Vietnam Dr. Oliver Massmann - POWER and ENERGY IN VIETNAM — How to ...
Lawyer in Vietnam Dr. Oliver Massmann - POWER and ENERGY IN VIETNAM — How to ...Lawyer in Vietnam Dr. Oliver Massmann - POWER and ENERGY IN VIETNAM — How to ...
Lawyer in Vietnam Dr. Oliver Massmann - POWER and ENERGY IN VIETNAM — How to ...
 
VIETNAM – MOIT PROPOSES NEW FIT RATE FOR WIND POWER PROJECTS
VIETNAM – MOIT PROPOSES NEW FIT RATE FOR WIND POWER PROJECTSVIETNAM – MOIT PROPOSES NEW FIT RATE FOR WIND POWER PROJECTS
VIETNAM – MOIT PROPOSES NEW FIT RATE FOR WIND POWER PROJECTS
 
VIETNAM - ONSHORE AND OFFSHORE WIND ENERGY PROJECTS - GETTING DEALS DONE
VIETNAM - ONSHORE AND OFFSHORE WIND ENERGY PROJECTS - GETTING DEALS DONEVIETNAM - ONSHORE AND OFFSHORE WIND ENERGY PROJECTS - GETTING DEALS DONE
VIETNAM - ONSHORE AND OFFSHORE WIND ENERGY PROJECTS - GETTING DEALS DONE
 
VIETNAM – THE GOVERNMENT ISSUES FAVORABLE POLICIES ON TAX AND FEES FOR BUSINE...
VIETNAM – THE GOVERNMENT ISSUES FAVORABLE POLICIES ON TAX AND FEES FOR BUSINE...VIETNAM – THE GOVERNMENT ISSUES FAVORABLE POLICIES ON TAX AND FEES FOR BUSINE...
VIETNAM – THE GOVERNMENT ISSUES FAVORABLE POLICIES ON TAX AND FEES FOR BUSINE...
 
VIETNAM TO IMPLEMENT DIRECT POWER PURCHASE MECHANISM AFTER 2021
VIETNAM TO IMPLEMENT DIRECT POWER PURCHASE MECHANISM AFTER 2021VIETNAM TO IMPLEMENT DIRECT POWER PURCHASE MECHANISM AFTER 2021
VIETNAM TO IMPLEMENT DIRECT POWER PURCHASE MECHANISM AFTER 2021
 
Lawyer in Vietnam Dr. Oliver Massmann Solar Power Investments - Latest upd...
   Lawyer in Vietnam Dr. Oliver Massmann Solar Power Investments - Latest upd...   Lawyer in Vietnam Dr. Oliver Massmann Solar Power Investments - Latest upd...
Lawyer in Vietnam Dr. Oliver Massmann Solar Power Investments - Latest upd...
 
Lawyer in Vietnam Dr. Oliver Massmann - Vietnam - Wind Investment Guide
Lawyer in Vietnam Dr. Oliver Massmann - Vietnam -  Wind Investment GuideLawyer in Vietnam Dr. Oliver Massmann - Vietnam -  Wind Investment Guide
Lawyer in Vietnam Dr. Oliver Massmann - Vietnam - Wind Investment Guide
 
VIETNAM – WIND AND SOLAR PROJECTS: HOW TO GET DEALS DONE
VIETNAM – WIND AND SOLAR PROJECTS:  HOW TO GET DEALS DONEVIETNAM – WIND AND SOLAR PROJECTS:  HOW TO GET DEALS DONE
VIETNAM – WIND AND SOLAR PROJECTS: HOW TO GET DEALS DONE
 
VIETNAM – MOIT IS REVIEWING NEW FEED IN TARIFFS (FiTs) FOR WIND POWER PROJECTS
VIETNAM – MOIT IS REVIEWING NEW FEED IN TARIFFS (FiTs) FOR WIND POWER PROJECTSVIETNAM – MOIT IS REVIEWING NEW FEED IN TARIFFS (FiTs) FOR WIND POWER PROJECTS
VIETNAM – MOIT IS REVIEWING NEW FEED IN TARIFFS (FiTs) FOR WIND POWER PROJECTS
 
2017 Outlook for Vietnam Renewable Energy
2017 Outlook for Vietnam Renewable Energy2017 Outlook for Vietnam Renewable Energy
2017 Outlook for Vietnam Renewable Energy
 
GIZ support mechanism for RE development in Vietnam
GIZ support mechanism for RE development in VietnamGIZ support mechanism for RE development in Vietnam
GIZ support mechanism for RE development in Vietnam
 
VIETNAM - ONSHORE AND OFFSHORE WIND ENERGY PROJECTS -GETTING DEALS DONE!
VIETNAM - ONSHORE AND OFFSHORE WIND ENERGY PROJECTS -GETTING DEALS DONE!VIETNAM - ONSHORE AND OFFSHORE WIND ENERGY PROJECTS -GETTING DEALS DONE!
VIETNAM - ONSHORE AND OFFSHORE WIND ENERGY PROJECTS -GETTING DEALS DONE!
 
Vietnam - Wind Power - Moving towards completion - With the newly-proposed w...
 Vietnam - Wind Power - Moving towards completion - With the newly-proposed w... Vietnam - Wind Power - Moving towards completion - With the newly-proposed w...
Vietnam - Wind Power - Moving towards completion - With the newly-proposed w...
 
VIETNAM – SOLAR POWER AUCTION SYSTEM: WHAT YOU MUST KNOW
VIETNAM – SOLAR POWER AUCTION SYSTEM: WHAT YOU MUST KNOWVIETNAM – SOLAR POWER AUCTION SYSTEM: WHAT YOU MUST KNOW
VIETNAM – SOLAR POWER AUCTION SYSTEM: WHAT YOU MUST KNOW
 
TÜV Rheinland "Solar Investment Risk Mitigation Workshop"
TÜV Rheinland "Solar Investment Risk Mitigation Workshop"TÜV Rheinland "Solar Investment Risk Mitigation Workshop"
TÜV Rheinland "Solar Investment Risk Mitigation Workshop"
 

Similar to VIETNAM’S SOLAR MARKET – MARKET STATUS, POTENTIAL AND KEY TO SUCCESSFUL PROJECTS

Lawyer in Vietnam Oliver Massmann Investing in Solar Energy in Vietnam How to...
Lawyer in Vietnam Oliver Massmann Investing in Solar Energy in Vietnam How to...Lawyer in Vietnam Oliver Massmann Investing in Solar Energy in Vietnam How to...
Lawyer in Vietnam Oliver Massmann Investing in Solar Energy in Vietnam How to...Dr. Oliver Massmann
 
Lawyer in Vietnam Oliver Massmann - Investing in Solar Energy - How To Do I...
Lawyer in Vietnam Oliver Massmann  -  Investing in Solar Energy - How To Do I...Lawyer in Vietnam Oliver Massmann  -  Investing in Solar Energy - How To Do I...
Lawyer in Vietnam Oliver Massmann - Investing in Solar Energy - How To Do I...Dr. Oliver Massmann
 
Oliver Massmann - Investing in Solar Energy in Vietnam - How to do it right?
Oliver Massmann - Investing in Solar Energy in Vietnam - How to do it right?Oliver Massmann - Investing in Solar Energy in Vietnam - How to do it right?
Oliver Massmann - Investing in Solar Energy in Vietnam - How to do it right?Dr. Oliver Massmann
 
Lawyer in Vietnam Dr. Oliver Massmann VIETNAM - ONSHORE AND OFFSHORE WIND EN...
Lawyer in Vietnam Dr. Oliver Massmann  VIETNAM - ONSHORE AND OFFSHORE WIND EN...Lawyer in Vietnam Dr. Oliver Massmann  VIETNAM - ONSHORE AND OFFSHORE WIND EN...
Lawyer in Vietnam Dr. Oliver Massmann VIETNAM - ONSHORE AND OFFSHORE WIND EN...Dr. Oliver Massmann
 
Lawyer in Vietnam Dr. Oliver Massmann LEGAL FRAMEWORK AND INVESTMENT POLICIES...
Lawyer in Vietnam Dr. Oliver Massmann LEGAL FRAMEWORK AND INVESTMENT POLICIES...Lawyer in Vietnam Dr. Oliver Massmann LEGAL FRAMEWORK AND INVESTMENT POLICIES...
Lawyer in Vietnam Dr. Oliver Massmann LEGAL FRAMEWORK AND INVESTMENT POLICIES...Dr. Oliver Massmann
 
Dr. Oliver Massmann PhD Legal Framework of Coal,Gas,Power and Renewable Energ...
Dr. Oliver Massmann PhD Legal Framework of Coal,Gas,Power and Renewable Energ...Dr. Oliver Massmann PhD Legal Framework of Coal,Gas,Power and Renewable Energ...
Dr. Oliver Massmann PhD Legal Framework of Coal,Gas,Power and Renewable Energ...Dr. Oliver Massmann
 
OMassmann - Investment into the grid and transmission system in Vietnam (2024...
OMassmann - Investment into the grid and transmission system in Vietnam (2024...OMassmann - Investment into the grid and transmission system in Vietnam (2024...
OMassmann - Investment into the grid and transmission system in Vietnam (2024...Dr. Oliver Massmann
 
Dr. Oliver Massmann - Future Energy of Vietnam - Opportunities and Challenges
Dr. Oliver Massmann - Future Energy of Vietnam - Opportunities and Challenges Dr. Oliver Massmann - Future Energy of Vietnam - Opportunities and Challenges
Dr. Oliver Massmann - Future Energy of Vietnam - Opportunities and Challenges Dr. Oliver Massmann
 
LAWYER IN VIETNAM DR. OLIVER MASSMANN - VIETNAM – CHALLENGES IN SOLAR PROJECT...
LAWYER IN VIETNAM DR. OLIVER MASSMANN - VIETNAM – CHALLENGES IN SOLAR PROJECT...LAWYER IN VIETNAM DR. OLIVER MASSMANN - VIETNAM – CHALLENGES IN SOLAR PROJECT...
LAWYER IN VIETNAM DR. OLIVER MASSMANN - VIETNAM – CHALLENGES IN SOLAR PROJECT...Dr. Oliver Massmann
 
Omass - Decarbonization - PDP 8
Omass - Decarbonization - PDP 8 Omass - Decarbonization - PDP 8
Omass - Decarbonization - PDP 8 Dr. Oliver Massmann
 
Omass - Vietnam Energy Future - PDP 8
Omass - Vietnam Energy Future - PDP 8 Omass - Vietnam Energy Future - PDP 8
Omass - Vietnam Energy Future - PDP 8 Dr. Oliver Massmann
 
Vietnam Power and Energy Future with Power Development Plan 8 - Getting deals...
Vietnam Power and Energy Future with Power Development Plan 8 - Getting deals...Vietnam Power and Energy Future with Power Development Plan 8 - Getting deals...
Vietnam Power and Energy Future with Power Development Plan 8 - Getting deals...Dr. Oliver Massmann
 
Investing in wind energy in Vietnam — legal certainty and bankability — makin...
Investing in wind energy in Vietnam — legal certainty and bankability — makin...Investing in wind energy in Vietnam — legal certainty and bankability — makin...
Investing in wind energy in Vietnam — legal certainty and bankability — makin...Dr. Oliver Massmann
 
Feed in-tariff regulations and getting wind power projects done (en)
Feed in-tariff regulations and getting wind power projects done (en)Feed in-tariff regulations and getting wind power projects done (en)
Feed in-tariff regulations and getting wind power projects done (en)Dr. Oliver Massmann
 
Om ass investment in the energy sector_
Om ass  investment in the energy sector_Om ass  investment in the energy sector_
Om ass investment in the energy sector_Dr. Oliver Massmann
 
Draft Decision on Supporting Regime for Solar Power Projects
Draft Decision on Supporting Regime for Solar Power Projects Draft Decision on Supporting Regime for Solar Power Projects
Draft Decision on Supporting Regime for Solar Power Projects Dr. Oliver Massmann
 
Omassmann investing in indochina power projects to secure energy supply
Omassmann investing in indochina power projects to secure energy supply Omassmann investing in indochina power projects to secure energy supply
Omassmann investing in indochina power projects to secure energy supply Dr. Oliver Massmann
 
Investing in Indochina Power Projects to Secure Energy Supply
Investing in Indochina Power Projects to Secure Energy Supply Investing in Indochina Power Projects to Secure Energy Supply
Investing in Indochina Power Projects to Secure Energy Supply Dr. Oliver Massmann
 
Lawyer in Myanmar Dr. Oliver Massmann Investing and Financing Power Projects ...
Lawyer in Myanmar Dr. Oliver Massmann Investing and Financing Power Projects ...Lawyer in Myanmar Dr. Oliver Massmann Investing and Financing Power Projects ...
Lawyer in Myanmar Dr. Oliver Massmann Investing and Financing Power Projects ...Dr. Oliver Massmann
 
8 Things You Should Know About Power Regulatory Reform in Myanmar
8 Things You Should Know About Power Regulatory Reform in Myanmar8 Things You Should Know About Power Regulatory Reform in Myanmar
8 Things You Should Know About Power Regulatory Reform in MyanmarDr. Oliver Massmann
 

Similar to VIETNAM’S SOLAR MARKET – MARKET STATUS, POTENTIAL AND KEY TO SUCCESSFUL PROJECTS (20)

Lawyer in Vietnam Oliver Massmann Investing in Solar Energy in Vietnam How to...
Lawyer in Vietnam Oliver Massmann Investing in Solar Energy in Vietnam How to...Lawyer in Vietnam Oliver Massmann Investing in Solar Energy in Vietnam How to...
Lawyer in Vietnam Oliver Massmann Investing in Solar Energy in Vietnam How to...
 
Lawyer in Vietnam Oliver Massmann - Investing in Solar Energy - How To Do I...
Lawyer in Vietnam Oliver Massmann  -  Investing in Solar Energy - How To Do I...Lawyer in Vietnam Oliver Massmann  -  Investing in Solar Energy - How To Do I...
Lawyer in Vietnam Oliver Massmann - Investing in Solar Energy - How To Do I...
 
Oliver Massmann - Investing in Solar Energy in Vietnam - How to do it right?
Oliver Massmann - Investing in Solar Energy in Vietnam - How to do it right?Oliver Massmann - Investing in Solar Energy in Vietnam - How to do it right?
Oliver Massmann - Investing in Solar Energy in Vietnam - How to do it right?
 
Lawyer in Vietnam Dr. Oliver Massmann VIETNAM - ONSHORE AND OFFSHORE WIND EN...
Lawyer in Vietnam Dr. Oliver Massmann  VIETNAM - ONSHORE AND OFFSHORE WIND EN...Lawyer in Vietnam Dr. Oliver Massmann  VIETNAM - ONSHORE AND OFFSHORE WIND EN...
Lawyer in Vietnam Dr. Oliver Massmann VIETNAM - ONSHORE AND OFFSHORE WIND EN...
 
Lawyer in Vietnam Dr. Oliver Massmann LEGAL FRAMEWORK AND INVESTMENT POLICIES...
Lawyer in Vietnam Dr. Oliver Massmann LEGAL FRAMEWORK AND INVESTMENT POLICIES...Lawyer in Vietnam Dr. Oliver Massmann LEGAL FRAMEWORK AND INVESTMENT POLICIES...
Lawyer in Vietnam Dr. Oliver Massmann LEGAL FRAMEWORK AND INVESTMENT POLICIES...
 
Dr. Oliver Massmann PhD Legal Framework of Coal,Gas,Power and Renewable Energ...
Dr. Oliver Massmann PhD Legal Framework of Coal,Gas,Power and Renewable Energ...Dr. Oliver Massmann PhD Legal Framework of Coal,Gas,Power and Renewable Energ...
Dr. Oliver Massmann PhD Legal Framework of Coal,Gas,Power and Renewable Energ...
 
OMassmann - Investment into the grid and transmission system in Vietnam (2024...
OMassmann - Investment into the grid and transmission system in Vietnam (2024...OMassmann - Investment into the grid and transmission system in Vietnam (2024...
OMassmann - Investment into the grid and transmission system in Vietnam (2024...
 
Dr. Oliver Massmann - Future Energy of Vietnam - Opportunities and Challenges
Dr. Oliver Massmann - Future Energy of Vietnam - Opportunities and Challenges Dr. Oliver Massmann - Future Energy of Vietnam - Opportunities and Challenges
Dr. Oliver Massmann - Future Energy of Vietnam - Opportunities and Challenges
 
LAWYER IN VIETNAM DR. OLIVER MASSMANN - VIETNAM – CHALLENGES IN SOLAR PROJECT...
LAWYER IN VIETNAM DR. OLIVER MASSMANN - VIETNAM – CHALLENGES IN SOLAR PROJECT...LAWYER IN VIETNAM DR. OLIVER MASSMANN - VIETNAM – CHALLENGES IN SOLAR PROJECT...
LAWYER IN VIETNAM DR. OLIVER MASSMANN - VIETNAM – CHALLENGES IN SOLAR PROJECT...
 
Omass - Decarbonization - PDP 8
Omass - Decarbonization - PDP 8 Omass - Decarbonization - PDP 8
Omass - Decarbonization - PDP 8
 
Omass - Vietnam Energy Future - PDP 8
Omass - Vietnam Energy Future - PDP 8 Omass - Vietnam Energy Future - PDP 8
Omass - Vietnam Energy Future - PDP 8
 
Vietnam Power and Energy Future with Power Development Plan 8 - Getting deals...
Vietnam Power and Energy Future with Power Development Plan 8 - Getting deals...Vietnam Power and Energy Future with Power Development Plan 8 - Getting deals...
Vietnam Power and Energy Future with Power Development Plan 8 - Getting deals...
 
Investing in wind energy in Vietnam — legal certainty and bankability — makin...
Investing in wind energy in Vietnam — legal certainty and bankability — makin...Investing in wind energy in Vietnam — legal certainty and bankability — makin...
Investing in wind energy in Vietnam — legal certainty and bankability — makin...
 
Feed in-tariff regulations and getting wind power projects done (en)
Feed in-tariff regulations and getting wind power projects done (en)Feed in-tariff regulations and getting wind power projects done (en)
Feed in-tariff regulations and getting wind power projects done (en)
 
Om ass investment in the energy sector_
Om ass  investment in the energy sector_Om ass  investment in the energy sector_
Om ass investment in the energy sector_
 
Draft Decision on Supporting Regime for Solar Power Projects
Draft Decision on Supporting Regime for Solar Power Projects Draft Decision on Supporting Regime for Solar Power Projects
Draft Decision on Supporting Regime for Solar Power Projects
 
Omassmann investing in indochina power projects to secure energy supply
Omassmann investing in indochina power projects to secure energy supply Omassmann investing in indochina power projects to secure energy supply
Omassmann investing in indochina power projects to secure energy supply
 
Investing in Indochina Power Projects to Secure Energy Supply
Investing in Indochina Power Projects to Secure Energy Supply Investing in Indochina Power Projects to Secure Energy Supply
Investing in Indochina Power Projects to Secure Energy Supply
 
Lawyer in Myanmar Dr. Oliver Massmann Investing and Financing Power Projects ...
Lawyer in Myanmar Dr. Oliver Massmann Investing and Financing Power Projects ...Lawyer in Myanmar Dr. Oliver Massmann Investing and Financing Power Projects ...
Lawyer in Myanmar Dr. Oliver Massmann Investing and Financing Power Projects ...
 
8 Things You Should Know About Power Regulatory Reform in Myanmar
8 Things You Should Know About Power Regulatory Reform in Myanmar8 Things You Should Know About Power Regulatory Reform in Myanmar
8 Things You Should Know About Power Regulatory Reform in Myanmar
 

More from Dr. Oliver Massmann

Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...
Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...
Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...Dr. Oliver Massmann
 
VIETNAM – LATEST GUIDE TO CONTRACT MANUFACTURING AND TOLLING AGREEMENTS
VIETNAM – LATEST GUIDE TO CONTRACT MANUFACTURING AND TOLLING AGREEMENTSVIETNAM – LATEST GUIDE TO CONTRACT MANUFACTURING AND TOLLING AGREEMENTS
VIETNAM – LATEST GUIDE TO CONTRACT MANUFACTURING AND TOLLING AGREEMENTSDr. Oliver Massmann
 
Vietnam - Global Water Intelligence interviewing Dr. Oliver Massmann on persp...
Vietnam - Global Water Intelligence interviewing Dr. Oliver Massmann on persp...Vietnam - Global Water Intelligence interviewing Dr. Oliver Massmann on persp...
Vietnam - Global Water Intelligence interviewing Dr. Oliver Massmann on persp...Dr. Oliver Massmann
 
Legal Alert - Vietnam - First draft Decree on mechanisms and policies to enco...
Legal Alert - Vietnam - First draft Decree on mechanisms and policies to enco...Legal Alert - Vietnam - First draft Decree on mechanisms and policies to enco...
Legal Alert - Vietnam - First draft Decree on mechanisms and policies to enco...Dr. Oliver Massmann
 
Anwalt in Vietnam Dr. Oliver Massmann - Vietnam's Plan für die Implementierun...
Anwalt in Vietnam Dr. Oliver Massmann - Vietnam's Plan für die Implementierun...Anwalt in Vietnam Dr. Oliver Massmann - Vietnam's Plan für die Implementierun...
Anwalt in Vietnam Dr. Oliver Massmann - Vietnam's Plan für die Implementierun...Dr. Oliver Massmann
 
Vietnam's Plan for Implementation of PDP8 – Key Highlights
Vietnam's Plan for Implementation of PDP8 – Key HighlightsVietnam's Plan for Implementation of PDP8 – Key Highlights
Vietnam's Plan for Implementation of PDP8 – Key HighlightsDr. Oliver Massmann
 
VIETNAM - THE NEW LAW ON CREDIT INSTITUTIONS - WHAT YOU MUST KNOW:
VIETNAM - THE NEW LAW ON CREDIT INSTITUTIONS - WHAT YOU MUST KNOW:VIETNAM - THE NEW LAW ON CREDIT INSTITUTIONS - WHAT YOU MUST KNOW:
VIETNAM - THE NEW LAW ON CREDIT INSTITUTIONS - WHAT YOU MUST KNOW:Dr. Oliver Massmann
 
Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...
Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...
Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...Dr. Oliver Massmann
 
ANWALT IN VIETNAM DR. OLIVER MASSMANN RECHTLICHER HINWEIS ZUM RUNDSCHREIBEN M...
ANWALT IN VIETNAM DR. OLIVER MASSMANN RECHTLICHER HINWEIS ZUM RUNDSCHREIBEN M...ANWALT IN VIETNAM DR. OLIVER MASSMANN RECHTLICHER HINWEIS ZUM RUNDSCHREIBEN M...
ANWALT IN VIETNAM DR. OLIVER MASSMANN RECHTLICHER HINWEIS ZUM RUNDSCHREIBEN M...Dr. Oliver Massmann
 
VIETNAM - LEGAL ALERT ON CIRCULAR PROVIDING REGULATIONS ON METHOD TO FORMULAT...
VIETNAM - LEGAL ALERT ON CIRCULAR PROVIDING REGULATIONS ON METHOD TO FORMULAT...VIETNAM - LEGAL ALERT ON CIRCULAR PROVIDING REGULATIONS ON METHOD TO FORMULAT...
VIETNAM - LEGAL ALERT ON CIRCULAR PROVIDING REGULATIONS ON METHOD TO FORMULAT...Dr. Oliver Massmann
 
Vietnam's National Energy Development Strategy – Key Highlights
Vietnam's National Energy Development Strategy – Key HighlightsVietnam's National Energy Development Strategy – Key Highlights
Vietnam's National Energy Development Strategy – Key HighlightsDr. Oliver Massmann
 
Anwalt in Vietnam Dr. Oliver Massmann Corporate Sustainability Due Diligence ...
Anwalt in Vietnam Dr. Oliver Massmann Corporate Sustainability Due Diligence ...Anwalt in Vietnam Dr. Oliver Massmann Corporate Sustainability Due Diligence ...
Anwalt in Vietnam Dr. Oliver Massmann Corporate Sustainability Due Diligence ...Dr. Oliver Massmann
 
ANWALT IN VIETNAM DR OLIVER MASSMANN MÖGLICHE RATIFIZIERUNG DES ÜBEREINKOMMEN...
ANWALT IN VIETNAM DR OLIVER MASSMANN MÖGLICHE RATIFIZIERUNG DES ÜBEREINKOMMEN...ANWALT IN VIETNAM DR OLIVER MASSMANN MÖGLICHE RATIFIZIERUNG DES ÜBEREINKOMMEN...
ANWALT IN VIETNAM DR OLIVER MASSMANN MÖGLICHE RATIFIZIERUNG DES ÜBEREINKOMMEN...Dr. Oliver Massmann
 
Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...
Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...
Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...Dr. Oliver Massmann
 
Anwalt in Vietnam Dr. Oliver Massmann- Franchising – Eine Strategie als Schlü...
Anwalt in Vietnam Dr. Oliver Massmann- Franchising – Eine Strategie als Schlü...Anwalt in Vietnam Dr. Oliver Massmann- Franchising – Eine Strategie als Schlü...
Anwalt in Vietnam Dr. Oliver Massmann- Franchising – Eine Strategie als Schlü...Dr. Oliver Massmann
 
POTENTIAL RATIFICATION OF CONVENTION 87 OF THE INTERNATIONAL LABOUR ORGANIZAT...
POTENTIAL RATIFICATION OF CONVENTION 87 OF THE INTERNATIONAL LABOUR ORGANIZAT...POTENTIAL RATIFICATION OF CONVENTION 87 OF THE INTERNATIONAL LABOUR ORGANIZAT...
POTENTIAL RATIFICATION OF CONVENTION 87 OF THE INTERNATIONAL LABOUR ORGANIZAT...Dr. Oliver Massmann
 
KEY TASKS SET OUT BY THE PRIME MINISTER FOR THE YEAR 2024 AND THE EMERGING MA...
KEY TASKS SET OUT BY THE PRIME MINISTER FOR THE YEAR 2024 AND THE EMERGING MA...KEY TASKS SET OUT BY THE PRIME MINISTER FOR THE YEAR 2024 AND THE EMERGING MA...
KEY TASKS SET OUT BY THE PRIME MINISTER FOR THE YEAR 2024 AND THE EMERGING MA...Dr. Oliver Massmann
 
Lawyer in Vietnam Dr. Oliver Massmann - Doing Business and Getting Deals Done...
Lawyer in Vietnam Dr. Oliver Massmann - Doing Business and Getting Deals Done...Lawyer in Vietnam Dr. Oliver Massmann - Doing Business and Getting Deals Done...
Lawyer in Vietnam Dr. Oliver Massmann - Doing Business and Getting Deals Done...Dr. Oliver Massmann
 
Anwalt in Vietnam Dr. Oliver Massmann im Interview mit Asia Business Law Jour...
Anwalt in Vietnam Dr. Oliver Massmann im Interview mit Asia Business Law Jour...Anwalt in Vietnam Dr. Oliver Massmann im Interview mit Asia Business Law Jour...
Anwalt in Vietnam Dr. Oliver Massmann im Interview mit Asia Business Law Jour...Dr. Oliver Massmann
 
Lawyer in Vietnam Dr Oliver Massmann - Vietnam and the World
Lawyer in Vietnam Dr Oliver Massmann - Vietnam and the WorldLawyer in Vietnam Dr Oliver Massmann - Vietnam and the World
Lawyer in Vietnam Dr Oliver Massmann - Vietnam and the WorldDr. Oliver Massmann
 

More from Dr. Oliver Massmann (20)

Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...
Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...
Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...
 
VIETNAM – LATEST GUIDE TO CONTRACT MANUFACTURING AND TOLLING AGREEMENTS
VIETNAM – LATEST GUIDE TO CONTRACT MANUFACTURING AND TOLLING AGREEMENTSVIETNAM – LATEST GUIDE TO CONTRACT MANUFACTURING AND TOLLING AGREEMENTS
VIETNAM – LATEST GUIDE TO CONTRACT MANUFACTURING AND TOLLING AGREEMENTS
 
Vietnam - Global Water Intelligence interviewing Dr. Oliver Massmann on persp...
Vietnam - Global Water Intelligence interviewing Dr. Oliver Massmann on persp...Vietnam - Global Water Intelligence interviewing Dr. Oliver Massmann on persp...
Vietnam - Global Water Intelligence interviewing Dr. Oliver Massmann on persp...
 
Legal Alert - Vietnam - First draft Decree on mechanisms and policies to enco...
Legal Alert - Vietnam - First draft Decree on mechanisms and policies to enco...Legal Alert - Vietnam - First draft Decree on mechanisms and policies to enco...
Legal Alert - Vietnam - First draft Decree on mechanisms and policies to enco...
 
Anwalt in Vietnam Dr. Oliver Massmann - Vietnam's Plan für die Implementierun...
Anwalt in Vietnam Dr. Oliver Massmann - Vietnam's Plan für die Implementierun...Anwalt in Vietnam Dr. Oliver Massmann - Vietnam's Plan für die Implementierun...
Anwalt in Vietnam Dr. Oliver Massmann - Vietnam's Plan für die Implementierun...
 
Vietnam's Plan for Implementation of PDP8 – Key Highlights
Vietnam's Plan for Implementation of PDP8 – Key HighlightsVietnam's Plan for Implementation of PDP8 – Key Highlights
Vietnam's Plan for Implementation of PDP8 – Key Highlights
 
VIETNAM - THE NEW LAW ON CREDIT INSTITUTIONS - WHAT YOU MUST KNOW:
VIETNAM - THE NEW LAW ON CREDIT INSTITUTIONS - WHAT YOU MUST KNOW:VIETNAM - THE NEW LAW ON CREDIT INSTITUTIONS - WHAT YOU MUST KNOW:
VIETNAM - THE NEW LAW ON CREDIT INSTITUTIONS - WHAT YOU MUST KNOW:
 
Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...
Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...
Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...
 
ANWALT IN VIETNAM DR. OLIVER MASSMANN RECHTLICHER HINWEIS ZUM RUNDSCHREIBEN M...
ANWALT IN VIETNAM DR. OLIVER MASSMANN RECHTLICHER HINWEIS ZUM RUNDSCHREIBEN M...ANWALT IN VIETNAM DR. OLIVER MASSMANN RECHTLICHER HINWEIS ZUM RUNDSCHREIBEN M...
ANWALT IN VIETNAM DR. OLIVER MASSMANN RECHTLICHER HINWEIS ZUM RUNDSCHREIBEN M...
 
VIETNAM - LEGAL ALERT ON CIRCULAR PROVIDING REGULATIONS ON METHOD TO FORMULAT...
VIETNAM - LEGAL ALERT ON CIRCULAR PROVIDING REGULATIONS ON METHOD TO FORMULAT...VIETNAM - LEGAL ALERT ON CIRCULAR PROVIDING REGULATIONS ON METHOD TO FORMULAT...
VIETNAM - LEGAL ALERT ON CIRCULAR PROVIDING REGULATIONS ON METHOD TO FORMULAT...
 
Vietnam's National Energy Development Strategy – Key Highlights
Vietnam's National Energy Development Strategy – Key HighlightsVietnam's National Energy Development Strategy – Key Highlights
Vietnam's National Energy Development Strategy – Key Highlights
 
Anwalt in Vietnam Dr. Oliver Massmann Corporate Sustainability Due Diligence ...
Anwalt in Vietnam Dr. Oliver Massmann Corporate Sustainability Due Diligence ...Anwalt in Vietnam Dr. Oliver Massmann Corporate Sustainability Due Diligence ...
Anwalt in Vietnam Dr. Oliver Massmann Corporate Sustainability Due Diligence ...
 
ANWALT IN VIETNAM DR OLIVER MASSMANN MÖGLICHE RATIFIZIERUNG DES ÜBEREINKOMMEN...
ANWALT IN VIETNAM DR OLIVER MASSMANN MÖGLICHE RATIFIZIERUNG DES ÜBEREINKOMMEN...ANWALT IN VIETNAM DR OLIVER MASSMANN MÖGLICHE RATIFIZIERUNG DES ÜBEREINKOMMEN...
ANWALT IN VIETNAM DR OLIVER MASSMANN MÖGLICHE RATIFIZIERUNG DES ÜBEREINKOMMEN...
 
Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...
Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...
Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...
 
Anwalt in Vietnam Dr. Oliver Massmann- Franchising – Eine Strategie als Schlü...
Anwalt in Vietnam Dr. Oliver Massmann- Franchising – Eine Strategie als Schlü...Anwalt in Vietnam Dr. Oliver Massmann- Franchising – Eine Strategie als Schlü...
Anwalt in Vietnam Dr. Oliver Massmann- Franchising – Eine Strategie als Schlü...
 
POTENTIAL RATIFICATION OF CONVENTION 87 OF THE INTERNATIONAL LABOUR ORGANIZAT...
POTENTIAL RATIFICATION OF CONVENTION 87 OF THE INTERNATIONAL LABOUR ORGANIZAT...POTENTIAL RATIFICATION OF CONVENTION 87 OF THE INTERNATIONAL LABOUR ORGANIZAT...
POTENTIAL RATIFICATION OF CONVENTION 87 OF THE INTERNATIONAL LABOUR ORGANIZAT...
 
KEY TASKS SET OUT BY THE PRIME MINISTER FOR THE YEAR 2024 AND THE EMERGING MA...
KEY TASKS SET OUT BY THE PRIME MINISTER FOR THE YEAR 2024 AND THE EMERGING MA...KEY TASKS SET OUT BY THE PRIME MINISTER FOR THE YEAR 2024 AND THE EMERGING MA...
KEY TASKS SET OUT BY THE PRIME MINISTER FOR THE YEAR 2024 AND THE EMERGING MA...
 
Lawyer in Vietnam Dr. Oliver Massmann - Doing Business and Getting Deals Done...
Lawyer in Vietnam Dr. Oliver Massmann - Doing Business and Getting Deals Done...Lawyer in Vietnam Dr. Oliver Massmann - Doing Business and Getting Deals Done...
Lawyer in Vietnam Dr. Oliver Massmann - Doing Business and Getting Deals Done...
 
Anwalt in Vietnam Dr. Oliver Massmann im Interview mit Asia Business Law Jour...
Anwalt in Vietnam Dr. Oliver Massmann im Interview mit Asia Business Law Jour...Anwalt in Vietnam Dr. Oliver Massmann im Interview mit Asia Business Law Jour...
Anwalt in Vietnam Dr. Oliver Massmann im Interview mit Asia Business Law Jour...
 
Lawyer in Vietnam Dr Oliver Massmann - Vietnam and the World
Lawyer in Vietnam Dr Oliver Massmann - Vietnam and the WorldLawyer in Vietnam Dr Oliver Massmann - Vietnam and the World
Lawyer in Vietnam Dr Oliver Massmann - Vietnam and the World
 

Recently uploaded

如何办理澳洲南澳大学(UniSA)毕业证学位证书
如何办理澳洲南澳大学(UniSA)毕业证学位证书如何办理澳洲南澳大学(UniSA)毕业证学位证书
如何办理澳洲南澳大学(UniSA)毕业证学位证书Fir L
 
如何办理伦敦南岸大学毕业证(本硕)LSBU学位证书
如何办理伦敦南岸大学毕业证(本硕)LSBU学位证书如何办理伦敦南岸大学毕业证(本硕)LSBU学位证书
如何办理伦敦南岸大学毕业证(本硕)LSBU学位证书FS LS
 
一比一原版西澳大学毕业证学位证书
 一比一原版西澳大学毕业证学位证书 一比一原版西澳大学毕业证学位证书
一比一原版西澳大学毕业证学位证书SS A
 
Mediation ppt for study materials. notes
Mediation ppt for study materials. notesMediation ppt for study materials. notes
Mediation ppt for study materials. notesPRATIKNAYAK31
 
Essentials of a Valid Transfer.pptxmmmmmm
Essentials of a Valid Transfer.pptxmmmmmmEssentials of a Valid Transfer.pptxmmmmmm
Essentials of a Valid Transfer.pptxmmmmmm2020000445musaib
 
Ricky French: Championing Truth and Change in Midlothian
Ricky French: Championing Truth and Change in MidlothianRicky French: Championing Truth and Change in Midlothian
Ricky French: Championing Truth and Change in MidlothianRicky French
 
PPT- Voluntary Liquidation (Under section 59).pptx
PPT- Voluntary Liquidation (Under section 59).pptxPPT- Voluntary Liquidation (Under section 59).pptx
PPT- Voluntary Liquidation (Under section 59).pptxRRR Chambers
 
Transferable and Non-Transferable Property.pptx
Transferable and Non-Transferable Property.pptxTransferable and Non-Transferable Property.pptx
Transferable and Non-Transferable Property.pptx2020000445musaib
 
FINALTRUEENFORCEMENT OF BARANGAY SETTLEMENT.ppt
FINALTRUEENFORCEMENT OF BARANGAY SETTLEMENT.pptFINALTRUEENFORCEMENT OF BARANGAY SETTLEMENT.ppt
FINALTRUEENFORCEMENT OF BARANGAY SETTLEMENT.pptjudeplata
 
如何办理提赛德大学毕业证(本硕)Teesside学位证书
如何办理提赛德大学毕业证(本硕)Teesside学位证书如何办理提赛德大学毕业证(本硕)Teesside学位证书
如何办理提赛德大学毕业证(本硕)Teesside学位证书Fir L
 
如何办理普利茅斯大学毕业证(本硕)Plymouth学位证书
如何办理普利茅斯大学毕业证(本硕)Plymouth学位证书如何办理普利茅斯大学毕业证(本硕)Plymouth学位证书
如何办理普利茅斯大学毕业证(本硕)Plymouth学位证书Fir L
 
如何办理新加坡南洋理工大学毕业证(本硕)NTU学位证书
如何办理新加坡南洋理工大学毕业证(本硕)NTU学位证书如何办理新加坡南洋理工大学毕业证(本硕)NTU学位证书
如何办理新加坡南洋理工大学毕业证(本硕)NTU学位证书Fir L
 
THE FACTORIES ACT,1948 (2).pptx labour
THE FACTORIES ACT,1948 (2).pptx   labourTHE FACTORIES ACT,1948 (2).pptx   labour
THE FACTORIES ACT,1948 (2).pptx labourBhavikaGholap1
 
IBC (Insolvency and Bankruptcy Code 2016)-IOD - PPT.pptx
IBC (Insolvency and Bankruptcy Code 2016)-IOD - PPT.pptxIBC (Insolvency and Bankruptcy Code 2016)-IOD - PPT.pptx
IBC (Insolvency and Bankruptcy Code 2016)-IOD - PPT.pptxRRR Chambers
 
Andrea Hill Featured in Canadian Lawyer as SkyLaw Recognized as a Top Boutique
Andrea Hill Featured in Canadian Lawyer as SkyLaw Recognized as a Top BoutiqueAndrea Hill Featured in Canadian Lawyer as SkyLaw Recognized as a Top Boutique
Andrea Hill Featured in Canadian Lawyer as SkyLaw Recognized as a Top BoutiqueSkyLaw Professional Corporation
 
如何办理(Lincoln文凭证书)林肯大学毕业证学位证书
如何办理(Lincoln文凭证书)林肯大学毕业证学位证书如何办理(Lincoln文凭证书)林肯大学毕业证学位证书
如何办理(Lincoln文凭证书)林肯大学毕业证学位证书Fs Las
 
Audience profile - SF.pptxxxxxxxxxxxxxxxxxxxxxxxxxxx
Audience profile - SF.pptxxxxxxxxxxxxxxxxxxxxxxxxxxxAudience profile - SF.pptxxxxxxxxxxxxxxxxxxxxxxxxxxx
Audience profile - SF.pptxxxxxxxxxxxxxxxxxxxxxxxxxxxMollyBrown86
 
一比一原版牛津布鲁克斯大学毕业证学位证书
一比一原版牛津布鲁克斯大学毕业证学位证书一比一原版牛津布鲁克斯大学毕业证学位证书
一比一原版牛津布鲁克斯大学毕业证学位证书E LSS
 

Recently uploaded (20)

如何办理澳洲南澳大学(UniSA)毕业证学位证书
如何办理澳洲南澳大学(UniSA)毕业证学位证书如何办理澳洲南澳大学(UniSA)毕业证学位证书
如何办理澳洲南澳大学(UniSA)毕业证学位证书
 
如何办理伦敦南岸大学毕业证(本硕)LSBU学位证书
如何办理伦敦南岸大学毕业证(本硕)LSBU学位证书如何办理伦敦南岸大学毕业证(本硕)LSBU学位证书
如何办理伦敦南岸大学毕业证(本硕)LSBU学位证书
 
一比一原版西澳大学毕业证学位证书
 一比一原版西澳大学毕业证学位证书 一比一原版西澳大学毕业证学位证书
一比一原版西澳大学毕业证学位证书
 
Old Income Tax Regime Vs New Income Tax Regime
Old  Income Tax Regime Vs  New Income Tax   RegimeOld  Income Tax Regime Vs  New Income Tax   Regime
Old Income Tax Regime Vs New Income Tax Regime
 
Mediation ppt for study materials. notes
Mediation ppt for study materials. notesMediation ppt for study materials. notes
Mediation ppt for study materials. notes
 
Essentials of a Valid Transfer.pptxmmmmmm
Essentials of a Valid Transfer.pptxmmmmmmEssentials of a Valid Transfer.pptxmmmmmm
Essentials of a Valid Transfer.pptxmmmmmm
 
Ricky French: Championing Truth and Change in Midlothian
Ricky French: Championing Truth and Change in MidlothianRicky French: Championing Truth and Change in Midlothian
Ricky French: Championing Truth and Change in Midlothian
 
PPT- Voluntary Liquidation (Under section 59).pptx
PPT- Voluntary Liquidation (Under section 59).pptxPPT- Voluntary Liquidation (Under section 59).pptx
PPT- Voluntary Liquidation (Under section 59).pptx
 
Transferable and Non-Transferable Property.pptx
Transferable and Non-Transferable Property.pptxTransferable and Non-Transferable Property.pptx
Transferable and Non-Transferable Property.pptx
 
FINALTRUEENFORCEMENT OF BARANGAY SETTLEMENT.ppt
FINALTRUEENFORCEMENT OF BARANGAY SETTLEMENT.pptFINALTRUEENFORCEMENT OF BARANGAY SETTLEMENT.ppt
FINALTRUEENFORCEMENT OF BARANGAY SETTLEMENT.ppt
 
Rohini Sector 25 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 25 Call Girls Delhi 9999965857 @Sabina Saikh No AdvanceRohini Sector 25 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 25 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
 
如何办理提赛德大学毕业证(本硕)Teesside学位证书
如何办理提赛德大学毕业证(本硕)Teesside学位证书如何办理提赛德大学毕业证(本硕)Teesside学位证书
如何办理提赛德大学毕业证(本硕)Teesside学位证书
 
如何办理普利茅斯大学毕业证(本硕)Plymouth学位证书
如何办理普利茅斯大学毕业证(本硕)Plymouth学位证书如何办理普利茅斯大学毕业证(本硕)Plymouth学位证书
如何办理普利茅斯大学毕业证(本硕)Plymouth学位证书
 
如何办理新加坡南洋理工大学毕业证(本硕)NTU学位证书
如何办理新加坡南洋理工大学毕业证(本硕)NTU学位证书如何办理新加坡南洋理工大学毕业证(本硕)NTU学位证书
如何办理新加坡南洋理工大学毕业证(本硕)NTU学位证书
 
THE FACTORIES ACT,1948 (2).pptx labour
THE FACTORIES ACT,1948 (2).pptx   labourTHE FACTORIES ACT,1948 (2).pptx   labour
THE FACTORIES ACT,1948 (2).pptx labour
 
IBC (Insolvency and Bankruptcy Code 2016)-IOD - PPT.pptx
IBC (Insolvency and Bankruptcy Code 2016)-IOD - PPT.pptxIBC (Insolvency and Bankruptcy Code 2016)-IOD - PPT.pptx
IBC (Insolvency and Bankruptcy Code 2016)-IOD - PPT.pptx
 
Andrea Hill Featured in Canadian Lawyer as SkyLaw Recognized as a Top Boutique
Andrea Hill Featured in Canadian Lawyer as SkyLaw Recognized as a Top BoutiqueAndrea Hill Featured in Canadian Lawyer as SkyLaw Recognized as a Top Boutique
Andrea Hill Featured in Canadian Lawyer as SkyLaw Recognized as a Top Boutique
 
如何办理(Lincoln文凭证书)林肯大学毕业证学位证书
如何办理(Lincoln文凭证书)林肯大学毕业证学位证书如何办理(Lincoln文凭证书)林肯大学毕业证学位证书
如何办理(Lincoln文凭证书)林肯大学毕业证学位证书
 
Audience profile - SF.pptxxxxxxxxxxxxxxxxxxxxxxxxxxx
Audience profile - SF.pptxxxxxxxxxxxxxxxxxxxxxxxxxxxAudience profile - SF.pptxxxxxxxxxxxxxxxxxxxxxxxxxxx
Audience profile - SF.pptxxxxxxxxxxxxxxxxxxxxxxxxxxx
 
一比一原版牛津布鲁克斯大学毕业证学位证书
一比一原版牛津布鲁克斯大学毕业证学位证书一比一原版牛津布鲁克斯大学毕业证学位证书
一比一原版牛津布鲁克斯大学毕业证学位证书
 

VIETNAM’S SOLAR MARKET – MARKET STATUS, POTENTIAL AND KEY TO SUCCESSFUL PROJECTS

  • 1. www.duanemorris.com ©2010 Duane Morris LLP. All Rights Reserved. Duane Morris is a registered service mark of Duane Morris LLP. Duane Morris – Firm and Affiliate Offices | New York | London | Singapore | Los Angeles | Chicago | Houston | Hanoi | Philadelphia | San Diego | San Francisco | Baltimore | Boston | Washington, D.C. Las Vegas | Atlanta | Miami | Pittsburgh | Newark | Boca Raton | Wilmington | Cherry Hill | Princeton | Lake Tahoe | Ho Chi Minh City | Duane Morris LLP – A Delaware limited liability partnership DR. OLIVER MASSMANN Partner, General Director DUANE MORRIS VIETNAM LLC VIETNAM’S SOLAR MARKET – MARKET STATUS, POTENTIAL AND KEY TO SUCCESSFUL PROJECTS 1
  • 2. www.duanemorris.com AGENDA • OVERVIEW OF VIETNAM’S ECONOMY • BACKGROUND OF SOLAR ENERGY INDUSTRY IN VIETNAM • REGULATORY FRAMEWORK ON SOLAR ENERGY • LATEST DEVELOPMENTS IN VIETNAM’S SOLAR MARKET • INVESTMENT GUIDELINES FOR FOREIGN INVESTORS 2
  • 3. www.duanemorris.com Vietnam 2017 Economy at a glance • GDP: US$220.3 billion • GDP per capita: US$2,385 • GDP Growth: 6.81% (2017) and 7.08% (first 6 months of 2018) (record breaking in 10 years) • Inflation: 1.41% • Population: About 91.70 million • Labor force aged 15 and above: 54.61 million • Total export and import turnover: : >US$420 billion (7.1% increase) • Regional Minimum wage (Region I): VND 3.980 million (US$ 175) per month (Jan 2018) • Vietnam’s average age: 29 years old 3
  • 4. www.duanemorris.com Welcome to the most dynamic country on this planet : Vietnam! 4 Growing middle-class (doubled by 2020 to 33 million people according to Boston Consulting Group) 90 million people Fastest-growing ASEAN economy in 2018 and 2019, as in 2017 – Standard Chartered Bank predicts
  • 5. www.duanemorris.com FOREIGN INVESTMENT IN VIETNAM REGIONAL COMPARISON OF COMPETIVENESS ON MARKET ACCESS Vietnam ties in first place with Singapore • *Typical restrictions: number of opened sectors, JV requirement, limits on foreign-owned shares, permission requirement 5 Country Limitation of market access* Country Limitation of market access* Malaysia medium Myanmar high Indonesia medium Cambodia medium Philippines medium Laos medium Singapore low India high Thailand medium China medium Brunei high Vietnam low
  • 8. www.duanemorris.com Vietnam’s super rich population is growing faster than anywhere else…. 8 … and is on track to continue leading the growth in the next decade
  • 9. www.duanemorris.com Communist Vietnam Has More Millionaires Than Capitalist Philippines 9
  • 10. www.duanemorris.com Female Business Ownership 10 11stst in Asia,in Asia, 66thth /53 surveyed/53 surveyed countriescountries 1818thth in terms of women’s advancement outcomes,in terms of women’s advancement outcomes, knowledge assets, financial access and supportingknowledge assets, financial access and supporting entrepreneurial conditions*entrepreneurial conditions* * Similar to Thailand, Hong Kong and Switzerland Women hold 25% of CEO or board-level positionsWomen hold 25% of CEO or board-level positions in Vietnam**in Vietnam** ** Far above Singapore, Myanmar and Indonesia Source: Mastercard Index of Women Entrepreneurs 2018
  • 11. www.duanemorris.com Energy Sector Background • Electricity demand is expected to increase by up to 11.4 pct. for the 2016-2020 period and 7 times to 800 billion Kwh in 2030 • Electricity consumption is projected to increase from 85,932 gigawatt hours (GWh) in 2010 to 251,763 GWh in 2020 11
  • 12. www.duanemorris.com POTENTIAL OF SOLAR ENERGY INDUSTRY IN VIETNAM • Total number of sunshine hours up to 1400 – 3000 hours/year • Potential: 4-6 kWh/m2 • Current use: 5 MW 12
  • 13. www.duanemorris.com REGULATORY FRAMEWORK ON SOLAR ENERGY • Electricity Law 2004 and 2012 • The Revised Power Development Plan 2011-2020 (revised PDP VII) approved by Prime Minister in Decision 428/QD-TTg dated 18 March 2016 • Decision 2068/QD-TTg dated 25 November 2015 on development strategy and vision of RE to 2050. • Decision 11/2017/QD-TTg dated 11 April 2017 by the PM on support mechanism for development of solar power projects in Vietnam • Circular 16/2017/TT-BCT dated 12 September 2017 setting out requirements on protect development and template PPA for solar power projects13
  • 14. www.duanemorris.com Amended Power Master Plan VII • State to keep monopoly on transmission • Prioritize development of renewable energy • Renewable energy target rate at 7 pct. of total energy output by 2020 and more than 10 pct. by 2030. • Increase the solar power output to 850 MW by 2020, 4,000 MW in 2025 and 12,000 MW in 2030. 14
  • 15. www.duanemorris.com Vietnam’s electrical energy mix • Vietnam policy emphasises the need to diversify the country’s energy mix whilst maximising the use of local energy reserves • Currently Vietnam is developing an energy mix sector with the mainstay of coal fired power 15
  • 16. www.duanemorris.com Coal production – World Bank no longer supports??? 16
  • 17. www.duanemorris.com Latest developments in Vietnam’s solar market • About 120 solar projects have been approved by the MOIT with total capacity of over 4,700 MW (September 2018) • 35 PPAs signed with the total capacity of approximately 2.271 MW (September 2018) • Vietnam would increase its electricity production from renewable sources from about 58 billion kWh in 2015 to 101 billion kWh by 2020 and 186 billion kWh by 2030. • Vietnam now plans to increase solar power consumption in households by 26% by 2030. 17
  • 18. www.duanemorris.com Latest developments in Vietnam’s solar market (cont.) • The Government will issue NEW FIT price (estimated at 7 – 7.5US cents/kWh) and NEW PPA that can be used for projects after 30 June 2019. • The Government is now also working on a Competition Auction System that may be completed at around the 2020. The NEW FIT price is to be applied until this Competition Auction System is completed. 18
  • 19. www.duanemorris.com Latest developments in Vietnam’s solar market (cont.) • Family households now can install the rooftop solar energy system for family use and then can sell the unused amount of electricity of EVN. EVN will install free electricity meter for family households. • As for the time being, MOF still has not finalized the tax relevant issues for the above structure, family households now still have to pay their monthly electricity bill after installing the rooftop solar energy system (that cost minimum of USD3,000) and then at the end of the year EVN will calculate and make payment to the family households. 19
  • 20. www.duanemorris.com Solar Decision • FIT: – On-grid projects: 9.35 US cents/kWh. – No FIT for off-grid rooftop projects – Only one off-taker (EVN) and No direct PPA (B2B) – The FIT applies for projects which come into operation before 30 June 2019 and within 20 years from the commercially operational date (“COD”) (i.e., the date when the solar plant is ready to sell electricity to the buyer – EVN) – The FIT COD will likely be extended for another half a year or another year for solar projects across Vietnam, except for projects in Ninh Thuan – For solar projects in Ninh Thuan, the COD deadline extension will be longer (i.e. until end of 2020). • Net metering: applicable for rooftop projects. Oversupply amount will be credited to the following month. At the end of the year or expiry of the PPA, exceeded amount will be sold to EVN at 9.35 US cents/ kWh. • MOIT is now working on revisions on Decision 11 on solar rooftop net-metering. 20
  • 21. www.duanemorris.com Solar power financial incentives • Preferential CIT: – Preferential corporate income tax (“CIT”) rate of 10% for fifteen (15) years, applied from the first year in which the project company has revenue from the new solar power project – CIT exemption for four (4) years and 50% tax reduction for the next nine (9) years applied from the first year in which the project company has taxable income from the solar power project. • Duty Exemption: – Import duty exemption for imported goods used as fixed assets – Import duty exemption for imported machinery, equipment, supplies that cannot be domestically produced serving production of renewable energy 21
  • 22. www.duanemorris.com Solar power financial incentive (Cont.) • Land and Water Surface: – For solar power projects, transmission lines and transformer stations for connecting to electricity grids – Land and water surface rent shall be exempted during the fundamental (capital) construction period. This exemption does not exceed three (3) years from the effective date of competent state authorities’ decisions for land lease / allocation – After the above fundamental construction period, the land rents and water surface rents shall be exempted for three (3) years 22
  • 23. www.duanemorris.com Solar PPA • Non-negotiable PPA and compulsory application for grid connected solar projects • EVN has the obligation the buy all electricity generated from solar power projects. However, in the Solar PPA, EVN may stop buying electricity in certain circumstances beyond the reasonable control of the seller, without any compensation or payments to the seller/project developer. • The purchaser must pay the seller only for the electricity that is received by the purchaser. The Solar PPA does not include any provision where the purchaser is unable to take the electricity produced. • Dispute resolution: by litigation before Vietnamese courts or mediation/ resolution at authorized energy state authorities of Vietnam. No international arbitration is mentioned! 23
  • 24. www.duanemorris.com Back up from the Government re. the PPA • In the recent concluded wind PPAs, the Government subsidizes EVN 1 US cent/ kWh with regards to the whole power output sold to EVN • This subsidy no longer exists in the Solar Decision. • Solar PPA: no provision on any form of government guarantee to enhance the creditability of EVN • No hint to make the solar PPA bankable. 24
  • 25. www.duanemorris.com The EVN • PPA is required to follow a specific template, which is not bankable. • The PPA template is unclear whether it is a “take or pay” agreement. • No amendment of the PPA template is possible, except the supplementation to clarify the rights and obligations of the parties, PROVIDED that it does not change the basic contents of the PPA template. 25
  • 26. www.duanemorris.com Direct solar PPA • The Government in practice does not support off-grid projects. • The Government is working on a pilot program for direct PPA. However, it is still at the research and study stage. • There is no final decisions on capacity, licensing process, participants, location, wheeling fee, and contractual terms for the piloted DPPA • DPPA pilot would be preferably designed for 110 KV or more system (not 220 KV or 22-25 KV) • ERAV is considering some models as below: q Physical DPPA: (a) onsite DPPA where the power plants to be constructed around the consumers, and / or (ii) offshore DPPA where power plants to be constructed anywhere. q Financial DPPA: this would be formed with competitive market for selling power. 26
  • 27. www.duanemorris.com But don’t worry! We have the EU – Vietnam FTA and CPTPP • EU – Vietnam FTA (“EVFTA”) and the Investment Protection Agreement (“IPA”): – When EVFTA is ratified, Vietnam will have more legal certainty than even Germany. – IPA implements investor-to-state dispute settlement (ISDS) mechanisms – investors can claim in case that an investor protection obligation has been breached – Domestic courts cannot question the legal validity of the decisions • Comprehensive and Progressive Agreement for the Trans-Pacific Partnership (CPTPP): – TPP continues without the US, to be signed on 08 March 2018. – New TPP accounts for 12.9% of global GDP and 14.9% of global trade. – Vietnam to ratify the CPTPP in November, becoming the 4th country to ratify the deal27
  • 28. www.duanemorris.com Non-recourse financing • What is it? The Project can be financed with a loan secured by a charge on specific assets or on the revenues generated from a specific project or assets. • How to obtain? ü Option 1: To develop the project by way of entering into a BOT (Build- Operate-Transfer) contract with the Government. As it is the Government who will own the project at the end upon the expiration of the BOT contract, the BOT contract will be more bankable  the non- recourse/limited recourse financing arrangement can be achievable. ü Option 2: To seek guarantee from the Multilateral Investment Guarantee Agency (“MIGA”). ü Option 3: To cooperate with a State-owned commercial bank for its guarantee of the project and then, negotiate with lenders to eliminate all recourses that lenders may ask from the sponsors and/or the borrowers. 28
  • 30. www.duanemorris.com Market access and Forms of investment in power market • No foreign ownership restriction • Investment forms: ü A wholly-owned foreign enterprise ü A joint venture company between a foreign investor and domestic investor ü Investment pursuant to the BOT legal framework ü Through the purchase of shares in either an EVN subsidiary being or having been equitized or a private IPP holding power assets. 30
  • 31. www.duanemorris.com BOT – BEST INVESTMENT FORM • Government’s Decree No. 63/2018/ND-CP on Public- Private Partnership: making projects more bankable • Easier to negotiate more favorable electricity rates. • Easier to obtain more government guarantees, especially in terms of EVN’s obligations to purchase all electricity from the project. • More fiscal and financial incentives. • Precedent large-scaled BOT power projects in Vietnam: Phu My, Vung Ang, Mong Duong 2 31
  • 32. www.duanemorris.com Project planning • Investors has to obtain prior agreement of EVN on power purchase prior to licensing procedure. • Commitment of banks or credit institutions on financing the project must be obtained prior to issuance of Investment Registration Certificate . • In-principle approval of the local People’s Committee is required prior to issuance of Investment Registration Certificate depending on the project size • A solar power plant must obtain a power generation permit from the competent State authorities in order to conduct power generation operations in Vietnam • Term of the permit: maximum 20 years for large power plants with particularly important meaning on economy, society, national defense and security as per the list approved by the Prime Minister; and 10 years for other power plants projects. • The permit cannot be renewed but the investor may apply for a new one within 60 days prior to the expiry date of the current permit. 32
  • 33. www.duanemorris.com Project licensing • Step 1: The investor obtains approval from the competent authority [e.g., Prime Minister, MOIT] approving the solar power plant as part of the power development master plan (if required). • Step 2: The investor obtains in-principle approval from the competent People’s Committee (or other competent authorities subject to the details of the project) approving the solar power plant project, land demand / location, environment, construction plan, other terms of the project. • Step 3: Application for issuance of the Investment Registration Certificate and the Enterprise Registration Certificate • Step 4: Preparation of construction / operations of the solar power plant (for example, acquiring land area, site clearance, preparation, land investigation, conducting environmental assessment) • Step 5: The project company to obtain necessary permits (e.g. electricity generating permit) and relevant agreements (e.g. PPA) for its and the power plant’s operation. • Step 6: Construction of solar power plant and operation 33
  • 34. www.duanemorris.com CONNECTIONS ARE BUSINESS PLEASE CONNECT WITH ME ON LINKEDIN: OLIVER MASSMANN 34
  • 35. www.duanemorris.com WHEREVER YOU ARE - BE ALL THERE Jim Elliot 35
  • 36. www.duanemorris.com36 DUANE MORRIS VIETNAM LLC Thank you very much! HANOI OFFICE HO CHI MINH CITY OFFICE Pacific Place, Unit V1307/08, 13th Floor, Suite 1503/04, Saigon Tower 83B Ly Thuong Kiet, Hoan Kiem District 29 Le Duan Street, District 1 Hanoi, Vietnam Ho Chi Minh City, Vietnam Tel.: +84 4 39462200 Tel.: +84 8 3824 0240 Fax: +84 4 3946 1311 Fax: +84 8 3824 0241 Contact email: omassmann@duanemorris.com