Value Stream Mapping
Project Template
Template for compiling a value stream improvement
storyboard from current state mapping to future state
design implementation
2
Contents
1. Team organization
2. Value stream mapping roadmap
3. Phase 1: Define & Pick Product/Service Family
4. Phase 2: Current State Mapping
5. Phase 3: Future State Mapping
6. Phase 4: Implementation Plan
Appendix 1 – Value stream mapping icons
NOTE: This is a PARTIAL PREVIEW. To download
the complete template, please visit:
http://www.oeconsulting.com.sg
© Operational Excellence Consulting. All rights reserved.
< Type Value Stream Improvement
Project Name Here >
Team Leader: <name>
Value Stream Champion: <name>
Executive Sponsor: <name>
Date:
4
Name of Project Team (e.g. Muda Busters)
Insert your team photo here.
5
Create
Implementation
Plan
Design
Future
State Document
Current State
Define
Product
Family
 Define and scope
problem
 Pick product family
 Determine VSM objective
and benefits
 Create VSM charter
 Map current state value
stream
 Quantify current state
value stream performance
 Analyze and identify
improvement
opportunities
 Develop future state
value stream map
 Prioritize improvement
projects
 Develop implementation
plan
 Seek management
approval
 Implement the plan
and monitor
progress
Value Stream Mapping Roadmap
1
2
3
4
© Operational Excellence Consulting. All rights reserved.
< Type Value Stream Improvement
Project Name Here >
Define Phase
Team Leader: <name>
Value Stream Champion: <name>
Executive Sponsor: <name>
Date:
7
Value Stream Mapping Roadmap
Create
Implementation
Plan
Design
Future
State Document
Current State
Define
Product
Family
 Define and scope
problem
 Pick product family
 Determine VSM objective
and benefits
 Create VSM charter
 Map current state value
stream
 Quantify current state
value stream performance
 Analyze and identify
improvement
opportunities
 Develop future state
value stream map
 Prioritize improvement
projects
 Develop implementation
plan
 Seek management
approval
 Implement the plan
and monitor
progress
1
2
3
4
8
Scoping: Define a Product FamilyProducts
A
321
B
4
Processes
Product
family
C
D
E
5 6 7 8 9 10
Machining Drilling Assy* Pack*Weld.
F
X X X X X
X X X X X
X X X X
XX X X
X X X X
X X X
* The two work stations at assembly and packaging respectively are similar.
Therefore they are considered as one work station in this analysis.
Product family:
• The characteristics
of a product family
are that the
products go through
the same – or nearly
the same –
processes (same
flow) and that the
products have
similar process
times.
Group Product Families by similar downstream processes, steps or equipment
9
VSM Charter
Value Stream Mapping Charter
Scope Accountable Parties Schedule & Logistics
Value Stream Value Stream being improved Executive Sponsor Director, VP or C-level Event Date(s) 3 days typically
Specific
Conditions
What circumstances are included and
excluded? (e.g type of customer, geographic
location, etc.)
Value Stream
Champion
If needed - often director or manager level Start/End Times Start and end times
Customer Demand How many times is this done per wk, mth, yr? Facilitator / VSM
Manager
Skilled person leading the activity Location Need ample wall space
Trigger What need does the value stream address?
First Step Task on first process block
Team Lead Not always needed Meals Provided?
Always a nice touch; keeps the team from
wandering.Last Step Task on last process block
Boundaries &
Limitations
What is the team NOT authorized to change?
Coordinator
The person arranging logistics (reserving the
room, ordering food, sending meeting notices,
etc.)
Interim Briefing(s)
Aid in consensus building and organizational
learning.
FS Implementation
Timeframe
Typically 90-120 days Briefing Attendees List required attendees; others are optional.
Current State Problems & Business Needs Mapping Team
1 What's driving the need for improvement? Function / Role Name Contact Information
2 1 Leadership-heavy
3 2
4 3
5 4
Measurable Target Condition 5
1 Reduce <defined metric> from X to Y (Z% improvement) 6
2 7
3 8
4 9
5 19
Benefits to Customers On-Call Support
1 How will internal/external customers benefit as a result Function / Role Name Contact Information
2 of improvements to the value stream? 1 SMEs that may not be needed full time
3 2
4 3
5 4
Benefits to Business Approvals
1 What other benefits will the business or internal customers Executive Sponsor Value Stream Champion Facilitator / VSM Manager
2 realize as a result of improvements to the VSM?
3
4 Signature: Signature: Signature:
5 Date: Date: Date:
10
Considerations & Approach
• What are the current and future demand rates?
• Is the VSM showing what happens 80 percent of the time to reduce
variation and focus on improving the majority of the work?
• If it is prudent to focus initially on the 20% that are the exceptions,
the charter should clearly define the specific conditions being
mapped and the reasons for focusing on the exceptions.
Alternatively, the space here can be used.
• Is the VSM depicting the flow of an average lot size or work that
happens on a typical shift or others?
• <Add other relevant information if necessary to help the audience or
reader understand the VSM>
11
Roles & Responsibilities
Team Roles Responsibilities
Executive Sponsor
Value Stream Mapping
Champion
Facilitator
Logistics Coordinator
Team Leader
Team Members
12
Objective Attendees / Roles Day / Time / Frequency
Project Status Meeting
Biweekly ‘drum beat’ to
communicate project status,
success, issue management
Project Phase Tollgate
Conducted at the end of each
phase
Cadence Meeting
Weekly ‘drum beat’ to
communicate project plan
activities, project status,
success, issue mgmt.
<Other Meetings>
<insert description>
Communication Plan
13
Define Phase Deliverables
• VSM charter
• VSM Manager sign-off
• Executive Sponsor sign-off
• Communication plan
© Operational Excellence Consulting. All rights reserved.
Current State Mapping Phase
Team Leader: <name>
Value Stream Champion: <name>
Executive Sponsor: <name>
Date:
< Type Value Stream Improvement
Project Name Here >
15
Value Stream Mapping Roadmap
Create
Implementation
Plan
Design
Future
State Document
Current State
Define
Product
Family
 Define and scope
problem
 Pick product family
 Determine VSM objective
and benefits
 Create VSM charter
 Map current state value
stream
 Quantify current state
value stream performance
 Analyze and identify
improvement
opportunities
 Develop future state
value stream map
 Prioritize improvement
projects
 Develop implementation
plan
 Seek management
approval
 Implement the plan
and monitor
progress
1
2
3
4
16
Basic Mapping Symbols
External
Organization
Process Block
Data Block
Work-in-Process
In-box
Push Arrow
Material Receipts
& Shipments
Manual
Information Flow
Electronic
Information Flow
Operator / Employee
Go See Scheduling
Movement by Truck
Minutes MinutesMinutesMinutes
HoursHoursHoursLead Time
Cycle Time
Timeline
Takt = 60 min
2 Shifts
CT = 25 min
C/O = 25 min
17
Data Collection Plan
What Data Box
Metrics to
Measure
How to
Measure
Data Source Sampling Plan
VSM Objective
it relates to
Comments
Prepare a data collection plan for the Data Boxes.
18
Operational Definitions
• Provide operational definitions of each metric in the data box:
 Lead time
 Process time
 Quality
 Changeover time
 FTE (full time equivalent)
 etc.
19
Current State Value Stream Map
Demand all families =
100 pcs/day.
Demand family A =
35 pcs/day.
2 shifts.
Takt time = 532 sec.
Customers
Machining
Ct = 420s
Co = 20m
Up = 70%
☺ = 1
Shifts = 3
Drilling
Ct = 145s
Co = 15m
Up = 50%
☺ = 1
Shifts = 2
Welding
Ct = 185s
Co = 8m
Up = 70%
☺ = 1
Shifts = 2
Assembly
Ct = 360s
Co = 7m
Up = 80%
☺ = 1
Shifts = 2
Packaging
Ct = 40s
Co = 3m
Up = 15%
☺ = 1
Shifts = 2
Suppliers
MRP
Weekly plan
Forecasts =
30 days
Daily orders
Continuous
forecasts
Daily orders
58 days 6 days 9 days 5 days 2 days 42 days
420 sec 145 sec 185 sec 360 sec 40 sec
Component A =
35 pcs per/day.
Orders are placed
on demand.
Lead time from order
is placed= 2 days.
2030 pcs 210 pcs 315 pcs 175 pcs 70 pcs 1470 pcs
= 122
days
=1150
sec.
Current state value stream map should show the key
process activities. A good range is 5 to 15 process boxes.
Show the timeline below the current state value stream.
ILLUSTRATIVE
20
Metric Current State Goal Projected Future State % Improvement
Timeline Lead Time
Timeline Cycle Time
% Activity
Rolled First Pass Yield
# Employees
Floor Space Used
# Shifts
Add Other Relevant Metrics
Current State Value Stream Mapping Results
21
Current State Findings & Analysis
Order
Value Add
Delivery
Unnecessary
Non Value
Add
Necessary
Non Value
Add
22
Current State Findings & Analysis
15%
20%
65%
Value Add (VA)
Necessary Non-Value
Add (SNVA)
Unnecessary Non-
Value Add (UNVA)
23
Current State Mapping Phase Deliverables
• Operational definitions of each metric in the data box
• Current state value stream map
 Process boxes
 Data boxes
 Timeline Metrics
 Lead Time
 Process Time
 Quality
• Current state plant layout/spaghetti diagram
• Current state results
• List of current state analysis and findings
© Operational Excellence Consulting. All rights reserved.
Future State Mapping Phase
Team Leader: <name>
Value Stream Champion: <name>
Executive Sponsor: <name>
Date:
< Type Value Stream Improvement
Project Name Here >
25
Value Stream Mapping Roadmap
Create
Implementation
Plan
Design
Future
State Document
Current State
Define
Product
Family
 Define and scope
problem
 Pick product family
 Determine VSM objective
and benefits
 Create VSM charter
 Map current state value
stream
 Quantify current state
value stream performance
 Analyze and identify
improvement
opportunities
 Develop future state
value stream map
 Prioritize improvement
projects
 Develop implementation
plan
 Seek management
approval
 Implement the plan
and monitor
progress
1
2
3
4
26
Develop Future State Value Stream Map
Demand all families =
100 pcs/day.
Demand family A =
35 pcs/day.
1 shift.
Takt time = 266 sec.
Customers
Machining
Ct = 420s
Co = 5m
Up = 85%
☺ = 1
Shifts = 2
U-Cell
Ct = 250s
Co = 1-3m
Up = 65-80%
☺ = 4
Shifts = 1
Suppliers
MRP
Daily plan
Forecasts =
30 days
Daily orders
Continuous
forecasts
Daily ordersComponent A =
35 pcs per/day.
Orders are placed
on demand.
Lead time from order
is placed= 2 days.
Goal 700 pcs Goal 140 pcs Goal 70 pcs
Kanban
U-cell
Orders
20 days 4 days 2 days
Sum = 730 sec
= 26
days
=1150
sec.
420 sec
Kanban
Changeover time
Increase OEE
Physical layout
Flow between
work stations
etc.
Daily
planning
Changeover times
Increase OEE
Task distribution
ILLUSTRATIVE
Define the future state value stream map. Highlight “Kaizen
bursts” to indicate proposed improvements.
© Operational Excellence Consulting. All rights reserved.
Implementation Phase
Team Leader: <name>
Value Stream Champion: <name>
Executive Sponsor: <name>
Date:
< Type Value Stream Improvement
Project Name Here >
28
Value Stream Mapping Roadmap
Create
Implementation
Plan
Design
Future
State Document
Current State
Define
Product
Family
 Define and scope
problem
 Pick product family
 Determine VSM objective
and benefits
 Create VSM charter
 Map current state value
stream
 Quantify current state
value stream performance
 Analyze and identify
improvement
opportunities
 Develop future state
value stream map
 Prioritize improvement
projects
 Develop implementation
plan
 Seek management
approval
 Implement the plan
and monitor
progress
1
2
3
4
29
Implementation Plan
Future State Implementation Plan
Value Stream Implementation Plan Review Dates
Executive Sponsor
Value Stream Champion
Value Stream Mapping Facilitator
Date Created
Block # Goal / Objective Improvement Activity Owner
Implementation Schedule (weeks) Date
1 2 3 4 5 6 7 8 9 10 11 12 Complete
Approvals
Executive Sponsor Value Stream Champion Value Stream Mapping Facilitator
Signature: Signature: Signature:
Date: Date: Dates:
© Operational Excellence Consulting. All rights reserved.
About
Operational Excellence
Consulting
31
About Operational Excellence
Consulting
• Operational Excellence Consulting is a management
training and consulting firm that assists organizations in
improving business performance and effectiveness.
• The firm’s mission is to create business value for
organizations through innovative operational excellence
management training and consulting solutions.
• OEC takes a unique “beyond the tools” approach to enable
clients develop internal capabilities and cultural
transformation to achieve sustainable world-class excellence
and competitive advantage. For more information, please visit
www.oeconsulting.com.sg
© Operational Excellence Consulting. All rights reserved.
To download this template,
please visit us at:
www.oeconsulting.com.sg
END OF PARTIAL PREVIEW

More Related Content

What's hot

VSM - Value Stream Mapping for made-to-order manufacturing
VSM - Value Stream Mapping for made-to-order manufacturingVSM - Value Stream Mapping for made-to-order manufacturing
VSM - Value Stream Mapping for made-to-order manufacturingJessica Mitchell
 
Value stream mapping - Future State
Value stream mapping - Future StateValue stream mapping - Future State
Value stream mapping - Future Statekrishnaheda
 
Value stream mapping
Value stream mappingValue stream mapping
Value stream mappingShaunak Kale
 
value stream mapping
value stream mappingvalue stream mapping
value stream mappingvvmech
 
Value Stream Transformation: 10 Keys to Success
Value Stream Transformation: 10 Keys to SuccessValue Stream Transformation: 10 Keys to Success
Value Stream Transformation: 10 Keys to SuccessTKMG, Inc.
 
Value stream mapping (1)
Value stream mapping (1)Value stream mapping (1)
Value stream mapping (1)jmachado33
 
Value Stream Transformation: Achieving Excellence through Leadership Alignmen...
Value Stream Transformation: Achieving Excellence through Leadership Alignmen...Value Stream Transformation: Achieving Excellence through Leadership Alignmen...
Value Stream Transformation: Achieving Excellence through Leadership Alignmen...TKMG, Inc.
 
Batch & Queue vs Lean Continuous Flow
Batch & Queue vs Lean Continuous FlowBatch & Queue vs Lean Continuous Flow
Batch & Queue vs Lean Continuous FlowJulian Kalac P.Eng
 
UCSD Class: Lean Office
UCSD Class: Lean OfficeUCSD Class: Lean Office
UCSD Class: Lean OfficeTKMG, Inc.
 
Value Stream Mapping: From Tool to Management Practice
Value Stream Mapping: From Tool to Management PracticeValue Stream Mapping: From Tool to Management Practice
Value Stream Mapping: From Tool to Management PracticeTKMG, Inc.
 
Value Stream Mapping in Office & Service Setttings
Value Stream Mapping in Office & Service SetttingsValue Stream Mapping in Office & Service Setttings
Value Stream Mapping in Office & Service SetttingsTKMG, Inc.
 
Metrics-Based Process Mapping
Metrics-Based Process Mapping Metrics-Based Process Mapping
Metrics-Based Process Mapping TKMG, Inc.
 
Value Stream Mapping Overview Update
Value Stream Mapping Overview UpdateValue Stream Mapping Overview Update
Value Stream Mapping Overview Updatejheaton418
 

What's hot (20)

VSM - Value Stream Mapping for made-to-order manufacturing
VSM - Value Stream Mapping for made-to-order manufacturingVSM - Value Stream Mapping for made-to-order manufacturing
VSM - Value Stream Mapping for made-to-order manufacturing
 
Value stream mapping - Future State
Value stream mapping - Future StateValue stream mapping - Future State
Value stream mapping - Future State
 
Value stream mapping
Value stream mappingValue stream mapping
Value stream mapping
 
value stream mapping
value stream mappingvalue stream mapping
value stream mapping
 
Value Stream Transformation: 10 Keys to Success
Value Stream Transformation: 10 Keys to SuccessValue Stream Transformation: 10 Keys to Success
Value Stream Transformation: 10 Keys to Success
 
Value stream mapping (1)
Value stream mapping (1)Value stream mapping (1)
Value stream mapping (1)
 
Hourly Lean Introduction
Hourly Lean IntroductionHourly Lean Introduction
Hourly Lean Introduction
 
Value Stream Transformation: Achieving Excellence through Leadership Alignmen...
Value Stream Transformation: Achieving Excellence through Leadership Alignmen...Value Stream Transformation: Achieving Excellence through Leadership Alignmen...
Value Stream Transformation: Achieving Excellence through Leadership Alignmen...
 
Value stream mapping for non manufacturing environments
Value stream mapping for non manufacturing environmentsValue stream mapping for non manufacturing environments
Value stream mapping for non manufacturing environments
 
Batch & Queue vs Lean Continuous Flow
Batch & Queue vs Lean Continuous FlowBatch & Queue vs Lean Continuous Flow
Batch & Queue vs Lean Continuous Flow
 
UCSD Class: Lean Office
UCSD Class: Lean OfficeUCSD Class: Lean Office
UCSD Class: Lean Office
 
VSM Lean Value Stream intro
VSM Lean Value Stream introVSM Lean Value Stream intro
VSM Lean Value Stream intro
 
Process mapping
Process mappingProcess mapping
Process mapping
 
Value Stream Mapping: From Tool to Management Practice
Value Stream Mapping: From Tool to Management PracticeValue Stream Mapping: From Tool to Management Practice
Value Stream Mapping: From Tool to Management Practice
 
Value Stream Mapping in Office & Service Setttings
Value Stream Mapping in Office & Service SetttingsValue Stream Mapping in Office & Service Setttings
Value Stream Mapping in Office & Service Setttings
 
Lean Process Improvement Techniques
Lean Process Improvement TechniquesLean Process Improvement Techniques
Lean Process Improvement Techniques
 
Value Stream Mapping (VSM) Poster
Value Stream Mapping (VSM) PosterValue Stream Mapping (VSM) Poster
Value Stream Mapping (VSM) Poster
 
Metrics-Based Process Mapping
Metrics-Based Process Mapping Metrics-Based Process Mapping
Metrics-Based Process Mapping
 
Value Stream Mapping Overview Update
Value Stream Mapping Overview UpdateValue Stream Mapping Overview Update
Value Stream Mapping Overview Update
 
Lean Office by Operational Excellence Consulting
Lean Office by Operational Excellence ConsultingLean Office by Operational Excellence Consulting
Lean Office by Operational Excellence Consulting
 

Similar to Value Stream Improvement Project Template

Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate templateSteven Bonacorsi
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate templateSteven Bonacorsi
 
Value Stream Mapping: Talk with Omaha Lean User Group
Value Stream Mapping: Talk with Omaha Lean User GroupValue Stream Mapping: Talk with Omaha Lean User Group
Value Stream Mapping: Talk with Omaha Lean User GroupTKMG, Inc.
 
Have you tried to lean your IT Service Management? by Daniel Breston
Have you tried to lean your IT Service Management? by Daniel BrestonHave you tried to lean your IT Service Management? by Daniel Breston
Have you tried to lean your IT Service Management? by Daniel BrestonInstitut Lean France
 
CRM Implementations and Upgrades
CRM Implementations and UpgradesCRM Implementations and Upgrades
CRM Implementations and UpgradesPeter Ware PMP
 
Lesson 10 - Value stream mapping
Lesson 10 - Value stream mappingLesson 10 - Value stream mapping
Lesson 10 - Value stream mappingTunAnhTrnh9
 
Six_Sigma_Report_Template_v2 (2).pptx
Six_Sigma_Report_Template_v2 (2).pptxSix_Sigma_Report_Template_v2 (2).pptx
Six_Sigma_Report_Template_v2 (2).pptxPhngPhmTrung
 
Metrics-Based Process Mapping
Metrics-Based Process MappingMetrics-Based Process Mapping
Metrics-Based Process MappingTKMG, Inc.
 
LKIN2019: Lean transformation journey of infra briefing for business agility...
LKIN2019: Lean transformation journey of infra  briefing for business agility...LKIN2019: Lean transformation journey of infra  briefing for business agility...
LKIN2019: Lean transformation journey of infra briefing for business agility...Ravi Tadwalkar
 
QM-029-Six Sigma Overview
QM-029-Six Sigma OverviewQM-029-Six Sigma Overview
QM-029-Six Sigma Overviewhandbook
 
Monetizing Risks - A Prioritization & Optimization Solution
Monetizing Risks - A Prioritization & Optimization SolutionMonetizing Risks - A Prioritization & Optimization Solution
Monetizing Risks - A Prioritization & Optimization SolutionBlack & Veatch
 
1 Business process Migrations
1   Business process Migrations1   Business process Migrations
1 Business process MigrationsVamseedhar SR
 
Kash Masuria Whats Six Simga Presentation
Kash Masuria Whats Six Simga PresentationKash Masuria Whats Six Simga Presentation
Kash Masuria Whats Six Simga Presentationguestd0440a
 

Similar to Value Stream Improvement Project Template (20)

Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate template
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate template
 
Value Stream Mapping: Talk with Omaha Lean User Group
Value Stream Mapping: Talk with Omaha Lean User GroupValue Stream Mapping: Talk with Omaha Lean User Group
Value Stream Mapping: Talk with Omaha Lean User Group
 
6 Sigma
6 Sigma6 Sigma
6 Sigma
 
Have you tried to lean your IT Service Management? by Daniel Breston
Have you tried to lean your IT Service Management? by Daniel BrestonHave you tried to lean your IT Service Management? by Daniel Breston
Have you tried to lean your IT Service Management? by Daniel Breston
 
VSM – Current & Future
VSM – Current & FutureVSM – Current & Future
VSM – Current & Future
 
CRM Implementations and Upgrades
CRM Implementations and UpgradesCRM Implementations and Upgrades
CRM Implementations and Upgrades
 
Value stream mapping
Value stream mappingValue stream mapping
Value stream mapping
 
Lesson 10 - Value stream mapping
Lesson 10 - Value stream mappingLesson 10 - Value stream mapping
Lesson 10 - Value stream mapping
 
Six_Sigma_Report_Template_v2 (2).pptx
Six_Sigma_Report_Template_v2 (2).pptxSix_Sigma_Report_Template_v2 (2).pptx
Six_Sigma_Report_Template_v2 (2).pptx
 
Metrics-Based Process Mapping
Metrics-Based Process MappingMetrics-Based Process Mapping
Metrics-Based Process Mapping
 
LKIN2019: Lean transformation journey of infra briefing for business agility...
LKIN2019: Lean transformation journey of infra  briefing for business agility...LKIN2019: Lean transformation journey of infra  briefing for business agility...
LKIN2019: Lean transformation journey of infra briefing for business agility...
 
Six sigma
Six sigmaSix sigma
Six sigma
 
Six sigma
Six sigmaSix sigma
Six sigma
 
Six Sigma Process Improvement Foundational Steps
Six Sigma Process Improvement Foundational StepsSix Sigma Process Improvement Foundational Steps
Six Sigma Process Improvement Foundational Steps
 
QM-029-Six Sigma Overview
QM-029-Six Sigma OverviewQM-029-Six Sigma Overview
QM-029-Six Sigma Overview
 
Monetizing Risks - A Prioritization & Optimization Solution
Monetizing Risks - A Prioritization & Optimization SolutionMonetizing Risks - A Prioritization & Optimization Solution
Monetizing Risks - A Prioritization & Optimization Solution
 
1 Business process Migrations
1   Business process Migrations1   Business process Migrations
1 Business process Migrations
 
Six sigma define - v1.0
Six sigma   define - v1.0Six sigma   define - v1.0
Six sigma define - v1.0
 
Kash Masuria Whats Six Simga Presentation
Kash Masuria Whats Six Simga PresentationKash Masuria Whats Six Simga Presentation
Kash Masuria Whats Six Simga Presentation
 

More from Operational Excellence Consulting

The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...Operational Excellence Consulting
 
ISO 37002:2021 (Whistleblowing Management Systems) Awareness Training
ISO 37002:2021 (Whistleblowing Management Systems) Awareness TrainingISO 37002:2021 (Whistleblowing Management Systems) Awareness Training
ISO 37002:2021 (Whistleblowing Management Systems) Awareness TrainingOperational Excellence Consulting
 
ISO 37000:2021 (Governance of Organizations) Awareness Training
ISO 37000:2021 (Governance of Organizations) Awareness TrainingISO 37000:2021 (Governance of Organizations) Awareness Training
ISO 37000:2021 (Governance of Organizations) Awareness TrainingOperational Excellence Consulting
 
Six Sigma Improvement Process: Transforming Processes, Elevating Performance
Six Sigma Improvement Process: Transforming Processes, Elevating PerformanceSix Sigma Improvement Process: Transforming Processes, Elevating Performance
Six Sigma Improvement Process: Transforming Processes, Elevating PerformanceOperational Excellence Consulting
 
Kaizen Event Guide: Transforming Challenges into Opportunities
Kaizen Event Guide: Transforming Challenges into OpportunitiesKaizen Event Guide: Transforming Challenges into Opportunities
Kaizen Event Guide: Transforming Challenges into OpportunitiesOperational Excellence Consulting
 
ISO/IEC 27001:2022 (Information Security Management Systems) Awareness Poster
ISO/IEC 27001:2022 (Information Security Management Systems) Awareness PosterISO/IEC 27001:2022 (Information Security Management Systems) Awareness Poster
ISO/IEC 27001:2022 (Information Security Management Systems) Awareness PosterOperational Excellence Consulting
 

More from Operational Excellence Consulting (20)

The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
 
ISO 37002:2021 (Whistleblowing Management Systems) Awareness Training
ISO 37002:2021 (Whistleblowing Management Systems) Awareness TrainingISO 37002:2021 (Whistleblowing Management Systems) Awareness Training
ISO 37002:2021 (Whistleblowing Management Systems) Awareness Training
 
ISO 37000:2021 (Governance of Organizations) Awareness Training
ISO 37000:2021 (Governance of Organizations) Awareness TrainingISO 37000:2021 (Governance of Organizations) Awareness Training
ISO 37000:2021 (Governance of Organizations) Awareness Training
 
Six Sigma Improvement Process: Transforming Processes, Elevating Performance
Six Sigma Improvement Process: Transforming Processes, Elevating PerformanceSix Sigma Improvement Process: Transforming Processes, Elevating Performance
Six Sigma Improvement Process: Transforming Processes, Elevating Performance
 
Kaizen Event Guide: Transforming Challenges into Opportunities
Kaizen Event Guide: Transforming Challenges into OpportunitiesKaizen Event Guide: Transforming Challenges into Opportunities
Kaizen Event Guide: Transforming Challenges into Opportunities
 
Kaizen: Elevating Continuous Improvement for Success
Kaizen: Elevating Continuous Improvement for SuccessKaizen: Elevating Continuous Improvement for Success
Kaizen: Elevating Continuous Improvement for Success
 
Strategic Planning: A3 Hoshin Planning Process
Strategic Planning: A3 Hoshin Planning ProcessStrategic Planning: A3 Hoshin Planning Process
Strategic Planning: A3 Hoshin Planning Process
 
A3 Problem Solving Process & Tools
A3 Problem Solving Process & ToolsA3 Problem Solving Process & Tools
A3 Problem Solving Process & Tools
 
Digital Strategic Business Planning Methodology
Digital Strategic Business Planning MethodologyDigital Strategic Business Planning Methodology
Digital Strategic Business Planning Methodology
 
Root Cause Analysis (RCA)
Root Cause Analysis (RCA)Root Cause Analysis (RCA)
Root Cause Analysis (RCA)
 
Business Process Reengineering (BPR)
Business Process Reengineering (BPR)Business Process Reengineering (BPR)
Business Process Reengineering (BPR)
 
5 Steps of Problem Solving
5 Steps of Problem Solving5 Steps of Problem Solving
5 Steps of Problem Solving
 
Seven Advanced Tools of Quality (Seven Advanced QC Tools)
Seven Advanced Tools of Quality (Seven Advanced QC Tools)Seven Advanced Tools of Quality (Seven Advanced QC Tools)
Seven Advanced Tools of Quality (Seven Advanced QC Tools)
 
Seven Basic Tools of Quality (Seven Basic QC Tools)
Seven Basic Tools of Quality (Seven Basic QC Tools)Seven Basic Tools of Quality (Seven Basic QC Tools)
Seven Basic Tools of Quality (Seven Basic QC Tools)
 
Problem Solving & Visualization Tools
Problem Solving & Visualization ToolsProblem Solving & Visualization Tools
Problem Solving & Visualization Tools
 
PDCA Problem Solving Process & Tools
PDCA Problem Solving Process & ToolsPDCA Problem Solving Process & Tools
PDCA Problem Solving Process & Tools
 
8D Problem Solving Process & Tools
8D Problem Solving Process & Tools8D Problem Solving Process & Tools
8D Problem Solving Process & Tools
 
Digital Transformation Process Poster
Digital Transformation Process PosterDigital Transformation Process Poster
Digital Transformation Process Poster
 
ISO/IEC 27001:2022 (Information Security Management Systems) Awareness Poster
ISO/IEC 27001:2022 (Information Security Management Systems) Awareness PosterISO/IEC 27001:2022 (Information Security Management Systems) Awareness Poster
ISO/IEC 27001:2022 (Information Security Management Systems) Awareness Poster
 
Four Steps of Jidoka Poster
Four Steps of Jidoka PosterFour Steps of Jidoka Poster
Four Steps of Jidoka Poster
 

Recently uploaded

Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Tina Ji
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
rishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdfrishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdfmuskan1121w
 
Non Text Magic Studio Magic Design for Presentations L&P.pptx
Non Text Magic Studio Magic Design for Presentations L&P.pptxNon Text Magic Studio Magic Design for Presentations L&P.pptx
Non Text Magic Studio Magic Design for Presentations L&P.pptxAbhayThakur200703
 
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service PuneVIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service PuneCall girls in Ahmedabad High profile
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdfOrient Homes
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Roomdivyansh0kumar0
 
Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsApsara Of India
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc.../:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...lizamodels9
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...lizamodels9
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 

Recently uploaded (20)

Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
rishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdfrishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdf
 
Non Text Magic Studio Magic Design for Presentations L&P.pptx
Non Text Magic Studio Magic Design for Presentations L&P.pptxNon Text Magic Studio Magic Design for Presentations L&P.pptx
Non Text Magic Studio Magic Design for Presentations L&P.pptx
 
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service PuneVIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdf
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
 
Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc.../:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 

Value Stream Improvement Project Template

  • 1. © Operational Excellence Consulting. All rights reserved. Value Stream Mapping Project Template Template for compiling a value stream improvement storyboard from current state mapping to future state design implementation
  • 2. 2 Contents 1. Team organization 2. Value stream mapping roadmap 3. Phase 1: Define & Pick Product/Service Family 4. Phase 2: Current State Mapping 5. Phase 3: Future State Mapping 6. Phase 4: Implementation Plan Appendix 1 – Value stream mapping icons NOTE: This is a PARTIAL PREVIEW. To download the complete template, please visit: http://www.oeconsulting.com.sg
  • 3. © Operational Excellence Consulting. All rights reserved. < Type Value Stream Improvement Project Name Here > Team Leader: <name> Value Stream Champion: <name> Executive Sponsor: <name> Date:
  • 4. 4 Name of Project Team (e.g. Muda Busters) Insert your team photo here.
  • 5. 5 Create Implementation Plan Design Future State Document Current State Define Product Family  Define and scope problem  Pick product family  Determine VSM objective and benefits  Create VSM charter  Map current state value stream  Quantify current state value stream performance  Analyze and identify improvement opportunities  Develop future state value stream map  Prioritize improvement projects  Develop implementation plan  Seek management approval  Implement the plan and monitor progress Value Stream Mapping Roadmap 1 2 3 4
  • 6. © Operational Excellence Consulting. All rights reserved. < Type Value Stream Improvement Project Name Here > Define Phase Team Leader: <name> Value Stream Champion: <name> Executive Sponsor: <name> Date:
  • 7. 7 Value Stream Mapping Roadmap Create Implementation Plan Design Future State Document Current State Define Product Family  Define and scope problem  Pick product family  Determine VSM objective and benefits  Create VSM charter  Map current state value stream  Quantify current state value stream performance  Analyze and identify improvement opportunities  Develop future state value stream map  Prioritize improvement projects  Develop implementation plan  Seek management approval  Implement the plan and monitor progress 1 2 3 4
  • 8. 8 Scoping: Define a Product FamilyProducts A 321 B 4 Processes Product family C D E 5 6 7 8 9 10 Machining Drilling Assy* Pack*Weld. F X X X X X X X X X X X X X X XX X X X X X X X X X * The two work stations at assembly and packaging respectively are similar. Therefore they are considered as one work station in this analysis. Product family: • The characteristics of a product family are that the products go through the same – or nearly the same – processes (same flow) and that the products have similar process times. Group Product Families by similar downstream processes, steps or equipment
  • 9. 9 VSM Charter Value Stream Mapping Charter Scope Accountable Parties Schedule & Logistics Value Stream Value Stream being improved Executive Sponsor Director, VP or C-level Event Date(s) 3 days typically Specific Conditions What circumstances are included and excluded? (e.g type of customer, geographic location, etc.) Value Stream Champion If needed - often director or manager level Start/End Times Start and end times Customer Demand How many times is this done per wk, mth, yr? Facilitator / VSM Manager Skilled person leading the activity Location Need ample wall space Trigger What need does the value stream address? First Step Task on first process block Team Lead Not always needed Meals Provided? Always a nice touch; keeps the team from wandering.Last Step Task on last process block Boundaries & Limitations What is the team NOT authorized to change? Coordinator The person arranging logistics (reserving the room, ordering food, sending meeting notices, etc.) Interim Briefing(s) Aid in consensus building and organizational learning. FS Implementation Timeframe Typically 90-120 days Briefing Attendees List required attendees; others are optional. Current State Problems & Business Needs Mapping Team 1 What's driving the need for improvement? Function / Role Name Contact Information 2 1 Leadership-heavy 3 2 4 3 5 4 Measurable Target Condition 5 1 Reduce <defined metric> from X to Y (Z% improvement) 6 2 7 3 8 4 9 5 19 Benefits to Customers On-Call Support 1 How will internal/external customers benefit as a result Function / Role Name Contact Information 2 of improvements to the value stream? 1 SMEs that may not be needed full time 3 2 4 3 5 4 Benefits to Business Approvals 1 What other benefits will the business or internal customers Executive Sponsor Value Stream Champion Facilitator / VSM Manager 2 realize as a result of improvements to the VSM? 3 4 Signature: Signature: Signature: 5 Date: Date: Date:
  • 10. 10 Considerations & Approach • What are the current and future demand rates? • Is the VSM showing what happens 80 percent of the time to reduce variation and focus on improving the majority of the work? • If it is prudent to focus initially on the 20% that are the exceptions, the charter should clearly define the specific conditions being mapped and the reasons for focusing on the exceptions. Alternatively, the space here can be used. • Is the VSM depicting the flow of an average lot size or work that happens on a typical shift or others? • <Add other relevant information if necessary to help the audience or reader understand the VSM>
  • 11. 11 Roles & Responsibilities Team Roles Responsibilities Executive Sponsor Value Stream Mapping Champion Facilitator Logistics Coordinator Team Leader Team Members
  • 12. 12 Objective Attendees / Roles Day / Time / Frequency Project Status Meeting Biweekly ‘drum beat’ to communicate project status, success, issue management Project Phase Tollgate Conducted at the end of each phase Cadence Meeting Weekly ‘drum beat’ to communicate project plan activities, project status, success, issue mgmt. <Other Meetings> <insert description> Communication Plan
  • 13. 13 Define Phase Deliverables • VSM charter • VSM Manager sign-off • Executive Sponsor sign-off • Communication plan
  • 14. © Operational Excellence Consulting. All rights reserved. Current State Mapping Phase Team Leader: <name> Value Stream Champion: <name> Executive Sponsor: <name> Date: < Type Value Stream Improvement Project Name Here >
  • 15. 15 Value Stream Mapping Roadmap Create Implementation Plan Design Future State Document Current State Define Product Family  Define and scope problem  Pick product family  Determine VSM objective and benefits  Create VSM charter  Map current state value stream  Quantify current state value stream performance  Analyze and identify improvement opportunities  Develop future state value stream map  Prioritize improvement projects  Develop implementation plan  Seek management approval  Implement the plan and monitor progress 1 2 3 4
  • 16. 16 Basic Mapping Symbols External Organization Process Block Data Block Work-in-Process In-box Push Arrow Material Receipts & Shipments Manual Information Flow Electronic Information Flow Operator / Employee Go See Scheduling Movement by Truck Minutes MinutesMinutesMinutes HoursHoursHoursLead Time Cycle Time Timeline Takt = 60 min 2 Shifts CT = 25 min C/O = 25 min
  • 17. 17 Data Collection Plan What Data Box Metrics to Measure How to Measure Data Source Sampling Plan VSM Objective it relates to Comments Prepare a data collection plan for the Data Boxes.
  • 18. 18 Operational Definitions • Provide operational definitions of each metric in the data box:  Lead time  Process time  Quality  Changeover time  FTE (full time equivalent)  etc.
  • 19. 19 Current State Value Stream Map Demand all families = 100 pcs/day. Demand family A = 35 pcs/day. 2 shifts. Takt time = 532 sec. Customers Machining Ct = 420s Co = 20m Up = 70% ☺ = 1 Shifts = 3 Drilling Ct = 145s Co = 15m Up = 50% ☺ = 1 Shifts = 2 Welding Ct = 185s Co = 8m Up = 70% ☺ = 1 Shifts = 2 Assembly Ct = 360s Co = 7m Up = 80% ☺ = 1 Shifts = 2 Packaging Ct = 40s Co = 3m Up = 15% ☺ = 1 Shifts = 2 Suppliers MRP Weekly plan Forecasts = 30 days Daily orders Continuous forecasts Daily orders 58 days 6 days 9 days 5 days 2 days 42 days 420 sec 145 sec 185 sec 360 sec 40 sec Component A = 35 pcs per/day. Orders are placed on demand. Lead time from order is placed= 2 days. 2030 pcs 210 pcs 315 pcs 175 pcs 70 pcs 1470 pcs = 122 days =1150 sec. Current state value stream map should show the key process activities. A good range is 5 to 15 process boxes. Show the timeline below the current state value stream. ILLUSTRATIVE
  • 20. 20 Metric Current State Goal Projected Future State % Improvement Timeline Lead Time Timeline Cycle Time % Activity Rolled First Pass Yield # Employees Floor Space Used # Shifts Add Other Relevant Metrics Current State Value Stream Mapping Results
  • 21. 21 Current State Findings & Analysis Order Value Add Delivery Unnecessary Non Value Add Necessary Non Value Add
  • 22. 22 Current State Findings & Analysis 15% 20% 65% Value Add (VA) Necessary Non-Value Add (SNVA) Unnecessary Non- Value Add (UNVA)
  • 23. 23 Current State Mapping Phase Deliverables • Operational definitions of each metric in the data box • Current state value stream map  Process boxes  Data boxes  Timeline Metrics  Lead Time  Process Time  Quality • Current state plant layout/spaghetti diagram • Current state results • List of current state analysis and findings
  • 24. © Operational Excellence Consulting. All rights reserved. Future State Mapping Phase Team Leader: <name> Value Stream Champion: <name> Executive Sponsor: <name> Date: < Type Value Stream Improvement Project Name Here >
  • 25. 25 Value Stream Mapping Roadmap Create Implementation Plan Design Future State Document Current State Define Product Family  Define and scope problem  Pick product family  Determine VSM objective and benefits  Create VSM charter  Map current state value stream  Quantify current state value stream performance  Analyze and identify improvement opportunities  Develop future state value stream map  Prioritize improvement projects  Develop implementation plan  Seek management approval  Implement the plan and monitor progress 1 2 3 4
  • 26. 26 Develop Future State Value Stream Map Demand all families = 100 pcs/day. Demand family A = 35 pcs/day. 1 shift. Takt time = 266 sec. Customers Machining Ct = 420s Co = 5m Up = 85% ☺ = 1 Shifts = 2 U-Cell Ct = 250s Co = 1-3m Up = 65-80% ☺ = 4 Shifts = 1 Suppliers MRP Daily plan Forecasts = 30 days Daily orders Continuous forecasts Daily ordersComponent A = 35 pcs per/day. Orders are placed on demand. Lead time from order is placed= 2 days. Goal 700 pcs Goal 140 pcs Goal 70 pcs Kanban U-cell Orders 20 days 4 days 2 days Sum = 730 sec = 26 days =1150 sec. 420 sec Kanban Changeover time Increase OEE Physical layout Flow between work stations etc. Daily planning Changeover times Increase OEE Task distribution ILLUSTRATIVE Define the future state value stream map. Highlight “Kaizen bursts” to indicate proposed improvements.
  • 27. © Operational Excellence Consulting. All rights reserved. Implementation Phase Team Leader: <name> Value Stream Champion: <name> Executive Sponsor: <name> Date: < Type Value Stream Improvement Project Name Here >
  • 28. 28 Value Stream Mapping Roadmap Create Implementation Plan Design Future State Document Current State Define Product Family  Define and scope problem  Pick product family  Determine VSM objective and benefits  Create VSM charter  Map current state value stream  Quantify current state value stream performance  Analyze and identify improvement opportunities  Develop future state value stream map  Prioritize improvement projects  Develop implementation plan  Seek management approval  Implement the plan and monitor progress 1 2 3 4
  • 29. 29 Implementation Plan Future State Implementation Plan Value Stream Implementation Plan Review Dates Executive Sponsor Value Stream Champion Value Stream Mapping Facilitator Date Created Block # Goal / Objective Improvement Activity Owner Implementation Schedule (weeks) Date 1 2 3 4 5 6 7 8 9 10 11 12 Complete Approvals Executive Sponsor Value Stream Champion Value Stream Mapping Facilitator Signature: Signature: Signature: Date: Date: Dates:
  • 30. © Operational Excellence Consulting. All rights reserved. About Operational Excellence Consulting
  • 31. 31 About Operational Excellence Consulting • Operational Excellence Consulting is a management training and consulting firm that assists organizations in improving business performance and effectiveness. • The firm’s mission is to create business value for organizations through innovative operational excellence management training and consulting solutions. • OEC takes a unique “beyond the tools” approach to enable clients develop internal capabilities and cultural transformation to achieve sustainable world-class excellence and competitive advantage. For more information, please visit www.oeconsulting.com.sg
  • 32. © Operational Excellence Consulting. All rights reserved. To download this template, please visit us at: www.oeconsulting.com.sg END OF PARTIAL PREVIEW