Application of Value Engineering in Commercial Building Projectsnitinrane33
The current construction industry conditions have entailed the use of rational method and techniques and
research and application of new techniques by utilizing advancements in technology in the field of production as well as in
every field. Value Engineering is a proven management technique that can make valuable contributions to value
enhancement and cost reduction in construction industry. Value Engineering is one of the most effective techniques
known to identify and eliminate unnecessary costs in product design, testing, manufacturing, construction, operations,
maintenance, data, procedures and practices. The methodology is composed of three main stages. The first stage is the
Pre-Study of the Value Engineering. The purpose of this stage is to plan and organize the value study. Value Engineering
is the systematic application of recognized techniques that identify the functions of the product or service, creatively
establish the worth of those functions, and provide only the necessary functions to meet the required performance at the
lowest overall cost. Value Engineering focuses on accomplishing the required functions at the lowest overall cost. It helps
in eliminating or minimizing wastage of material, time, and unnecessary cost, which improves value to the customer. The
second stage is the Value Study which is the core of Value Engineering study and it is composed of five phases, the
Information phase, Function Analysis Phase, Creative Phase, Evaluation Phase and the Presentation phase. All phases
and steps perform sequentially. Such sequence of the methodology is expected to assist in logical and systematic flow of
the process to achieve the targets of the VE study. The third stage is the Post Study. The objective during post-study
activities is to assure the implementation of the approved value study change recommendations. In this study, how the
principles of Value Engineering are applied in construction projects is explained, and by taking case study on commercial
building as the sample project, practices of Value Engineering in this project are described.
Application of Value Engineering in Construction Projectsnitinrane33
Value Engineering is a proven management
technique that can make valuable contributions to value
enhancement and cost reduction in construction industry.
Value Engineering is one of the most effective techniques
known to identify and eliminate unnecessary costs in product
design, testing, manufacturing, construction, operations,
maintenance, data, procedures and practices. The
methodology is composed of three main stages. The first stage
is the Pre-Study of the Value Engineering. The purpose of
this stage is to plan and organize the value study. Value
Engineering is the systematic application of recognized
techniques that identify the functions of the product or
service, creatively establish the worth of those functions, and
provide only the necessary functions to meet the required
performance at the lowest overall cost. Value Engineering
focuses on accomplishing the required functions at the lowest
overall cost. It helps in eliminating or minimizing wastage of
material, time, and unnecessary cost, which improves value to
the customer. The second stage is the Value Study which is
the core of Value Engineering study and it is composed of five
phases, the Information phase, Function Analysis Phase,
Creative Phase, Evaluation Phase and the Presentation phase.
All phases and steps perform sequentially. Such sequence of
the methodology is expected to assist in logical and systematic
flow of the process to achieve the targets of the VE study. The
third stage is the Post Study. The objective during post-study
activities is to assure the implementation of the approved
value study change recommendations. In this study, how the
principles of Value Engineering are applied in construction
projects is explained, and by taking case study on residential
building as the sample project, practices of Value
Engineering in this project are described.
Application of Value Engineering in Commercial Building Projectsnitinrane33
The current construction industry conditions have entailed the use of rational method and techniques and
research and application of new techniques by utilizing advancements in technology in the field of production as well as in
every field. Value Engineering is a proven management technique that can make valuable contributions to value
enhancement and cost reduction in construction industry. Value Engineering is one of the most effective techniques
known to identify and eliminate unnecessary costs in product design, testing, manufacturing, construction, operations,
maintenance, data, procedures and practices. The methodology is composed of three main stages. The first stage is the
Pre-Study of the Value Engineering. The purpose of this stage is to plan and organize the value study. Value Engineering
is the systematic application of recognized techniques that identify the functions of the product or service, creatively
establish the worth of those functions, and provide only the necessary functions to meet the required performance at the
lowest overall cost. Value Engineering focuses on accomplishing the required functions at the lowest overall cost. It helps
in eliminating or minimizing wastage of material, time, and unnecessary cost, which improves value to the customer. The
second stage is the Value Study which is the core of Value Engineering study and it is composed of five phases, the
Information phase, Function Analysis Phase, Creative Phase, Evaluation Phase and the Presentation phase. All phases
and steps perform sequentially. Such sequence of the methodology is expected to assist in logical and systematic flow of
the process to achieve the targets of the VE study. The third stage is the Post Study. The objective during post-study
activities is to assure the implementation of the approved value study change recommendations. In this study, how the
principles of Value Engineering are applied in construction projects is explained, and by taking case study on commercial
building as the sample project, practices of Value Engineering in this project are described.
Application of Value Engineering in Construction Projectsnitinrane33
Value Engineering is a proven management
technique that can make valuable contributions to value
enhancement and cost reduction in construction industry.
Value Engineering is one of the most effective techniques
known to identify and eliminate unnecessary costs in product
design, testing, manufacturing, construction, operations,
maintenance, data, procedures and practices. The
methodology is composed of three main stages. The first stage
is the Pre-Study of the Value Engineering. The purpose of
this stage is to plan and organize the value study. Value
Engineering is the systematic application of recognized
techniques that identify the functions of the product or
service, creatively establish the worth of those functions, and
provide only the necessary functions to meet the required
performance at the lowest overall cost. Value Engineering
focuses on accomplishing the required functions at the lowest
overall cost. It helps in eliminating or minimizing wastage of
material, time, and unnecessary cost, which improves value to
the customer. The second stage is the Value Study which is
the core of Value Engineering study and it is composed of five
phases, the Information phase, Function Analysis Phase,
Creative Phase, Evaluation Phase and the Presentation phase.
All phases and steps perform sequentially. Such sequence of
the methodology is expected to assist in logical and systematic
flow of the process to achieve the targets of the VE study. The
third stage is the Post Study. The objective during post-study
activities is to assure the implementation of the approved
value study change recommendations. In this study, how the
principles of Value Engineering are applied in construction
projects is explained, and by taking case study on residential
building as the sample project, practices of Value
Engineering in this project are described.
VALUE ENGINEERING IN RESIDENTIAL HOUSE CONSTRUCTIONIAEME Publication
The current construction practices require a great effort to balance the factors such as money,time and quality. Comparing with other industries it seemed that construction industry remains the toughest one to deal with. It is proven that certain modern techniques can be easily adapted to the
project to balance the factors above said. Value engineering is an efficient tool among them for fostering the construction quality with an aim of low cost and high services. The value engineering study is carried out with analysis of basic functions of the project and based on that analysis unwanted elements in the project are scrutinized and eliminated.
Value Management concentrates on the actual needs of the user to focus its resources. It is different to cost-cutting exercises, which achieve economies by using less or cheaper materials.
The Value Management approach involves the use of creative techniques, combined with the latest technical information on materials and construction methods.
7th OECD Regional Policy Network Meeting on Sustainable Infrastructure - Mr. Roderick Planta, Assistant Secretary, Investment Programming Group,
National Economic and Development Authority (NEDA), Philippines
1: Value Analysis provides great turnaround in the operations of the businesses.
2: Use Value Analysis to analyze and understand the detail of cost for specific situations.
3: Use it to find a focus on key areas for innovation.
4: Use it in reverse (called Value Engineering) to identify specific solutions to detail problems.
This presentation is about Value Engineering and contains:
1.History of VE
2.Value Concept
3.What is Value Engineering?
4.Implementation of VE in our project
5.Principle and Purpose of VE
6.Case Study
7.Conclusion
This Presentation Is About Value Engineering & It Covers Following Topics ;
1. Concept Of Value Engineering
2. History Of Value Engineering
3. Aims/Purposes/Objectives Of Value Engineering
4. Steps/Phases/Procedures Of Value Engineering
VALUE ENGINEERING IN RESIDENTIAL HOUSE CONSTRUCTIONIAEME Publication
The current construction practices require a great effort to balance the factors such as money,time and quality. Comparing with other industries it seemed that construction industry remains the toughest one to deal with. It is proven that certain modern techniques can be easily adapted to the
project to balance the factors above said. Value engineering is an efficient tool among them for fostering the construction quality with an aim of low cost and high services. The value engineering study is carried out with analysis of basic functions of the project and based on that analysis unwanted elements in the project are scrutinized and eliminated.
Value Management concentrates on the actual needs of the user to focus its resources. It is different to cost-cutting exercises, which achieve economies by using less or cheaper materials.
The Value Management approach involves the use of creative techniques, combined with the latest technical information on materials and construction methods.
7th OECD Regional Policy Network Meeting on Sustainable Infrastructure - Mr. Roderick Planta, Assistant Secretary, Investment Programming Group,
National Economic and Development Authority (NEDA), Philippines
1: Value Analysis provides great turnaround in the operations of the businesses.
2: Use Value Analysis to analyze and understand the detail of cost for specific situations.
3: Use it to find a focus on key areas for innovation.
4: Use it in reverse (called Value Engineering) to identify specific solutions to detail problems.
This presentation is about Value Engineering and contains:
1.History of VE
2.Value Concept
3.What is Value Engineering?
4.Implementation of VE in our project
5.Principle and Purpose of VE
6.Case Study
7.Conclusion
This Presentation Is About Value Engineering & It Covers Following Topics ;
1. Concept Of Value Engineering
2. History Of Value Engineering
3. Aims/Purposes/Objectives Of Value Engineering
4. Steps/Phases/Procedures Of Value Engineering
Hierarchical Digital Twin of a Naval Power SystemKerry Sado
A hierarchical digital twin of a Naval DC power system has been developed and experimentally verified. Similar to other state-of-the-art digital twins, this technology creates a digital replica of the physical system executed in real-time or faster, which can modify hardware controls. However, its advantage stems from distributing computational efforts by utilizing a hierarchical structure composed of lower-level digital twin blocks and a higher-level system digital twin. Each digital twin block is associated with a physical subsystem of the hardware and communicates with a singular system digital twin, which creates a system-level response. By extracting information from each level of the hierarchy, power system controls of the hardware were reconfigured autonomously. This hierarchical digital twin development offers several advantages over other digital twins, particularly in the field of naval power systems. The hierarchical structure allows for greater computational efficiency and scalability while the ability to autonomously reconfigure hardware controls offers increased flexibility and responsiveness. The hierarchical decomposition and models utilized were well aligned with the physical twin, as indicated by the maximum deviations between the developed digital twin hierarchy and the hardware.
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...Amil Baba Dawood bangali
Contact with Dawood Bhai Just call on +92322-6382012 and we'll help you. We'll solve all your problems within 12 to 24 hours and with 101% guarantee and with astrology systematic. If you want to take any personal or professional advice then also you can call us on +92322-6382012 , ONLINE LOVE PROBLEM & Other all types of Daily Life Problem's.Then CALL or WHATSAPP us on +92322-6382012 and Get all these problems solutions here by Amil Baba DAWOOD BANGALI
#vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore#blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #blackmagicforlove #blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #Amilbabainuk #amilbabainspain #amilbabaindubai #Amilbabainnorway #amilbabainkrachi #amilbabainlahore #amilbabaingujranwalan #amilbabainislamabad
HEAP SORT ILLUSTRATED WITH HEAPIFY, BUILD HEAP FOR DYNAMIC ARRAYS.
Heap sort is a comparison-based sorting technique based on Binary Heap data structure. It is similar to the selection sort where we first find the minimum element and place the minimum element at the beginning. Repeat the same process for the remaining elements.
Literature Review Basics and Understanding Reference Management.pptxDr Ramhari Poudyal
Three-day training on academic research focuses on analytical tools at United Technical College, supported by the University Grant Commission, Nepal. 24-26 May 2024
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
VALUE ENGINNERING.pdf
1. GROUP MEMBERS:
1. DEESHA KHAMAR
2. SHREYA RASTOGI
3. ZEEL BHOJAK
4. VISHVA RAMANI
INSTITUTE OF ARCHITECTURE
HNGU-PATAN
DESCRIPTION:
Adv. B.C.-VIII
CASE STUDY-II
FACULTY:
AR.MAYANK PATEL
VALUE ENGINEERING
COMMERCIAL BUILDING
2. Application of Value Engineering in Commercial Building Projects
• Value Engineering is a systematic study to seek out the best functional balance
between the cost, reliability and performance of a project.
• It can be defined as a systematic interdisciplinary examination of various factors those
affect the cost of a project or service in order to device means of achieving the specified
purpose most economically at the reduced standards of quality and reliability
• Value engineering is basically a team effort. It aims at promotion of value awareness
and raising the level of professional competence and technological excellence in the
organization.
• Value engineering not only aims at cost reduction but also cost effectiveness which in turn
enhances the value and provides competitive advantage. Value engineering techniques can be
applied wherever cost is proposed or likely to be incurred in terms of money, skills/expertise,
energy or other resources.
3. The first stage is the Pre-Study of the Value Engineering.
The purpose of this stage is to plan and organize the value study.
Value Engineering is the systematic application of recognized techniques that identify the functions of the product or service,
creatively establish the worth of those functions, and provide
only the necessary functions to meet the required performance at the lowest overall cost.
Value Engineering focuses on accomplishing the required functions at the lowest overall cost.
It helps in eliminating or minimizing wastage of material, time, and unnecessary cost, which improves value to the customer.
The second stage is the Value Study which is the core of Value Engineering study and it is composed of five phases, the
Information phase, Function Analysis Phase, Creative Phase, Evaluation Phase and the Presentation phase.
All phases and steps perform sequentially. Such sequence of the methodology is expected to assist in logical and systematic
flow of the process to achieve the targets of the VE study
The third stage is the Post Study. The objective during post-study activities is to assure the implementation of the
approved value study change recommendations. In this study, how the principles of Value Engineering are applied in
construction projects is explained, and by taking case study on commercial building as the sample project, practices
of Value Engineering in this project are described.
4. VALUE ENGINEERING IN CONSTRUCTION
• Construction projects are becoming bigger in size and scope. Construction companies are pressured to deliver
construction projects at a lower cost while maintaining performance on design functions.
• The engineers have always tried to reduce the cost of construction without affecting the quality and the functional
utility, however their approach was based mainly on the past experience.
• Keeping costs low with traditional methods has been a common practice to improve competitiveness. Saving
money at the same time, providing better value is a concept that everyone emphasizes.
• Value engineering (VR) is a practice whose goal is, always, to achieve value for money.
• With the advancement of science and technology, it became comparatively easy to reduce the construction cost,
but the concept of functional utility was not given due consideration.
• Reliability and durability were of little importance.
5.
6. A. Pre-Study Pre-study tasks involve six areas: Collect User/Customer Attitudes, Complete Data File, Determine Evaluation
Factors, Scope the Study, Build Models, Determine Team Composition.
B. Value Engineering Study The VE study is composed of six phases: Information, Function, Creativity, Evaluation,
Development, and Presentation phase.
C. Information Phase: The objective of the information phase is to complete the value study data package started in the
pre study work. If not done during the pre study activities, the project sponsor or designer brief the value study team,
providing an opportunity for the team to ask questions based on their data research. If a site visit wherever applicable
was not possible during pre-study, it should be completed during this phase.
D. In order to keep this process easy, however, the function of each task must be defined as simply as possible, such as
using two verb-noun words.
E. Function Analysis Phase: Functional analysis outlines the basic function of a product using a verb and a noun such as
‘boil water’ as in the case of our kettle.
F. In function Analysis Phase the team performs: Determine the functions, classify the functions, build a function model,
estimate the cost of performing each function, determine the best opportunities for improvement, refine study scope.
[3] 3) Creative Phase: The Creative Phase develops ideas for alternative ways to perform each function selected for
further study. The objective of the creativity phase is to develop a large quantity of ideas for performing each function
selected for study. [9] This is a creative type of effort, totally unconstrained by habit, tradition, negative attitudes,
assumed restrictions, and specific criteria. No judgement or discussion occurs during this activity.