1.0 Introduction 
• Value Management was first introduced in 1986 by Prof. Roy 
Barton to the QS Department of UTM in Malaysia. 
• The implementation of value management in construction 
industry is less practiced by the private sector compared to 
government projects which mostly using the value management 
application as a structured approach. 
• The key justification is construction field in Malaysia is lack of 
knowledge and experience in value management
What is Value Management? 
Value Management is a rigorous systematic effort to 
increase the value and optimize the cost of project, facilities 
and systems.
According to Dell I’sola, the relationship between Value, Function, 
Quality and Cost can be defined as follow: 
퐕퐚퐥퐮퐞 = 
퐅퐮퐧퐜퐭퐢퐨퐧 + 푸풖풂풍풊풕풚 
푪풐풔풕
Evolution of Value 
Management 
1940s Value Analysis 
1960s Value Engineering 
1980s Value Management
Benefits of Value Management 
1. Solves immediate and high priority problem 
2. Established least cost goals 
3. Encourage communications among the team 
4. Reduce time 
5. Reduce commercial risks 
6. Spread cost consciousness 
7. Develop hidden abilities and talents 
8. Identifying & eliminating unnecessary cost 
9. It encourage staff development & promote system thinking 
10. Optimising resources by saving time , money & energy 
11. It is a risk management 
12. Updating standards, criteria and objective 
13. Increase value and improve quality of building. 
14. Enhance competitiveness in the industry. 
15. Better focus on clients and project’s objective. 
16. Offer a second look at key design decision 
17. Encourage creativity and innovation of new ideas 
18. Simplify and improve methods and procedures or schedules in construction to reduce time for completion 
19. It can achieve balance between economic, social, environmental outcomes and needs.
Space Management 
• The space management is to increase overall usage and 
effectiveness of existing space. 
• It is also reduce the need for additional space, fast response to 
users request and achieving harmony among the space 
provided. 
• The major elements that used to described space included type 
of space, quantity of space, facilities provided, finishes and 
security level.
• Space is considered as critical resources that an organization has to provide and 
manage. In clause 4.0, ISO 9001:2000, it is clearly stated that requirement for 
compliance to quality management system standards. The main purpose for 
space in an organization is to provide working space, security, allow circulation 
and received visitors or clients. The well planned and managed space can 
provide the cost effectiveness of the operation and optimize usage of resources in 
the organization. 
• There are alternatives in providing space for organization which are: 
– Buying new building. 
– Building new building. 
– Renting space. 
– Extending existing building. 
– Refurbishing and upgrading the existing space. 
– Rearranging the layout space usage. 
– Sharing existing space.
Space Management 
Objectives 
Objective Explanation 
Functionality To ensure organisation functionality is suitable with optimisation of building space. 
Consistency 
To ensure space management is carried out consistently and systematically in achieving 
organization objectives. 
Efficiency 
To ensure space being used efficiently, in good control and bring maximum profits to 
the organization. 
Flexibility 
Even though space management required control over space usage, the element of 
flexibility is not ignored such as when there is expansion of staff or staff reduction. 
Cost 
The effective space management which have considered planning, execution and 
monitoring elements will result in overlal cost reduction and maintenance cost 
decrease.
2.0 Case Study 
• Value Management methodology was adopted in finding alternatives 
and selection of the suitable solutions to address new space 
requirement in School of Chemical Engineering, USM. 
• Attentions were given to consider the wide range of influencing 
factors and parameters and defining critically and accurately the real 
needs of the school. 
• The value management workshops have helped the school 
members to discuss and analyse the issues comprehensively as a 
team enabling them to achieve consensus quickly.
• Among the challenging but critical stages of the workshop were:- 
Space Function Analysis that provided clear definition and purpose of 
space required linked to objectives of the school and work process. Actual 
floor area requirements were obtained based on actual work areas 
required. 
Creativity session to generate ideas on all possible ways and strategies to 
provide space and even considered means to improve work processes 
and management structure. 
Using the Evaluation Matrix to define and rank criteria to evaluate the 
alternative solutions proposed by the workshop members. This gave very 
clear justifications on the selection of the final solution and helped 
tremendously in achieving consensus.
Value Management studies were commissioned to achieve the 
following objectives: 
To provide adequate space and facilities to enable the enhancement 
and development of Chemical Engineering to achieve international 
recognition. 
To accommodate the large number of students 
To save cost 
To propose new alternative/ ideas
Executive Summary 
• A Value Management workshop was conducted for the laboratories 
of School of Chemical Engineering in Universiti Sains Malaysia 
(USM) which is located at Nibong Tebal which is about 50 km from 
USM Main Campus in Penang Island. 
• The School of Chemical Engineering is one of the leading institution 
in the country offering both undergraduate and graduate 
programmes in chemical engineering. 
• Their student population are currently totalled to about 352 
undergraduates and more than 50 postgraduates. 
• However they only have an office, two lecture rooms, six tutorial 
rooms, a computer lab and eleven laboratories in the same building.
• There are several issues being faced by them which need proper 
improvement. The following are the issues being proposed: 
Inadequate space to accommodate the increasing activities and the 
amount of equipment as well as materials used in the laboratories. 
Improper and not enough facilities and provision for safety and security 
session. 
Research works is not able to be expanded. 
Negative image and impression given by the industrial clients during the 
visiting of those laboratories.
• After a preliminary discussion with the heads of laboratories 
together with a one day visit and inspection to the eleven 
laboratories, a one and a half day intensive Value Management 
workshop was done which involve the relevant staffs working in 
the laboratories.
Based on the preliminary discussion with the school’s management, 
two alternatives were proposed to manage the issues and meet the 
requirements as follows: 
 Provide new building to house the laboratories. 
 Renovate and upgrade existing laboratories by providing improved 
and added facilities and building services. Significant changes would 
have to be done to the layout of equipment and circulation system 
within the laboratories and might require additional spaces to be 
provided as annexes to existing building. Management system and 
scheduling of activities would also require changes.
• After the Evaluation Matrix had made, the final decision is to 
provide new building to house the laboratories. Hence, in order 
to achieve the objectives stated previously, Space Function 
Analysis is used.
Linear Process of Space Planning Management with improved application of Value 
Management Methodology (Source : Che Mat MM & Zulkarnian, 2006)
There are 5 phases of value management job plan to be taken in Universiti 
Sains Malaysia (USM) 
Identification of actual space requirements 
through collection of comprehensive data and 
information 
Brainstorming session to identify alternative 
solutions through creativity 
Evaluation of alternatives by teamwork and 
consensus 
Final selection of recommended solutions 
according to the ranking of alternatives 
The End
1. Evaluation Matrix 
Priority Setting Matrix
Weighted Scoring Matrix
Space Function Analysis 
Component 
Function 
Kind 
Cost Area 
(m2) 
Worth Area 
(m2) 
Value 
Index 
Remarks 
Verb Noun 
Ground Floor 
Lobby Receive Visitor S 20.00 20.00 1.00 NO CHANGE 
Process Control Laboratory Test Student B 180.00 130.00 1.38 28% REDUCTION 
Chemistry Laboratory Test Student B 180.00 130.00 1.38 28% REDUCTION 
Environmental and Separation Process Research 
Laboratory Test Student B 180.00 130.00 1.38 28% REDUCTION 
Reaction Engineering Research Laboratory Test Student B 180.00 130.00 1.38 28% REDUCTION 
Service (M&E) House Service RS 100.00 100.00 1.00 NO CHANGE 
SUB-TOTAL 840.00 640.00 
Level 1 
Analytical Laboratory Test Student B 180.00 130.00 1.38 28% REDUCTION 
Environmental Control Laboratory Test Student B 180.00 130.00 1.38 28% REDUCTION 
Petroleum and Gas Laboratory Test Student B 180.00 130.00 1.38 28% REDUCTION 
Bioprocess Engineering Research Laboratory Test Student B 180.00 130.00 1.38 28% REDUCTION 
Service (M&E) House Service RS 100.00 100.00 1.00 NO CHANGE 
SUB-TOTAL 820.00 620.00 
Level 2 
Thermodynamics Laboratory Test Student B 180.00 130.00 1.38 28% REDUCTION 
Biochemical Laboratory Test Student B 180.00 130.00 1.38 28% REDUCTION 
Service (M&E) House Service RS 100.00 100.00 1.00 NO CHANGE 
SUB-TOTAL 460.00 360.00 
TOTAL 2,120.00 1,620.00
• The workshop successfully worked out an approximate 28% 
savings to the original proposal and request of space made by 
the school’s management. 
• The school was also able to decide on the location of the new 
building within their existing complex area with ease.
3.0 Sketches before and after design 
showing proposed changes
4.0 Reasons Supporting the 
Selection of Alternative 
The final decision is to build a new building to house the laboratories 
instead of renovate the existing building. The followings are the reasons 
to support the decision made: 
1. Student enrolment in universities is on the rise 
2. Reduce health and safety issues 
3. Growing IT needs 
4. Meet regulatory compliance 
5. Compete with other universities
5.0 Cost Analysis 
Item Description 
Area 
Before After 
m2 m2 
Ground Floor 
1 Lobby 20.00 20.00 
2 Process Control Laboratory 180.00 130.00 
3 Chemistry Laboratory 180.00 130.00 
4 
Environmental and Separation Process Research Laboratory 
180.00 130.00 
5 Reaction Engineering Research Laboratory 180.00 130.00 
6 Service (M&E) 100.00 100.00 
7 Toilet 35 35 
Level 1 
8 Analytical Laboratory 180.00 130.00 
9 Environmental Control Laboratory 180.00 130.00 
10 Petroleum and Gas Laboratory 180.00 130.00 
11 Bioprocess Engineering Research Laboratory 180.00 130.00 
12 Service (M&E) 100.00 100.00 
13 Toilet 35 35 
Level 2 
14 Thermodynamics Laboratory 180.00 130.00 
15 Biochemical Laboratory 180.00 130.00 
16 Service (M&E) 100.00 100.00 
17 Toilet 35 35
Item Description 
Cost (RM) 
Before After Before After 
per m2 per m2 Total Cost Total Cost 
Ground Floor 
1 Lobby 1,200.00 1,200.00 24,000.00 24,000.00 
2 Process Control Laboratory 1,500.00 1,500.00 270,000.00 195,000.00 
3 Chemistry Laboratory 1,500.00 1,500.00 270,000.00 195,000.00 
4 
Environmental and Separation Process Research 
Laboratory 1,500.00 1,500.00 270,000.00 195,000.00 
5 Reaction Engineering Research Laboratory 1,500.00 1,500.00 270,000.00 195,000.00 
6 Service (M&E) 100.00 1,500.00 10,000.00 150,000.00 
7 Toilet 1,000.00 1,000.00 35,000.00 35,000.00 
Level 1 
8 Analytical Laboratory 1,500.00 1,500.00 270,000.00 195,000.00 
9 Environmental Control Laboratory 1,500.00 1,500.00 270,000.00 195,000.00 
10 Petroleum and Gas Laboratory 1,500.00 1,500.00 270,000.00 195,000.00 
11 Bioprocess Engineering Research Laboratory 1,500.00 1,500.00 270,000.00 195,000.00 
12 Service (M&E) 100.00 1,500.00 10,000.00 150,000.00 
13 Toilet 1,000.00 1,000.00 35,000.00 35,000.00 
Level 2 
14 Thermodynamics Laboratory 1,500.00 1,500.00 270,000.00 195,000.00 
15 Biochemical Laboratory 1,500.00 1,500.00 270,000.00 195,000.00 
16 Service (M&E) 100.00 1,500.00 10,000.00 150,000.00 
17 Toilet 1,000.00 1,000.00 35,000.00 35,000.00 
TOTAL 2,859,000.00 2,529,000.00 
Hence, the estimated saving cost is RM330,000.00.
6.0 Action Plan 
Ground Floor 
Element 
Recommended 
Solution Task Action by Timeline 
Lobby No change Architectural Design Architect 
Detailed Design Stage 
Process Control Laboratory 
Reduction in space / 
Space Optimisation 
Structural Design Engineer 
Chemistry Laboratory 
Cost Plan 
Consultant 
Quantity Surveyor 
Environmental and Separation 
Process Research Laboratory 
Implementation per 
recommendation Project Manager Construction Stage 
Reaction Engineering Research 
Laboratory Ensure implementation as 
per recommendation 
Value 
Management 
Facilitator Implementation Stage 
Service (M&E) 
No change 
Review and audit 
implementation and 
approval 
Client / 
Stakeholder 
Implementation Stage and 
post implementation 
Toilet No change
Level 1 
Element 
Recommended 
Solution Task Action by Timeline 
Analytical Laboratory 
Reduction in space / 
Space Optimisation 
Architectural Design Architect 
Environmental Control Laboratory Detailed Design Stage 
Structural Design Engineer 
Petroleum and Gas Laboratory 
Cost Plan 
Consultant 
Quantity Surveyor 
Bioprocess Engineering Research 
Laboratory 
Implementation per 
recommendation Project Manager Construction Stage 
Service (M&E) 
No change 
Ensure implementation as 
per recommendation 
Value 
Management 
Facilitator Implementation Stage 
Toilet 
No change 
Review and audit 
implementation and 
approval 
Client / 
Stakeholder 
Implementation Stage and 
post implementation
Level 2 
Element 
Recommended 
Solution Task Action by Timeline 
Thermodynamics Laboratory Reduction in space / 
Space Optimisation 
Architectural Design Architect 
Biochemical Laboratory Structural Design Engineer Detailed Design Stage 
Service (M&E) 
No change Cost Plan 
Consultant 
Quantity Surveyor 
Toilet 
No change 
Implementation per 
recommendation Project Manager Construction Stage 
Ensure implementation as 
per recommendation 
Value 
Management 
Facilitator Implementation Stage 
Review and audit 
implementation and 
approval 
Client / 
Stakeholder 
Implementation Stage and 
post implementation
Conclusion 
• Value Management has provided an effective way to deliver 
objectives and fulfil user’s requirements. 
• The system based functional analysis of Value Management 
allows consideration of complex interrelationships. 
• Consequently, Value Management has a broad range of 
applications, with principle opportunity of gains in the early 
stages of development of programs and projects. 
• It is particularly useful in focusing or distilling objectives and 
priorities, and in generating alternative solutions.
In the project of constructing a new building to house the laboratories of School of 
Chemical Engineering, USM, it clearly shows that there is an obvious cost reduction 
by implementing Value Management. There is a total of RM 330,000.00 cost 
reduction based on the space function analysis. It has shown that Value 
Management is an effective tool in the planning of space requirement. There are 
clear and obvious impact and advantages gained in applying the concept of Value 
Management in the planning of space as follows: 
 Systematic and comprehensive process 
 Able to provide solutions in a short time compared to conventional process 
requiring time to gather information and integrate requirements from various 
parties. 
 Cost effective – able to provide large savings through defining real requirements 
and avoid or minimize wastage or irrelevant elements. 
 Clear justification on selection of solution which enables efficient process of 
modification or revision of solution if the need arise.
Recommendation 
• The implementation of Value Management should be a standard 
practice for every project as it is able to provide a better value 
for money for the client in the project. 
• The benefits of implementing Value Management such as 
increase in the value of the project should be introduced to 
client to encourage them to practice the implementation of 
Value Management into the projects. 
• The Government should create more local guidelines in order to 
promote the use of Value Management in the projects.

More Related Content

What's hot

Application of value engineering in construction
Application of value engineering in constructionApplication of value engineering in construction
Application of value engineering in constructionDr Ezzat Mansour
 
Value Analysis Value Engineering & Business Process Reengineering
Value Analysis Value Engineering  &  Business Process ReengineeringValue Analysis Value Engineering  &  Business Process Reengineering
Value Analysis Value Engineering & Business Process ReengineeringT HARI KUMAR
 
Application of VAVE in Cost reduction at Automobile Industry
Application of VAVE in Cost reduction at Automobile IndustryApplication of VAVE in Cost reduction at Automobile Industry
Application of VAVE in Cost reduction at Automobile IndustryVivek Singh
 
Value analysis and value engineering
Value  analysis and value engineeringValue  analysis and value engineering
Value analysis and value engineeringudayravi2
 
Fundamentals of value engineering
Fundamentals of value engineering Fundamentals of value engineering
Fundamentals of value engineering Karim Ragab
 
Value Engineering for Roads & Highways Project
Value Engineering for Roads & Highways ProjectValue Engineering for Roads & Highways Project
Value Engineering for Roads & Highways Projectajmal4
 
Value engineering and Analysis
Value engineering and AnalysisValue engineering and Analysis
Value engineering and AnalysisChaitanya Chenna
 
Value engineering Short Over view ppt
Value engineering Short Over view pptValue engineering Short Over view ppt
Value engineering Short Over view pptMashfiq Albartross
 
Value analysis and value engineering
Value analysis and value engineeringValue analysis and value engineering
Value analysis and value engineeringAyush dixit
 
Value engineering seminar presentation
Value engineering seminar presentationValue engineering seminar presentation
Value engineering seminar presentationamrutrajbk
 
Value Analysis and Value Engineering in Material Management
Value Analysis and Value Engineering in Material ManagementValue Analysis and Value Engineering in Material Management
Value Analysis and Value Engineering in Material ManagementManoj Abraham
 
Value analysis and Value Engineering in Cost Control
Value analysis and Value Engineering in Cost ControlValue analysis and Value Engineering in Cost Control
Value analysis and Value Engineering in Cost Controlsunilrajpawar
 
Value analysis and Value Engineering
Value analysis and Value EngineeringValue analysis and Value Engineering
Value analysis and Value EngineeringTushar Lohani
 
Value_Analysis_and_Value_Engineering, A_seminar_by_Mohan_Kumar_G
Value_Analysis_and_Value_Engineering, A_seminar_by_Mohan_Kumar_GValue_Analysis_and_Value_Engineering, A_seminar_by_Mohan_Kumar_G
Value_Analysis_and_Value_Engineering, A_seminar_by_Mohan_Kumar_GMohan Kumar G
 
Value Engineering Part 1
Value Engineering Part 1Value Engineering Part 1
Value Engineering Part 1Pankaj Nalwa
 
What is value engineering
What is value engineeringWhat is value engineering
What is value engineeringPuneet Pal
 

What's hot (20)

Application of value engineering in construction
Application of value engineering in constructionApplication of value engineering in construction
Application of value engineering in construction
 
Value Engineering
Value Engineering Value Engineering
Value Engineering
 
Value Analysis Value Engineering & Business Process Reengineering
Value Analysis Value Engineering  &  Business Process ReengineeringValue Analysis Value Engineering  &  Business Process Reengineering
Value Analysis Value Engineering & Business Process Reengineering
 
122 value engineering
122 value engineering122 value engineering
122 value engineering
 
Application of VAVE in Cost reduction at Automobile Industry
Application of VAVE in Cost reduction at Automobile IndustryApplication of VAVE in Cost reduction at Automobile Industry
Application of VAVE in Cost reduction at Automobile Industry
 
Value Engineering
Value   EngineeringValue   Engineering
Value Engineering
 
Value analysis and value engineering
Value  analysis and value engineeringValue  analysis and value engineering
Value analysis and value engineering
 
Fundamentals of value engineering
Fundamentals of value engineering Fundamentals of value engineering
Fundamentals of value engineering
 
Value Engineering for Roads & Highways Project
Value Engineering for Roads & Highways ProjectValue Engineering for Roads & Highways Project
Value Engineering for Roads & Highways Project
 
Value Engineering
Value EngineeringValue Engineering
Value Engineering
 
Value engineering and Analysis
Value engineering and AnalysisValue engineering and Analysis
Value engineering and Analysis
 
Value engineering Short Over view ppt
Value engineering Short Over view pptValue engineering Short Over view ppt
Value engineering Short Over view ppt
 
Value analysis and value engineering
Value analysis and value engineeringValue analysis and value engineering
Value analysis and value engineering
 
Value engineering seminar presentation
Value engineering seminar presentationValue engineering seminar presentation
Value engineering seminar presentation
 
Value Analysis and Value Engineering in Material Management
Value Analysis and Value Engineering in Material ManagementValue Analysis and Value Engineering in Material Management
Value Analysis and Value Engineering in Material Management
 
Value analysis and Value Engineering in Cost Control
Value analysis and Value Engineering in Cost ControlValue analysis and Value Engineering in Cost Control
Value analysis and Value Engineering in Cost Control
 
Value analysis and Value Engineering
Value analysis and Value EngineeringValue analysis and Value Engineering
Value analysis and Value Engineering
 
Value_Analysis_and_Value_Engineering, A_seminar_by_Mohan_Kumar_G
Value_Analysis_and_Value_Engineering, A_seminar_by_Mohan_Kumar_GValue_Analysis_and_Value_Engineering, A_seminar_by_Mohan_Kumar_G
Value_Analysis_and_Value_Engineering, A_seminar_by_Mohan_Kumar_G
 
Value Engineering Part 1
Value Engineering Part 1Value Engineering Part 1
Value Engineering Part 1
 
What is value engineering
What is value engineeringWhat is value engineering
What is value engineering
 

Similar to Cve presentation slide

Rework Reduction in Construction Project
Rework Reduction in Construction ProjectRework Reduction in Construction Project
Rework Reduction in Construction ProjectDr. Firdaus Basbeth
 
Value Menagement
Value Menagement Value Menagement
Value Menagement LEIYEE24
 
IES Faculty - Closing the Performance Gap
IES Faculty - Closing the Performance GapIES Faculty - Closing the Performance Gap
IES Faculty - Closing the Performance GapIES VE
 
Application of Value Engineering in Construction Projects
Application of Value Engineering in Construction ProjectsApplication of Value Engineering in Construction Projects
Application of Value Engineering in Construction Projectsnitinrane33
 
Value Management
Value Management Value Management
Value Management Golden WONG
 
Application of-value-engineering-in-residential-building-ijertv9 is050725
Application of-value-engineering-in-residential-building-ijertv9 is050725Application of-value-engineering-in-residential-building-ijertv9 is050725
Application of-value-engineering-in-residential-building-ijertv9 is050725Minn Lwin
 
VALUE ENGINNERING.pdf
VALUE ENGINNERING.pdfVALUE ENGINNERING.pdf
VALUE ENGINNERING.pdfParvDhonde1
 
VALUE ENGINNERING.pptx
VALUE ENGINNERING.pptxVALUE ENGINNERING.pptx
VALUE ENGINNERING.pptxDeeshaKhamar1
 
Value engineering significance
Value engineering significanceValue engineering significance
Value engineering significanceYash Patel
 
Value Management
Value ManagementValue Management
Value ManagementTengYu Leom
 
QUS5207 COST CONTROL 2 VM: CONCEPTS, TERMS, RISKS & COSTS
 QUS5207 COST CONTROL 2    VM: CONCEPTS, TERMS, RISKS & COSTS QUS5207 COST CONTROL 2    VM: CONCEPTS, TERMS, RISKS & COSTS
QUS5207 COST CONTROL 2 VM: CONCEPTS, TERMS, RISKS & COSTSLizz Sim Kit Mun
 
Application of Value Engineering in Commercial Building Projects
Application of Value Engineering in  Commercial Building ProjectsApplication of Value Engineering in  Commercial Building Projects
Application of Value Engineering in Commercial Building Projectsnitinrane33
 
The study of Perpetual Evolution_Group 5_ Final Project_PPT.pdf
The study of Perpetual Evolution_Group 5_ Final Project_PPT.pdfThe study of Perpetual Evolution_Group 5_ Final Project_PPT.pdf
The study of Perpetual Evolution_Group 5_ Final Project_PPT.pdfRuhiRangwala1
 
Implementing total quality management to improve facilities
Implementing total quality management to improve facilitiesImplementing total quality management to improve facilities
Implementing total quality management to improve facilitiesLaukik Raut
 
Module-1 Introduction to Operations Management
Module-1 Introduction to Operations ManagementModule-1 Introduction to Operations Management
Module-1 Introduction to Operations ManagementNirajMishra67
 
Pem zhipeng xie engg 5812 change management presentation
Pem zhipeng xie  engg 5812  change management presentationPem zhipeng xie  engg 5812  change management presentation
Pem zhipeng xie engg 5812 change management presentationPem Zhipeng Xie
 

Similar to Cve presentation slide (20)

Rework Reduction in Construction Project
Rework Reduction in Construction ProjectRework Reduction in Construction Project
Rework Reduction in Construction Project
 
Value Menagement
Value Menagement Value Menagement
Value Menagement
 
IES Faculty - Closing the Performance Gap
IES Faculty - Closing the Performance GapIES Faculty - Closing the Performance Gap
IES Faculty - Closing the Performance Gap
 
Application of Value Engineering in Construction Projects
Application of Value Engineering in Construction ProjectsApplication of Value Engineering in Construction Projects
Application of Value Engineering in Construction Projects
 
Value Management
Value Management Value Management
Value Management
 
Application of-value-engineering-in-residential-building-ijertv9 is050725
Application of-value-engineering-in-residential-building-ijertv9 is050725Application of-value-engineering-in-residential-building-ijertv9 is050725
Application of-value-engineering-in-residential-building-ijertv9 is050725
 
VALUE ENGINNERING.pdf
VALUE ENGINNERING.pdfVALUE ENGINNERING.pdf
VALUE ENGINNERING.pdf
 
PM FrameWork: Module 4
PM FrameWork: Module 4PM FrameWork: Module 4
PM FrameWork: Module 4
 
VALUE ENGINNERING.pptx
VALUE ENGINNERING.pptxVALUE ENGINNERING.pptx
VALUE ENGINNERING.pptx
 
Value engineering significance
Value engineering significanceValue engineering significance
Value engineering significance
 
Value Management
Value ManagementValue Management
Value Management
 
QUS5207 COST CONTROL 2 VM: CONCEPTS, TERMS, RISKS & COSTS
 QUS5207 COST CONTROL 2    VM: CONCEPTS, TERMS, RISKS & COSTS QUS5207 COST CONTROL 2    VM: CONCEPTS, TERMS, RISKS & COSTS
QUS5207 COST CONTROL 2 VM: CONCEPTS, TERMS, RISKS & COSTS
 
Application of Value Engineering in Commercial Building Projects
Application of Value Engineering in  Commercial Building ProjectsApplication of Value Engineering in  Commercial Building Projects
Application of Value Engineering in Commercial Building Projects
 
Value Engineering
Value EngineeringValue Engineering
Value Engineering
 
The study of Perpetual Evolution_Group 5_ Final Project_PPT.pdf
The study of Perpetual Evolution_Group 5_ Final Project_PPT.pdfThe study of Perpetual Evolution_Group 5_ Final Project_PPT.pdf
The study of Perpetual Evolution_Group 5_ Final Project_PPT.pdf
 
Summary (English)
Summary (English)Summary (English)
Summary (English)
 
Implementing total quality management to improve facilities
Implementing total quality management to improve facilitiesImplementing total quality management to improve facilities
Implementing total quality management to improve facilities
 
Module-1 Introduction to Operations Management
Module-1 Introduction to Operations ManagementModule-1 Introduction to Operations Management
Module-1 Introduction to Operations Management
 
071 Maturity Assessment
071 Maturity Assessment071 Maturity Assessment
071 Maturity Assessment
 
Pem zhipeng xie engg 5812 change management presentation
Pem zhipeng xie  engg 5812  change management presentationPem zhipeng xie  engg 5812  change management presentation
Pem zhipeng xie engg 5812 change management presentation
 

Recently uploaded

1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxRoyAbrique
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application ) Sakshi Ghasle
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104misteraugie
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesFatimaKhan178732
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 

Recently uploaded (20)

1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application )
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and Actinides
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 
Staff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSDStaff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSD
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 

Cve presentation slide

  • 1. Cost Value Engineering – Group Assignment Title: Case Study Report for project implementing Value Management in the Construction Industry .
  • 2. Group Members 1. Chian Chee Yong 2. Hong Kok Hang 3. Wong Yee Yung 4. Fu Yih Shyang 5. Tan Rou Jin 6. Tie Tung Lik 7. Vincent Kah Wee Sen 8. Lim Chze Wei
  • 3. 1.0 Introduction • Value Management was first introduced in 1986 by Prof. Roy Barton to the QS Department of UTM in Malaysia. • The implementation of value management in construction industry is less practiced by the private sector compared to government projects which mostly using the value management application as a structured approach. • The key justification is construction field in Malaysia is lack of knowledge and experience in value management
  • 4. What is Value Management? Value Management is a rigorous systematic effort to increase the value and optimize the cost of project, facilities and systems.
  • 5. According to Dell I’sola, the relationship between Value, Function, Quality and Cost can be defined as follow: 퐕퐚퐥퐮퐞 = 퐅퐮퐧퐜퐭퐢퐨퐧 + 푸풖풂풍풊풕풚 푪풐풔풕
  • 6. Evolution of Value Management 1940s Value Analysis 1960s Value Engineering 1980s Value Management
  • 7. Benefits of Value Management 1. Solves immediate and high priority problem 2. Established least cost goals 3. Encourage communications among the team 4. Reduce time 5. Reduce commercial risks 6. Spread cost consciousness 7. Develop hidden abilities and talents 8. Identifying & eliminating unnecessary cost 9. It encourage staff development & promote system thinking 10. Optimising resources by saving time , money & energy 11. It is a risk management 12. Updating standards, criteria and objective 13. Increase value and improve quality of building. 14. Enhance competitiveness in the industry. 15. Better focus on clients and project’s objective. 16. Offer a second look at key design decision 17. Encourage creativity and innovation of new ideas 18. Simplify and improve methods and procedures or schedules in construction to reduce time for completion 19. It can achieve balance between economic, social, environmental outcomes and needs.
  • 8. Space Management • The space management is to increase overall usage and effectiveness of existing space. • It is also reduce the need for additional space, fast response to users request and achieving harmony among the space provided. • The major elements that used to described space included type of space, quantity of space, facilities provided, finishes and security level.
  • 9. • Space is considered as critical resources that an organization has to provide and manage. In clause 4.0, ISO 9001:2000, it is clearly stated that requirement for compliance to quality management system standards. The main purpose for space in an organization is to provide working space, security, allow circulation and received visitors or clients. The well planned and managed space can provide the cost effectiveness of the operation and optimize usage of resources in the organization. • There are alternatives in providing space for organization which are: – Buying new building. – Building new building. – Renting space. – Extending existing building. – Refurbishing and upgrading the existing space. – Rearranging the layout space usage. – Sharing existing space.
  • 10. Space Management Objectives Objective Explanation Functionality To ensure organisation functionality is suitable with optimisation of building space. Consistency To ensure space management is carried out consistently and systematically in achieving organization objectives. Efficiency To ensure space being used efficiently, in good control and bring maximum profits to the organization. Flexibility Even though space management required control over space usage, the element of flexibility is not ignored such as when there is expansion of staff or staff reduction. Cost The effective space management which have considered planning, execution and monitoring elements will result in overlal cost reduction and maintenance cost decrease.
  • 11. 2.0 Case Study • Value Management methodology was adopted in finding alternatives and selection of the suitable solutions to address new space requirement in School of Chemical Engineering, USM. • Attentions were given to consider the wide range of influencing factors and parameters and defining critically and accurately the real needs of the school. • The value management workshops have helped the school members to discuss and analyse the issues comprehensively as a team enabling them to achieve consensus quickly.
  • 12. • Among the challenging but critical stages of the workshop were:- Space Function Analysis that provided clear definition and purpose of space required linked to objectives of the school and work process. Actual floor area requirements were obtained based on actual work areas required. Creativity session to generate ideas on all possible ways and strategies to provide space and even considered means to improve work processes and management structure. Using the Evaluation Matrix to define and rank criteria to evaluate the alternative solutions proposed by the workshop members. This gave very clear justifications on the selection of the final solution and helped tremendously in achieving consensus.
  • 13. Value Management studies were commissioned to achieve the following objectives: To provide adequate space and facilities to enable the enhancement and development of Chemical Engineering to achieve international recognition. To accommodate the large number of students To save cost To propose new alternative/ ideas
  • 14. Executive Summary • A Value Management workshop was conducted for the laboratories of School of Chemical Engineering in Universiti Sains Malaysia (USM) which is located at Nibong Tebal which is about 50 km from USM Main Campus in Penang Island. • The School of Chemical Engineering is one of the leading institution in the country offering both undergraduate and graduate programmes in chemical engineering. • Their student population are currently totalled to about 352 undergraduates and more than 50 postgraduates. • However they only have an office, two lecture rooms, six tutorial rooms, a computer lab and eleven laboratories in the same building.
  • 15. • There are several issues being faced by them which need proper improvement. The following are the issues being proposed: Inadequate space to accommodate the increasing activities and the amount of equipment as well as materials used in the laboratories. Improper and not enough facilities and provision for safety and security session. Research works is not able to be expanded. Negative image and impression given by the industrial clients during the visiting of those laboratories.
  • 16. • After a preliminary discussion with the heads of laboratories together with a one day visit and inspection to the eleven laboratories, a one and a half day intensive Value Management workshop was done which involve the relevant staffs working in the laboratories.
  • 17. Based on the preliminary discussion with the school’s management, two alternatives were proposed to manage the issues and meet the requirements as follows:  Provide new building to house the laboratories.  Renovate and upgrade existing laboratories by providing improved and added facilities and building services. Significant changes would have to be done to the layout of equipment and circulation system within the laboratories and might require additional spaces to be provided as annexes to existing building. Management system and scheduling of activities would also require changes.
  • 18. • After the Evaluation Matrix had made, the final decision is to provide new building to house the laboratories. Hence, in order to achieve the objectives stated previously, Space Function Analysis is used.
  • 19. Linear Process of Space Planning Management with improved application of Value Management Methodology (Source : Che Mat MM & Zulkarnian, 2006)
  • 20. There are 5 phases of value management job plan to be taken in Universiti Sains Malaysia (USM) Identification of actual space requirements through collection of comprehensive data and information Brainstorming session to identify alternative solutions through creativity Evaluation of alternatives by teamwork and consensus Final selection of recommended solutions according to the ranking of alternatives The End
  • 21. 1. Evaluation Matrix Priority Setting Matrix
  • 23. Space Function Analysis Component Function Kind Cost Area (m2) Worth Area (m2) Value Index Remarks Verb Noun Ground Floor Lobby Receive Visitor S 20.00 20.00 1.00 NO CHANGE Process Control Laboratory Test Student B 180.00 130.00 1.38 28% REDUCTION Chemistry Laboratory Test Student B 180.00 130.00 1.38 28% REDUCTION Environmental and Separation Process Research Laboratory Test Student B 180.00 130.00 1.38 28% REDUCTION Reaction Engineering Research Laboratory Test Student B 180.00 130.00 1.38 28% REDUCTION Service (M&E) House Service RS 100.00 100.00 1.00 NO CHANGE SUB-TOTAL 840.00 640.00 Level 1 Analytical Laboratory Test Student B 180.00 130.00 1.38 28% REDUCTION Environmental Control Laboratory Test Student B 180.00 130.00 1.38 28% REDUCTION Petroleum and Gas Laboratory Test Student B 180.00 130.00 1.38 28% REDUCTION Bioprocess Engineering Research Laboratory Test Student B 180.00 130.00 1.38 28% REDUCTION Service (M&E) House Service RS 100.00 100.00 1.00 NO CHANGE SUB-TOTAL 820.00 620.00 Level 2 Thermodynamics Laboratory Test Student B 180.00 130.00 1.38 28% REDUCTION Biochemical Laboratory Test Student B 180.00 130.00 1.38 28% REDUCTION Service (M&E) House Service RS 100.00 100.00 1.00 NO CHANGE SUB-TOTAL 460.00 360.00 TOTAL 2,120.00 1,620.00
  • 24. • The workshop successfully worked out an approximate 28% savings to the original proposal and request of space made by the school’s management. • The school was also able to decide on the location of the new building within their existing complex area with ease.
  • 25. 3.0 Sketches before and after design showing proposed changes
  • 26.
  • 27.
  • 28. 4.0 Reasons Supporting the Selection of Alternative The final decision is to build a new building to house the laboratories instead of renovate the existing building. The followings are the reasons to support the decision made: 1. Student enrolment in universities is on the rise 2. Reduce health and safety issues 3. Growing IT needs 4. Meet regulatory compliance 5. Compete with other universities
  • 29. 5.0 Cost Analysis Item Description Area Before After m2 m2 Ground Floor 1 Lobby 20.00 20.00 2 Process Control Laboratory 180.00 130.00 3 Chemistry Laboratory 180.00 130.00 4 Environmental and Separation Process Research Laboratory 180.00 130.00 5 Reaction Engineering Research Laboratory 180.00 130.00 6 Service (M&E) 100.00 100.00 7 Toilet 35 35 Level 1 8 Analytical Laboratory 180.00 130.00 9 Environmental Control Laboratory 180.00 130.00 10 Petroleum and Gas Laboratory 180.00 130.00 11 Bioprocess Engineering Research Laboratory 180.00 130.00 12 Service (M&E) 100.00 100.00 13 Toilet 35 35 Level 2 14 Thermodynamics Laboratory 180.00 130.00 15 Biochemical Laboratory 180.00 130.00 16 Service (M&E) 100.00 100.00 17 Toilet 35 35
  • 30. Item Description Cost (RM) Before After Before After per m2 per m2 Total Cost Total Cost Ground Floor 1 Lobby 1,200.00 1,200.00 24,000.00 24,000.00 2 Process Control Laboratory 1,500.00 1,500.00 270,000.00 195,000.00 3 Chemistry Laboratory 1,500.00 1,500.00 270,000.00 195,000.00 4 Environmental and Separation Process Research Laboratory 1,500.00 1,500.00 270,000.00 195,000.00 5 Reaction Engineering Research Laboratory 1,500.00 1,500.00 270,000.00 195,000.00 6 Service (M&E) 100.00 1,500.00 10,000.00 150,000.00 7 Toilet 1,000.00 1,000.00 35,000.00 35,000.00 Level 1 8 Analytical Laboratory 1,500.00 1,500.00 270,000.00 195,000.00 9 Environmental Control Laboratory 1,500.00 1,500.00 270,000.00 195,000.00 10 Petroleum and Gas Laboratory 1,500.00 1,500.00 270,000.00 195,000.00 11 Bioprocess Engineering Research Laboratory 1,500.00 1,500.00 270,000.00 195,000.00 12 Service (M&E) 100.00 1,500.00 10,000.00 150,000.00 13 Toilet 1,000.00 1,000.00 35,000.00 35,000.00 Level 2 14 Thermodynamics Laboratory 1,500.00 1,500.00 270,000.00 195,000.00 15 Biochemical Laboratory 1,500.00 1,500.00 270,000.00 195,000.00 16 Service (M&E) 100.00 1,500.00 10,000.00 150,000.00 17 Toilet 1,000.00 1,000.00 35,000.00 35,000.00 TOTAL 2,859,000.00 2,529,000.00 Hence, the estimated saving cost is RM330,000.00.
  • 31. 6.0 Action Plan Ground Floor Element Recommended Solution Task Action by Timeline Lobby No change Architectural Design Architect Detailed Design Stage Process Control Laboratory Reduction in space / Space Optimisation Structural Design Engineer Chemistry Laboratory Cost Plan Consultant Quantity Surveyor Environmental and Separation Process Research Laboratory Implementation per recommendation Project Manager Construction Stage Reaction Engineering Research Laboratory Ensure implementation as per recommendation Value Management Facilitator Implementation Stage Service (M&E) No change Review and audit implementation and approval Client / Stakeholder Implementation Stage and post implementation Toilet No change
  • 32. Level 1 Element Recommended Solution Task Action by Timeline Analytical Laboratory Reduction in space / Space Optimisation Architectural Design Architect Environmental Control Laboratory Detailed Design Stage Structural Design Engineer Petroleum and Gas Laboratory Cost Plan Consultant Quantity Surveyor Bioprocess Engineering Research Laboratory Implementation per recommendation Project Manager Construction Stage Service (M&E) No change Ensure implementation as per recommendation Value Management Facilitator Implementation Stage Toilet No change Review and audit implementation and approval Client / Stakeholder Implementation Stage and post implementation
  • 33. Level 2 Element Recommended Solution Task Action by Timeline Thermodynamics Laboratory Reduction in space / Space Optimisation Architectural Design Architect Biochemical Laboratory Structural Design Engineer Detailed Design Stage Service (M&E) No change Cost Plan Consultant Quantity Surveyor Toilet No change Implementation per recommendation Project Manager Construction Stage Ensure implementation as per recommendation Value Management Facilitator Implementation Stage Review and audit implementation and approval Client / Stakeholder Implementation Stage and post implementation
  • 34. Conclusion • Value Management has provided an effective way to deliver objectives and fulfil user’s requirements. • The system based functional analysis of Value Management allows consideration of complex interrelationships. • Consequently, Value Management has a broad range of applications, with principle opportunity of gains in the early stages of development of programs and projects. • It is particularly useful in focusing or distilling objectives and priorities, and in generating alternative solutions.
  • 35. In the project of constructing a new building to house the laboratories of School of Chemical Engineering, USM, it clearly shows that there is an obvious cost reduction by implementing Value Management. There is a total of RM 330,000.00 cost reduction based on the space function analysis. It has shown that Value Management is an effective tool in the planning of space requirement. There are clear and obvious impact and advantages gained in applying the concept of Value Management in the planning of space as follows:  Systematic and comprehensive process  Able to provide solutions in a short time compared to conventional process requiring time to gather information and integrate requirements from various parties.  Cost effective – able to provide large savings through defining real requirements and avoid or minimize wastage or irrelevant elements.  Clear justification on selection of solution which enables efficient process of modification or revision of solution if the need arise.
  • 36. Recommendation • The implementation of Value Management should be a standard practice for every project as it is able to provide a better value for money for the client in the project. • The benefits of implementing Value Management such as increase in the value of the project should be introduced to client to encourage them to practice the implementation of Value Management into the projects. • The Government should create more local guidelines in order to promote the use of Value Management in the projects.