The document provides guidance on installing a Cray Research computer system, including positioning support equipment in designated locations, reassembling the system, and verifying startup. It outlines considerations for site selection such as power quality, air quality, cooling water quality, and vibration sources. The computer room design must address personnel safety, air quality, future equipment plans, seismic activity, and accessibility. Computer equipment requires specific temperature, humidity, and air quality ranges. The installation also requires a protective power ground system, signal reference grid, and clean cooling water supply.