Unit-4
Strategy
Implementation
Dr. Prashant B. Kalaskar
Syllabus
• 4.1: Strategy Implementation: Components of Strategic Plan, Barriers to
Implementation of Strategy, Mintzberg’s 5 P’s, Deliberate & Emergent
Strategies, McKinsey 7S Framework
• 4.2: Organization Structure for Strategy Implementation:
Entrepreneurial, Functional, Divisional, SBU, Matrix Network Structures,
Cellular, Modular Organization, Matching Structure to Strategy,
Organization Design for Stable Vs. Turbulent Environment
• 4.3: Changing Structures & Processes: Reengineering & Strategy
Implementation, Principles of Reengineering, Six Sigma, Process
consisting of Defining, Analyzing, Improving & Establishing Steps, Lean
Six Sigma (Concepts Only)
• 4.4: Corporate Culture: Building Learning Organization, Promoting
Participation thro’ technique of Management by Objectives (MBO), Total
Quality Management (TQM)
• 4.5: Strategy Evaluation: Operations Control & Strategic Control,
Symptoms of Malfunctioning of Strategy, Use of Balanced Score Card for
Strategy Evaluation
Dr. Prashant B. Kalaskar
Strategy Implementation
Dr. Prashant B. Kalaskar
• “Strategies most often fail because they
aren’t executed well.”
Larry Bossidy and Ram Charan
“Successful strategy formulation does not
guarantee successful strategy
implementation.”
Strategic Management Process
Dr. Prashant B. Kalaskar
4
Implement
Strategy
SWOT
Formulate
Strategy –
Corporate,
Business,
Functional
Define new
Mission Goals,
Grand Strategy
Identify Strategic
Factors –
Strengths,
Weaknesses
Identify Strategic
Factors –
Opportunities,
Threats
Scan Internal
Environment – Core
Competence,
Synergy, Value
Creation
Evaluate Current
Mission, Goals,
Strategies
Scan External
Environment –
National, Global
Strategy Implementation
• Strategy implementation is actually putting strategies
in to action.
• The Strategies formulated at various levels of the
organizations are implemented so as to achieve the
objectives taken up at the corporate level.
• Strategy implementation happens in two stages
1) Project Implementation
2) Procedural Implementation
• A poor control on strategy implementation may result
in unexpected situation of Malfunctioning of Strategy
Dr. Prashant B. Kalaskar
Strategy Formulation & Strategic Choice
Dr. Prashant B. Kalaskar
Strategy
Formulation
Strategy
Analysis
Strategy
Choice
Interrelationship of Strategy & Implementation
Dr. Prashant B. Kalaskar
Forward
Linkage
• Strategy implementation needs some
restructure in Organization or in Resources
to match with the strategy.
• Strategy Provides overall direction for
implementation
Backward
Linkage
• Strategies are selected based on current
structure and resources that are available
for effective implementation.
• Circumstances may affect selection of
Strategy
Mintzberg’s Types of Strategies
Dr. Prashant B. Kalaskar
Emergent Strategies
(Alternate Strategies)
Intended
Strategy
(Strategy Formulated)
Unrealised
Strategy
(Unfruitful)
Realised
Strategy
(Implemented)
Intended, emergent and realised strategies
Deliberate Strategy
(Choice of Strategy)
Model of Strategy Implementation
Dr. Prashant B. Kalaskar
Strategic
Plan
Project
Implementation
Procedural
Implementation
Resource
Allocation
Structural
Implementn.
Leadership
Implementn.
Behavioral
Implementn.
Functional
Operational
E
V
A
L
U
A
T
I
O
N
Activating Strategy Managing Change Achieving Effectiveness
What is Strategic Planning?
• Process to establish priorities on what you will
accomplish in the future/objectives
• Allows you to make choices on what you will do and
what you will not do (Action Plans)
• Pulls the entire organization together around a single
game plan for execution (Direction)
• Broad outline on where resources will get allocated
Dr. Prashant B. Kalaskar
Important aspects of Str. Implementation
• Where are we now? (Assessment)
• Where do we need to be? (Gap / Future End
State)
• How will we close the gap (Strategic Plan)
• How will we monitor our progress (Evaluation
Balanced Scorecard)
Dr. Prashant B. Kalaskar
Strategic Planning Model
A B C D E
Dr. Prashant B. Kalaskar
•Environmental
Scan
Assessment
•Background
Information
•Situational
Analysis
•SWOT –
Strength’s,
Weaknesses,
Opportunities,
Threats
•Situation – Past,
Present and Future
•Significant Issues
•Align / Fit with
Capabilities
•Mission & Vision
•Values / Guiding
Principles
•Major Goals
•Specific
Objectives
•Performance
Measurement
•Targets / Standards
of Performance
•Initiatives and
Projects
Baseline Components
•Performance
Management
•Review Progress –
Balanced Scorecard
•Take Corrective
Actions
Down to
Specifics
Evaluate
Where we are Where we want to be How we will do it How are we doing
•Gaps •Action Plans •Feedback
upstream – revise
plans
Assessment Model:
S W O T
Dr. Prashant B. Kalaskar
External Assessment:
Marketplace, competitor’s, social
trends, technology, regulatory
environment, economic cycles .
Internal Assessment:
Organizational assets, resources,
people, culture, systems,
partnerships, suppliers, . . .
Where is your organization in its development RIGHT now?
Assess the Internal and External Environments
Components of a Strategic Plan
• Vision – Developing a clear understanding of what is
your preferred future
• Mission – Developing a sound statement about why
you exist
• Core Values and Beliefs – Describes behaviors and
ideas that are important to your organization
• Strategic Issues – The issues that create a gap between
the ideal and reality
• Operational Plans – How are you going to achieve your
vision?
Dr. Prashant B. Kalaskar
Components of Strategic Planning
Dr. Prashant B. Kalaskar
Mission
Vision
Goals
Objectives
Measures
Why we exist
What we want to be
Indicators and
Monitors of success
Desired level of
performance and timelines
Planned Actions to
Achieve Objectives
O1 O2
AI1 AI2 AI3
M1 M2 M3
T1 T1 T1
Specific outcomes expressed in
measurable terms (NOT activities)
Strategic Plan
Action Plans
Evaluate Progress
Targets
Initiatives
What we must achieve to be successful
Barriers to Implementation of Strategy
• Strategy Formulation
Dr. Prashant B. Kalaskar
Corporate Level
Business Level
Functional Level
• Strategy
Implementation
Barriers to Implementation of Strategy
• Implementing strategy has always been a challenge for
organizations across the industry
• Ability to implement strategy is the deciding factor
between success and failure of a company’s strategy.
• Strategy formulation and strategy implementation are
not two discrete processes but are intertwined
together.
• Planning is no doubt important, but making the plan
work is a bigger challenge which deals with
organizational politics, culture and sometimes
managing change.
Dr. Prashant B. Kalaskar
Barriers to Implementation of Strategy
Dr. Prashant B. Kalaskar
Barriers to Strategy Implementation
Only 5% of
the
workforce
understand
the Vision
Vision Barrier
Only 25%
of the
Managers
have
Incentives
linked to
Strategy
People Barrier
85% of the
executive
teams
spends less
than one
hr/month
discussing
Strategy
Management
Barrier
60% of
organizatio
ns don’t
link budget
to strategy
Resource Barrier
Mintzberg’s 5P’s to Define Strategy
 Plan
 Ploy
 Pattern
 Position
 Perspective
Dr. Prashant B. Kalaskar
Henry Mintzberg
Plan
Dr. Prashant B. Kalaskar
 A plan is an intended
course of action
 For example, a business
makes a plan to increase
their market share
 Plan is not enough on its
own. This is where the
other four Ps come into
play
Ploy Strategy
Dr. Prashant B. Kalaskar
 A strategy can be a ploy
 A ploy is a specific
maneuver intended to gain
an advantage on an
opponent or competitor
 For example, a business
may threaten to introduce
a new product or reduce
price of product to scare
competitors
Ploy Strategy
Dr. Prashant B. Kalaskar
 Mintzberg says that getting the better of
competitors, by plotting to disrupt, dissuade,
discourage, or otherwise influence them, can be part
of a strategy.
 This is where strategy can be a ploy, as well as a plan.
 For example, a grocery chain might threaten to
expand a store, so that a competitor doesn't move
into the same area; or a telecommunications
company might buy up patents that a competitor
could potentially use to launch a rival product
Pattern Strategy
Dr. Prashant B. Kalaskar
 Strategy can be a pattern
 Pattern means a series of
actions
 For example, a business
makes a plan to increase
market share
 Then the business does a
pattern of behavior to follow
the plan
for example, a company that regularly markets very expensive
products is using a "high end" strategy.
Pattern Strategy
Dr. Prashant B. Kalaskar
 Strategic plans and ploys are both deliberate
exercises.
 Strategy emerges from past organizational behavior.
 Rather than being an intentional choice, a consistent
and successful way of doing business can develop
into a strategy.
 Example: A manager who makes decisions that
further enhance an already highly responsive
customer support process than doing anything
intentionally as a part of behavioral pattern
Position Strategy
Dr. Prashant B. Kalaskar
 Strategy can be a position
 Position means place in
relation to competition
 For example, a business
may position itself in the
market as a high quality
service provider
it reflects decisions to offer particular products
or services in particular markets.
Position Strategy
Dr. Prashant B. Kalaskar
 This is how the Organization decides to position their
self in the marketplace.
 This helps to explore the fit between the
organization & the environment, and it helps to
develop a sustainable competitive advantage
 Example: Developing a niche product to avoid
competition or products with differentiation to avoid
competition
Perspective Strategy
Dr. Prashant B. Kalaskar
 Strategy can be a
Perspective
 Perspective is a way of
looking at the world
 For example, different
businesses view
themselves and their
customers differently
that is, vision and direction.
Perspective Strategy
Dr. Prashant B. Kalaskar
 The choices an organization makes about its strategy
rely heavily on its culture & pattern of behavior
 Example: an organization that encourages risk-taking
& innovation from employees might focus on coming
up with innovative products as the main thrust
behind its strategy.
 By contrast, an organization that emphasizes the
reliable processing of data may follow a strategy of
offering these services to other organizations under
outsourcing arrangements.
Example of Mintzberg’s 5
• McDonald’s strategy plan “the Plan to Win” – growth
strategies for McDonald’s by opening new and
improving current McDonald’s restaurants.
• Using growth strategies such as Market penetration,
Product development and also CSR activities – in order
to obtain legitimacy from their stakeholders
Dr. Prashant B. Kalaskar
Plan Strategy
Ploy Strategy
• McDonald’s “Healthy Living” Campaign – Teaching
consumers to eat healthy – thereby McDonalds gain
some “goodwill” by showing that they care about
consumers’ health – thereby they meet consumers’
need
Dr. Prashant B. Kalaskar
Pattern Strategy
• Expansion, expansion, expansion & Quality, Quality &
Quality : McDonald’s expands in every matter and
world corner.
• The chance of growth is grasp at every time and any
time.
Dr. Prashant B. Kalaskar
Position Strategy
• McDonalds’ “Healthy Living” Campaign
• Quality of Service & Food
• Customers will love the quality, service, ambience,
variety of products
• “I am Loving It”
Dr. Prashant B. Kalaskar
Perspective Strategy
Dr. Prashant B. Kalaskar
 Perspective Strategy
McDonalds has focus on sheer productive
efficiency
McKinsey 7 S Model
• The 7-S Framework was first mentioned in "The Art Of
Japanese Management" by Richard Pascale and
Anthony Athos in 1981.
• They had been investigating how Japanese had been so
successful.
• At around the same time, Tom Peters and Robert
Waterman were exploring what makes a company
excellent.
• The 7 S model was born at a meeting of these four
authors in 1978.
• It was taken up as a basic tool by the global management
consultancy company McKinsey.
Dr. Prashant B. Kalaskar
McKinsey 7 S Model
• The McKinsey 7S model is a useful framework
for reviewing an organization's capabilities from
different viewpoints.
• The power of the McKinsey 7S model is that,
managers should take into account all seven of
these factors, to be sure of successful
implementation of a strategy.
Dr. Prashant B. Kalaskar
McKensey 7 S Framework
Dr. Prashant B. Kalaskar
THE HARD S-1- Strategy
• Strategy: the direction and scope of the company
over the long term.
• Ways to achieve competitive advantage.
Examples.
• Low-cost strategy through economic production or
delivery
• Product differentiation through distinct features or
innovative sales.
Dr. Prashant B. Kalaskar
THE HARD S-2- Structure
• Ways in which task and people are specialized and
divided, and authority is distributed.
Four main structures
• Functional Structure
• Divisional Structure
• Matrix Structure
• Network Structure
Dr. Prashant B. Kalaskar
THE HARD S-2- Structure
Dr. Prashant B. Kalaskar
Functional Structure Divisional Structure
THE HARD S-3- Systems
• Formal processes and procedures to manage the
organization.
Examples:
• Performance Measurements
• Reward Systems
• Planning
• Budgeting
• Resource Allocation
• Information System
• Distribution System
Dr. Prashant B. Kalaskar
THE Soft S-1: Staffing
Dr. Prashant B. Kalaskar
 People, their background & competencies.
 Organization’s approach to recruitment,
selection, socialization, training and employee
development is important for effective
staffing.
THE Soft S-2 Skills
• Distinctive competencies in the organization.
• Can be of People, Management Practices,
Systems and/or Technologies.
Dr. Prashant B. Kalaskar
THE Soft S-3 Style
• Leadership style of top management and overall
operating style of organization.
• Impacts norms followed by people, how they
work and interact with each other and
customers.
Dr. Prashant B. Kalaskar
THE Soft S-4 Shared Values
• Core values shared in the organization and
serve as guiding principles of what is important.
• Helps focus attention and provides a broader
sense of purpose.
Dr. Prashant B. Kalaskar
Using the 7-S Model
• Each “S” is consistent with and reinforces the other
S’s.
• Recognize the full range of elements that need to be
changed and focus on the one’s that will have the
greatest effects on performance.
• All seven variables are interconnected- to make
progress in one, adjustments need to be made in
others also.
Dr. Prashant B. Kalaskar
Using the 7-S Model
• Hard S’s (Easier to change)
– Strategy
– Structure &
– Systems
• Softer S’s (Harder to change directly and take longer time)
– Staffing
– Skills
– Style &
– Shared Values
Dr. Prashant B. Kalaskar
Objectives of McKensey 7 S Model
To analyze how well an organization is positioned to
achieve its intended objective
1. Improve the performance of a company
2. Examine the likely effects of future changes within a
company
3. Align departments and processes during a merger or
acquisition
4. Determine how best to implement a proposed
strategy
Dr. Prashant B. Kalaskar
Organizing & Organization
Organizing
“Arranging the activities & resources of the enterprise
in such a way that they systematically contribute to the
enterprise’s goals.”
Organizational structure: “ It refers to formalized
patterns of interactions that link a firm’s tasks,
technologies, and people”
Organization Chart: “A chart that shows the structure
of the organization including the title of each
manager’s position and, by means of connecting lines,
who is accountable to whom and who has authority for
each area”
Dr. Prashant B. Kalaskar
Organization Design & Structure
Organization design
“A process in which managers develop or change their
organization’s structure”
Work specialization
“A component of organization structure that involves
having each discrete step of a job done by a different
individual rather than having one individual do the
whole job”
Dr. Prashant B. Kalaskar
Different Types of Org. Structures
• Functional Structure (U Form)
• Divisional Structure (M Form or H Form)
• Matrix Organization (Matrix Form)
• Network Organization Structure
• Cellular Organization Structure
• Modular Organization Structure
Dr. Prashant B. Kalaskar
Functional Structure
• This kind of organisational structure classifies people
according to the function they perform in the
organization.
• The organisation chart for a functional based
organisation consists of:
Vice President, Sales department, Customer Service
Department, Engineering or production department,
Accounting department and Administrative
department.
Dr. Prashant B. Kalaskar
Functional Structure
Dr. Prashant B. Kalaskar
Production Marketing Accounts Personnel IT
Board of Directors
Chief Executive
Functional Structure
Dr. Prashant B. Kalaskar
Advantages
• Specialisation – each
department focuses
on its own work
• Accountability –
someone is
responsible for the
section
• Clarity – know your
and others’ roles
Disadvantages
• Closed communication
could lead to lack
of focus
• Departments can
become resistant
to change
• Coordination
may take too long time
• Gap between top and
bottom
Divisional Structures
• Divisional Structure
Managers create a series of business units to
produce a specific kind of product for a specific kind
of customer
Dr. Prashant B. Kalaskar
Other Types of Divisional Structures
• Geographic Structure
• Market Structure
Dr. Prashant B. Kalaskar
Other Types of Divisional Structures
Market Structure
• Managers place each distinct product line or business
in its own self-contained division
• Divisional managers have the responsibility for devising
an appropriate business-level strategy for goals
Advantages:
- Specialize in one product area
- Managers become experts in their area
- No direct supervision of division by Top managers
- Improves the use of resources
Dr. Prashant B. Kalaskar
Matrix Design Structure
• An organizational structure that simultaneously
groups people and resources by function and
product
- Complex network
- Flexible & can respond rapidly to the change
- Each employee has two bosses (functional manager
and product manager)
Dr. Prashant B. Kalaskar
Matrix Structure
Dr. Prashant B. Kalaskar
Modular Structure
Modular organization
• An organization in which non-vital functions are
outsourced, which uses the knowledge and expertise
of outside suppliers while retaining strategic control.
Dr. Prashant B. Kalaskar
Matching Structure to Strategy
(Organization Design & Change)
• There is no perfect organizational structure
• There is only structures that match or do not match
with requirements of strategy.
• If they match, it’s a right structure or else is a bad
structure.
• Organization designing is the process to create a right
structure.
• Organization Design means modifying existing
structure to fit the strategic requirement
Dr. Prashant B. Kalaskar
Organization Design
• Organization Design has two dimensions;
1) Structural Dimension
Dr. Prashant B. Kalaskar
2) Contextual Dimension
Formalization
Specialization
Hierarchy of Authority
Centralization &
Decentralization
Professionalism
Personnel Ratios
Environment
Goals & Strategy
Culture
Technology
Size
Structural Dimension
• Formalization: Written documentation, procedures,
regulations & policies
• Specialization: Division of tasks on expertise
• Hierarchy of Authority: Who reports to whom & span
of control
• Centralization & Decentralization: Decision making by
one/top management & decentralization is decision is
delegated to lower levels of management
• Professionalism: formal education & Training
• Personnel Ratios: Deployment of people to various
functions & departments
Dr. Prashant B. Kalaskar
Organizational Structure & Design
• Organizations moves from one stage of growth to next
• Internal & external environment affects organization
design.
• Organization facing a stable environment may use a
functional structure as there will be less
interdepartmental coordination required.
• A turbulent environment requires a rapid response
capability, flexibility & quick decision making.
• In such Turbulent environment Matrix or Divisional
form of Structure is suitable
Dr. Prashant B. Kalaskar
Organizational Structure & Design
• In case of Internal Environment type;
1) A slow or bureaucratic organization may work well
with a functional Structure while,
2) Dynamic & Innovative nature of organization may
require Divisional structure for effective
implementation of strategies.
Dr. Prashant B. Kalaskar
Organizational Change
• Organizational change takes place in two broad
dimensions
1) Structural Changes &
2) Behavioral Changes to absorb impact of changes.
The restructuring can be done either as…
ReOrganization ReEngineering
DeLayering Flatter Structures
Dr. Prashant B. Kalaskar
Organizational Change
 Reorganization/Restructuring: is changing org.
structure matching to the change in external
environment
 Reengineering: Fundamental Rethinking & Radical
Redesigning of business process in areas like product
quality, service, speed etc.
 DeLayering: Reducing the number of layers in
hierarchy for better & improved control
 Flatter Structures: It is the result due to delayering
Dr. Prashant B. Kalaskar
Matching Structures to Strategies
• Change in structure is dependent on change in external
environment.
• Structural changes also requires to compensate the
impact of how people will react to the changed
situations & how to manage the new relationships.
Dr. Prashant B. Kalaskar
Structure for Strategy
• For Example @ Corporate Level Strategy:
1) A company has implemented a STABILITY strategy &
has a simple functional structure working.
2) Now the company has planned to implement
Concentric Diversification .
3) In such case the company should move from a
Functional Structure to a Divisional Structure
4) As products will increase need to have a better
coordination, company can create few departments &
for the related product line
5) Personnel & Finance departments can be retained as
centralized department.
Dr. Prashant B. Kalaskar
Structure for Strategy
• For Example @ Business Level Strategy:
1) A company is pursuing a low cost leadership strategy
in mature industry, can work well with Functional
Structure.
2) Now the company has planned to implement
Differentiation Strategy in a Turbulent environment, a
divisional structure could serve better .
3) In such case the company can cater to changing
customer needs more effectively.
Dr. Prashant B. Kalaskar
Business Process Reengineering (BPR)
• Business Process Re-engineering or BPR is
“The analysis and redesign of workflow and
processes within and between Organizations”
• BPR is the
• Fundamental rethinking and Radical redesign of
Business Processes to achieve Dramatic
improvements in critical measures of performance
.. such as Cost, Quality, Service and Speed.
Dr. Prashant B. Kalaskar
BPR Principles - Derived
• Redesign process steps such that they can be
performed in a correct order.
• Combine several process steps into one.
• Design for parallel sub-processes whenever
possible to reduce waiting time between tasks.
Dr. Prashant B. Kalaskar
BPR Principles - Derived
• Processes may have multiple versions. Remove
complex, exceptions, and special cases.
• Empower human potentials. Give front-line
workers the responsibility to make decisions.
• Provide mechanism (Machines) in the process to
encourage individual, team, and organizational
learning
• An individual without information cannot take
responsibility;
Dr. Prashant B. Kalaskar
A BPR Framework
Dr. Prashant B. Kalaskar
Organization
– Job skills
– Structures
– Reward
– Values
Technology
– Enabling technologies
– Methods and tools
Process
– Core business processes - Value-added
– Customer-focus -Innovation
Approaches to BPR
• Focus on core business processes.
• Use information technology to enable new business
processes, not just to automate existing ones.
• Start with a clean sheet of paper and think out-of-the-
box. (Do not rework old process)
• Consider all aspects of the process.
• Adopt a BPR methodology.
• Use proven methods and tools in analyzing and
redesigning the process.
• Manage the implementation and change process from
the beginning.
Dr. Prashant B. Kalaskar
Reengineering Example: Taco Bell Co.
• We were going backwards fast ... If something was
simple, we made it complex. If it was hard, we figured
out a way to make it impossible.” - Taco Bell CEO
• Customer buy product for $1 are worth about 25 cents.
& 75 cents goes into marketing, advertising, and
overhead.
• Reengineering from the customer’s point of view.
“Are customer willing to pay for these ‘value-added’
activities?” Dr. Prashant B. Kalaskar
Taco Bell Co.
• Corporate Vision: “We want to become
number one in share of stomach.”
Kitchens : Seating capacity
70% : 30% ð 30% : 70%
• Eliminate district managers. Restaurant managers are
given profit-and-loss responsibility. (Rewards based)
• Moving cooking of meat and bean outside.
• Boost peak serving capacity at average restaurant from
$400 an hour to $1,500 a hour.
• $500 millions regional company in 1982 to $3 billion national
company in 1992.
Dr. Prashant B. Kalaskar
What is Six Sigma…?
• Six sigma is a business statistical Strategy.
• Is to identifying defects and removing them
from the process of products to improve quality.
• A defect is defined as any process output that
does not meet customer specifications.
• The term " Sigma " is used to designate the
distribution or spread about the mean (average)
of any process or procedure.
“Process Improvement”
Dr. Prashant B. Kalaskar
What is Six Sigma…?
Dr. Prashant B. Kalaskar
 Six Sigma, is the common measurement index of
"defects-per-unit," where a unit can be virtually
anything--- a component, piece of material,
administrative form, time frame, distance, etc.
The Sigma value indicates how often defects are
likely to occur.
The higher the sigma value, the less likely a process
will produce defects.
As sigma increases, costs go down, cycle time goes
down, and customer satisfaction goes up.
History of Six Sigma
• The Six sigma was founded by Motorola in the
1970s.
• Out of senior executive Art Sundry's criticism of
Motorola’s bad quality.
• They found a connection between increase in
quality and decreases in costs of production.
• Bill Smith, “Father of six sigma” introduce this
quality improvement Methodology to Motorola.
Dr. Prashant B. Kalaskar
Definition of Six Sigma
• Quality management program developed by
Motorola in the 1980s.
• Management philosophy focused on business
process improvements to:
Eliminate waste, rework, and mistakes
Increase customer satisfaction
Increase profitability and competitiveness
Dr. Prashant B. Kalaskar
Six Sigma
Dr. Prashant B. Kalaskar
μ
σ
• Sigma is the Greek letter representing the
standard deviation of a population of data.
• Sigma is a measure
of variation
(the data spread)
What does variation mean?
Dr. Prashant B. Kalaskar
Variation means that a
process does not produce
the same result (the “Y”)
every time.
Some variation will exist in
all processes.
Variation directly affects customer
experiences.
Customers do not feel averages!
-10
-5
0
5
10
15
20
Managing Up the Sigma Scale
Dr. Prashant B. Kalaskar
Sigma % Good % Bad DPMO
1 30.9% 69.1% 691,462
2 69.1% 30.9% 308,538
3 93.3% 6.7% 66,807
4 99.38% 0.62% 6,210
5 99.977% 0.023% 233
6 99.9997% 0.00034% 3.4
Examples of the Sigma Scale
Dr. Prashant B. Kalaskar
In a world at 3 sigma. . .
There are 964 U.S. flight
cancellations per day.
The police make 7 false
arrests every 4 minutes.
In MA, 5,390 newborns are
dropped each year.
In one hour, 47,283
international long distance
calls are accidentally
disconnected.
In a world at 6 sigma. . .
1 U.S. flight is cancelled every 3
weeks.
There are fewer than 4 false
arrests per month.
1 newborn is dropped every 4
years in MA.
It would take more than
2 years to see the same number
of dropped international calls.
Six Sigma Companies
Dr. Prashant B. Kalaskar
Lean Six Sigma
• What is Lean..?
Lean is a methodology that evaluates processes
with a focus on..
Speed
Efficiency
Dr. Prashant B. Kalaskar
Process Improvement
Dr. Prashant B. Kalaskar
1. Initial Perception of problem
2. Clarify Problem
3. Locate Point of Cause
4. Root Cause Analysis
5. Design Solutions
6. Measure
Effectiveness
7. Standardize
Lean Six Sigma Process Improvement
• Lean Six Sigma Seeks to improve the quality of
manufacturing and business process by:
Identifying and removing the causes of defects
(errors) and variation.
Identifying and removing sources of waste within
the process
Focusing on outputs that are critical to customers
Dr. Prashant B. Kalaskar
Define
Measure
AnalyzeImprove
Control
Lean Six Sigma Process Improvement
• LSS is a management philosophy that seeks to drive a
quality culture change through a multi-level based
program
Dr. Prashant B. Kalaskar
Level Training
Green Belt LSS Methodology and basic tool set
Black Belt
Green Belt content plus advanced
data analysis
Master Black Belt
Black belt content plus program
management, leadership skills,
some advanced tools
Background on Lean
• Lean comes out of the industrial engineering world
• Taiichi Ohno – Toyota Production System.
– 1940s-1950s company was on verge of bankruptcy
– Dynamics of industry were changing – moving from mass
production to more flexible, shorter, varied batch runs
(people wanted more colors, different features, more
models, etc).
• Ohno was inspired by 3 observations on a trip to America
– Henry Ford’s assembly line inspired the principle of flow
(keep products moving because no value is added while it
is sitting still)
– The Indy 500 – Rapid Changeover
– The American Grocery Store – led to the Pull system –
material use signals when and how stock needs to be
replenished
Dr. Prashant B. Kalaskar
Path To Lean
Dr. Prashant B. Kalaskar
Theory Waste is Deadly
Application 1. Define Value – act on what is important to the customer
2. Identify Value Stream – understand what steps in the
process add value and which don’t
3. Make it flow – keep the work moving at all times and
eliminate waste that creates delay
4. Let customer pull -- Avoid making more or ordering more
inputs for customer demand you don’t have
5. Pursue perfection -- there is no optimum level of
performance
Focus Flow Focused
Assumptions Non-Value added steps exit
Results Reduced cycle time
The Eight Wastes
1) Overproduction—making or doing more than is required or
earlier than needed.
2) Waiting—for information, materials, people, maintenance, etc.
3) Transport—moving people or goods around or between sites.
4) Poor process design—too many/too few steps, non-
standardization, inspection rather than prevention, etc.
5) Inventory—raw materials, work-in-progress, finished goods,
papers, electronic files, etc.
6) Motion—inefficient layouts or poor ergonomics at work-stations or in
offices.
7) Defects—errors, scrap, rework, non-conformance.
8) Underutilized personnel resources and creativity—ideas that are not
listened to, skills that are not utilized.
Dr. Prashant B. Kalaskar
Lean Methods
• Kaizen Events (or SCORE events)
– Planned and structured process that enables a small group of
people to improve some aspect of their business in a quick,
focused manner.
• Select
• Clarify
• Organize
• Run
• Evaluate
• 5S – this methodology reduces waste through improved
workplace organization and visual management
– Sort, Store, Shine, Standardize and Sustain
• Kanban – a Japanese term that can be translated as “signal,”
“card,” or “sign.”
– Most often a physical signal (paper card of plastic bin), that
indicates when it is time to order more, from whom, and in what
quantity.
Dr. Prashant B. Kalaskar
DMAIC: Lean Methodology
• Define – describe the problem quantifiably and the
underlying process to determine how performance will
be measured.
• Measure – use measures or metrics to understand
performance and the improvement opportunity.
• Analyze – identify the true root cause(s) of the
underlying problem.
• Improve – identify and test the best improvements that
address the root causes.
• Control – identify sustainment strategies that ensure
process performance maintains the improved state.
Dr. Prashant B. Kalaskar
Why Define a Process as a Value Stream?
• A Value Stream
–Focuses attention on what is important for the
customer.
–Identifies all the necessary components to bring a
product or service from conception to
commercialization.
–Identifies waste inherent in processes and works to
remove it.
–Reduces defects in products and deficiencies in
processes.
–Focuses on improving specs and cost. Dr. Prashant B. Kalaskar
What Is Typically Found
Dr. Prashant B. Kalaskar
Lean Value Stream Management starts with defining value in
terms of products and process capabilities to provide the
customer with what they need at the right time and at an
appropriate price.
Value
added
Non-value
added/waste
The Methods
Dr. Prashant B. Kalaskar
Lean
&
Six
Sigma
Improve Speed
Achieve Breakthrough Dashboard Results
Lower Costs
Culture Change
Sustain Performance
Higher Quality
Methods Results
Lean and Six Sigma
Dr. Prashant B. Kalaskar
LEAN = Improvement principles focused on dramatically
improving process speed and eliminating the eight deadly
wastes.
Improve
Process-
Pull
Control
Process
Analyze
Process-
Flow
Measure
Value
Define
Value
SIX SIGMA = Breakthrough Process, Design, or
Improvement Teams focused on eliminating chronic
problems and reducing variation in processes.
Improve ControlAnalyzeMeasureDefine
Lean and Six Sigma
Dr. Prashant B. Kalaskar
Six Sigma = Breakthrough Process Improvement Teams focused on
eliminating chronic problems and reducing variation in processes.
Lean = Rapid Improvement Teams focused on dramatically improving process
speed, and the elimination of the eight deadly wastes.
IMPROVED
EFFICIENCY
Improve
Process-
Pull
Control
Process
Analyze
Process-
Flow
Measure
Value
Define
Value
IMPROVED
EFFECTIVENESS
Improve ControlAnalyzeMeasureDefine
Learning Organization
“A learning organization is an organization skilled at
creating, acquiring, and transferring knowledge, and at
modifying its behavior to reflect new knowledge and
insights”
“New ideas are essential, if learning is to take place”
“Without accompanying changes in the way that work
gets done, only the potential for improvements exist”
Dr. Prashant B. Kalaskar
3 M’s in Learning organizations
• Meaning
Plausible, well grounded definition, actionable and
easy to apply.
• Management
Clear guidelines for practice, filled with operational
advice rather than high aspirations.
• Measurement
Tools for assessing organizations rate and level of
learning to ensure gains have been made.
Dr. Prashant B. Kalaskar
Organization & Qualities
Three distinct stages.
1. Cognitive
• Exposed to new ideas, expand their knowledge and
begin to think differently.
2. Behavioral
• Employees internalize new insights and alter
behavior.
3. Performance Improvement
• Changes in behavior leading to measurable
improvements in results.
Dr. Prashant B. Kalaskar
Levels in the
LEARNING ORGANIZATION
• Individual Learning (IL)
• Organizational Learning (OL)
IL: Sincé the individuals form the bulk of the
organization, they must establish the necessary forms
and processes to enable organizational learning in
order to facilitate change.
OL: is more than the sum of the parts of individual
learning.
An organization does not lose out on its learning abilities
when members leave the organization.
Dr. Prashant B. Kalaskar
Building Blocks of Learning Organisation
• Systematic Problem Solving
• Experimentation
• Learning from Past Experience
• Learning from others.
• Transferring knowledge
• Measuring learning
Each is accompanied by a distinctive mindset, tool kit
and pattern of behavior.
Dr. Prashant B. Kalaskar
Systematic Problem Solving
• Rely on scientific method for diagnosing
problems “plan, do, check, act”
• Statistical analysis
– Generating ideas and collecting information
– Reaching consensus
– Analyzing and displaying data
– Planning actions
Dr. Prashant B. Kalaskar
Experimentation
• On-going programs
– Series of small experiments
– Steady flow of new ideas
– Incentive system
– Need managers and employees trained in evaluating
and performing experiments
Dr. Prashant B. Kalaskar
Learning from Past Experience
• Companies revive successes and failures.
• Assessment done systematically and in an open
and accessible forum
“Those who cannot remember the past are
condemned to repeat it”
Dr. Prashant B. Kalaskar
Learning from Others
• “Most powerful insights come from looking
outside ones immediate environment to gain a
new perspective”
• SIS-Steal Ideas Shamelessly
• Benchmarking
– Ongoing investigation and learning experience that
ensures the best industry practices are uncovered,
analyzed, adapted and implemented.
Dr. Prashant B. Kalaskar
Transferring Knowledge
• Knowledge must be spread quickly and
efficiently throughout the organization
• Maximum impact when shared broadly
– Written reports
– Oral reports
– Site visits and tours
– Personnel rotation programs
– Standardization programs
– Education and training programs
Dr. Prashant B. Kalaskar
Measuring Learning
• “If you can’t measure it, you can’t manage it”
• Actual data comparison
• Learning or experience curves.
– Incomplete measures, ignore other competitive
variables, like quality, delivery or new product
introductions
Dr. Prashant B. Kalaskar
3 types of
Organizational Learning
• SINGLE-LOOP LEARNING
• DOUBLE-LOOP LEARNING
• DEUTERO-LEARNING
Dr. Prashant B. Kalaskar
Single-loop Learning
• This occurs when errors are detected and
corrected.
• Firms continue with their present policies and
goals.
• This is the “Lower-level Learning”, “Not-
Strategic Learning”, “
• This is an “Adaptive Learning”.
Dr. Prashant B. Kalaskar
Double-loop Learning
• This occurs when, in addition to detection and
correction of errors, the organization questions and
modifies its existing norms, procedures, policies and
objectives.
• It involves changing the organization’s knowledge-
base or firm-specific competences or routines.
• It is called as “Higher-Level Learning”,
• “Strategic Learning” :Learning to expand
organization’s capabilities
Dr. Prashant B. Kalaskar
Deutero-learning
• This occurs when organizations learn HOW to
CARRY OUT Single-loop learning and Double-loop
Learning.
• Being aware of ignorace motivates learning.
• Identification of LEARNING STYLES and
FACILITATING FACTORS required to promote
learning.
Dr. Prashant B. Kalaskar
Management by Objective (MBO)
Dr. Prashant B. Kalaskar
MANAGEMENT
By
OBJECTIVE
Management by Objectives (MBO)
• The term “Management by Objectives" was first
popularized by Peter Drucker in his book 'The Practice
of Management in 1954.
• Management by Objectives (MBO) is a process of
agreeing upon objectives within an organization so
that management and employees agree to the
objectives and understand what they are supposed to
do in the organization.
• Objectives can be set in all domains of activities
(production, services, sales, R&D, human resources,
finance, information systems etc.). Dr. Prashant B. Kalaskar
Definition of MBO
• Management By Objectives (MBO) can be
defined as a process whereby the employees
and the superiors come together to identify
common goals, the employees set their goals to
be achieved, the standards to be taken as the
criteria for measurement of their performance
and contribution and deciding the course of
action to be followed.
Dr. Prashant B. Kalaskar
Main Concept
• The principle behind Management by Objectives
(MBO) is to make sure that everybody within the
organization has a clear understanding of the aims, or
objectives of that of organization, as well as awareness
of their own roles and responsibilities in achieving
those aims.
• The complete MBO system is to get managers and
empowered employees acting to implement and
achieve their plans, which automatically achieve those
of the organization.
Dr. Prashant B. Kalaskar
Principles of MBO
• Cascading of organizational vision, goals and
objectives
• Specific objectives for each member
• Participative decision making
• Explicit time period
• Performance evaluation and feedback
Dr. Prashant B. Kalaskar
Process of MBO
Dr. Prashant B. Kalaskar
Appraise
Performance
•Corporate Strategic goals
•Departmental goals
•Individual goals
STEP 1: SET GOALS
STEP 4: APPRAISE OVERALL
PERFORMANCE
Action Plans
Review Progress & Take
Corrective Action
STEP 2: DEVELOP PLANS
STEP 3: REVIEW PROGRESS
The Smart Method
Clarity of goals – With MBO, came the
concept of SMART goals i.e. goals that are:
• Specific
• Measurable
• Achievable
• Relevant, and
• Time bound.
Dr. Prashant B. Kalaskar
MBO: 3 Basic Parts
• All individuals within an organization are assigned a
special set of objectives that they try to reach during
a normal operating period. These objectives are
mutually set and agreed upon by individuals and
their managers.
• Performance reviews are conducted periodically to
determine how close individuals are to attaining
their objectives.
• Rewards are given to individuals on the basis of
how close they come to reaching their goals.
Dr. Prashant B. Kalaskar
Advantages of MBO
• Improves employee motivation
• Improves communication in the organisation
• Flags up and highlights training needs required to
achieve objectives
• Improves overall performance and efficiency
• Attainment of goals can lead to the satisfaction of
Maslow’s higher order needs
Dr. Prashant B. Kalaskar
Disadvantages of MBO
• May demotivate staff if targets are too high and
unrealistic, also if imposed rather than agreed
• Requires the cooperation of all employees to succeed
• Can be bureaucratic and time consuming (meetings,
feedback)
• Can encourage short-term rather a more focused long-
term growth
• Setting targets for certain specialized employees may
be difficult
Dr. Prashant B. Kalaskar
MBO at Intel
A Manager's Guide at Intel provides the following
directions.
Start with a few well-chosen overriding objectives.
Set your subordinates objectives that fit in with
your overriding objectives.
Allow your subordinates to set their own key
results areas (KRA’s) to enable them to meet their
objectives.
Dr. Prashant B. Kalaskar
MBO at Intel
• In Management by Objectives systems at Intel,
objectives are written down for each level of the
organization, and individuals are given specific aims
and targets.
• The principle behind this is to ensure that people know
what the organization is trying to achieve, what their
part of the organization must do to meet those aims,
and how, as individuals, they are expected to help
Dr. Prashant B. Kalaskar
MBO at Microsoft
By Bill Gates
• Eliminate politics, by giving everybody the same
message.
• Keep a flat organization in which all issues are
discussed openly.
• Insist on clear and direct communication.
• Eliminate rivalry between different parts of the
organization
• Empower teams to do their own things
Dr. Prashant B. Kalaskar
Total Quality Management (TQM)
“Quality is everyone’s responsibility”
-Edward Deming
• The integration of all processes and functions of
the firm in the task of ensuring a product’s
quality throughout its life cycle (mfg. & usage) .
• Measurement of Success:
– 100% Customer Satisfaction
• Method of Achievement:
– Continuous Improvement
Dr. Prashant B. Kalaskar
Total Quality Management (TQM)
 TQM is an operating philosophy (experience) and
management tool (SOP) that focuses on continuous
process improvement.
 Everything is a scientific method.
 Do it right the first time through universal
participation.
 Teams as well as individuals that results in customer
satisfaction.
 Internal and External customers ultimately contributes
to co.’s performance.
Dr. Prashant B. Kalaskar
Total Quality Management (TQM)
• 1. The customer makes the ultimate determination of
quality.
• 2. Top management must provide leadership and
support for all quality initiatives.
• 3. Preventing variability is the key to producing high
quality.
• 4. Quality goals are a moving target, thereby requiring
a commitment toward continuous improvement.
• 5. Improving quality requires the establishment of
effective metrics. We must speak with data and facts
not just opinions.
Dr. Prashant B. Kalaskar
Continuous Process Improvement Cycle
Dr. Prashant B. Kalaskar
1. Identify the
opportunity
2. Analyze
the process
3. Develop the
optimal Solution
4. Implement
5. Study
the results
6. Standardize
the solution
7. Plan for
the future
Plan
Do
Act
Check
TQM Six Basic Concepts
1. A committed and involved management to provide
long-term-top-to-bottom organizational support.
2. An unwavering (constant) focus on the customer,
both internally and externally.
3. Effective evaluation of the business and production
process.
4. Continuous improvement of the business and
production process.
5. Treating suppliers as partners.
6. Establish performance measures for the process.
Dr. Prashant B. Kalaskar
7 Important Principles of TQM
• 1. Quality can and must be managed.
• 2. Processes, not people, are the problem.
• 3. Don’t treat symptoms, look for the cure.
• 4. Every employee is responsible for quality.
• 5. Quality must be measurable.
• 6. Quality improvements must be continuous.
• 7. Quality is a long-term investment.
Dr. Prashant B. Kalaskar
5 Main Advantages of TQM
1. Encourages a strategic approach to management at the
operational level through involving multiple departments
in cross-functional improvements and systemic innovation
processes;
2. Provides high ROI through improving efficiency;
3. Works equally well for service and manufacturing sectors;
4. Allows organizations to take advantage of developments
that enable managing operations as cross-functional
processes; and
5. Fits an orientation toward inter – organizational
collaboration and strategic alliances through establishing
a culture of collaboration among different departments
within organization.
Dr. Prashant B. Kalaskar
Benefits of TQM
• Improve quality
• Employee participation and satisfaction
• Teamwork and Working relationships
• Customer satisfaction
• Productivity
• Communication
• Profitability and Market Share
Dr. Prashant B. Kalaskar
TQM techniques that Ford used
• Six Sigma
• Quality Operating System or (QOS)
• Developed their own quality process or 5S.
• The DMAIC process (Define, Measure, Analyze,
Improve, and Control) has built an overall
strategy for consistency in their teams
Dr. Prashant B. Kalaskar
Toyota Corporation uses
• 5S
• Lean manufacturing
• JIT
• Kaizen
• Six Sigma
(5 S: Sort, Store, Shine, Standardize and Sustain)
Dr. Prashant B. Kalaskar
Strategy Evaluation
Strategy Evaluation—the 3 Basics
• Examining the underlying basis (objectives) of
the firm’s strategy
• Comparing actual to expected results
• Taking corrective action to address
performance gaps
Dr. Prashant B. Kalaskar
Need of Strategic Evaluation
 Strategies are formulated on certain assumptions
 Strategies are formulated after analysis of Internal &
External Environmental factors which are dynamic
 Gap in Strategy formulation & implementation
 Assumptions may get changed over Gap period
 Hence Strategies must be evaluated continuously to
adjust the strategies with new requirements of the
present time
 2 ways for Strategic Evaluation:
Strategic & Operational Control
Dr. Prashant B. Kalaskar
Strategic Control
• Strategic control
– It is the process of monitoring and correcting
a firm’s strategy & performance, 2 ways….
– Informational Control: is the ability to respond
effectively to environmental change
– Behavioral Control: is the appropriate balance
and alignment among a firm’s culture,
rewards, and boundaries/limitations
Dr. Prashant B. Kalaskar
Informational Control
• Traditional control system
1. strategies are formulated and top
management sets goals
2. strategies are implemented
3. performance is measured against the
predetermined goal set
Dr. Prashant B. Kalaskar
Contemporary Approach
to Strategic Control
• Informational control
– a method of organizational control in which a firm
gathers and analyzes information from the internal
and external environment in order to obtain the best
fit between the organization’s goals and strategies
and the strategic environment.
Dr. Prashant B. Kalaskar
Formulate
Strategies
Strategic
Control
Implement
Strategies
Informational
Control
Behavioral
Control
Question…?
Top managers at HUL meet every Friday to review
daily operational reports and year-to-date (YTD)
data.
This is an example of……
A. Behavioral control
B. Informational control
C. Strategy formulation
D. Strategy implementation
Dr. Prashant B. Kalaskar
Informational Control
• Primarily concerned with whether or not the
organization is “doing the right things”
• Two key issues/factors
– Scan and monitor external environment
(general and industry)
– Continuously monitor the internal environment
Dr. Prashant B. Kalaskar
Informational Control
• Two key issues
– Scan and monitor external environment
(general and industry)
– Continuously monitor the internal environment
Dr. Prashant B. Kalaskar
Contemporary Approach
to Strategic Control
• Behavioral control
– It is the method of organizational control in
which a firm influences the actions of employees
through culture, rewards, and boundaries.
Behavioral control is focused on implementation
“doing things right”
Dr. Prashant B. Kalaskar
Culture
Bounda
-ries
Rewards
Reasons for an increased emphasis on
culture and rewards
Dr. Prashant B. Kalaskar
1. The competitive
environment is
increasingly
complex and
unpredictable,
demanding both
flexibility and
quick response to
its challenges.
2. The implicit long-
term contract
between the
organization and
its key employees
has been eroded.
Motivating with Rewards and Incentives
• Rewards and incentive systems
– Powerful means of influencing an organization’s
culture
– Focuses efforts on high-priority tasks
– Motivates individual and collective task
performance
– Can be an effective motivator and control
mechanism
Dr. Prashant B. Kalaskar
Types of Strategic Control
1. Premise control
2. Strategic surveillance
3. Special alert control
4. Implementation control
Dr. Prashant B. Kalaskar
1. Premise Control
• Premise control is designed to check
systematically and continuously whether the
premises on which the strategy is based are
still valid (goals)
• Environmental factors
• Industry factors
Dr. Prashant B. Kalaskar
2. Strategic Surveillance
• Strategic surveillance is designed to monitor a
broad range of events inside and outside the
firm that are likely to affect the course of its
strategy (close watch)
• Strategic surveillance must be kept as
unfocused as possible
• Despite its looseness, strategic surveillance
provides an ongoing, broad-based vigilance in
all daily operations
Dr. Prashant B. Kalaskar
3. Special Alert Control
• A special alert control is the thorough, and
often rapid reconsideration of the firm’s
strategy because of a sudden, unexpected
event (emergency plans)
• A drastic event should trigger an immediate
and intense reassessment of the firm’s
strategy and its current strategic situation
• Crisis teams
• Contingency plans
Dr. Prashant B. Kalaskar
4. Implementation Control
• Strategy implementation takes place as series
of steps, programs, investments, and moves
that occur over an extended time
• Implementation control is designed to assess
whether the overall strategy should be
changed in light of the results associated with
the incremental actions that implement the
overall strategy
– Monitoring strategic thrusts
– Milestone reviews
Dr. Prashant B. Kalaskar
Operational Control
Operational control is aimed at;
- Allocation &
- Use of Organizational resources through
evaluation of the performance of individual
units viz. SBU, Functional Divisions, Managers…
- It helps to asses contribution of each unit
towards accomplishment of Organizational
Objectives.
- Operational control is mainly concerned with
“Actions”
Dr. Prashant B. Kalaskar
Difference in Strategic & Operational
Control
Dr. Prashant B. Kalaskar
Attribute Strategic Control Operational Control
Basic Question
Are we moving in Right
Direction?
How are we Performing?
Aim
Proactive; Continuous
questioning
Allocation & Use of Resources
Main Concern
Steering Organization's Future
Direction
Action Control
Focus External Environment Internal Organization
Time Horizon Long Term Short Term
Exercise of
Control
By Top Management By Executive or Middle Level
Main Techniques
Environmental Scanning, Info
Gathering, Review
Budgets, Schedules & MBO
Operational Control Evaluation Process
Dr. Prashant B. Kalaskar
Strategy/Plan/
Objectives
Setting
Standards of
Performance
Actual
Performance
Management
of
Performance
Analyzing
Variances
Feedback
CheckStandards
CheckPerformances
Reformulate
4 Elements of Operational Control
Operational control Cycle contains 4 Elements…..
1) Setting Standards of Performance
2) Measurement of Performance
3) Analyzing Variances
4) Taking Corrective Actions
Dr. Prashant B. Kalaskar
1. Setting of Standards
3 Pronged approach to standard settings;
1) As per strategic requirement, the defined managerial
tasks be connected with KRA’s, Standards can be set
for each KRA’s
2) Special requirements for the for the performance of
the key tasks, can help to determine the type of
standards to be set.
3) KPI’s that can be decided to evaluate these standards
Dr. Prashant B. Kalaskar
1. Setting of Standards
Example:
• Say, one company is using Cost Leadership
Strategy.
• Key Managerial task: overall cost reduction.
• Special requirement: to monitor & reduce costs.
• KPI: reduction in cost of inventory, reduction
cost of production
Dr. Prashant B. Kalaskar
1. Setting Standards
Operational Control can be well exercised using
1) Quantitative Criteria of performance evaluation:
- Performance/Growth of company over last 10 years
- Growth rate, Industry norms, past performances
- Net profit, stock price, dividends rates, Ret. On Capital
2) Qualitative Criteria of performance evaluation:
- Capabilities, Core competencies,
- Risk bearing Capacity,
- Flexibility, Workability
Dr. Prashant B. Kalaskar
2. Measurement of Performance
- Evaluation process operates at Performance level,
as action takes place here
- Performance can be compared against standard
benchmark
- Measuring of performance can be done through;
“Accounting, Reporting & Communication System”
Dr. Prashant B. Kalaskar
3. Analysing Variances
The measurement of actual performance & comparing
it with the set standards provides variances.
There could be 3 situation that may arise;
1) The actual performance matches with set standard
2) The actual performance exceeds the set standard,
i.e. deviates positively from the set standards
3) The actual performance is below the set standard,
i.e. performance deviates negatively from the set
standards
Dr. Prashant B. Kalaskar
Variance Chart for Performance Evaluations
Dr. Prashant B. Kalaskar
Performance Indicators Standard Actual Deviation
Financial Area:
Profit Over Sales (%) 12 10 (-) 2
Dividend (%) 10 10 0
Marketing Area:
Sales Revenue (`) 25 23 (-) 2
No. of Customer Complaints 1.5 1.3 (+) 0.2
Operations Area;
Capacity Utilization (%) 85 90 (+) 5
Man Hours Per Unit 4 3.5 (+) 0.5
Symptoms of Malfunctioning of Strategy
1) Company is not performing as well as against its all close
rivals pr industry as a whole.
2) Company is not performing in terms of stated objectives,
ROI, Market Share, Profitability etc.
3) Corporate culture is not aligned with strategy
4) Implementation of Strategy is Slow
5) Organizational conflicts & interdepartmental bickering are
often symptoms of Strategy Malfunction
6) Managerial problem continue despite changes in
personnel & if they tend to be issue-based rather than
people-based, their strategies may be inconsistent
Dr. Prashant B. Kalaskar
Symptoms of Malfunctioning of Strategy
7) If success for one organizational department means failure
for another department then it is a symptom of
malfunctioning.
8) If policy problems & issues continue to be brought to the
top for resolution, then strategy may be Malfunctioning
9) Overtaxing of available resources is a symptom of
malfunctioning
10) Degree of risk is high as compared to rewards
11) Strategy is inconsistent with changing environment
12) If strategy implementation does not give due cognizance
to time horizon, then it is symptom of strategy is
malfunctioning
Dr. Prashant B. Kalaskar
Balanced Scorecard Methodology
• An alternative approach linking operational
and strategic control, developed by Harvard
Business School professors Robert Kaplan and
David Norton, is a system they names the
balanced scorecard
• The balanced scorecard is a management
system (not only a measurement system) that
enables companies to clarify their strategies,
translate them into action, and provide
meaningful feedback
Dr. Prashant B. Kalaskar
Integrating Shareholder Value and Organizational
Activities across Organizational Levels
Dr. Prashant B. Kalaskar
Balanced Scorecard
Four perspectives:
1. The learning and growth perspective: How well are
we continuously improving and creating value?
2. The business process perspective: What are our
core competencies and areas of operational
excellence?
3. The customer perspective: How satisfied are our
customers?
4. The financial perspective:
How are we doing for our shareholders
Dr. Prashant B. Kalaskar
Balanced Scorecard
For Any Query…..
Dr. Prashant B. Kalaskar
M: 9975770407, 7350520025
pbkalaskar@sinhgad.edu
prashantkalaskar007@gmail.com

Unit 4 Strategy Implementation

  • 1.
  • 2.
    Syllabus • 4.1: StrategyImplementation: Components of Strategic Plan, Barriers to Implementation of Strategy, Mintzberg’s 5 P’s, Deliberate & Emergent Strategies, McKinsey 7S Framework • 4.2: Organization Structure for Strategy Implementation: Entrepreneurial, Functional, Divisional, SBU, Matrix Network Structures, Cellular, Modular Organization, Matching Structure to Strategy, Organization Design for Stable Vs. Turbulent Environment • 4.3: Changing Structures & Processes: Reengineering & Strategy Implementation, Principles of Reengineering, Six Sigma, Process consisting of Defining, Analyzing, Improving & Establishing Steps, Lean Six Sigma (Concepts Only) • 4.4: Corporate Culture: Building Learning Organization, Promoting Participation thro’ technique of Management by Objectives (MBO), Total Quality Management (TQM) • 4.5: Strategy Evaluation: Operations Control & Strategic Control, Symptoms of Malfunctioning of Strategy, Use of Balanced Score Card for Strategy Evaluation Dr. Prashant B. Kalaskar
  • 3.
    Strategy Implementation Dr. PrashantB. Kalaskar • “Strategies most often fail because they aren’t executed well.” Larry Bossidy and Ram Charan “Successful strategy formulation does not guarantee successful strategy implementation.”
  • 4.
    Strategic Management Process Dr.Prashant B. Kalaskar 4 Implement Strategy SWOT Formulate Strategy – Corporate, Business, Functional Define new Mission Goals, Grand Strategy Identify Strategic Factors – Strengths, Weaknesses Identify Strategic Factors – Opportunities, Threats Scan Internal Environment – Core Competence, Synergy, Value Creation Evaluate Current Mission, Goals, Strategies Scan External Environment – National, Global
  • 5.
    Strategy Implementation • Strategyimplementation is actually putting strategies in to action. • The Strategies formulated at various levels of the organizations are implemented so as to achieve the objectives taken up at the corporate level. • Strategy implementation happens in two stages 1) Project Implementation 2) Procedural Implementation • A poor control on strategy implementation may result in unexpected situation of Malfunctioning of Strategy Dr. Prashant B. Kalaskar
  • 6.
    Strategy Formulation &Strategic Choice Dr. Prashant B. Kalaskar Strategy Formulation Strategy Analysis Strategy Choice
  • 7.
    Interrelationship of Strategy& Implementation Dr. Prashant B. Kalaskar Forward Linkage • Strategy implementation needs some restructure in Organization or in Resources to match with the strategy. • Strategy Provides overall direction for implementation Backward Linkage • Strategies are selected based on current structure and resources that are available for effective implementation. • Circumstances may affect selection of Strategy
  • 8.
    Mintzberg’s Types ofStrategies Dr. Prashant B. Kalaskar Emergent Strategies (Alternate Strategies) Intended Strategy (Strategy Formulated) Unrealised Strategy (Unfruitful) Realised Strategy (Implemented) Intended, emergent and realised strategies Deliberate Strategy (Choice of Strategy)
  • 9.
    Model of StrategyImplementation Dr. Prashant B. Kalaskar Strategic Plan Project Implementation Procedural Implementation Resource Allocation Structural Implementn. Leadership Implementn. Behavioral Implementn. Functional Operational E V A L U A T I O N Activating Strategy Managing Change Achieving Effectiveness
  • 10.
    What is StrategicPlanning? • Process to establish priorities on what you will accomplish in the future/objectives • Allows you to make choices on what you will do and what you will not do (Action Plans) • Pulls the entire organization together around a single game plan for execution (Direction) • Broad outline on where resources will get allocated Dr. Prashant B. Kalaskar
  • 11.
    Important aspects ofStr. Implementation • Where are we now? (Assessment) • Where do we need to be? (Gap / Future End State) • How will we close the gap (Strategic Plan) • How will we monitor our progress (Evaluation Balanced Scorecard) Dr. Prashant B. Kalaskar
  • 12.
    Strategic Planning Model AB C D E Dr. Prashant B. Kalaskar •Environmental Scan Assessment •Background Information •Situational Analysis •SWOT – Strength’s, Weaknesses, Opportunities, Threats •Situation – Past, Present and Future •Significant Issues •Align / Fit with Capabilities •Mission & Vision •Values / Guiding Principles •Major Goals •Specific Objectives •Performance Measurement •Targets / Standards of Performance •Initiatives and Projects Baseline Components •Performance Management •Review Progress – Balanced Scorecard •Take Corrective Actions Down to Specifics Evaluate Where we are Where we want to be How we will do it How are we doing •Gaps •Action Plans •Feedback upstream – revise plans
  • 13.
    Assessment Model: S WO T Dr. Prashant B. Kalaskar External Assessment: Marketplace, competitor’s, social trends, technology, regulatory environment, economic cycles . Internal Assessment: Organizational assets, resources, people, culture, systems, partnerships, suppliers, . . . Where is your organization in its development RIGHT now? Assess the Internal and External Environments
  • 14.
    Components of aStrategic Plan • Vision – Developing a clear understanding of what is your preferred future • Mission – Developing a sound statement about why you exist • Core Values and Beliefs – Describes behaviors and ideas that are important to your organization • Strategic Issues – The issues that create a gap between the ideal and reality • Operational Plans – How are you going to achieve your vision? Dr. Prashant B. Kalaskar
  • 15.
    Components of StrategicPlanning Dr. Prashant B. Kalaskar Mission Vision Goals Objectives Measures Why we exist What we want to be Indicators and Monitors of success Desired level of performance and timelines Planned Actions to Achieve Objectives O1 O2 AI1 AI2 AI3 M1 M2 M3 T1 T1 T1 Specific outcomes expressed in measurable terms (NOT activities) Strategic Plan Action Plans Evaluate Progress Targets Initiatives What we must achieve to be successful
  • 16.
    Barriers to Implementationof Strategy • Strategy Formulation Dr. Prashant B. Kalaskar Corporate Level Business Level Functional Level • Strategy Implementation
  • 17.
    Barriers to Implementationof Strategy • Implementing strategy has always been a challenge for organizations across the industry • Ability to implement strategy is the deciding factor between success and failure of a company’s strategy. • Strategy formulation and strategy implementation are not two discrete processes but are intertwined together. • Planning is no doubt important, but making the plan work is a bigger challenge which deals with organizational politics, culture and sometimes managing change. Dr. Prashant B. Kalaskar
  • 18.
    Barriers to Implementationof Strategy Dr. Prashant B. Kalaskar Barriers to Strategy Implementation Only 5% of the workforce understand the Vision Vision Barrier Only 25% of the Managers have Incentives linked to Strategy People Barrier 85% of the executive teams spends less than one hr/month discussing Strategy Management Barrier 60% of organizatio ns don’t link budget to strategy Resource Barrier
  • 19.
    Mintzberg’s 5P’s toDefine Strategy  Plan  Ploy  Pattern  Position  Perspective Dr. Prashant B. Kalaskar Henry Mintzberg
  • 20.
    Plan Dr. Prashant B.Kalaskar  A plan is an intended course of action  For example, a business makes a plan to increase their market share  Plan is not enough on its own. This is where the other four Ps come into play
  • 21.
    Ploy Strategy Dr. PrashantB. Kalaskar  A strategy can be a ploy  A ploy is a specific maneuver intended to gain an advantage on an opponent or competitor  For example, a business may threaten to introduce a new product or reduce price of product to scare competitors
  • 22.
    Ploy Strategy Dr. PrashantB. Kalaskar  Mintzberg says that getting the better of competitors, by plotting to disrupt, dissuade, discourage, or otherwise influence them, can be part of a strategy.  This is where strategy can be a ploy, as well as a plan.  For example, a grocery chain might threaten to expand a store, so that a competitor doesn't move into the same area; or a telecommunications company might buy up patents that a competitor could potentially use to launch a rival product
  • 23.
    Pattern Strategy Dr. PrashantB. Kalaskar  Strategy can be a pattern  Pattern means a series of actions  For example, a business makes a plan to increase market share  Then the business does a pattern of behavior to follow the plan for example, a company that regularly markets very expensive products is using a "high end" strategy.
  • 24.
    Pattern Strategy Dr. PrashantB. Kalaskar  Strategic plans and ploys are both deliberate exercises.  Strategy emerges from past organizational behavior.  Rather than being an intentional choice, a consistent and successful way of doing business can develop into a strategy.  Example: A manager who makes decisions that further enhance an already highly responsive customer support process than doing anything intentionally as a part of behavioral pattern
  • 25.
    Position Strategy Dr. PrashantB. Kalaskar  Strategy can be a position  Position means place in relation to competition  For example, a business may position itself in the market as a high quality service provider it reflects decisions to offer particular products or services in particular markets.
  • 26.
    Position Strategy Dr. PrashantB. Kalaskar  This is how the Organization decides to position their self in the marketplace.  This helps to explore the fit between the organization & the environment, and it helps to develop a sustainable competitive advantage  Example: Developing a niche product to avoid competition or products with differentiation to avoid competition
  • 27.
    Perspective Strategy Dr. PrashantB. Kalaskar  Strategy can be a Perspective  Perspective is a way of looking at the world  For example, different businesses view themselves and their customers differently that is, vision and direction.
  • 28.
    Perspective Strategy Dr. PrashantB. Kalaskar  The choices an organization makes about its strategy rely heavily on its culture & pattern of behavior  Example: an organization that encourages risk-taking & innovation from employees might focus on coming up with innovative products as the main thrust behind its strategy.  By contrast, an organization that emphasizes the reliable processing of data may follow a strategy of offering these services to other organizations under outsourcing arrangements.
  • 29.
    Example of Mintzberg’s5 • McDonald’s strategy plan “the Plan to Win” – growth strategies for McDonald’s by opening new and improving current McDonald’s restaurants. • Using growth strategies such as Market penetration, Product development and also CSR activities – in order to obtain legitimacy from their stakeholders Dr. Prashant B. Kalaskar Plan Strategy
  • 30.
    Ploy Strategy • McDonald’s“Healthy Living” Campaign – Teaching consumers to eat healthy – thereby McDonalds gain some “goodwill” by showing that they care about consumers’ health – thereby they meet consumers’ need Dr. Prashant B. Kalaskar
  • 31.
    Pattern Strategy • Expansion,expansion, expansion & Quality, Quality & Quality : McDonald’s expands in every matter and world corner. • The chance of growth is grasp at every time and any time. Dr. Prashant B. Kalaskar
  • 32.
    Position Strategy • McDonalds’“Healthy Living” Campaign • Quality of Service & Food • Customers will love the quality, service, ambience, variety of products • “I am Loving It” Dr. Prashant B. Kalaskar
  • 33.
    Perspective Strategy Dr. PrashantB. Kalaskar  Perspective Strategy McDonalds has focus on sheer productive efficiency
  • 34.
    McKinsey 7 SModel • The 7-S Framework was first mentioned in "The Art Of Japanese Management" by Richard Pascale and Anthony Athos in 1981. • They had been investigating how Japanese had been so successful. • At around the same time, Tom Peters and Robert Waterman were exploring what makes a company excellent. • The 7 S model was born at a meeting of these four authors in 1978. • It was taken up as a basic tool by the global management consultancy company McKinsey. Dr. Prashant B. Kalaskar
  • 35.
    McKinsey 7 SModel • The McKinsey 7S model is a useful framework for reviewing an organization's capabilities from different viewpoints. • The power of the McKinsey 7S model is that, managers should take into account all seven of these factors, to be sure of successful implementation of a strategy. Dr. Prashant B. Kalaskar
  • 36.
    McKensey 7 SFramework Dr. Prashant B. Kalaskar
  • 37.
    THE HARD S-1-Strategy • Strategy: the direction and scope of the company over the long term. • Ways to achieve competitive advantage. Examples. • Low-cost strategy through economic production or delivery • Product differentiation through distinct features or innovative sales. Dr. Prashant B. Kalaskar
  • 38.
    THE HARD S-2-Structure • Ways in which task and people are specialized and divided, and authority is distributed. Four main structures • Functional Structure • Divisional Structure • Matrix Structure • Network Structure Dr. Prashant B. Kalaskar
  • 39.
    THE HARD S-2-Structure Dr. Prashant B. Kalaskar Functional Structure Divisional Structure
  • 40.
    THE HARD S-3-Systems • Formal processes and procedures to manage the organization. Examples: • Performance Measurements • Reward Systems • Planning • Budgeting • Resource Allocation • Information System • Distribution System Dr. Prashant B. Kalaskar
  • 41.
    THE Soft S-1:Staffing Dr. Prashant B. Kalaskar  People, their background & competencies.  Organization’s approach to recruitment, selection, socialization, training and employee development is important for effective staffing.
  • 42.
    THE Soft S-2Skills • Distinctive competencies in the organization. • Can be of People, Management Practices, Systems and/or Technologies. Dr. Prashant B. Kalaskar
  • 43.
    THE Soft S-3Style • Leadership style of top management and overall operating style of organization. • Impacts norms followed by people, how they work and interact with each other and customers. Dr. Prashant B. Kalaskar
  • 44.
    THE Soft S-4Shared Values • Core values shared in the organization and serve as guiding principles of what is important. • Helps focus attention and provides a broader sense of purpose. Dr. Prashant B. Kalaskar
  • 45.
    Using the 7-SModel • Each “S” is consistent with and reinforces the other S’s. • Recognize the full range of elements that need to be changed and focus on the one’s that will have the greatest effects on performance. • All seven variables are interconnected- to make progress in one, adjustments need to be made in others also. Dr. Prashant B. Kalaskar
  • 46.
    Using the 7-SModel • Hard S’s (Easier to change) – Strategy – Structure & – Systems • Softer S’s (Harder to change directly and take longer time) – Staffing – Skills – Style & – Shared Values Dr. Prashant B. Kalaskar
  • 47.
    Objectives of McKensey7 S Model To analyze how well an organization is positioned to achieve its intended objective 1. Improve the performance of a company 2. Examine the likely effects of future changes within a company 3. Align departments and processes during a merger or acquisition 4. Determine how best to implement a proposed strategy Dr. Prashant B. Kalaskar
  • 48.
    Organizing & Organization Organizing “Arrangingthe activities & resources of the enterprise in such a way that they systematically contribute to the enterprise’s goals.” Organizational structure: “ It refers to formalized patterns of interactions that link a firm’s tasks, technologies, and people” Organization Chart: “A chart that shows the structure of the organization including the title of each manager’s position and, by means of connecting lines, who is accountable to whom and who has authority for each area” Dr. Prashant B. Kalaskar
  • 49.
    Organization Design &Structure Organization design “A process in which managers develop or change their organization’s structure” Work specialization “A component of organization structure that involves having each discrete step of a job done by a different individual rather than having one individual do the whole job” Dr. Prashant B. Kalaskar
  • 50.
    Different Types ofOrg. Structures • Functional Structure (U Form) • Divisional Structure (M Form or H Form) • Matrix Organization (Matrix Form) • Network Organization Structure • Cellular Organization Structure • Modular Organization Structure Dr. Prashant B. Kalaskar
  • 51.
    Functional Structure • Thiskind of organisational structure classifies people according to the function they perform in the organization. • The organisation chart for a functional based organisation consists of: Vice President, Sales department, Customer Service Department, Engineering or production department, Accounting department and Administrative department. Dr. Prashant B. Kalaskar
  • 52.
    Functional Structure Dr. PrashantB. Kalaskar Production Marketing Accounts Personnel IT Board of Directors Chief Executive
  • 53.
    Functional Structure Dr. PrashantB. Kalaskar Advantages • Specialisation – each department focuses on its own work • Accountability – someone is responsible for the section • Clarity – know your and others’ roles Disadvantages • Closed communication could lead to lack of focus • Departments can become resistant to change • Coordination may take too long time • Gap between top and bottom
  • 54.
    Divisional Structures • DivisionalStructure Managers create a series of business units to produce a specific kind of product for a specific kind of customer Dr. Prashant B. Kalaskar
  • 55.
    Other Types ofDivisional Structures • Geographic Structure • Market Structure Dr. Prashant B. Kalaskar
  • 56.
    Other Types ofDivisional Structures Market Structure • Managers place each distinct product line or business in its own self-contained division • Divisional managers have the responsibility for devising an appropriate business-level strategy for goals Advantages: - Specialize in one product area - Managers become experts in their area - No direct supervision of division by Top managers - Improves the use of resources Dr. Prashant B. Kalaskar
  • 57.
    Matrix Design Structure •An organizational structure that simultaneously groups people and resources by function and product - Complex network - Flexible & can respond rapidly to the change - Each employee has two bosses (functional manager and product manager) Dr. Prashant B. Kalaskar
  • 58.
  • 59.
    Modular Structure Modular organization •An organization in which non-vital functions are outsourced, which uses the knowledge and expertise of outside suppliers while retaining strategic control. Dr. Prashant B. Kalaskar
  • 60.
    Matching Structure toStrategy (Organization Design & Change) • There is no perfect organizational structure • There is only structures that match or do not match with requirements of strategy. • If they match, it’s a right structure or else is a bad structure. • Organization designing is the process to create a right structure. • Organization Design means modifying existing structure to fit the strategic requirement Dr. Prashant B. Kalaskar
  • 61.
    Organization Design • OrganizationDesign has two dimensions; 1) Structural Dimension Dr. Prashant B. Kalaskar 2) Contextual Dimension Formalization Specialization Hierarchy of Authority Centralization & Decentralization Professionalism Personnel Ratios Environment Goals & Strategy Culture Technology Size
  • 62.
    Structural Dimension • Formalization:Written documentation, procedures, regulations & policies • Specialization: Division of tasks on expertise • Hierarchy of Authority: Who reports to whom & span of control • Centralization & Decentralization: Decision making by one/top management & decentralization is decision is delegated to lower levels of management • Professionalism: formal education & Training • Personnel Ratios: Deployment of people to various functions & departments Dr. Prashant B. Kalaskar
  • 63.
    Organizational Structure &Design • Organizations moves from one stage of growth to next • Internal & external environment affects organization design. • Organization facing a stable environment may use a functional structure as there will be less interdepartmental coordination required. • A turbulent environment requires a rapid response capability, flexibility & quick decision making. • In such Turbulent environment Matrix or Divisional form of Structure is suitable Dr. Prashant B. Kalaskar
  • 64.
    Organizational Structure &Design • In case of Internal Environment type; 1) A slow or bureaucratic organization may work well with a functional Structure while, 2) Dynamic & Innovative nature of organization may require Divisional structure for effective implementation of strategies. Dr. Prashant B. Kalaskar
  • 65.
    Organizational Change • Organizationalchange takes place in two broad dimensions 1) Structural Changes & 2) Behavioral Changes to absorb impact of changes. The restructuring can be done either as… ReOrganization ReEngineering DeLayering Flatter Structures Dr. Prashant B. Kalaskar
  • 66.
    Organizational Change  Reorganization/Restructuring:is changing org. structure matching to the change in external environment  Reengineering: Fundamental Rethinking & Radical Redesigning of business process in areas like product quality, service, speed etc.  DeLayering: Reducing the number of layers in hierarchy for better & improved control  Flatter Structures: It is the result due to delayering Dr. Prashant B. Kalaskar
  • 67.
    Matching Structures toStrategies • Change in structure is dependent on change in external environment. • Structural changes also requires to compensate the impact of how people will react to the changed situations & how to manage the new relationships. Dr. Prashant B. Kalaskar
  • 68.
    Structure for Strategy •For Example @ Corporate Level Strategy: 1) A company has implemented a STABILITY strategy & has a simple functional structure working. 2) Now the company has planned to implement Concentric Diversification . 3) In such case the company should move from a Functional Structure to a Divisional Structure 4) As products will increase need to have a better coordination, company can create few departments & for the related product line 5) Personnel & Finance departments can be retained as centralized department. Dr. Prashant B. Kalaskar
  • 69.
    Structure for Strategy •For Example @ Business Level Strategy: 1) A company is pursuing a low cost leadership strategy in mature industry, can work well with Functional Structure. 2) Now the company has planned to implement Differentiation Strategy in a Turbulent environment, a divisional structure could serve better . 3) In such case the company can cater to changing customer needs more effectively. Dr. Prashant B. Kalaskar
  • 70.
    Business Process Reengineering(BPR) • Business Process Re-engineering or BPR is “The analysis and redesign of workflow and processes within and between Organizations” • BPR is the • Fundamental rethinking and Radical redesign of Business Processes to achieve Dramatic improvements in critical measures of performance .. such as Cost, Quality, Service and Speed. Dr. Prashant B. Kalaskar
  • 71.
    BPR Principles -Derived • Redesign process steps such that they can be performed in a correct order. • Combine several process steps into one. • Design for parallel sub-processes whenever possible to reduce waiting time between tasks. Dr. Prashant B. Kalaskar
  • 72.
    BPR Principles -Derived • Processes may have multiple versions. Remove complex, exceptions, and special cases. • Empower human potentials. Give front-line workers the responsibility to make decisions. • Provide mechanism (Machines) in the process to encourage individual, team, and organizational learning • An individual without information cannot take responsibility; Dr. Prashant B. Kalaskar
  • 73.
    A BPR Framework Dr.Prashant B. Kalaskar Organization – Job skills – Structures – Reward – Values Technology – Enabling technologies – Methods and tools Process – Core business processes - Value-added – Customer-focus -Innovation
  • 74.
    Approaches to BPR •Focus on core business processes. • Use information technology to enable new business processes, not just to automate existing ones. • Start with a clean sheet of paper and think out-of-the- box. (Do not rework old process) • Consider all aspects of the process. • Adopt a BPR methodology. • Use proven methods and tools in analyzing and redesigning the process. • Manage the implementation and change process from the beginning. Dr. Prashant B. Kalaskar
  • 75.
    Reengineering Example: TacoBell Co. • We were going backwards fast ... If something was simple, we made it complex. If it was hard, we figured out a way to make it impossible.” - Taco Bell CEO • Customer buy product for $1 are worth about 25 cents. & 75 cents goes into marketing, advertising, and overhead. • Reengineering from the customer’s point of view. “Are customer willing to pay for these ‘value-added’ activities?” Dr. Prashant B. Kalaskar
  • 76.
    Taco Bell Co. •Corporate Vision: “We want to become number one in share of stomach.” Kitchens : Seating capacity 70% : 30% ð 30% : 70% • Eliminate district managers. Restaurant managers are given profit-and-loss responsibility. (Rewards based) • Moving cooking of meat and bean outside. • Boost peak serving capacity at average restaurant from $400 an hour to $1,500 a hour. • $500 millions regional company in 1982 to $3 billion national company in 1992. Dr. Prashant B. Kalaskar
  • 77.
    What is SixSigma…? • Six sigma is a business statistical Strategy. • Is to identifying defects and removing them from the process of products to improve quality. • A defect is defined as any process output that does not meet customer specifications. • The term " Sigma " is used to designate the distribution or spread about the mean (average) of any process or procedure. “Process Improvement” Dr. Prashant B. Kalaskar
  • 78.
    What is SixSigma…? Dr. Prashant B. Kalaskar  Six Sigma, is the common measurement index of "defects-per-unit," where a unit can be virtually anything--- a component, piece of material, administrative form, time frame, distance, etc. The Sigma value indicates how often defects are likely to occur. The higher the sigma value, the less likely a process will produce defects. As sigma increases, costs go down, cycle time goes down, and customer satisfaction goes up.
  • 79.
    History of SixSigma • The Six sigma was founded by Motorola in the 1970s. • Out of senior executive Art Sundry's criticism of Motorola’s bad quality. • They found a connection between increase in quality and decreases in costs of production. • Bill Smith, “Father of six sigma” introduce this quality improvement Methodology to Motorola. Dr. Prashant B. Kalaskar
  • 80.
    Definition of SixSigma • Quality management program developed by Motorola in the 1980s. • Management philosophy focused on business process improvements to: Eliminate waste, rework, and mistakes Increase customer satisfaction Increase profitability and competitiveness Dr. Prashant B. Kalaskar
  • 81.
    Six Sigma Dr. PrashantB. Kalaskar μ σ • Sigma is the Greek letter representing the standard deviation of a population of data. • Sigma is a measure of variation (the data spread)
  • 82.
    What does variationmean? Dr. Prashant B. Kalaskar Variation means that a process does not produce the same result (the “Y”) every time. Some variation will exist in all processes. Variation directly affects customer experiences. Customers do not feel averages! -10 -5 0 5 10 15 20
  • 83.
    Managing Up theSigma Scale Dr. Prashant B. Kalaskar Sigma % Good % Bad DPMO 1 30.9% 69.1% 691,462 2 69.1% 30.9% 308,538 3 93.3% 6.7% 66,807 4 99.38% 0.62% 6,210 5 99.977% 0.023% 233 6 99.9997% 0.00034% 3.4
  • 84.
    Examples of theSigma Scale Dr. Prashant B. Kalaskar In a world at 3 sigma. . . There are 964 U.S. flight cancellations per day. The police make 7 false arrests every 4 minutes. In MA, 5,390 newborns are dropped each year. In one hour, 47,283 international long distance calls are accidentally disconnected. In a world at 6 sigma. . . 1 U.S. flight is cancelled every 3 weeks. There are fewer than 4 false arrests per month. 1 newborn is dropped every 4 years in MA. It would take more than 2 years to see the same number of dropped international calls.
  • 85.
    Six Sigma Companies Dr.Prashant B. Kalaskar
  • 86.
    Lean Six Sigma •What is Lean..? Lean is a methodology that evaluates processes with a focus on.. Speed Efficiency Dr. Prashant B. Kalaskar
  • 87.
    Process Improvement Dr. PrashantB. Kalaskar 1. Initial Perception of problem 2. Clarify Problem 3. Locate Point of Cause 4. Root Cause Analysis 5. Design Solutions 6. Measure Effectiveness 7. Standardize
  • 88.
    Lean Six SigmaProcess Improvement • Lean Six Sigma Seeks to improve the quality of manufacturing and business process by: Identifying and removing the causes of defects (errors) and variation. Identifying and removing sources of waste within the process Focusing on outputs that are critical to customers Dr. Prashant B. Kalaskar Define Measure AnalyzeImprove Control
  • 89.
    Lean Six SigmaProcess Improvement • LSS is a management philosophy that seeks to drive a quality culture change through a multi-level based program Dr. Prashant B. Kalaskar Level Training Green Belt LSS Methodology and basic tool set Black Belt Green Belt content plus advanced data analysis Master Black Belt Black belt content plus program management, leadership skills, some advanced tools
  • 90.
    Background on Lean •Lean comes out of the industrial engineering world • Taiichi Ohno – Toyota Production System. – 1940s-1950s company was on verge of bankruptcy – Dynamics of industry were changing – moving from mass production to more flexible, shorter, varied batch runs (people wanted more colors, different features, more models, etc). • Ohno was inspired by 3 observations on a trip to America – Henry Ford’s assembly line inspired the principle of flow (keep products moving because no value is added while it is sitting still) – The Indy 500 – Rapid Changeover – The American Grocery Store – led to the Pull system – material use signals when and how stock needs to be replenished Dr. Prashant B. Kalaskar
  • 91.
    Path To Lean Dr.Prashant B. Kalaskar Theory Waste is Deadly Application 1. Define Value – act on what is important to the customer 2. Identify Value Stream – understand what steps in the process add value and which don’t 3. Make it flow – keep the work moving at all times and eliminate waste that creates delay 4. Let customer pull -- Avoid making more or ordering more inputs for customer demand you don’t have 5. Pursue perfection -- there is no optimum level of performance Focus Flow Focused Assumptions Non-Value added steps exit Results Reduced cycle time
  • 92.
    The Eight Wastes 1)Overproduction—making or doing more than is required or earlier than needed. 2) Waiting—for information, materials, people, maintenance, etc. 3) Transport—moving people or goods around or between sites. 4) Poor process design—too many/too few steps, non- standardization, inspection rather than prevention, etc. 5) Inventory—raw materials, work-in-progress, finished goods, papers, electronic files, etc. 6) Motion—inefficient layouts or poor ergonomics at work-stations or in offices. 7) Defects—errors, scrap, rework, non-conformance. 8) Underutilized personnel resources and creativity—ideas that are not listened to, skills that are not utilized. Dr. Prashant B. Kalaskar
  • 93.
    Lean Methods • KaizenEvents (or SCORE events) – Planned and structured process that enables a small group of people to improve some aspect of their business in a quick, focused manner. • Select • Clarify • Organize • Run • Evaluate • 5S – this methodology reduces waste through improved workplace organization and visual management – Sort, Store, Shine, Standardize and Sustain • Kanban – a Japanese term that can be translated as “signal,” “card,” or “sign.” – Most often a physical signal (paper card of plastic bin), that indicates when it is time to order more, from whom, and in what quantity. Dr. Prashant B. Kalaskar
  • 94.
    DMAIC: Lean Methodology •Define – describe the problem quantifiably and the underlying process to determine how performance will be measured. • Measure – use measures or metrics to understand performance and the improvement opportunity. • Analyze – identify the true root cause(s) of the underlying problem. • Improve – identify and test the best improvements that address the root causes. • Control – identify sustainment strategies that ensure process performance maintains the improved state. Dr. Prashant B. Kalaskar
  • 95.
    Why Define aProcess as a Value Stream? • A Value Stream –Focuses attention on what is important for the customer. –Identifies all the necessary components to bring a product or service from conception to commercialization. –Identifies waste inherent in processes and works to remove it. –Reduces defects in products and deficiencies in processes. –Focuses on improving specs and cost. Dr. Prashant B. Kalaskar
  • 96.
    What Is TypicallyFound Dr. Prashant B. Kalaskar Lean Value Stream Management starts with defining value in terms of products and process capabilities to provide the customer with what they need at the right time and at an appropriate price. Value added Non-value added/waste
  • 97.
    The Methods Dr. PrashantB. Kalaskar Lean & Six Sigma Improve Speed Achieve Breakthrough Dashboard Results Lower Costs Culture Change Sustain Performance Higher Quality Methods Results
  • 98.
    Lean and SixSigma Dr. Prashant B. Kalaskar LEAN = Improvement principles focused on dramatically improving process speed and eliminating the eight deadly wastes. Improve Process- Pull Control Process Analyze Process- Flow Measure Value Define Value SIX SIGMA = Breakthrough Process, Design, or Improvement Teams focused on eliminating chronic problems and reducing variation in processes. Improve ControlAnalyzeMeasureDefine
  • 99.
    Lean and SixSigma Dr. Prashant B. Kalaskar Six Sigma = Breakthrough Process Improvement Teams focused on eliminating chronic problems and reducing variation in processes. Lean = Rapid Improvement Teams focused on dramatically improving process speed, and the elimination of the eight deadly wastes. IMPROVED EFFICIENCY Improve Process- Pull Control Process Analyze Process- Flow Measure Value Define Value IMPROVED EFFECTIVENESS Improve ControlAnalyzeMeasureDefine
  • 100.
    Learning Organization “A learningorganization is an organization skilled at creating, acquiring, and transferring knowledge, and at modifying its behavior to reflect new knowledge and insights” “New ideas are essential, if learning is to take place” “Without accompanying changes in the way that work gets done, only the potential for improvements exist” Dr. Prashant B. Kalaskar
  • 101.
    3 M’s inLearning organizations • Meaning Plausible, well grounded definition, actionable and easy to apply. • Management Clear guidelines for practice, filled with operational advice rather than high aspirations. • Measurement Tools for assessing organizations rate and level of learning to ensure gains have been made. Dr. Prashant B. Kalaskar
  • 102.
    Organization & Qualities Threedistinct stages. 1. Cognitive • Exposed to new ideas, expand their knowledge and begin to think differently. 2. Behavioral • Employees internalize new insights and alter behavior. 3. Performance Improvement • Changes in behavior leading to measurable improvements in results. Dr. Prashant B. Kalaskar
  • 103.
    Levels in the LEARNINGORGANIZATION • Individual Learning (IL) • Organizational Learning (OL) IL: Sincé the individuals form the bulk of the organization, they must establish the necessary forms and processes to enable organizational learning in order to facilitate change. OL: is more than the sum of the parts of individual learning. An organization does not lose out on its learning abilities when members leave the organization. Dr. Prashant B. Kalaskar
  • 104.
    Building Blocks ofLearning Organisation • Systematic Problem Solving • Experimentation • Learning from Past Experience • Learning from others. • Transferring knowledge • Measuring learning Each is accompanied by a distinctive mindset, tool kit and pattern of behavior. Dr. Prashant B. Kalaskar
  • 105.
    Systematic Problem Solving •Rely on scientific method for diagnosing problems “plan, do, check, act” • Statistical analysis – Generating ideas and collecting information – Reaching consensus – Analyzing and displaying data – Planning actions Dr. Prashant B. Kalaskar
  • 106.
    Experimentation • On-going programs –Series of small experiments – Steady flow of new ideas – Incentive system – Need managers and employees trained in evaluating and performing experiments Dr. Prashant B. Kalaskar
  • 107.
    Learning from PastExperience • Companies revive successes and failures. • Assessment done systematically and in an open and accessible forum “Those who cannot remember the past are condemned to repeat it” Dr. Prashant B. Kalaskar
  • 108.
    Learning from Others •“Most powerful insights come from looking outside ones immediate environment to gain a new perspective” • SIS-Steal Ideas Shamelessly • Benchmarking – Ongoing investigation and learning experience that ensures the best industry practices are uncovered, analyzed, adapted and implemented. Dr. Prashant B. Kalaskar
  • 109.
    Transferring Knowledge • Knowledgemust be spread quickly and efficiently throughout the organization • Maximum impact when shared broadly – Written reports – Oral reports – Site visits and tours – Personnel rotation programs – Standardization programs – Education and training programs Dr. Prashant B. Kalaskar
  • 110.
    Measuring Learning • “Ifyou can’t measure it, you can’t manage it” • Actual data comparison • Learning or experience curves. – Incomplete measures, ignore other competitive variables, like quality, delivery or new product introductions Dr. Prashant B. Kalaskar
  • 111.
    3 types of OrganizationalLearning • SINGLE-LOOP LEARNING • DOUBLE-LOOP LEARNING • DEUTERO-LEARNING Dr. Prashant B. Kalaskar
  • 112.
    Single-loop Learning • Thisoccurs when errors are detected and corrected. • Firms continue with their present policies and goals. • This is the “Lower-level Learning”, “Not- Strategic Learning”, “ • This is an “Adaptive Learning”. Dr. Prashant B. Kalaskar
  • 113.
    Double-loop Learning • Thisoccurs when, in addition to detection and correction of errors, the organization questions and modifies its existing norms, procedures, policies and objectives. • It involves changing the organization’s knowledge- base or firm-specific competences or routines. • It is called as “Higher-Level Learning”, • “Strategic Learning” :Learning to expand organization’s capabilities Dr. Prashant B. Kalaskar
  • 114.
    Deutero-learning • This occurswhen organizations learn HOW to CARRY OUT Single-loop learning and Double-loop Learning. • Being aware of ignorace motivates learning. • Identification of LEARNING STYLES and FACILITATING FACTORS required to promote learning. Dr. Prashant B. Kalaskar
  • 115.
    Management by Objective(MBO) Dr. Prashant B. Kalaskar MANAGEMENT By OBJECTIVE
  • 116.
    Management by Objectives(MBO) • The term “Management by Objectives" was first popularized by Peter Drucker in his book 'The Practice of Management in 1954. • Management by Objectives (MBO) is a process of agreeing upon objectives within an organization so that management and employees agree to the objectives and understand what they are supposed to do in the organization. • Objectives can be set in all domains of activities (production, services, sales, R&D, human resources, finance, information systems etc.). Dr. Prashant B. Kalaskar
  • 117.
    Definition of MBO •Management By Objectives (MBO) can be defined as a process whereby the employees and the superiors come together to identify common goals, the employees set their goals to be achieved, the standards to be taken as the criteria for measurement of their performance and contribution and deciding the course of action to be followed. Dr. Prashant B. Kalaskar
  • 118.
    Main Concept • Theprinciple behind Management by Objectives (MBO) is to make sure that everybody within the organization has a clear understanding of the aims, or objectives of that of organization, as well as awareness of their own roles and responsibilities in achieving those aims. • The complete MBO system is to get managers and empowered employees acting to implement and achieve their plans, which automatically achieve those of the organization. Dr. Prashant B. Kalaskar
  • 119.
    Principles of MBO •Cascading of organizational vision, goals and objectives • Specific objectives for each member • Participative decision making • Explicit time period • Performance evaluation and feedback Dr. Prashant B. Kalaskar
  • 120.
    Process of MBO Dr.Prashant B. Kalaskar Appraise Performance •Corporate Strategic goals •Departmental goals •Individual goals STEP 1: SET GOALS STEP 4: APPRAISE OVERALL PERFORMANCE Action Plans Review Progress & Take Corrective Action STEP 2: DEVELOP PLANS STEP 3: REVIEW PROGRESS
  • 121.
    The Smart Method Clarityof goals – With MBO, came the concept of SMART goals i.e. goals that are: • Specific • Measurable • Achievable • Relevant, and • Time bound. Dr. Prashant B. Kalaskar
  • 122.
    MBO: 3 BasicParts • All individuals within an organization are assigned a special set of objectives that they try to reach during a normal operating period. These objectives are mutually set and agreed upon by individuals and their managers. • Performance reviews are conducted periodically to determine how close individuals are to attaining their objectives. • Rewards are given to individuals on the basis of how close they come to reaching their goals. Dr. Prashant B. Kalaskar
  • 123.
    Advantages of MBO •Improves employee motivation • Improves communication in the organisation • Flags up and highlights training needs required to achieve objectives • Improves overall performance and efficiency • Attainment of goals can lead to the satisfaction of Maslow’s higher order needs Dr. Prashant B. Kalaskar
  • 124.
    Disadvantages of MBO •May demotivate staff if targets are too high and unrealistic, also if imposed rather than agreed • Requires the cooperation of all employees to succeed • Can be bureaucratic and time consuming (meetings, feedback) • Can encourage short-term rather a more focused long- term growth • Setting targets for certain specialized employees may be difficult Dr. Prashant B. Kalaskar
  • 125.
    MBO at Intel AManager's Guide at Intel provides the following directions. Start with a few well-chosen overriding objectives. Set your subordinates objectives that fit in with your overriding objectives. Allow your subordinates to set their own key results areas (KRA’s) to enable them to meet their objectives. Dr. Prashant B. Kalaskar
  • 126.
    MBO at Intel •In Management by Objectives systems at Intel, objectives are written down for each level of the organization, and individuals are given specific aims and targets. • The principle behind this is to ensure that people know what the organization is trying to achieve, what their part of the organization must do to meet those aims, and how, as individuals, they are expected to help Dr. Prashant B. Kalaskar
  • 127.
    MBO at Microsoft ByBill Gates • Eliminate politics, by giving everybody the same message. • Keep a flat organization in which all issues are discussed openly. • Insist on clear and direct communication. • Eliminate rivalry between different parts of the organization • Empower teams to do their own things Dr. Prashant B. Kalaskar
  • 128.
    Total Quality Management(TQM) “Quality is everyone’s responsibility” -Edward Deming • The integration of all processes and functions of the firm in the task of ensuring a product’s quality throughout its life cycle (mfg. & usage) . • Measurement of Success: – 100% Customer Satisfaction • Method of Achievement: – Continuous Improvement Dr. Prashant B. Kalaskar
  • 129.
    Total Quality Management(TQM)  TQM is an operating philosophy (experience) and management tool (SOP) that focuses on continuous process improvement.  Everything is a scientific method.  Do it right the first time through universal participation.  Teams as well as individuals that results in customer satisfaction.  Internal and External customers ultimately contributes to co.’s performance. Dr. Prashant B. Kalaskar
  • 130.
    Total Quality Management(TQM) • 1. The customer makes the ultimate determination of quality. • 2. Top management must provide leadership and support for all quality initiatives. • 3. Preventing variability is the key to producing high quality. • 4. Quality goals are a moving target, thereby requiring a commitment toward continuous improvement. • 5. Improving quality requires the establishment of effective metrics. We must speak with data and facts not just opinions. Dr. Prashant B. Kalaskar
  • 131.
    Continuous Process ImprovementCycle Dr. Prashant B. Kalaskar 1. Identify the opportunity 2. Analyze the process 3. Develop the optimal Solution 4. Implement 5. Study the results 6. Standardize the solution 7. Plan for the future Plan Do Act Check
  • 132.
    TQM Six BasicConcepts 1. A committed and involved management to provide long-term-top-to-bottom organizational support. 2. An unwavering (constant) focus on the customer, both internally and externally. 3. Effective evaluation of the business and production process. 4. Continuous improvement of the business and production process. 5. Treating suppliers as partners. 6. Establish performance measures for the process. Dr. Prashant B. Kalaskar
  • 133.
    7 Important Principlesof TQM • 1. Quality can and must be managed. • 2. Processes, not people, are the problem. • 3. Don’t treat symptoms, look for the cure. • 4. Every employee is responsible for quality. • 5. Quality must be measurable. • 6. Quality improvements must be continuous. • 7. Quality is a long-term investment. Dr. Prashant B. Kalaskar
  • 134.
    5 Main Advantagesof TQM 1. Encourages a strategic approach to management at the operational level through involving multiple departments in cross-functional improvements and systemic innovation processes; 2. Provides high ROI through improving efficiency; 3. Works equally well for service and manufacturing sectors; 4. Allows organizations to take advantage of developments that enable managing operations as cross-functional processes; and 5. Fits an orientation toward inter – organizational collaboration and strategic alliances through establishing a culture of collaboration among different departments within organization. Dr. Prashant B. Kalaskar
  • 135.
    Benefits of TQM •Improve quality • Employee participation and satisfaction • Teamwork and Working relationships • Customer satisfaction • Productivity • Communication • Profitability and Market Share Dr. Prashant B. Kalaskar
  • 136.
    TQM techniques thatFord used • Six Sigma • Quality Operating System or (QOS) • Developed their own quality process or 5S. • The DMAIC process (Define, Measure, Analyze, Improve, and Control) has built an overall strategy for consistency in their teams Dr. Prashant B. Kalaskar
  • 137.
    Toyota Corporation uses •5S • Lean manufacturing • JIT • Kaizen • Six Sigma (5 S: Sort, Store, Shine, Standardize and Sustain) Dr. Prashant B. Kalaskar
  • 138.
    Strategy Evaluation Strategy Evaluation—the3 Basics • Examining the underlying basis (objectives) of the firm’s strategy • Comparing actual to expected results • Taking corrective action to address performance gaps Dr. Prashant B. Kalaskar
  • 139.
    Need of StrategicEvaluation  Strategies are formulated on certain assumptions  Strategies are formulated after analysis of Internal & External Environmental factors which are dynamic  Gap in Strategy formulation & implementation  Assumptions may get changed over Gap period  Hence Strategies must be evaluated continuously to adjust the strategies with new requirements of the present time  2 ways for Strategic Evaluation: Strategic & Operational Control Dr. Prashant B. Kalaskar
  • 140.
    Strategic Control • Strategiccontrol – It is the process of monitoring and correcting a firm’s strategy & performance, 2 ways…. – Informational Control: is the ability to respond effectively to environmental change – Behavioral Control: is the appropriate balance and alignment among a firm’s culture, rewards, and boundaries/limitations Dr. Prashant B. Kalaskar
  • 141.
    Informational Control • Traditionalcontrol system 1. strategies are formulated and top management sets goals 2. strategies are implemented 3. performance is measured against the predetermined goal set Dr. Prashant B. Kalaskar
  • 142.
    Contemporary Approach to StrategicControl • Informational control – a method of organizational control in which a firm gathers and analyzes information from the internal and external environment in order to obtain the best fit between the organization’s goals and strategies and the strategic environment. Dr. Prashant B. Kalaskar Formulate Strategies Strategic Control Implement Strategies Informational Control Behavioral Control
  • 143.
    Question…? Top managers atHUL meet every Friday to review daily operational reports and year-to-date (YTD) data. This is an example of…… A. Behavioral control B. Informational control C. Strategy formulation D. Strategy implementation Dr. Prashant B. Kalaskar
  • 144.
    Informational Control • Primarilyconcerned with whether or not the organization is “doing the right things” • Two key issues/factors – Scan and monitor external environment (general and industry) – Continuously monitor the internal environment Dr. Prashant B. Kalaskar
  • 145.
    Informational Control • Twokey issues – Scan and monitor external environment (general and industry) – Continuously monitor the internal environment Dr. Prashant B. Kalaskar
  • 146.
    Contemporary Approach to StrategicControl • Behavioral control – It is the method of organizational control in which a firm influences the actions of employees through culture, rewards, and boundaries. Behavioral control is focused on implementation “doing things right” Dr. Prashant B. Kalaskar Culture Bounda -ries Rewards
  • 147.
    Reasons for anincreased emphasis on culture and rewards Dr. Prashant B. Kalaskar 1. The competitive environment is increasingly complex and unpredictable, demanding both flexibility and quick response to its challenges. 2. The implicit long- term contract between the organization and its key employees has been eroded.
  • 148.
    Motivating with Rewardsand Incentives • Rewards and incentive systems – Powerful means of influencing an organization’s culture – Focuses efforts on high-priority tasks – Motivates individual and collective task performance – Can be an effective motivator and control mechanism Dr. Prashant B. Kalaskar
  • 149.
    Types of StrategicControl 1. Premise control 2. Strategic surveillance 3. Special alert control 4. Implementation control Dr. Prashant B. Kalaskar
  • 150.
    1. Premise Control •Premise control is designed to check systematically and continuously whether the premises on which the strategy is based are still valid (goals) • Environmental factors • Industry factors Dr. Prashant B. Kalaskar
  • 151.
    2. Strategic Surveillance •Strategic surveillance is designed to monitor a broad range of events inside and outside the firm that are likely to affect the course of its strategy (close watch) • Strategic surveillance must be kept as unfocused as possible • Despite its looseness, strategic surveillance provides an ongoing, broad-based vigilance in all daily operations Dr. Prashant B. Kalaskar
  • 152.
    3. Special AlertControl • A special alert control is the thorough, and often rapid reconsideration of the firm’s strategy because of a sudden, unexpected event (emergency plans) • A drastic event should trigger an immediate and intense reassessment of the firm’s strategy and its current strategic situation • Crisis teams • Contingency plans Dr. Prashant B. Kalaskar
  • 153.
    4. Implementation Control •Strategy implementation takes place as series of steps, programs, investments, and moves that occur over an extended time • Implementation control is designed to assess whether the overall strategy should be changed in light of the results associated with the incremental actions that implement the overall strategy – Monitoring strategic thrusts – Milestone reviews Dr. Prashant B. Kalaskar
  • 154.
    Operational Control Operational controlis aimed at; - Allocation & - Use of Organizational resources through evaluation of the performance of individual units viz. SBU, Functional Divisions, Managers… - It helps to asses contribution of each unit towards accomplishment of Organizational Objectives. - Operational control is mainly concerned with “Actions” Dr. Prashant B. Kalaskar
  • 155.
    Difference in Strategic& Operational Control Dr. Prashant B. Kalaskar Attribute Strategic Control Operational Control Basic Question Are we moving in Right Direction? How are we Performing? Aim Proactive; Continuous questioning Allocation & Use of Resources Main Concern Steering Organization's Future Direction Action Control Focus External Environment Internal Organization Time Horizon Long Term Short Term Exercise of Control By Top Management By Executive or Middle Level Main Techniques Environmental Scanning, Info Gathering, Review Budgets, Schedules & MBO
  • 156.
    Operational Control EvaluationProcess Dr. Prashant B. Kalaskar Strategy/Plan/ Objectives Setting Standards of Performance Actual Performance Management of Performance Analyzing Variances Feedback CheckStandards CheckPerformances Reformulate
  • 157.
    4 Elements ofOperational Control Operational control Cycle contains 4 Elements….. 1) Setting Standards of Performance 2) Measurement of Performance 3) Analyzing Variances 4) Taking Corrective Actions Dr. Prashant B. Kalaskar
  • 158.
    1. Setting ofStandards 3 Pronged approach to standard settings; 1) As per strategic requirement, the defined managerial tasks be connected with KRA’s, Standards can be set for each KRA’s 2) Special requirements for the for the performance of the key tasks, can help to determine the type of standards to be set. 3) KPI’s that can be decided to evaluate these standards Dr. Prashant B. Kalaskar
  • 159.
    1. Setting ofStandards Example: • Say, one company is using Cost Leadership Strategy. • Key Managerial task: overall cost reduction. • Special requirement: to monitor & reduce costs. • KPI: reduction in cost of inventory, reduction cost of production Dr. Prashant B. Kalaskar
  • 160.
    1. Setting Standards OperationalControl can be well exercised using 1) Quantitative Criteria of performance evaluation: - Performance/Growth of company over last 10 years - Growth rate, Industry norms, past performances - Net profit, stock price, dividends rates, Ret. On Capital 2) Qualitative Criteria of performance evaluation: - Capabilities, Core competencies, - Risk bearing Capacity, - Flexibility, Workability Dr. Prashant B. Kalaskar
  • 161.
    2. Measurement ofPerformance - Evaluation process operates at Performance level, as action takes place here - Performance can be compared against standard benchmark - Measuring of performance can be done through; “Accounting, Reporting & Communication System” Dr. Prashant B. Kalaskar
  • 162.
    3. Analysing Variances Themeasurement of actual performance & comparing it with the set standards provides variances. There could be 3 situation that may arise; 1) The actual performance matches with set standard 2) The actual performance exceeds the set standard, i.e. deviates positively from the set standards 3) The actual performance is below the set standard, i.e. performance deviates negatively from the set standards Dr. Prashant B. Kalaskar
  • 163.
    Variance Chart forPerformance Evaluations Dr. Prashant B. Kalaskar Performance Indicators Standard Actual Deviation Financial Area: Profit Over Sales (%) 12 10 (-) 2 Dividend (%) 10 10 0 Marketing Area: Sales Revenue (`) 25 23 (-) 2 No. of Customer Complaints 1.5 1.3 (+) 0.2 Operations Area; Capacity Utilization (%) 85 90 (+) 5 Man Hours Per Unit 4 3.5 (+) 0.5
  • 164.
    Symptoms of Malfunctioningof Strategy 1) Company is not performing as well as against its all close rivals pr industry as a whole. 2) Company is not performing in terms of stated objectives, ROI, Market Share, Profitability etc. 3) Corporate culture is not aligned with strategy 4) Implementation of Strategy is Slow 5) Organizational conflicts & interdepartmental bickering are often symptoms of Strategy Malfunction 6) Managerial problem continue despite changes in personnel & if they tend to be issue-based rather than people-based, their strategies may be inconsistent Dr. Prashant B. Kalaskar
  • 165.
    Symptoms of Malfunctioningof Strategy 7) If success for one organizational department means failure for another department then it is a symptom of malfunctioning. 8) If policy problems & issues continue to be brought to the top for resolution, then strategy may be Malfunctioning 9) Overtaxing of available resources is a symptom of malfunctioning 10) Degree of risk is high as compared to rewards 11) Strategy is inconsistent with changing environment 12) If strategy implementation does not give due cognizance to time horizon, then it is symptom of strategy is malfunctioning Dr. Prashant B. Kalaskar
  • 166.
    Balanced Scorecard Methodology •An alternative approach linking operational and strategic control, developed by Harvard Business School professors Robert Kaplan and David Norton, is a system they names the balanced scorecard • The balanced scorecard is a management system (not only a measurement system) that enables companies to clarify their strategies, translate them into action, and provide meaningful feedback Dr. Prashant B. Kalaskar
  • 167.
    Integrating Shareholder Valueand Organizational Activities across Organizational Levels Dr. Prashant B. Kalaskar
  • 168.
    Balanced Scorecard Four perspectives: 1.The learning and growth perspective: How well are we continuously improving and creating value? 2. The business process perspective: What are our core competencies and areas of operational excellence? 3. The customer perspective: How satisfied are our customers? 4. The financial perspective: How are we doing for our shareholders Dr. Prashant B. Kalaskar
  • 169.
  • 170.
    For Any Query….. Dr.Prashant B. Kalaskar M: 9975770407, 7350520025 pbkalaskar@sinhgad.edu prashantkalaskar007@gmail.com