Background of Technical reports
Introduction to technical reports
Purpose of technical reports
Initials of technical reports
“nuts” and “bolts” of technical report
Types of
Technical
Reports
Structural report
Features of my Presentations
5
6
A technical report is a
formal report designed
to convey technical
information.
Technical Report
7
• Technical reports first appeared in the early part of the 20th
century;
• The U.S. Geological Survey published a series of Professional
papers beginning in 1902
• National Advisory Committee for Aeronautics (NACA) issued its
first technical report in 1915
• Technical report seems to be the preferred designation.
Background of Technical Report
8
• Majority of engineering tasks include the writing of technical
reports
• Objectives
1. help students to present the reports in a professional format.
2. prepare students for the writing of technical reports and
papers in engineering practice.
• How to produce High quality technical report
• an important skill regardless of the means of communication
Brief Introduction to Technical Reports
9
Why write reports?
How to write reports in a fashion acceptable to a journal in your
field?
The main purpose of a technical report is fact findings and
prepares the base for making decision.
Purpose of Technical Report
10
ask yourself the following questions
Who are your readers
How is the technical report organized
Where are technical reports written
who are your stake holders
Why is the report written
Before you write………………
“Nuts” and “Bolts” of the report
11
12
Structural report
Analytical report
Periodic report
Feasibility report
Progressive report
Informational report
Evaluation Report
Different types of reports
13
14
• Structural Reports are often referred to as
“Engineers Reports” or “Structural
Engineers Reports” or “Structural Survey”.
• Structural report will specify which items
were inspected and the observations and
conclusions found during the inspection.
• It will state whether or not there is a
structural concern and if so, what needs
to be done to rectify the problem or what
further investigations may be necessary.
What is Structural Report
15
Specific
Structural
Report (SSR)
General
Structural
Report (GSR)
Types of Structural Report
16
• primary planning document for decision-making about mapping
and construction treatments
• Documentation to help establish significant dates or periods of
construction
• basis for design of recommended work
• summary of information known and conditions observed at the
time of the survey
structural report facilitates
17
• title of the structural report
• name of submitting engineer
• name of department
• name of receiving commitee
title page of a structural report
18
Sample title Page of a Structural Report
Title of the report
Department + author
name
date of submission
Submitted to
19
Road map of Structural Report
STRUCTURAL
INFORMATION
• Executive Summary
• Structural Plans
BODY OF THE
STRUCTURAL REPORT
• Structural Problems
• Recommendations and
department response
CONCLUSIONS
20
Sample road map of a structural report
21
Structural information
Recommendations and
actions
Identify
structural issues
+
concerns
Full
structural
survey
sample structural information of a
structural report
Full Structural Survey
structural
issues
Resolving
issues
23
• thorough overview of the existing conditions of the structural
system
• detailed descriptions of the components that contribute to the
strength of the structure
• Challenges surrounding the project
Executive Summary
24
Executive summary of structural report
existing
conditions
Strengthen
components
Challenges
25
Structural Plans
A key plan is generally used when only a
part of a plan is being shown, there will be a
smaller version of the entire document,
showing which part that particular page is
showing
Site plan is
a plan of a construction site showing the
position and dimensions of the building
A Location plan will show the Lot in
question with the surrounding streets,
major highways, places that are around it so
that somebody can orientate themselves as
to where the site is.
26
Key Plans
plans showing primary architectural elements of each
building. They graphically represent walls, doors,
windows, room numbers, and other features.
wall door
Room number
27
surroundings
28
Site plan
Travel ways
garden elements
building footprint
Water pool
29
Body of the report
30
• assessment of structural problem concentrated in a specific area
of the property.
• parts of the property not related to the specific problem may not
be inspected or mentioned in the written report.
Structural Problems
31
• Recommendations should be focused on decisions or actions to
be taken (or not taken) as a result of the analysis
• Department’s response will focus on the recommendations.
Recommendations and Department
Response
32
• represent the need for more urgent action
Priority Recommendations
Urgently
needed
33
Department Response
34
• represent the need for lateral action
Other recommendations
need to be
considered
35
Department Response
36
Conclusions
37
Conclusion
The property was generally found to be in a condition commensurate with a property
of its age.
Many of the defects noted are issues of general fabric repairs and not significant structural
defects. From a structural aspect there are however areas of concern:
• The condition of the floor in the kitchen.
• The deflections in the main bedroom ceiling joists.
• The structural tie of the walls at wall plate level, in localized areas.
• The water tank supports.
• The cracking in the garden wall which abuts the main dwelling.
• The condition of the garage roof surface coverings.
• The bow in the garage wall below dpc level.
• The cracking in the garage pier and the condition of steel bearings.
Conclusion of general structural survey
report
Main outcome
Relation
to
theory
+ main
ideas
feasibility report
Feasibility report
examines the practicality
of a proposed project
Feasibility reports are
created to help the
decision makers to
choose between
available options.
A feasibility report also determines
whether or not the investigated task
can be done with the amount of
resources available
What is a Feasibility Report?
• The feasibility report answers the question "Should we
implement Plan X?
• Not only does it give a recommendation, it also provides the
data and the reasoning behind that recommendation.
Purpose of feasibility report
Structural fundamental principle
The structural fundamental principle to this type of report is:
• you provide not only your recommendation, choice, or judgment, but
also the data and the conclusions leading up to it.
Important Features of a Basic Feasibility Report
Below are the seven elements of a feasibility report:
1. Introduction
2. Criteria/Constraints
3. Methods of obtaining facts
4. Overview of Alternative Options
5. Evaluation
6. Conclusions
7. Recommendations
Introduction
• The introductory part of the report of the report should:
• Provide the reason why you conducted this study.
• provide background information.
• identify the alternatives you investigated.
• persuade readers to use this study as a valid document.
Example of introduction section
Example of introduction section
Criteria/constraints
• This part should identify the standards by which the action or
alternatives were evaluated?
• It is also very important to map out the constraints of your
suggested solutions.
• Sources of criteria
Example of criteria section
• This part of your paper demonstrates to the reader what you
discovered through your research, actually matters and has
reliability.
• With strong methods for finding out your facts, your readers
will then feel comfortable and confident to make the necessary
changes.
Methods of obtaining facts
Example of Methods section
• You must underline the key features of each possible option.
• Make sure they are easy to understand and presented in a friendly
layout.
• Keep in mind that the goal is to allow your audience to make the
best decision.
Overview of Alternative Options
• This should be the bulk of your report, you must evaluate the
options using the criteria you created.
• Add graphs, charts, etc. to show that you have studied your
options, and have come up with statistics that back up your
reasons as to why your alternative beats the competition.
Evaluation
Conclusion
• You need to state the conclusion you have came up with.
• How did you evaluate the alternatives?
• And then from there, which alternative best fit your
organization.
Example of conclusion section
You need to use
your experience
and knowledge in
order to state
which option you
think should be
adopted.
Recommendations
Example of recommendation section
Progress report
• what sub-goals have been
accomplished,
• what resources have been expended,
• what problems have been encountered,
• whether the project or process is
expected to be completed on time and
within budget.
An assessment
that takes
place during a
project or
process, that
conveys details
such as
Definition of progress report
Purpose of the progress report
Main purpose:
• Project monitoring
• accountability
Reassure recipients that you
are making progress, that the
project is going smoothly,
and that it will be complete
by the expected date.
Provide their recipients
with a brief look at some
of the findings or some of
the work of the project.
Give their recipients a
chance to evaluate your
work on the project and
to request changes.
Give you a chance to
discuss problems in the
project and thus to
forewarn recipients.
Force you to establish a
work schedule so that
you'll complete the
project on time.
Progress reports have several important functions:
Points to be covered in progress report
• How much of the work is complete
• What part of the work is currently in progress
• What work remains to be done
• What problems or unexpected things
• How the project is going in general
In the
progress
report, you
explain any
or all of the
following:
Contents of progress report
1. Introduction
2. Project description
3. Work status
4. Problems encountered
5. Summary & conclusion
It should include
Topic and purpose of the report:
• Very briefly explain the project and what this progress report is
for
Time period covered:
• The date from the commencement of the project to the present
date
Introduction
Example introduction to a progress report
• In most progress reports, include a project description to review
the details of your project for the recipients
Project description
Example project description from a
report
Work status
• It describes
• Work completed before this report
• Work completed during this time period-present work
• Work you need to complete before you finish the project –future work
• Describe problems encountered during the report period and
solutions adopted.
• Describe problems not solved and propose solutions.
Problems encountered
• Give an overall assessment of the work progress on site and
highlighting the issues to be brought to the attention.
• Give an estimate for the completion date for the project.
Summary and Conclusions
Overall appraisal used as conclusion to a
progress report
Evaluation report
• This type provides an opinion or judgment rather than a yes-no-
maybe answer or a recommendation.
• It provides a studied opinion on the value or worth of
something.
• This type of report compares a thing to a set of requirements (or
criteria) and determines how well it meets those requirements.
What is an evaluation report?
• The purpose of the evaluation report can be twofold;
to:
• assist in decision-making; and
• to provide a better understanding of the project's achievements
(and areas for improvement).
Purpose of evaluation report
It includes
• Title of evaluation report
• Executive summary
• Background of project
• Purpose, intent and design of the evaluation study
• Results
• Discussion
• Conclusions, recommendations and options
Contents of evaluation report
• Choose a title that is descriptive of your project keeping your
main audience in mind.
Title of evaluation report
This might cover:
• origins of the project (e.g. in response to some perceived need)
• project goals and objectives
• staff and resources involved
• funding sources
Background of project
This is a critical opening to the report. It should provide:
• an overview of the evaluation (the 'what' and 'why');
• the major sources of data and methods of data collection and
analysis
• general results of the evaluation
• summary of recommendations
• any major limitations or constraints placed on the evaluation.
Executive summary
Items here include:
• aims/objectives of the evaluation (refer to Practice Note)
• evaluation criteria chosen (performance measures, standards in
this case we require the set key competencies)
• key questions explored
• other design parameters — data collection and analysis
methods, data sources
• composition of evaluation team (rank, level etc).
Purpose, intent and design of the
evaluation study
• This section provides a description of the evaluation findings.
• Use graphs, tables, diagrams etc. to aid understanding and
interpretation where necessary.
Results
This should include:
• interpretations of the findings
• any limitations or weaknesses in the findings, methods, data,
etc.
• judgments against the evaluation criteria
• comment on the generalizability of the findings
• any 'unexpected' findings.
Discussion
This section should encapsulate the outcomes of the evaluation
and clearly point to appropriate actions that stem from the
findings.
It should include:
• overall judgment
• comment on the validity and reliability of the findings on which
the conclusions are made
• any recommendations for change/improvement.
Conclusions, recommendations and options
Subtitle
Information report
What is an information report?
• Information report provide data, facts, feedback, and other
types of information without analysis or recommendations
• Recommendations is the biggest difference between
informational and analytical reporting.
The purpose of an
information report is to
classify and describe
general classes of
phenomenon by
organizing and
recording factual
information.
Purpose of information report
uses facts
to explain
something
gives
details
about a
topic
does not
contain
personal
views
An information report :
Information report structure typically includes an opening
statement (often a classification of definition), a series of
paragraphs describing various aspects and features of the topic, a
summary paragraph and conclusion i.e
• Title
• Introduction
• Body (Paragraphs)
• Conclusion
Structure of information report
Title
The first part of an information
report is the title, or heading, of
the report. This will tell the
reader what topic is covered in
the report.
• The first introductory
paragraph, known as the
classification, explains the
aspects of the topic that
will be covered in the
report.
Introduction
• The following information is
contained in the body
paragraphs.
• This is where the topic of the
report is covered in more
detail.
• These paragraphs use factual
information to give the
reader a better
understanding of the topic.
• Sometimes, these
paragraphs are broken up by
sub-headings to help
organise the information
Main body (paragraphs)
• The conclusion of an
information report
gives any final details
or facts about the
topic. It may also be
used to review what
the report was
about.
Conclusion
Analytical report
91
Contents
• Analytical
Report
• Periodic
Report
• Checklist
&
Overview
• An analytical report examines a problem or issue and
recommends an action.
• These reports attempt to describe why or how something
happened and then to explain what it means.
• An analytical report is professional document written mostly for
business uses.
What is an analytical report
Goals of an analytical report
Assesses
Opportunities
Solves Problems
Supports Decisions
94
Questions to be answered
Title page.
Table of contents.
Introduction.
Executive summary.
Conclusions and
recommendations.
Appendices.
Elements of an analytical report
The title of the report should
• Be long enough to describe the report's contents.
• Incorporate the key words from the report.
Title page
• An outline for the report.
• The table of contents allows your reader to easily find the
information.
• The table of contents is usually constructed using chapter or
section titles.
Table of Contents
• Concise version of your report.
• The purpose of the analytical report.
• Research design.
• General conclusions.
• Any recommendations.
Executive summary
• The introduction should establish the context of your work and
explain the problem being researched.
• It includes
1. A “resources” section.
2. A “scope” section.
3. A “limitations” section.
Introduction
Tables of figures are necessary
only when the report has a
number of charts, graphs, or
line drawings and the readers
will be accessing them non-
sequentially.
Glossaries are necessary only
in those rare cases when the
report will use a number of
terms that are not familiar to
the reader.
Table of Figures & Glossary of Terms
• Conclusions are a natural extension of the
report and complete its logic.Conclusions
• Recommendations typically look to the future.
Recommendations
Conclusion and Recommendations
• Appendices are supplementary materials you include at the end
of your report.
• Each of your appendix should be numbered or lettered
consecutively and given a title.
• Appendix should be referenced in the table of contents and in
the body of text.
Appendices
The key term is
ANALYZE
Use simple, clear
language .
Every point
you make in your
report must be
supported by
factual data from
your research.
Tips for writing an analytical report
Periodic report
• It is one which is submitted at regular intervals for the purpose
of recording information.
• It can take almost any form depending on the project and the
frequency of reports required.
• It serves to show comparison and tendencies.
What is a periodic report?
• Consider all the activities of the organization for the specific time
period.
• Begin by noting the time period.
• Are you sharing information about the last two weeks,the past
month or the fiscal year?
• The information or data may include performance, current
status, challenges faced during the period, activities undertaken.
How to write a periodic report?
• Organize task so you can report them logically.
• Once lists are completed categories of tasks becomes
subheadings under a major heading.
• Organize so the reader can find important information easily.
How to write a periodic report?
When written for an internal
reader a short periodic report
may be formatted as memo.
For an external reader, the
report may be formatted as a
letter.
Format For The Audience
• For the introduction, develops an overview that briefly presents
the highlights of the report.
• Mention each idea included in a major heading.
• Also state the reporting period, the times of which the
document describes activities or progress.
Introduction
• Tasks proposed to be completed in the upcoming period.
• Problems encountered.
• List of submitted reports.
• Copy of submitted reports.
• Response to questions and comments on previous report.
• Methods and materials.
• Data and analysis.
• Significant findings.
Status Summary & Technical Summary
• In the conclusion,
highlight any key
ideas and refer to
the next report.
Conclusion
Checklist for effective technical report
• Are the purpose and aims clear?
• Are the main points included?
• Are the points supported by evidence?
• Is all the information relevant to the purpose?
• Is the information presented clearly?
Checklist for effective technical report
• Is the language clear and easy to understand?
• Is the style formal?
• Is the grammar and punctuation correct?
• Is the spelling ok?
• Are the conclusions and recommendations clearly
linked to the purpose and based on findings?
125
The Structural report will specify
which items were inspected and the
observations and conclusions found
during the inspection.
Overview
Overview
A feasibility report is a
document that assesses
potential solutions to the
business problem or
opportunity, and determines
which of these are viable for
further analysis.
A progress report is a
written record of what has
been done and what is left
to do on a project.
Overview
Evaluation report provides
an opinion or judgment
rather than a yes-no-maybe
answer or a
recommendation.
Periodic report is one which
is submitted at regular
intervals for the purpose of
recording information.
Overview
Information report provide
data, facts, feedback, and
other types of information
without analysis or
recommendations.
An analytical report
examines a problem or issue
and recommends an action.
129
• https://www.tu-
chemnitz.de/phil/english/sections/linguist/independent/kursmaterialien/TechComm/acch
tml/feas.html
• https://www.slideshare.net/mobile/lisachiang1209/progress-report-12696365
• http://evaluationtoolbox.net.au/index.php?option=com_content&view=article&id=48&Ite
mid=60
• http://surveyorsreports.co.uk/structural_engineer_report.htm
• https://www.youtube.com/watch?v=u9djIwXfM3Q
• http://www.tasbuildinginspections.com.au/wp-content/uploads/2014/04/Sample-
Structural-Building-Inspection-Report.pdf
• https://www.youtube.com/watch?v=MrljzRy6HVc
• https://www.youtube.com/watch?v=OSVEsZjGf30
• https://prezi.com/il20fla4ks4i/periodic-report/
Refrences

TYPES OF TECHNICAL REPORTS

  • 1.
  • 2.
    • Click toedit Master text styles • Second level • Third level • Fourth level • Fifth level Title and Content Layout with List Sidra Khan 2014-EE-474 Amber Rasheed 2014-EE-406 Farwa Jafar 2014-EE-408 Syeda Farwa Fatima 2014-EE438 2
  • 3.
  • 4.
    4 Technical Report Background of Technicalreports Introduction to technical reports Purpose of technical reports Initials of technical reports “nuts” and “bolts” of technical report Types of Technical Reports Structural report Features of my Presentations
  • 5.
  • 6.
    6 A technical reportis a formal report designed to convey technical information. Technical Report
  • 7.
    7 • Technical reportsfirst appeared in the early part of the 20th century; • The U.S. Geological Survey published a series of Professional papers beginning in 1902 • National Advisory Committee for Aeronautics (NACA) issued its first technical report in 1915 • Technical report seems to be the preferred designation. Background of Technical Report
  • 8.
    8 • Majority ofengineering tasks include the writing of technical reports • Objectives 1. help students to present the reports in a professional format. 2. prepare students for the writing of technical reports and papers in engineering practice. • How to produce High quality technical report • an important skill regardless of the means of communication Brief Introduction to Technical Reports
  • 9.
    9 Why write reports? Howto write reports in a fashion acceptable to a journal in your field? The main purpose of a technical report is fact findings and prepares the base for making decision. Purpose of Technical Report
  • 10.
    10 ask yourself thefollowing questions Who are your readers How is the technical report organized Where are technical reports written who are your stake holders Why is the report written Before you write………………
  • 11.
  • 12.
    12 Structural report Analytical report Periodicreport Feasibility report Progressive report Informational report Evaluation Report Different types of reports
  • 13.
  • 14.
    14 • Structural Reportsare often referred to as “Engineers Reports” or “Structural Engineers Reports” or “Structural Survey”. • Structural report will specify which items were inspected and the observations and conclusions found during the inspection. • It will state whether or not there is a structural concern and if so, what needs to be done to rectify the problem or what further investigations may be necessary. What is Structural Report
  • 15.
  • 16.
    16 • primary planningdocument for decision-making about mapping and construction treatments • Documentation to help establish significant dates or periods of construction • basis for design of recommended work • summary of information known and conditions observed at the time of the survey structural report facilitates
  • 17.
    17 • title ofthe structural report • name of submitting engineer • name of department • name of receiving commitee title page of a structural report
  • 18.
    18 Sample title Pageof a Structural Report Title of the report Department + author name date of submission Submitted to
  • 19.
    19 Road map ofStructural Report STRUCTURAL INFORMATION • Executive Summary • Structural Plans BODY OF THE STRUCTURAL REPORT • Structural Problems • Recommendations and department response CONCLUSIONS
  • 20.
    20 Sample road mapof a structural report
  • 21.
  • 22.
    sample structural informationof a structural report Full Structural Survey structural issues Resolving issues
  • 23.
    23 • thorough overviewof the existing conditions of the structural system • detailed descriptions of the components that contribute to the strength of the structure • Challenges surrounding the project Executive Summary
  • 24.
    24 Executive summary ofstructural report existing conditions Strengthen components Challenges
  • 25.
    25 Structural Plans A keyplan is generally used when only a part of a plan is being shown, there will be a smaller version of the entire document, showing which part that particular page is showing Site plan is a plan of a construction site showing the position and dimensions of the building A Location plan will show the Lot in question with the surrounding streets, major highways, places that are around it so that somebody can orientate themselves as to where the site is.
  • 26.
    26 Key Plans plans showingprimary architectural elements of each building. They graphically represent walls, doors, windows, room numbers, and other features. wall door Room number
  • 27.
  • 28.
    28 Site plan Travel ways gardenelements building footprint Water pool
  • 29.
  • 30.
    30 • assessment ofstructural problem concentrated in a specific area of the property. • parts of the property not related to the specific problem may not be inspected or mentioned in the written report. Structural Problems
  • 31.
    31 • Recommendations shouldbe focused on decisions or actions to be taken (or not taken) as a result of the analysis • Department’s response will focus on the recommendations. Recommendations and Department Response
  • 32.
    32 • represent theneed for more urgent action Priority Recommendations Urgently needed
  • 33.
  • 34.
    34 • represent theneed for lateral action Other recommendations need to be considered
  • 35.
  • 36.
  • 37.
    37 Conclusion The property wasgenerally found to be in a condition commensurate with a property of its age. Many of the defects noted are issues of general fabric repairs and not significant structural defects. From a structural aspect there are however areas of concern: • The condition of the floor in the kitchen. • The deflections in the main bedroom ceiling joists. • The structural tie of the walls at wall plate level, in localized areas. • The water tank supports. • The cracking in the garden wall which abuts the main dwelling. • The condition of the garage roof surface coverings. • The bow in the garage wall below dpc level. • The cracking in the garage pier and the condition of steel bearings. Conclusion of general structural survey report Main outcome Relation to theory + main ideas
  • 38.
  • 39.
    Feasibility report examines thepracticality of a proposed project Feasibility reports are created to help the decision makers to choose between available options. A feasibility report also determines whether or not the investigated task can be done with the amount of resources available What is a Feasibility Report?
  • 40.
    • The feasibilityreport answers the question "Should we implement Plan X? • Not only does it give a recommendation, it also provides the data and the reasoning behind that recommendation. Purpose of feasibility report
  • 41.
    Structural fundamental principle Thestructural fundamental principle to this type of report is: • you provide not only your recommendation, choice, or judgment, but also the data and the conclusions leading up to it.
  • 42.
    Important Features ofa Basic Feasibility Report Below are the seven elements of a feasibility report: 1. Introduction 2. Criteria/Constraints 3. Methods of obtaining facts 4. Overview of Alternative Options 5. Evaluation 6. Conclusions 7. Recommendations
  • 43.
    Introduction • The introductorypart of the report of the report should: • Provide the reason why you conducted this study. • provide background information. • identify the alternatives you investigated. • persuade readers to use this study as a valid document.
  • 44.
  • 45.
  • 46.
    Criteria/constraints • This partshould identify the standards by which the action or alternatives were evaluated? • It is also very important to map out the constraints of your suggested solutions. • Sources of criteria
  • 47.
  • 48.
    • This partof your paper demonstrates to the reader what you discovered through your research, actually matters and has reliability. • With strong methods for finding out your facts, your readers will then feel comfortable and confident to make the necessary changes. Methods of obtaining facts
  • 49.
  • 50.
    • You mustunderline the key features of each possible option. • Make sure they are easy to understand and presented in a friendly layout. • Keep in mind that the goal is to allow your audience to make the best decision. Overview of Alternative Options
  • 51.
    • This shouldbe the bulk of your report, you must evaluate the options using the criteria you created. • Add graphs, charts, etc. to show that you have studied your options, and have come up with statistics that back up your reasons as to why your alternative beats the competition. Evaluation
  • 52.
    Conclusion • You needto state the conclusion you have came up with. • How did you evaluate the alternatives? • And then from there, which alternative best fit your organization.
  • 53.
  • 54.
    You need touse your experience and knowledge in order to state which option you think should be adopted. Recommendations
  • 55.
  • 56.
  • 57.
    • what sub-goalshave been accomplished, • what resources have been expended, • what problems have been encountered, • whether the project or process is expected to be completed on time and within budget. An assessment that takes place during a project or process, that conveys details such as Definition of progress report
  • 58.
    Purpose of theprogress report Main purpose: • Project monitoring • accountability
  • 59.
    Reassure recipients thatyou are making progress, that the project is going smoothly, and that it will be complete by the expected date. Provide their recipients with a brief look at some of the findings or some of the work of the project. Give their recipients a chance to evaluate your work on the project and to request changes. Give you a chance to discuss problems in the project and thus to forewarn recipients. Force you to establish a work schedule so that you'll complete the project on time. Progress reports have several important functions:
  • 60.
    Points to becovered in progress report • How much of the work is complete • What part of the work is currently in progress • What work remains to be done • What problems or unexpected things • How the project is going in general In the progress report, you explain any or all of the following:
  • 61.
    Contents of progressreport 1. Introduction 2. Project description 3. Work status 4. Problems encountered 5. Summary & conclusion
  • 62.
    It should include Topicand purpose of the report: • Very briefly explain the project and what this progress report is for Time period covered: • The date from the commencement of the project to the present date Introduction
  • 63.
    Example introduction toa progress report
  • 64.
    • In mostprogress reports, include a project description to review the details of your project for the recipients Project description
  • 65.
  • 66.
    Work status • Itdescribes • Work completed before this report • Work completed during this time period-present work • Work you need to complete before you finish the project –future work
  • 67.
    • Describe problemsencountered during the report period and solutions adopted. • Describe problems not solved and propose solutions. Problems encountered
  • 68.
    • Give anoverall assessment of the work progress on site and highlighting the issues to be brought to the attention. • Give an estimate for the completion date for the project. Summary and Conclusions
  • 69.
    Overall appraisal usedas conclusion to a progress report
  • 70.
  • 71.
    • This typeprovides an opinion or judgment rather than a yes-no- maybe answer or a recommendation. • It provides a studied opinion on the value or worth of something. • This type of report compares a thing to a set of requirements (or criteria) and determines how well it meets those requirements. What is an evaluation report?
  • 72.
    • The purposeof the evaluation report can be twofold; to: • assist in decision-making; and • to provide a better understanding of the project's achievements (and areas for improvement). Purpose of evaluation report
  • 73.
    It includes • Titleof evaluation report • Executive summary • Background of project • Purpose, intent and design of the evaluation study • Results • Discussion • Conclusions, recommendations and options Contents of evaluation report
  • 74.
    • Choose atitle that is descriptive of your project keeping your main audience in mind. Title of evaluation report
  • 75.
    This might cover: •origins of the project (e.g. in response to some perceived need) • project goals and objectives • staff and resources involved • funding sources Background of project
  • 76.
    This is acritical opening to the report. It should provide: • an overview of the evaluation (the 'what' and 'why'); • the major sources of data and methods of data collection and analysis • general results of the evaluation • summary of recommendations • any major limitations or constraints placed on the evaluation. Executive summary
  • 77.
    Items here include: •aims/objectives of the evaluation (refer to Practice Note) • evaluation criteria chosen (performance measures, standards in this case we require the set key competencies) • key questions explored • other design parameters — data collection and analysis methods, data sources • composition of evaluation team (rank, level etc). Purpose, intent and design of the evaluation study
  • 78.
    • This sectionprovides a description of the evaluation findings. • Use graphs, tables, diagrams etc. to aid understanding and interpretation where necessary. Results
  • 79.
    This should include: •interpretations of the findings • any limitations or weaknesses in the findings, methods, data, etc. • judgments against the evaluation criteria • comment on the generalizability of the findings • any 'unexpected' findings. Discussion
  • 80.
    This section shouldencapsulate the outcomes of the evaluation and clearly point to appropriate actions that stem from the findings. It should include: • overall judgment • comment on the validity and reliability of the findings on which the conclusions are made • any recommendations for change/improvement. Conclusions, recommendations and options
  • 81.
  • 82.
    What is aninformation report? • Information report provide data, facts, feedback, and other types of information without analysis or recommendations • Recommendations is the biggest difference between informational and analytical reporting.
  • 83.
    The purpose ofan information report is to classify and describe general classes of phenomenon by organizing and recording factual information. Purpose of information report
  • 84.
    uses facts to explain something gives details abouta topic does not contain personal views An information report :
  • 85.
    Information report structuretypically includes an opening statement (often a classification of definition), a series of paragraphs describing various aspects and features of the topic, a summary paragraph and conclusion i.e • Title • Introduction • Body (Paragraphs) • Conclusion Structure of information report
  • 86.
    Title The first partof an information report is the title, or heading, of the report. This will tell the reader what topic is covered in the report.
  • 87.
    • The firstintroductory paragraph, known as the classification, explains the aspects of the topic that will be covered in the report. Introduction
  • 88.
    • The followinginformation is contained in the body paragraphs. • This is where the topic of the report is covered in more detail. • These paragraphs use factual information to give the reader a better understanding of the topic. • Sometimes, these paragraphs are broken up by sub-headings to help organise the information Main body (paragraphs)
  • 89.
    • The conclusionof an information report gives any final details or facts about the topic. It may also be used to review what the report was about. Conclusion
  • 90.
  • 91.
  • 92.
    • An analyticalreport examines a problem or issue and recommends an action. • These reports attempt to describe why or how something happened and then to explain what it means. • An analytical report is professional document written mostly for business uses. What is an analytical report
  • 93.
    Goals of ananalytical report Assesses Opportunities Solves Problems Supports Decisions
  • 94.
  • 95.
    Title page. Table ofcontents. Introduction. Executive summary. Conclusions and recommendations. Appendices. Elements of an analytical report
  • 96.
    The title ofthe report should • Be long enough to describe the report's contents. • Incorporate the key words from the report. Title page
  • 100.
    • An outlinefor the report. • The table of contents allows your reader to easily find the information. • The table of contents is usually constructed using chapter or section titles. Table of Contents
  • 102.
    • Concise versionof your report. • The purpose of the analytical report. • Research design. • General conclusions. • Any recommendations. Executive summary
  • 104.
    • The introductionshould establish the context of your work and explain the problem being researched. • It includes 1. A “resources” section. 2. A “scope” section. 3. A “limitations” section. Introduction
  • 106.
    Tables of figuresare necessary only when the report has a number of charts, graphs, or line drawings and the readers will be accessing them non- sequentially. Glossaries are necessary only in those rare cases when the report will use a number of terms that are not familiar to the reader. Table of Figures & Glossary of Terms
  • 107.
    • Conclusions area natural extension of the report and complete its logic.Conclusions • Recommendations typically look to the future. Recommendations Conclusion and Recommendations
  • 110.
    • Appendices aresupplementary materials you include at the end of your report. • Each of your appendix should be numbered or lettered consecutively and given a title. • Appendix should be referenced in the table of contents and in the body of text. Appendices
  • 114.
    The key termis ANALYZE Use simple, clear language . Every point you make in your report must be supported by factual data from your research. Tips for writing an analytical report
  • 115.
  • 116.
    • It isone which is submitted at regular intervals for the purpose of recording information. • It can take almost any form depending on the project and the frequency of reports required. • It serves to show comparison and tendencies. What is a periodic report?
  • 117.
    • Consider allthe activities of the organization for the specific time period. • Begin by noting the time period. • Are you sharing information about the last two weeks,the past month or the fiscal year? • The information or data may include performance, current status, challenges faced during the period, activities undertaken. How to write a periodic report?
  • 118.
    • Organize taskso you can report them logically. • Once lists are completed categories of tasks becomes subheadings under a major heading. • Organize so the reader can find important information easily. How to write a periodic report?
  • 119.
    When written foran internal reader a short periodic report may be formatted as memo. For an external reader, the report may be formatted as a letter. Format For The Audience
  • 120.
    • For theintroduction, develops an overview that briefly presents the highlights of the report. • Mention each idea included in a major heading. • Also state the reporting period, the times of which the document describes activities or progress. Introduction
  • 121.
    • Tasks proposedto be completed in the upcoming period. • Problems encountered. • List of submitted reports. • Copy of submitted reports. • Response to questions and comments on previous report. • Methods and materials. • Data and analysis. • Significant findings. Status Summary & Technical Summary
  • 122.
    • In theconclusion, highlight any key ideas and refer to the next report. Conclusion
  • 123.
    Checklist for effectivetechnical report • Are the purpose and aims clear? • Are the main points included? • Are the points supported by evidence? • Is all the information relevant to the purpose? • Is the information presented clearly?
  • 124.
    Checklist for effectivetechnical report • Is the language clear and easy to understand? • Is the style formal? • Is the grammar and punctuation correct? • Is the spelling ok? • Are the conclusions and recommendations clearly linked to the purpose and based on findings?
  • 125.
    125 The Structural reportwill specify which items were inspected and the observations and conclusions found during the inspection. Overview
  • 126.
    Overview A feasibility reportis a document that assesses potential solutions to the business problem or opportunity, and determines which of these are viable for further analysis. A progress report is a written record of what has been done and what is left to do on a project.
  • 127.
    Overview Evaluation report provides anopinion or judgment rather than a yes-no-maybe answer or a recommendation. Periodic report is one which is submitted at regular intervals for the purpose of recording information.
  • 128.
    Overview Information report provide data,facts, feedback, and other types of information without analysis or recommendations. An analytical report examines a problem or issue and recommends an action.
  • 129.
    129 • https://www.tu- chemnitz.de/phil/english/sections/linguist/independent/kursmaterialien/TechComm/acch tml/feas.html • https://www.slideshare.net/mobile/lisachiang1209/progress-report-12696365 •http://evaluationtoolbox.net.au/index.php?option=com_content&view=article&id=48&Ite mid=60 • http://surveyorsreports.co.uk/structural_engineer_report.htm • https://www.youtube.com/watch?v=u9djIwXfM3Q • http://www.tasbuildinginspections.com.au/wp-content/uploads/2014/04/Sample- Structural-Building-Inspection-Report.pdf • https://www.youtube.com/watch?v=MrljzRy6HVc • https://www.youtube.com/watch?v=OSVEsZjGf30 • https://prezi.com/il20fla4ks4i/periodic-report/ Refrences