Mastering Vendor Selection and Partnership Management
Troy ruybal.resume
1. Troy Ruybal
troyruybal@hotmail.com
780-293-6130
OBJECTIVE
To contribute long term to a dynamic company by utilizing my technical abilities and knowledge
as a Journeyman Electrician to achieve the goals set by the organization.
HIGHLIGHTS OF QUALIFICATIONS
Project Management
Lead Quality Inspector and Quality Coordinator
Monitor sub-Contractors
Audit sub-Contractors
Insure sub-Contractors are following ITP, correct standards and procedures
Electrical Foremen
Safety Advisor field safety for shut down
Experience working in Power and Oil & Gas projects
Experience working on substations, grounding grids and transformers
Commercial / residential electrician experience
SKILLS and ABILITIES
Quality Inspection of EHT, cable tray’s, mod’s, high voltage lines, and electrical
installation
Walk downs with clients
Monitor sub-Contractor QA/QC program
Coordinate the third party welding inspectors
Conducted audits
Building Substation and MCC
Retro fitting Celanese with updated Electrical Equipment
Ensured planning, coordination and monitoring of electrical
construction/installation activities provided by engineering.
Preparation and approval of work packages.
Inspection and final acceptance walk down of installed equipment
Ensure equipment and materials are preserved and ready for installation.
Monitored the disposition of all non-conformances.
Preparation of "As-Built" drawings
Report writing
Ensured and inspected electrical work was completed per drawings
Solved Red Line Issues.
Set up the defense package for the electrical team
Created turnover documentation.
Lead safety meetings, toolbox meetings, accident investigations, and workplace
inspections
2. RELATED EDUCATION
Red Seal Electrician Ticket
First Aid Ticket/CPR
CSTS
Construction Site Safety Coordinator (BCIT)
RELATED WORK EXPERIENCE
Project Coordinator and Safety , POWER MAX
Quality Lead, URS
T&H Ruybal Inc.
Electrical Quality Control Inspector, Saipem Construction Canada Inc. Edmonton
AB
Quality Coordinator, KIEWIT ENERGY CANADA CORPORATION, Calgary. AB
Quality Coordinator, SNC Lavalin, Calgary, AB
Electrician, Pyramid Corp. Canada, Edmonton, AB
Electrical Coordinator, PCL Constructor Inc., Fort Saskatchewan, AB
* Scotford Expansion Upgrade for SHELL
Safety Advisor, Powell, Edmonton AB
Quality Inspector, Studon, Hardisty, AB
* TransCanada Keystone Pipe Line
Quality Inspector, Flint Alberta
* Long Lake, Gasifier
Quality Inspector/ Tools, Ledcor, Edmonton, Alberta
*Long Lake / Albian Sands
Work experience:
Project Coordinator, Power Max Summerland BC
(December 2014 to Nov 2015)
Did Scheduling
Coordinating scheduling and tracking work completion
Track work
Kept up on RFI
Coordinated with all trades to make sure work is done
Quality Lead, URS Flint Edmonton Alberta
(June 2014 to November 2014)
Insured work was up to QMS and URS standards
wrote up ITPs
created exhibits
scheduled inspection
walk downs with clients
Liaison
Audits
Kept up on RFI
Electrical Quality Control Inspector, Saipem Construction Canada Inc, Edmonton AB
(Oct 2013 to May 2014)
3. Quality Inspection EHT
Quality Inspection Cable tray
Walk downs with clients/and walk downs relocated to Electrical work
Advice Electrical Sub-contractor
Quality Coordinator,
KIEWIT ENERGY CANADA CORPORATION, Calgary. AB
Feb 2013 to Oct 2013
Inspecting
Mod
Monitor sub-Contractor QA/QC program
Coordinate the third party welding inspectors
Audits
Liaison
coordinated E&I inspection
Quality Coordinator
SNC Lavalin, Calgary, AB
Oct 2011 to Jan 2013
Inspect the high voltage Line
Monitor sub-Contractor QA/QC program
Transmission and distribution
Coordinate the third party welding inspectors
Ran the QC Department.
Audits
Liaison
Electrician for Pyramid Corp.
Canada, Edmonton, AB
Feb 2011 to Sept 2011
Building Substation and MCC
Including quantity inspection off all Electrical installation
Retro fitting Celanese with updated Electrical Equipment
Electrical Coordinator, PCL
Constructor Inc., Fort Saskatchewan, AB
Project: * Scotford Expansion Upgrade for SHELL
Jan2010 to Feb 2011)
Responsible for planning, coordination and monitoring electrical
construction/installation activities provided by Engineering.
Ensure Electricians do their job right the first time, avoiding re-work through
training session.
Preparation and approval of work packages.
Inspection and final acceptance walk down of installed equipment
Ensure equipment and materials are preserved and ready for installation.
Monitoring the disposition of all non-conformances.
Preparation of "As-Built" drawings
4. Quality Inspector,
Studon, Hardisty, AB
Project: * TransCanada Keystone Pipe Line
Aug 2009 to Dec 2009
Inspected All Electrical work was completed as drawing.
Solve Red Line Issues.
Validate test and procedures.
Set up the defence package for the Electrical team.
Responsible for as-built construction drawings.
Creates Turnover documentation.
Quality Inspector,
Flint Alberta
(Jan 2007- Sept 2008)
Project* Long Lake, Gasified
Points to Points
Testing
E&I Inspection
Quality Inspector/ Tools,
Ledcor, Edmonton, Alberta
Project: *Long Lake / Albian Sands
(Sept 2004- Nov 2006) and (Sept 2008 to July 2009)
Construction Election
Inspected the Electrical work
QC Punch list
INTERESTS
My Family, Fishing, Mountain Biking, and Reading
REFERENCES
Ben Marco, QA/QC for CNRL ( 1-778-210-0578 )
Jeff Swanson, QA/QC for CNRL (1-780-838-6056)
James Comeau, QA/QC for Kiewit (1-506-625-5317)
Mark Prentice, Quality Advisor for URS (1-587-582-9390)