SlideShare a Scribd company logo
1 of 4
Shaun Bould CV
1
Shaun Bould
ProjectEngineer
Qualifications
City & Guilds 2360- 1
City & Guilds 2360- 2
City & Guilds 2360- 3
City & Guilds 2360- 3
City & Guilds 2382- 17th
Edition
City & Guilds 2391- Inspection & Testing
City & Guilds 2377- Portable Appliance Testing
Vocational Training includes:
 Site Person in Charge
 Emergency First Aid
 PASMA
 IPAF (MEWP)
 PTS
 UKPNS Powerlink Substation Competence
 LUCAS
 LUL Track SPIC (Engineering/Traffic Hours)
 Track and Depot Accustom
 Confined Space Training
 LUL Fire Watchmen
 Safe Isolations Level 3
 HV/LV Level 2
 IOSH Working Safely
 IOSH Managing Safley
 CITB - Site Enviromental Awareness (SEATS)
 CITB – Site Supervisors Safety Training (SSSTS)
 JIB Graded Technician
Current Position Project Engineer
Years of Experience 15 years
I have extensive installation and supervisory experience
gained on a large number of London Underground and
Infraco projects. Responsibilities have included the
installation of electrical control and instrumentation
switchboards, 630v and 11kv cable installation and site
person in charge duties in conjunction with LUL safe
systems and rules. I am highly motivated individual with
significant experience at organising site teams that perform
with a high level of commitment and consistently deliver on
key milestones. Successful programme controls, good
planning and organisational skills are my keys to the
successful deliveryof these projects. Since my promotion to
engineer my aspirations are to continue applying the skills I
have learnt into an exciting new career in project
management.
Shaun Bould CV
2
Experience
Balfour Beatty Major Projects – 2014 to Present
Project Engineer
Reporting to Project Manager whilst leading a team that have the responsibility for a
complete substation upgrade on the SSR 3A District Line Power Supply Upgrade.
Engineering duties include the installation of HV, LV and DC switchboard replacement;
630v and 11kv cable installation, SCADA control and the installation of 2.5 MW transformer
rectifiers and all associated civil, L&SP and ventilation requirements).
Current duties include:
 Maintaining good relations with the client
 Attending progress meetings with project management
 Ensuring project cost and programmes are managed and worked to with reference to
the completion of construction activities
 Develop and manage programs and project schedules
 Produce Engineering and Project documentation.
 Accessing the required design information with instruction to site level
 Setting up monthly review of site safety including acting on feedback from site
operatives
 Promoting good relations between site and management
 Organising operatives, plant and materials for site installation works
 Ensuring daily briefing, toolbox talks and site safety documentation are complete.
 Ensuring that BB Zero Harm and Golden Rules are embedded in the site culture
Balfour Beatty Major Projects - 2012 to 2014
Electrical Supervisor
Reporting to the Site Engineer and Project Manager whilst leading a team that have the
responsibility for two complete substation upgrades on the SSR 3A District Line Power
Supply Upgrade. Duties include the supervision of HV, LV and DC switchboard
replacement; 630v and 11kv cable installation, SCADA control and the installation of 2.5
MW transformer rectifiers and all associated civil, L&SP and ventilation requirements).
Current duties include:
 Maintaining good relations with the client
 Attending progress meetings with project management and BBES Engineers
 Setting up monthly review of site safety including feedback from site operatives
 Promoting good relations between site and management
 Organising plant and materials for site installation works
 Ensuring daily briefing, toolbox talks and site safety documentation are complete.
 Ensuring that BB Zero Harm and Golden Rules are embedded in the site culture
Balfour Beatty Engineering Services, 2010-2012
Shaun Bould CV
3
Electrical Supervisor
Reporting to the Site Engineer and Project Manager whilst leading a team that have the
responsibility for Three complete substation upgrades on the SSl 1B Metropolitan Line
Power Supply Upgrade. Duties include the supervision of HV, LV and DC switchboard
replacement; 630v and 11kv cable installation, SCADA control and the installation of 2.5
MW transformer rectifiers and all associated civil, L&SP and ventilation requirements).
Duties include:
 Maintaining good relations with the client
 Attending progress meetings with project management and BB Engineers
 Ensuring project programmes are followed and worked to with reference to the
completion of construction activities
 Setting up monthly review of site safety including feedback from site operatives
 Promoting good relations between site and management
 Organising plant and materials for site installation works
 Ensuring daily briefing, toolbox talks and site safety documentation are complete.
 Ensuring that BB Zero Harm and Golden Rules are embedded in the site culture
Balfour Kilpatrick, 2005-2010
Lead Electrician
Working on various cabling projects including the Victoria Line Power Upgrade where I
gained experience in cable route works and cable installation works including DC Track
feeder cables, HV Distribution cabling within various environments including through existing
LU Tunnels, cable shafts and substations and also surface level track cabling. As the lead
electrician it was also my role to ensure that all cable were tested and inspected with final
connections made at distribution board ends.
Duties included:
 Supervise onsite installation teams and sub-contractors
 Organising plant and materials for site installation works
 Working as part of cable installation team
 Managing the delivery of cable drums
 Attending meetings and monthly reporting of progress
 Implementation and monitoring of Site Safety and Quality
Balfour Kilpatrick, 1999-2005
Apprentice Electrician
Shaun Bould CV
4
I started working for Balfour Kilpatrick in 1999 where I started my apprentership and early
stages of electrical work on the Northern Line substation upgrades. This included working as
part of a team installing HV, LV and DC switchboard replacement, SCADA control and the
installation of transformer rectifiers

More Related Content

What's hot (16)

Moh'd Gaweish_CV
Moh'd Gaweish_CVMoh'd Gaweish_CV
Moh'd Gaweish_CV
 
Andrew_Wellbelove's_CV_July_2016_ doc_a1
Andrew_Wellbelove's_CV_July_2016_ doc_a1Andrew_Wellbelove's_CV_July_2016_ doc_a1
Andrew_Wellbelove's_CV_July_2016_ doc_a1
 
Elect Eng. Rizwan CV
Elect Eng. Rizwan CVElect Eng. Rizwan CV
Elect Eng. Rizwan CV
 
Mike Koons - Resume_Linkedin 2016_
Mike Koons - Resume_Linkedin 2016_Mike Koons - Resume_Linkedin 2016_
Mike Koons - Resume_Linkedin 2016_
 
saif.resume dxb
saif.resume dxbsaif.resume dxb
saif.resume dxb
 
CV ROBIN JACOB
CV ROBIN JACOBCV ROBIN JACOB
CV ROBIN JACOB
 
Tabrez
TabrezTabrez
Tabrez
 
Professional Experience
Professional ExperienceProfessional Experience
Professional Experience
 
MATHAVAN LATEST CV ON AUG 2015
MATHAVAN LATEST CV ON AUG 2015MATHAVAN LATEST CV ON AUG 2015
MATHAVAN LATEST CV ON AUG 2015
 
CV
CVCV
CV
 
Resume Edward Maszczak linkedin
Resume  Edward Maszczak linkedinResume  Edward Maszczak linkedin
Resume Edward Maszczak linkedin
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
 
ELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIANELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIAN
 
rcallueng resume
rcallueng resumercallueng resume
rcallueng resume
 
ENGINEER MUHAMMED ZAFAR SHAH 2
ENGINEER MUHAMMED ZAFAR SHAH 2ENGINEER MUHAMMED ZAFAR SHAH 2
ENGINEER MUHAMMED ZAFAR SHAH 2
 
CV - MEP Inspector Engineer Froilan Ramos Balanao
CV -  MEP Inspector Engineer  Froilan Ramos BalanaoCV -  MEP Inspector Engineer  Froilan Ramos Balanao
CV - MEP Inspector Engineer Froilan Ramos Balanao
 

Viewers also liked

Tarek's Updated Cv
Tarek's Updated CvTarek's Updated Cv
Tarek's Updated Cvtarek saudi
 
12 Month Loans Ohio- Long Term Loans No Credit Check
12 Month Loans Ohio- Long Term Loans No Credit Check12 Month Loans Ohio- Long Term Loans No Credit Check
12 Month Loans Ohio- Long Term Loans No Credit CheckBrandon Kling
 
Ew01 u01-03 review
Ew01 u01-03 reviewEw01 u01-03 review
Ew01 u01-03 reviewAnano23
 
Educational objectives and styles
Educational objectives and stylesEducational objectives and styles
Educational objectives and stylesTahir Nazir
 
the message_of_adhan
the message_of_adhanthe message_of_adhan
the message_of_adhanTahir Nazir
 
Thermo Group CA patrocina Maratón Guarenas segunda edición
Thermo Group CA patrocina Maratón Guarenas segunda ediciónThermo Group CA patrocina Maratón Guarenas segunda edición
Thermo Group CA patrocina Maratón Guarenas segunda ediciónDaneil Micca
 

Viewers also liked (12)

Tarek's Updated Cv
Tarek's Updated CvTarek's Updated Cv
Tarek's Updated Cv
 
12 Month Loans Ohio- Long Term Loans No Credit Check
12 Month Loans Ohio- Long Term Loans No Credit Check12 Month Loans Ohio- Long Term Loans No Credit Check
12 Month Loans Ohio- Long Term Loans No Credit Check
 
Kali Linux
Kali LinuxKali Linux
Kali Linux
 
Ew01 u01-03 review
Ew01 u01-03 reviewEw01 u01-03 review
Ew01 u01-03 review
 
FROSTIMO_BROCHURE_2015
FROSTIMO_BROCHURE_2015FROSTIMO_BROCHURE_2015
FROSTIMO_BROCHURE_2015
 
linux
linuxlinux
linux
 
Apple VS LG watch
Apple VS LG watchApple VS LG watch
Apple VS LG watch
 
Presentatievaardigheden - Presentatietips
Presentatievaardigheden - PresentatietipsPresentatievaardigheden - Presentatietips
Presentatievaardigheden - Presentatietips
 
Educational objectives and styles
Educational objectives and stylesEducational objectives and styles
Educational objectives and styles
 
the message_of_adhan
the message_of_adhanthe message_of_adhan
the message_of_adhan
 
Presentatievaardigheden
PresentatievaardighedenPresentatievaardigheden
Presentatievaardigheden
 
Thermo Group CA patrocina Maratón Guarenas segunda edición
Thermo Group CA patrocina Maratón Guarenas segunda ediciónThermo Group CA patrocina Maratón Guarenas segunda edición
Thermo Group CA patrocina Maratón Guarenas segunda edición
 

Similar to Shaun Bould Project Engineer CV

Similar to Shaun Bould Project Engineer CV (20)

Alwin CV 032016_neW.
Alwin CV 032016_neW.Alwin CV 032016_neW.
Alwin CV 032016_neW.
 
Moncrieff_Craig_CV
Moncrieff_Craig_CVMoncrieff_Craig_CV
Moncrieff_Craig_CV
 
KEVIN DAVID MORTON cv
KEVIN DAVID MORTON cvKEVIN DAVID MORTON cv
KEVIN DAVID MORTON cv
 
Ron Williams CV Feb 2017
Ron Williams CV Feb 2017Ron Williams CV Feb 2017
Ron Williams CV Feb 2017
 
CV-MAMOON template Jan 2016 & Roles final
CV-MAMOON template Jan 2016 & Roles finalCV-MAMOON template Jan 2016 & Roles final
CV-MAMOON template Jan 2016 & Roles final
 
Maninder Kajal CV
Maninder Kajal CVManinder Kajal CV
Maninder Kajal CV
 
Bill resume
Bill resumeBill resume
Bill resume
 
G_Clifford_resume_Feb 15
G_Clifford_resume_Feb 15G_Clifford_resume_Feb 15
G_Clifford_resume_Feb 15
 
Hamza El Gabour cv MEP CORDINATOR
Hamza El Gabour cv MEP CORDINATORHamza El Gabour cv MEP CORDINATOR
Hamza El Gabour cv MEP CORDINATOR
 
CV PF
CV PFCV PF
CV PF
 
FPL RESUME1115
FPL RESUME1115FPL RESUME1115
FPL RESUME1115
 
Resume
ResumeResume
Resume
 
ameen cv new
ameen cv newameen cv new
ameen cv new
 
Structural Engineer
Structural EngineerStructural Engineer
Structural Engineer
 
HMcKellar CV 26th Nov 2016
HMcKellar CV 26th Nov 2016HMcKellar CV 26th Nov 2016
HMcKellar CV 26th Nov 2016
 
01 CV 2016 Simon Barkley (1)
01 CV  2016 Simon Barkley  (1)01 CV  2016 Simon Barkley  (1)
01 CV 2016 Simon Barkley (1)
 
Res Sher Chauhan general est Nov 2016
Res  Sher Chauhan general est Nov 2016Res  Sher Chauhan general est Nov 2016
Res Sher Chauhan general est Nov 2016
 
E&I Farukh
E&I FarukhE&I Farukh
E&I Farukh
 
Neil Todd CV
Neil Todd CVNeil Todd CV
Neil Todd CV
 
Engr. Ayaz Khan CV11 (1)
Engr.  Ayaz Khan CV11 (1)Engr.  Ayaz Khan CV11 (1)
Engr. Ayaz Khan CV11 (1)
 

Shaun Bould Project Engineer CV

  • 1. Shaun Bould CV 1 Shaun Bould ProjectEngineer Qualifications City & Guilds 2360- 1 City & Guilds 2360- 2 City & Guilds 2360- 3 City & Guilds 2360- 3 City & Guilds 2382- 17th Edition City & Guilds 2391- Inspection & Testing City & Guilds 2377- Portable Appliance Testing Vocational Training includes:  Site Person in Charge  Emergency First Aid  PASMA  IPAF (MEWP)  PTS  UKPNS Powerlink Substation Competence  LUCAS  LUL Track SPIC (Engineering/Traffic Hours)  Track and Depot Accustom  Confined Space Training  LUL Fire Watchmen  Safe Isolations Level 3  HV/LV Level 2  IOSH Working Safely  IOSH Managing Safley  CITB - Site Enviromental Awareness (SEATS)  CITB – Site Supervisors Safety Training (SSSTS)  JIB Graded Technician Current Position Project Engineer Years of Experience 15 years I have extensive installation and supervisory experience gained on a large number of London Underground and Infraco projects. Responsibilities have included the installation of electrical control and instrumentation switchboards, 630v and 11kv cable installation and site person in charge duties in conjunction with LUL safe systems and rules. I am highly motivated individual with significant experience at organising site teams that perform with a high level of commitment and consistently deliver on key milestones. Successful programme controls, good planning and organisational skills are my keys to the successful deliveryof these projects. Since my promotion to engineer my aspirations are to continue applying the skills I have learnt into an exciting new career in project management.
  • 2. Shaun Bould CV 2 Experience Balfour Beatty Major Projects – 2014 to Present Project Engineer Reporting to Project Manager whilst leading a team that have the responsibility for a complete substation upgrade on the SSR 3A District Line Power Supply Upgrade. Engineering duties include the installation of HV, LV and DC switchboard replacement; 630v and 11kv cable installation, SCADA control and the installation of 2.5 MW transformer rectifiers and all associated civil, L&SP and ventilation requirements). Current duties include:  Maintaining good relations with the client  Attending progress meetings with project management  Ensuring project cost and programmes are managed and worked to with reference to the completion of construction activities  Develop and manage programs and project schedules  Produce Engineering and Project documentation.  Accessing the required design information with instruction to site level  Setting up monthly review of site safety including acting on feedback from site operatives  Promoting good relations between site and management  Organising operatives, plant and materials for site installation works  Ensuring daily briefing, toolbox talks and site safety documentation are complete.  Ensuring that BB Zero Harm and Golden Rules are embedded in the site culture Balfour Beatty Major Projects - 2012 to 2014 Electrical Supervisor Reporting to the Site Engineer and Project Manager whilst leading a team that have the responsibility for two complete substation upgrades on the SSR 3A District Line Power Supply Upgrade. Duties include the supervision of HV, LV and DC switchboard replacement; 630v and 11kv cable installation, SCADA control and the installation of 2.5 MW transformer rectifiers and all associated civil, L&SP and ventilation requirements). Current duties include:  Maintaining good relations with the client  Attending progress meetings with project management and BBES Engineers  Setting up monthly review of site safety including feedback from site operatives  Promoting good relations between site and management  Organising plant and materials for site installation works  Ensuring daily briefing, toolbox talks and site safety documentation are complete.  Ensuring that BB Zero Harm and Golden Rules are embedded in the site culture Balfour Beatty Engineering Services, 2010-2012
  • 3. Shaun Bould CV 3 Electrical Supervisor Reporting to the Site Engineer and Project Manager whilst leading a team that have the responsibility for Three complete substation upgrades on the SSl 1B Metropolitan Line Power Supply Upgrade. Duties include the supervision of HV, LV and DC switchboard replacement; 630v and 11kv cable installation, SCADA control and the installation of 2.5 MW transformer rectifiers and all associated civil, L&SP and ventilation requirements). Duties include:  Maintaining good relations with the client  Attending progress meetings with project management and BB Engineers  Ensuring project programmes are followed and worked to with reference to the completion of construction activities  Setting up monthly review of site safety including feedback from site operatives  Promoting good relations between site and management  Organising plant and materials for site installation works  Ensuring daily briefing, toolbox talks and site safety documentation are complete.  Ensuring that BB Zero Harm and Golden Rules are embedded in the site culture Balfour Kilpatrick, 2005-2010 Lead Electrician Working on various cabling projects including the Victoria Line Power Upgrade where I gained experience in cable route works and cable installation works including DC Track feeder cables, HV Distribution cabling within various environments including through existing LU Tunnels, cable shafts and substations and also surface level track cabling. As the lead electrician it was also my role to ensure that all cable were tested and inspected with final connections made at distribution board ends. Duties included:  Supervise onsite installation teams and sub-contractors  Organising plant and materials for site installation works  Working as part of cable installation team  Managing the delivery of cable drums  Attending meetings and monthly reporting of progress  Implementation and monitoring of Site Safety and Quality Balfour Kilpatrick, 1999-2005 Apprentice Electrician
  • 4. Shaun Bould CV 4 I started working for Balfour Kilpatrick in 1999 where I started my apprentership and early stages of electrical work on the Northern Line substation upgrades. This included working as part of a team installing HV, LV and DC switchboard replacement, SCADA control and the installation of transformer rectifiers