SlideShare a Scribd company logo
Transitional Refugee Housing
1025 Park Street, Syracuse, NY 13208
Site Plan
Scale: 1/16” = 1’-0”
Longitudinal Building Section A
Scale: 1/8” = 1’-0”
Transverse Building Section B
Scale: 1/8” = 1’-0”
North Elevation
Scale: 1/8” = 1’-0”
East Elevation
Scale: 1/8” = 1’-0”
South Elevation
Scale: 1/8” = 1’-0”
West Elevation
Scale: 1/8” = 1’-0”
Unit B Kitchen Rendering Unit B Master Bath Rendering
Gilbert Ave
Spring St
OberstSt
Schneider St
Peters St
AshSt
Park St
Park St
Park St
PondSt
MarySt
KirkpatrickSt
N Alvord St
Steuben St
Lilac St
Lilac St
UnionPl
Lodi St
Lodi St
NSalinaSt
Isabella St
N
StateSt
Basin
St
S Alvord St
81
LockAlleySt
GebhardtAve
N
TownsendSt
Catawba St
Union Pl
TitusAlley
E Division St
EDivisionSt
JohnSt
ButternutSt
Mary Street Strand Pl
Carbon St
JohnSt
Grassman Ave
Project
Vicinity
Mary Street Strand Pl
Park St
Park St
MarySt
MarySt
Neutral Ct
EDivisionSt
EDivisionSt
JohnSt
JohnSt
Carbon St
PondSt
Lilac St
Project
Location
Level 1 Floor Plan - Unit B - 3 Bed/2 Bath
Scale: 1/8” = 1’-0”
A
B
Level 2 Floor Plan - Unit C - 1 Bed/1 Bath
Scale: 1/8” = 1’-0”
A
B
Basement Floor Plan - Unit A - 2 Bed/2 Bath
Scale: 1/8” = 1’-0”
A
B
Mary Street
ParkStreet
ID Task
Mode
Task Name Duration Start Finish Predecessors Baseline2 Cost
1 Park Street Project 71 days Tue 9/4/18 Tue 12/11/18 $0.00
2 Start of project 1 day Tue 9/4/18 Tue 9/4/18 $0.00
3 Demolition 20 days Tue 9/4/18 Mon 10/1/18 2FS-1 day $3,800.00
4 Installing the columns 2 days Fri 9/28/18 Mon 10/1/18 3FF $3,000.00
5 Garage 27 days Mon 10/1/18 Tue 11/6/18 $0.00
6 Roofing 12 days Mon 10/1/18 Tue 10/16/184FS-1 day $3,500.00
7 Insulation 6 days Mon 10/15/18Mon 10/22/186FS-2 days $3,000.00
8 Raising the floor 12 days Mon 10/22/18Tue 11/6/18 7FS-1 day $2,000.00
9 Interior walls 16 days Mon 10/1/18 Mon 10/22/184FS-1 day,6SS,7FF $4,500.00
10 Rest of the roof 6 days Mon 10/22/18Mon 10/29/187FS-1 day,9FS-1 day $3,000.00
11 Windows 11 days Mon 10/22/18 Mon 11/5/18 10SS $5,320.00
12 ADA Ramp 11 days Thu 11/15/18 Thu 11/29/18 10SS $3,000.00
13 Siding 6 days Mon 10/1/18 Mon 10/8/18 6SS $1,800.00
14 Plumbing 16 days Mon 10/1/18 Mon 10/22/186SS $800.00
15 Electrical 16 days Mon 10/1/18 Mon 10/22/186SS $800.00
16 Fire Proofing 16 days Mon 10/1/18 Mon 10/22/186SS $3,500.00
17 Installation of the meters 6 days Mon 10/15/18Mon 10/22/187SS $3,600.00
18 Paint 16 days Mon 10/29/18Mon 11/19/1810FS-1 day $1,500.00
19 Linoleum 7 days Fri 11/9/18 Mon 11/19/1818FF $1,600.00
20 Installation of Appliances, fixtures
and lighting
12 days Mon
11/26/18
Tue 12/11/1819FS+4 days $5,905.00
21 End of Project 1 day Tue 12/11/18Tue 12/11/1820FS-1 day $0.00
M T W T F
Mar 5, '18
Task
Split
Milestone
Summary
Project Summary
External Tasks
External Milestone
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
Deadline
Critical
Critical Split
Late
Progress
Slack
Page 1
Project: C:UserskyathDesktop
Date: Tue 3/20/18
Inspiration/Mood Images Existing Property
Need Outside Labor:
o Removing bearing walls and inserting columns
o Raising garage roof
o Roofing
o ADA ramp
Sustainability:
o High- Efficient Appliances: Energy Star rated refrigerator, cooking range, washer/
dryer and microwave
o Water sense fixtures for water efficiency
o Local Materials: Lumber
o Local Labor: Student volunteers and future inhabitants
o LED Lighting throughout is more energy efficient and reduces long term energy
costs.
o Increased insulation to lower costs of energy consumption
o New windows to lower cost of energy consumption
o Saving and recycling materials throughout demolition process
Value Engineering:
The cost of labor can be reduced by 70% by using students and volunteers for the
construction. Electrician and plumbers among the family and friends can contribute and
work on the building for lower prices. Low priced, basic appliances can be obtained from
local Habitat restore and local vendors. The appliances and fixtures used in the project are
essential for living and not optional.
o Student Labor – Students at SUNY ESF will get hands-on experience with
construction as a part of the course curriculum and will provide labor for the
construction process through the duration of a semester.
o Sweat Hour Labor – People who are going to live in the house must put work
hours into the revamping of the house
o Habitat for Humanity to volunteer people for labor
o Appliances from local Habitat restore and local vendors
Plumbing, Hardware and lumber stores: http://shop.bigreuse.org/kitchen-bath/
Tools and Equipment: https://www.govdeals.com/
o Electricians and plumbers we know – Lower prices, Family & Friends
o Refurbishing floors instead of installing all new hardwood floors.
o Not installing top of the line materials and appliances – installing basic necessities
o No dishwasher necessary
1025 Park Street in Syracuse is the transitional refugee housing that was selected. As construction management students, we looked into the elements in the
existing house and analyzed the drawing provided by the Syracuse University interior design student. The cost and schedule were developed considering the
sustainability of the construction and implementing value engineering. The total budget estimated for construction including Demoltion, Re-build, Appliances and
Finishes is $48,905. The schedule that corresponds with this estimate starts September 4th, 2018 and ends December 11th, 2018, meaning it would have a
duration of 15 weeks. There are four elements of the construction process that cannot be done by students and unqualified participants making a need for outside
labor. Below are the elements that need outside labor, the elements to make the project more sustainable and the elements that we chose for value engineering.
Park Street Estimate
Type # Unit Price Sub-Total
Demolition:
Dumpster - 2 weeks $800
Remove Bearing Walls and Inserting Columns $3,000
Sub Total $3,800
Re-Build:
Framing SF 1997.5 $3,000
Drywall SF 1997.5 $1,500
Raise Garage - Wood Subfloor SF 540.87 $2,000
Raise Garage Roof + Labor $3,500
Insulate Garage $3,000
15% Roof Fixed $1,800
15% Siding Fixed $1,200
Plumbing $800
Electrical $800
Fireproofing between floors $3,500
ADA Ramp + Labor CY 16 $3,000
Window - 1 - 4 x 2'6" Double Hung 14 $1,960
Window - 2 - 4 x 2 Double Hung 6 $960
Window - 3 - 4 x 4 Double Hung 2 $320
Window - 4 - 4 x 3 Double Hung 4 $640
Window - 5 - 2'6" x 2'6" Double Hung 1 $140
Window - 6 - 2 x 2'6" Double Hung 5 $700
Window - 7 - 2 x 2 Double Hung 3 $600
Sub Total $29,420
Appliance:
Meters 3 $3,600
Bathroom Sink 5 $700
Kitchen Sink 3 $260
Shower Head 5 $250
Shower Drain 5 $75
Toliet 3 $420
Refridgerator 3 $1,200
Range 3 $1,500
Microwave 3 $240
Washer/Dryer 3 $750
Pendant Lighting 2 $80
Recessed Lighting 11 $220
Wall Sconce Lighting 4 $120
Semi-Flush Mount Light 2 $50
Outdoor Wall Mount Light 1 $40
Interior Doors 15 $1,050
Exterior Doors 3 $900
Double Exterior ADA 1 $750
Closet Doors 5 $350
Sub Total $12,555
Finishes:
Paint SF 1800 $1,500
Linoleum Flooring $1,600
LED Light Bulbs 20 $30
Sub Total $3,130
Total $48,905

More Related Content

What's hot

2012 QQA Annual Report
2012 QQA Annual Report2012 QQA Annual Report
2012 QQA Annual Report
quapawquarter
 
Ministry Teams Meetings Minutes July 2013
Ministry Teams Meetings Minutes July 2013Ministry Teams Meetings Minutes July 2013
Ministry Teams Meetings Minutes July 2013Church of the Nativity
 
Okc replacement windows
Okc replacement windowsOkc replacement windows
Okc replacement windows
Fred Lydick
 
What to Look for When House Hunting
What to Look for When House HuntingWhat to Look for When House Hunting
What to Look for When House Hunting
Neal Elbaum
 
Burrah Estates Portfolio
Burrah Estates PortfolioBurrah Estates Portfolio
Burrah Estates PortfolioBob Johnson
 
Mortgage analysis, Real Estate Investments, Irinel Ciocioc
Mortgage analysis, Real Estate Investments, Irinel CiociocMortgage analysis, Real Estate Investments, Irinel Ciocioc
Mortgage analysis, Real Estate Investments, Irinel Ciocioc
irinelc
 
New Jersey Urban Water Conference December 2015
New Jersey Urban Water Conference December 2015New Jersey Urban Water Conference December 2015
New Jersey Urban Water Conference December 2015
Jersey Water Works
 
Residential Real Estate Investments power point
Residential Real Estate Investments power pointResidential Real Estate Investments power point
Residential Real Estate Investments power point
Newton Consultancy
 
resume andrew schigulski upd. 25.5.10
resume andrew schigulski upd. 25.5.10resume andrew schigulski upd. 25.5.10
resume andrew schigulski upd. 25.5.10Andrew Schigulski
 
1516 hinman apartment
1516 hinman apartment1516 hinman apartment
1516 hinman apartment
Panagiotis
 
TJ Navilio, Realtor April Newsletter
TJ Navilio, Realtor April NewsletterTJ Navilio, Realtor April Newsletter
TJ Navilio, Realtor April Newsletter
guestf77561
 
Austin Britnell’s Local Lawn Care
Austin Britnell’s Local Lawn Care Austin Britnell’s Local Lawn Care
Austin Britnell’s Local Lawn Care Austin Britnell
 
What to Look for When Buying a House
What to Look for When Buying a HouseWhat to Look for When Buying a House
What to Look for When Buying a House
Kristi McNeilly
 
Walk Through Wednesday (141008)
Walk Through Wednesday (141008)Walk Through Wednesday (141008)
Walk Through Wednesday (141008)
National Association of Home Builders
 
HUGE PROFIT POTENTIAL with Rehabbed Homes
HUGE PROFIT POTENTIAL with Rehabbed HomesHUGE PROFIT POTENTIAL with Rehabbed Homes
HUGE PROFIT POTENTIAL with Rehabbed Homes
rschulenburg
 
2010-2016 Challenges and Solutions
2010-2016 Challenges and Solutions2010-2016 Challenges and Solutions
2010-2016 Challenges and SolutionsMichael Leamons
 
Quick and easy fixes to spruce up your(finished)
Quick and easy fixes to spruce up your(finished)Quick and easy fixes to spruce up your(finished)
Quick and easy fixes to spruce up your(finished)RandyBett
 

What's hot (20)

2012 QQA Annual Report
2012 QQA Annual Report2012 QQA Annual Report
2012 QQA Annual Report
 
Ministry Teams Meetings Minutes July 2013
Ministry Teams Meetings Minutes July 2013Ministry Teams Meetings Minutes July 2013
Ministry Teams Meetings Minutes July 2013
 
Okc replacement windows
Okc replacement windowsOkc replacement windows
Okc replacement windows
 
What to Look for When House Hunting
What to Look for When House HuntingWhat to Look for When House Hunting
What to Look for When House Hunting
 
Burrah Estates Portfolio
Burrah Estates PortfolioBurrah Estates Portfolio
Burrah Estates Portfolio
 
Mortgage analysis, Real Estate Investments, Irinel Ciocioc
Mortgage analysis, Real Estate Investments, Irinel CiociocMortgage analysis, Real Estate Investments, Irinel Ciocioc
Mortgage analysis, Real Estate Investments, Irinel Ciocioc
 
New Jersey Urban Water Conference December 2015
New Jersey Urban Water Conference December 2015New Jersey Urban Water Conference December 2015
New Jersey Urban Water Conference December 2015
 
Residential Real Estate Investments power point
Residential Real Estate Investments power pointResidential Real Estate Investments power point
Residential Real Estate Investments power point
 
resume andrew schigulski upd. 25.5.10
resume andrew schigulski upd. 25.5.10resume andrew schigulski upd. 25.5.10
resume andrew schigulski upd. 25.5.10
 
1516 hinman apartment
1516 hinman apartment1516 hinman apartment
1516 hinman apartment
 
Staging Info
Staging InfoStaging Info
Staging Info
 
TJ Navilio, Realtor April Newsletter
TJ Navilio, Realtor April NewsletterTJ Navilio, Realtor April Newsletter
TJ Navilio, Realtor April Newsletter
 
Austin Britnell’s Local Lawn Care
Austin Britnell’s Local Lawn Care Austin Britnell’s Local Lawn Care
Austin Britnell’s Local Lawn Care
 
What to Look for When Buying a House
What to Look for When Buying a HouseWhat to Look for When Buying a House
What to Look for When Buying a House
 
Walk Through Wednesday (141008)
Walk Through Wednesday (141008)Walk Through Wednesday (141008)
Walk Through Wednesday (141008)
 
HUGE PROFIT POTENTIAL with Rehabbed Homes
HUGE PROFIT POTENTIAL with Rehabbed HomesHUGE PROFIT POTENTIAL with Rehabbed Homes
HUGE PROFIT POTENTIAL with Rehabbed Homes
 
2010-2016 Challenges and Solutions
2010-2016 Challenges and Solutions2010-2016 Challenges and Solutions
2010-2016 Challenges and Solutions
 
Brie_Kitchen
Brie_KitchenBrie_Kitchen
Brie_Kitchen
 
Quick and easy fixes to spruce up your(finished)
Quick and easy fixes to spruce up your(finished)Quick and easy fixes to spruce up your(finished)
Quick and easy fixes to spruce up your(finished)
 
Bottle village
Bottle villageBottle village
Bottle village
 

Similar to Transitional refugee housing

Area I Community Town Hall Sept. 18, 2013
Area I Community Town Hall Sept. 18, 2013Area I Community Town Hall Sept. 18, 2013
Area I Community Town Hall Sept. 18, 2013
U.S. Army Garrison Red Cloud and Area I
 
Ministry teams minutes Nov. 2015
Ministry teams minutes Nov. 2015Ministry teams minutes Nov. 2015
Ministry teams minutes Nov. 2015
Church of the Nativity
 
Portfolio_160115_web_OPT
Portfolio_160115_web_OPTPortfolio_160115_web_OPT
Portfolio_160115_web_OPTSarah Mann
 
9/9 FRI 2:45 | Green Great Neighborhoods
9/9 FRI 2:45 | Green Great Neighborhoods9/9 FRI 2:45 | Green Great Neighborhoods
9/9 FRI 2:45 | Green Great Neighborhoods
APA Florida
 
APWA Central FL Branch Summer 2013 Newsletter
APWA Central FL Branch Summer 2013 NewsletterAPWA Central FL Branch Summer 2013 Newsletter
APWA Central FL Branch Summer 2013 Newsletter
Amy Blaida
 
Sustainable Technology At Duke Farms
Sustainable Technology At Duke FarmsSustainable Technology At Duke Farms
Sustainable Technology At Duke Farms
Duke Farms
 
Oceanside Beach Project
Oceanside Beach ProjectOceanside Beach Project
Oceanside Beach Project
Epic
 
Building a garage
Building a garageBuilding a garage
Building a garage
Reese Boone
 
Ripon Stadium Project 06042012
Ripon Stadium Project   06042012Ripon Stadium Project   06042012
Ripon Stadium Project 06042012
StephanieHobbs
 
Capstone Presentation
Capstone PresentationCapstone Presentation
Capstone PresentationJosue Campos
 
Wind turbines in wild places
Wind turbines in wild placesWind turbines in wild places
Wind turbines in wild places
Shaun West
 
Eyesore to beautification awards through partnerships
Eyesore to beautification awards through partnershipsEyesore to beautification awards through partnerships
Eyesore to beautification awards through partnershipsafchief
 
House & Garden special section
House & Garden special sectionHouse & Garden special section
House & Garden special sectionDogwoodArts
 
Redmaster Company Profile with List of Projects and References
Redmaster Company Profile with List of Projects and ReferencesRedmaster Company Profile with List of Projects and References
Redmaster Company Profile with List of Projects and References
Redmaster
 
Brentcliffe-Victoria Park CLC Meeting
Brentcliffe-Victoria Park CLC MeetingBrentcliffe-Victoria Park CLC Meeting
Brentcliffe-Victoria Park CLC Meeting
Crosstown TO
 
RCMC PowerPoint Presentation
RCMC   PowerPoint PresentationRCMC   PowerPoint Presentation
RCMC PowerPoint Presentation
Keith Daggett
 
Public works presentation 9 30final
Public works presentation 9 30finalPublic works presentation 9 30final
Public works presentation 9 30finalCityofEvanston2
 
Updated power point lpg
Updated power point lpgUpdated power point lpg
Updated power point lpgmiguel1054
 

Similar to Transitional refugee housing (20)

Area I Community Town Hall Sept. 18, 2013
Area I Community Town Hall Sept. 18, 2013Area I Community Town Hall Sept. 18, 2013
Area I Community Town Hall Sept. 18, 2013
 
Ministry teams minutes Nov. 2015
Ministry teams minutes Nov. 2015Ministry teams minutes Nov. 2015
Ministry teams minutes Nov. 2015
 
Ici final 2
Ici final 2Ici final 2
Ici final 2
 
Portfolio_160115_web_OPT
Portfolio_160115_web_OPTPortfolio_160115_web_OPT
Portfolio_160115_web_OPT
 
9/9 FRI 2:45 | Green Great Neighborhoods
9/9 FRI 2:45 | Green Great Neighborhoods9/9 FRI 2:45 | Green Great Neighborhoods
9/9 FRI 2:45 | Green Great Neighborhoods
 
GRANT PROPOSAL
GRANT PROPOSALGRANT PROPOSAL
GRANT PROPOSAL
 
APWA Central FL Branch Summer 2013 Newsletter
APWA Central FL Branch Summer 2013 NewsletterAPWA Central FL Branch Summer 2013 Newsletter
APWA Central FL Branch Summer 2013 Newsletter
 
Sustainable Technology At Duke Farms
Sustainable Technology At Duke FarmsSustainable Technology At Duke Farms
Sustainable Technology At Duke Farms
 
Oceanside Beach Project
Oceanside Beach ProjectOceanside Beach Project
Oceanside Beach Project
 
Building a garage
Building a garageBuilding a garage
Building a garage
 
Ripon Stadium Project 06042012
Ripon Stadium Project   06042012Ripon Stadium Project   06042012
Ripon Stadium Project 06042012
 
Capstone Presentation
Capstone PresentationCapstone Presentation
Capstone Presentation
 
Wind turbines in wild places
Wind turbines in wild placesWind turbines in wild places
Wind turbines in wild places
 
Eyesore to beautification awards through partnerships
Eyesore to beautification awards through partnershipsEyesore to beautification awards through partnerships
Eyesore to beautification awards through partnerships
 
House & Garden special section
House & Garden special sectionHouse & Garden special section
House & Garden special section
 
Redmaster Company Profile with List of Projects and References
Redmaster Company Profile with List of Projects and ReferencesRedmaster Company Profile with List of Projects and References
Redmaster Company Profile with List of Projects and References
 
Brentcliffe-Victoria Park CLC Meeting
Brentcliffe-Victoria Park CLC MeetingBrentcliffe-Victoria Park CLC Meeting
Brentcliffe-Victoria Park CLC Meeting
 
RCMC PowerPoint Presentation
RCMC   PowerPoint PresentationRCMC   PowerPoint Presentation
RCMC PowerPoint Presentation
 
Public works presentation 9 30final
Public works presentation 9 30finalPublic works presentation 9 30final
Public works presentation 9 30final
 
Updated power point lpg
Updated power point lpgUpdated power point lpg
Updated power point lpg
 

Recently uploaded

Technical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prismsTechnical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prisms
heavyhaig
 
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
ssuser7dcef0
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
ChristineTorrepenida1
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Christina Lin
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdfTutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
aqil azizi
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
Kerry Sado
 
basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
NidhalKahouli2
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
ClaraZara1
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
Aditya Rajan Patra
 
Fundamentals of Induction Motor Drives.pptx
Fundamentals of Induction Motor Drives.pptxFundamentals of Induction Motor Drives.pptx
Fundamentals of Induction Motor Drives.pptx
manasideore6
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
gestioneergodomus
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Soumen Santra
 
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
dxobcob
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 

Recently uploaded (20)

Technical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prismsTechnical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prisms
 
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdfTutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
 
basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
 
Fundamentals of Induction Motor Drives.pptx
Fundamentals of Induction Motor Drives.pptxFundamentals of Induction Motor Drives.pptx
Fundamentals of Induction Motor Drives.pptx
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
 
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 

Transitional refugee housing

  • 1. Transitional Refugee Housing 1025 Park Street, Syracuse, NY 13208 Site Plan Scale: 1/16” = 1’-0” Longitudinal Building Section A Scale: 1/8” = 1’-0” Transverse Building Section B Scale: 1/8” = 1’-0” North Elevation Scale: 1/8” = 1’-0” East Elevation Scale: 1/8” = 1’-0” South Elevation Scale: 1/8” = 1’-0” West Elevation Scale: 1/8” = 1’-0” Unit B Kitchen Rendering Unit B Master Bath Rendering Gilbert Ave Spring St OberstSt Schneider St Peters St AshSt Park St Park St Park St PondSt MarySt KirkpatrickSt N Alvord St Steuben St Lilac St Lilac St UnionPl Lodi St Lodi St NSalinaSt Isabella St N StateSt Basin St S Alvord St 81 LockAlleySt GebhardtAve N TownsendSt Catawba St Union Pl TitusAlley E Division St EDivisionSt JohnSt ButternutSt Mary Street Strand Pl Carbon St JohnSt Grassman Ave Project Vicinity Mary Street Strand Pl Park St Park St MarySt MarySt Neutral Ct EDivisionSt EDivisionSt JohnSt JohnSt Carbon St PondSt Lilac St Project Location Level 1 Floor Plan - Unit B - 3 Bed/2 Bath Scale: 1/8” = 1’-0” A B Level 2 Floor Plan - Unit C - 1 Bed/1 Bath Scale: 1/8” = 1’-0” A B Basement Floor Plan - Unit A - 2 Bed/2 Bath Scale: 1/8” = 1’-0” A B Mary Street ParkStreet ID Task Mode Task Name Duration Start Finish Predecessors Baseline2 Cost 1 Park Street Project 71 days Tue 9/4/18 Tue 12/11/18 $0.00 2 Start of project 1 day Tue 9/4/18 Tue 9/4/18 $0.00 3 Demolition 20 days Tue 9/4/18 Mon 10/1/18 2FS-1 day $3,800.00 4 Installing the columns 2 days Fri 9/28/18 Mon 10/1/18 3FF $3,000.00 5 Garage 27 days Mon 10/1/18 Tue 11/6/18 $0.00 6 Roofing 12 days Mon 10/1/18 Tue 10/16/184FS-1 day $3,500.00 7 Insulation 6 days Mon 10/15/18Mon 10/22/186FS-2 days $3,000.00 8 Raising the floor 12 days Mon 10/22/18Tue 11/6/18 7FS-1 day $2,000.00 9 Interior walls 16 days Mon 10/1/18 Mon 10/22/184FS-1 day,6SS,7FF $4,500.00 10 Rest of the roof 6 days Mon 10/22/18Mon 10/29/187FS-1 day,9FS-1 day $3,000.00 11 Windows 11 days Mon 10/22/18 Mon 11/5/18 10SS $5,320.00 12 ADA Ramp 11 days Thu 11/15/18 Thu 11/29/18 10SS $3,000.00 13 Siding 6 days Mon 10/1/18 Mon 10/8/18 6SS $1,800.00 14 Plumbing 16 days Mon 10/1/18 Mon 10/22/186SS $800.00 15 Electrical 16 days Mon 10/1/18 Mon 10/22/186SS $800.00 16 Fire Proofing 16 days Mon 10/1/18 Mon 10/22/186SS $3,500.00 17 Installation of the meters 6 days Mon 10/15/18Mon 10/22/187SS $3,600.00 18 Paint 16 days Mon 10/29/18Mon 11/19/1810FS-1 day $1,500.00 19 Linoleum 7 days Fri 11/9/18 Mon 11/19/1818FF $1,600.00 20 Installation of Appliances, fixtures and lighting 12 days Mon 11/26/18 Tue 12/11/1819FS+4 days $5,905.00 21 End of Project 1 day Tue 12/11/18Tue 12/11/1820FS-1 day $0.00 M T W T F Mar 5, '18 Task Split Milestone Summary Project Summary External Tasks External Milestone Inactive Task Inactive Milestone Inactive Summary Manual Task Duration-only Manual Summary Rollup Manual Summary Start-only Finish-only Deadline Critical Critical Split Late Progress Slack Page 1 Project: C:UserskyathDesktop Date: Tue 3/20/18 Inspiration/Mood Images Existing Property Need Outside Labor: o Removing bearing walls and inserting columns o Raising garage roof o Roofing o ADA ramp Sustainability: o High- Efficient Appliances: Energy Star rated refrigerator, cooking range, washer/ dryer and microwave o Water sense fixtures for water efficiency o Local Materials: Lumber o Local Labor: Student volunteers and future inhabitants o LED Lighting throughout is more energy efficient and reduces long term energy costs. o Increased insulation to lower costs of energy consumption o New windows to lower cost of energy consumption o Saving and recycling materials throughout demolition process Value Engineering: The cost of labor can be reduced by 70% by using students and volunteers for the construction. Electrician and plumbers among the family and friends can contribute and work on the building for lower prices. Low priced, basic appliances can be obtained from local Habitat restore and local vendors. The appliances and fixtures used in the project are essential for living and not optional. o Student Labor – Students at SUNY ESF will get hands-on experience with construction as a part of the course curriculum and will provide labor for the construction process through the duration of a semester. o Sweat Hour Labor – People who are going to live in the house must put work hours into the revamping of the house o Habitat for Humanity to volunteer people for labor o Appliances from local Habitat restore and local vendors Plumbing, Hardware and lumber stores: http://shop.bigreuse.org/kitchen-bath/ Tools and Equipment: https://www.govdeals.com/ o Electricians and plumbers we know – Lower prices, Family & Friends o Refurbishing floors instead of installing all new hardwood floors. o Not installing top of the line materials and appliances – installing basic necessities o No dishwasher necessary 1025 Park Street in Syracuse is the transitional refugee housing that was selected. As construction management students, we looked into the elements in the existing house and analyzed the drawing provided by the Syracuse University interior design student. The cost and schedule were developed considering the sustainability of the construction and implementing value engineering. The total budget estimated for construction including Demoltion, Re-build, Appliances and Finishes is $48,905. The schedule that corresponds with this estimate starts September 4th, 2018 and ends December 11th, 2018, meaning it would have a duration of 15 weeks. There are four elements of the construction process that cannot be done by students and unqualified participants making a need for outside labor. Below are the elements that need outside labor, the elements to make the project more sustainable and the elements that we chose for value engineering. Park Street Estimate Type # Unit Price Sub-Total Demolition: Dumpster - 2 weeks $800 Remove Bearing Walls and Inserting Columns $3,000 Sub Total $3,800 Re-Build: Framing SF 1997.5 $3,000 Drywall SF 1997.5 $1,500 Raise Garage - Wood Subfloor SF 540.87 $2,000 Raise Garage Roof + Labor $3,500 Insulate Garage $3,000 15% Roof Fixed $1,800 15% Siding Fixed $1,200 Plumbing $800 Electrical $800 Fireproofing between floors $3,500 ADA Ramp + Labor CY 16 $3,000 Window - 1 - 4 x 2'6" Double Hung 14 $1,960 Window - 2 - 4 x 2 Double Hung 6 $960 Window - 3 - 4 x 4 Double Hung 2 $320 Window - 4 - 4 x 3 Double Hung 4 $640 Window - 5 - 2'6" x 2'6" Double Hung 1 $140 Window - 6 - 2 x 2'6" Double Hung 5 $700 Window - 7 - 2 x 2 Double Hung 3 $600 Sub Total $29,420 Appliance: Meters 3 $3,600 Bathroom Sink 5 $700 Kitchen Sink 3 $260 Shower Head 5 $250 Shower Drain 5 $75 Toliet 3 $420 Refridgerator 3 $1,200 Range 3 $1,500 Microwave 3 $240 Washer/Dryer 3 $750 Pendant Lighting 2 $80 Recessed Lighting 11 $220 Wall Sconce Lighting 4 $120 Semi-Flush Mount Light 2 $50 Outdoor Wall Mount Light 1 $40 Interior Doors 15 $1,050 Exterior Doors 3 $900 Double Exterior ADA 1 $750 Closet Doors 5 $350 Sub Total $12,555 Finishes: Paint SF 1800 $1,500 Linoleum Flooring $1,600 LED Light Bulbs 20 $30 Sub Total $3,130 Total $48,905