SlideShare a Scribd company logo
TR 25-1:2022
84
COPYRIGHT
Annex B
(normative)
Checklist for new charger / parts replacement /
modification to EVCS
Purpose of use: Checklist for New charger☐ / Parts replacement☐ / Modification to EVCS☐
Particulars of EVCS
(one report is to be used for each charger)
Brand/model of EV charger(s):
S/No.:
Name of owner/operator:
(Responsible for the EVCS)
Address of installation:
(Indicate carpark lot number and floor level where applicable)
To be performed by equipment specialist
Description
Compliance Remarks/
measurement
value1
C NC NA
A Authority requirement
A1 Letter of no objection (LNO) is obtained from
relevant authority / TR25 certificate of
compliance is obtained
A2 For building with EMA EI License, letter of
consent is obtained from building LEW
B External and environmental checks (with EVCS power TURN-OFF at isolator)
B1 Installed outside hazardous zones where
flammable/combustible gas or material may be
present
B2 Enclosure is not dented, damaged, corroded or
in any rusty condition
B3 Space around the EVCS is adequate for easy
access and maintenance work
B4 Sealing rubber of all doors are in order, and
doors including lockset (if any) can be opened
and closed easily
B5 No sign of insects inside EVCS. Openings or
vents are not blocked, no excess foreign
particles
B6 Detachable parts are not loose or falling off and
not in a rusty condition
B7 No visible moisture, waterlogging or burnt
marks at the EVCS and connector charging
pins
B8 Floor or wall mounting of EVCS remains rigid
and strong
Single user licence only, no reproduction or circulation. Copying and networking prohibited
Licensed to Mr Benjamin Tan, Member, WG, compliments of Enterprise Singapore
TR 25-1:2022
85
COPYRIGHT
Description
Compliance Remarks/
measurement
value1
C NC NA
B9 Vehicle connector cable, mounting and support
is secured and not damaged
B10 Electrical warning labels is clear and prominent
B11 Source of DB for EVCS is clearly labelled and
electrical source DB is accessible for operation
B12 Bollards or continuous kerb(s) or other means
of crash protection is installed provide adequate
protection against moving vehicle
B13 Charger specification plate is clear, legible and
prominent according TR25 requirement
B14 Owner/operator contact details label is legible
and prominent
B15 Fail-safe emergency stop button (in red and
yellow) is prominent and not damaged. For
outdoor installation it shall be weatherproof.
Clear directional signs shall be provided for
multiple charger installation.
B16 Adequate lighting for charging operation
B17 Inspection label provided as below. Last inspection date:
B18 EVCS's display and all UI accessories (eg,
press button, RFID reader etc.) are not
damaged and working properly
B19 Incoming power supply cable including circuit
protective conductor connections and
termination(s) are properly made and tightened
B20 Measurement of PP-PE resistance value and
compare with IEC given value
PP-PE : (Ohm)
B21 Manufacturer handbook and instruction
manuals given to owner/operator
C Functionality checks and tests (with EVCS power TURN-ON at isolator)
C1 Inspect RCCB(s) protecting connecting points
shall be at least type A 30mA of symbol
and perform manual trip test to all RCCB(s) for
Mode 2/2A1/2B1/3 chargers
For mode 4 chargers, earth leakage protection
device trip setting should comply with
requirements in 411.5.3L of SS 638:2018
1 Modes 2A and 2B chargers with galvanic
isolation shall be at least type AC
C2 Perform the sequence of normal start and stop
on every charging point
C3 While charging, check EV ventilation fan (if any)
is working
Single user licence only, no reproduction or circulation. Copying and networking prohibited
Licensed to Mr Benjamin Tan, Member, WG, compliments of Enterprise Singapore
TR 25-1:2022
86
COPYRIGHT
Description
Compliance Remarks/
measurement
value1
C NC NA
C4 While charging, test all the fail-safe emergency
stop button(s) to ensure it is functioning.
(EVSE shall reset to state A upon releasing)
C5 Perform CP short fault simulation for every
charging point.
(EVSE shall reset to state A when fault is
cleared)
C6 (For AC charger) – connector 1
Perform functionality test for mode 2/2A/2B/3
charging point
EVCS is able to complete energisation and de-
energisation sequence
C7 (For AC charger) – connector 2 (if any)
Perform functionality test for mode 2/2A/2B/3
charging point
EVCS is able to complete energisation and de-
energisation sequence
C8 (For DC charger) – connector 1
Perform functionality test for mode 4 charging
point (IEC 61851-23)
EVCS is able to complete energisation and de-
energisation sequence
C9 (For DC charger) – connector 2 (if any)
Perform functionality test for mode 4 charging
point (IEC 61851-23)
EVCS is able to complete energisation and de-
energisation sequence
D Additional item not listed but required in the manufacturer’s instructions
(Please list accordingly or indicate as NA where appropriate)
D1
D2
D3
To be performed by skilled person (LEW)
Description
Compliance Remarks/
measurement
value1
C NC NA
E Electrical checks and tests
E1 Perform earth loop impedance test and record
value complies with SS 638 (For TT and TNS
system)
Ohm
E2 Record the incoming power supply and
charging cable insulation resistance value is
more than 1 M-Ohm
M-ohm
Single user licence only, no reproduction or circulation. Copying and networking prohibited
Licensed to Mr Benjamin Tan, Member, WG, compliments of Enterprise Singapore
TR 25-1:2022
87
COPYRIGHT
Description
Compliance Remarks/
measurement
value1
C NC NA
E3 Tripping time of 30 mA RCCB type A (min) as
measured by an RCCB tester using AC and DC
injection curve is acceptable according to SS 97
tripping time for mode 2 and mode 3 chargers
For mode 4 charger, the trip setting should
comply with 411.5.3L of SS 638:2018
0 deg: ________ ms
180 deg: ______ ms
E4 EVCS installation tally with single line diagram
(SLD) provided by owner/operator.
Means of isolation, lockable at OFF position (2P
for 1ph and 3P/4P for 3ph), is provided for
maintenance switching
E5 Rating of incoming cable from source DB and
charging cable are adequate for max rated
charging current.
1) Measured values where required shall be recorded in this report.
2) EV charging station installed in petrol kiosks shall comply with SCDF's requirements.
General remarks:
Recommended date of next inspection:
(Extract from TR 25-1:2022) Non-restricted access EVCS – every 6 months (required)
Restricted access EVCS – every 24 months (recommended)
Endorsed by LEW
The results obtained in E (Electrical checks and tests) is acceptable to the best of my knowledge
Name of LEW : Licence No:
Signature: Date:
Endorsed by equipment specialist
I have inspected and tested the EVCS. To the best of my knowledge, I declare that the EVCS is
*fit and safe / unfit and unsafe for operation
*Please delete as appropriate
Name of equipment specialist:
Company: Designation:
Signature: Date:
Single user licence only, no reproduction or circulation. Copying and networking prohibited
Licensed to Mr Benjamin Tan, Member, WG, compliments of Enterprise Singapore
TR 25-1:2022
88
COPYRIGHT
The inspection was witnessed by owner/operator of EVCS
Name of owner/operator representative:
Company: Designation:
Signature: Date:
(Extract from TR 25-1:2022)
NOTE 1 – It is the responsibility of the operator/owner of the EVCSs to perform the necessary maintenance routines
as recommended by the equipment specialist or manufacturer to ensure the safe use of the EVCS and any potential
hazard due to lack of maintenance.
NOTE 2 – Fault reporting procedure
If any EV charging station or charging point is found to be unsafe or unsuitable for operation, the following steps
shall be taken:
a) The supply to the equipment shall be switched off;
b) The means of isolation shall be off and locked to prevent re-connection of supply;
c) A clear label notifying users that the equipment is out of service shall be displayed prominently;and
d) The operator/owner shall be informed immediately.
Single user licence only, no reproduction or circulation. Copying and networking prohibited
Licensed to Mr Benjamin Tan, Member, WG, compliments of Enterprise Singapore

More Related Content

Similar to TR25-1 Annex B - T&C Checklist.pdf

Engineer Mr. AR.Mohamed Iqbal Resume
Engineer Mr. AR.Mohamed Iqbal ResumeEngineer Mr. AR.Mohamed Iqbal Resume
Engineer Mr. AR.Mohamed Iqbal Resume
Iqbal Mohamed
 
MANUFACTURE DRAWING 220V DC SYSTEM.pdf
MANUFACTURE DRAWING 220V DC SYSTEM.pdfMANUFACTURE DRAWING 220V DC SYSTEM.pdf
MANUFACTURE DRAWING 220V DC SYSTEM.pdf
Suparlan7
 
EV Charging Infrastructure: Littelfuse Solutions to Enhance Safety, Efficienc...
EV Charging Infrastructure: Littelfuse Solutions to Enhance Safety, Efficienc...EV Charging Infrastructure: Littelfuse Solutions to Enhance Safety, Efficienc...
EV Charging Infrastructure: Littelfuse Solutions to Enhance Safety, Efficienc...
Littelfuse
 
EIT_Presentation
EIT_PresentationEIT_Presentation
EIT_Presentation
Ernst Lourens de Villiers
 
Relay testing procedure
Relay testing procedure Relay testing procedure
Relay testing procedure
sambit mohapatra
 
Level 3 ais-manual-12kv
Level 3 ais-manual-12kvLevel 3 ais-manual-12kv
Level 3 ais-manual-12kv
HamZer
 
66 k v_sf6_bkr_r3_may12
66 k v_sf6_bkr_r3_may1266 k v_sf6_bkr_r3_may12
66 k v_sf6_bkr_r3_may12
Yendapalli Chinnarao
 
ANBARASAN R CV
ANBARASAN R CV ANBARASAN R CV
ANBARASAN R CV
Anbarasan Rajadurai
 
ASB Nº EC120-52A014 - Alert Service Bulltin - Subject - DOORS - Sliding door ...
ASB Nº EC120-52A014 - Alert Service Bulltin - Subject - DOORS - Sliding door ...ASB Nº EC120-52A014 - Alert Service Bulltin - Subject - DOORS - Sliding door ...
ASB Nº EC120-52A014 - Alert Service Bulltin - Subject - DOORS - Sliding door ...
Jeferson Espindola
 
Electricty wiring code 2016
Electricty wiring code 2016Electricty wiring code 2016
Electricty wiring code 2016
Manikandan Mani
 
Advanced motion controls be12a6
Advanced motion controls be12a6Advanced motion controls be12a6
Advanced motion controls be12a6
Electromate
 
The MVAC system equipment installation approval
The MVAC system equipment installation approvalThe MVAC system equipment installation approval
The MVAC system equipment installation approval
urmanxu
 
Singapore Power
Singapore PowerSingapore Power
Singapore Power
Muhammad Suradi
 
JORGE LUIS ROJAS BARNETT
JORGE LUIS ROJAS BARNETT JORGE LUIS ROJAS BARNETT
JORGE LUIS ROJAS BARNETT
Jorge Luis Rojas Barnett
 
BuseResumeBinder
BuseResumeBinderBuseResumeBinder
BuseResumeBinder
Taylor Buse
 
01552_17_06899_1.0__K5_EPS_RCD_Applicative_TS.doc
01552_17_06899_1.0__K5_EPS_RCD_Applicative_TS.doc01552_17_06899_1.0__K5_EPS_RCD_Applicative_TS.doc
01552_17_06899_1.0__K5_EPS_RCD_Applicative_TS.doc
azrfdstgdgdfh
 
ITU-T K21 guide
ITU-T K21 guideITU-T K21 guide
ITU-T K21 guide
Flavio Dotta
 
3D_Distribution transformer_Specification.pdf
3D_Distribution transformer_Specification.pdf3D_Distribution transformer_Specification.pdf
3D_Distribution transformer_Specification.pdf
ShahrukhKhan424745
 
electrician
electricianelectrician
electrician
Mahesh Nai
 
Delta vfd lfrekv
Delta vfd lfrekvDelta vfd lfrekv
Delta vfd lfrekv
Eko Kiswanto
 

Similar to TR25-1 Annex B - T&C Checklist.pdf (20)

Engineer Mr. AR.Mohamed Iqbal Resume
Engineer Mr. AR.Mohamed Iqbal ResumeEngineer Mr. AR.Mohamed Iqbal Resume
Engineer Mr. AR.Mohamed Iqbal Resume
 
MANUFACTURE DRAWING 220V DC SYSTEM.pdf
MANUFACTURE DRAWING 220V DC SYSTEM.pdfMANUFACTURE DRAWING 220V DC SYSTEM.pdf
MANUFACTURE DRAWING 220V DC SYSTEM.pdf
 
EV Charging Infrastructure: Littelfuse Solutions to Enhance Safety, Efficienc...
EV Charging Infrastructure: Littelfuse Solutions to Enhance Safety, Efficienc...EV Charging Infrastructure: Littelfuse Solutions to Enhance Safety, Efficienc...
EV Charging Infrastructure: Littelfuse Solutions to Enhance Safety, Efficienc...
 
EIT_Presentation
EIT_PresentationEIT_Presentation
EIT_Presentation
 
Relay testing procedure
Relay testing procedure Relay testing procedure
Relay testing procedure
 
Level 3 ais-manual-12kv
Level 3 ais-manual-12kvLevel 3 ais-manual-12kv
Level 3 ais-manual-12kv
 
66 k v_sf6_bkr_r3_may12
66 k v_sf6_bkr_r3_may1266 k v_sf6_bkr_r3_may12
66 k v_sf6_bkr_r3_may12
 
ANBARASAN R CV
ANBARASAN R CV ANBARASAN R CV
ANBARASAN R CV
 
ASB Nº EC120-52A014 - Alert Service Bulltin - Subject - DOORS - Sliding door ...
ASB Nº EC120-52A014 - Alert Service Bulltin - Subject - DOORS - Sliding door ...ASB Nº EC120-52A014 - Alert Service Bulltin - Subject - DOORS - Sliding door ...
ASB Nº EC120-52A014 - Alert Service Bulltin - Subject - DOORS - Sliding door ...
 
Electricty wiring code 2016
Electricty wiring code 2016Electricty wiring code 2016
Electricty wiring code 2016
 
Advanced motion controls be12a6
Advanced motion controls be12a6Advanced motion controls be12a6
Advanced motion controls be12a6
 
The MVAC system equipment installation approval
The MVAC system equipment installation approvalThe MVAC system equipment installation approval
The MVAC system equipment installation approval
 
Singapore Power
Singapore PowerSingapore Power
Singapore Power
 
JORGE LUIS ROJAS BARNETT
JORGE LUIS ROJAS BARNETT JORGE LUIS ROJAS BARNETT
JORGE LUIS ROJAS BARNETT
 
BuseResumeBinder
BuseResumeBinderBuseResumeBinder
BuseResumeBinder
 
01552_17_06899_1.0__K5_EPS_RCD_Applicative_TS.doc
01552_17_06899_1.0__K5_EPS_RCD_Applicative_TS.doc01552_17_06899_1.0__K5_EPS_RCD_Applicative_TS.doc
01552_17_06899_1.0__K5_EPS_RCD_Applicative_TS.doc
 
ITU-T K21 guide
ITU-T K21 guideITU-T K21 guide
ITU-T K21 guide
 
3D_Distribution transformer_Specification.pdf
3D_Distribution transformer_Specification.pdf3D_Distribution transformer_Specification.pdf
3D_Distribution transformer_Specification.pdf
 
electrician
electricianelectrician
electrician
 
Delta vfd lfrekv
Delta vfd lfrekvDelta vfd lfrekv
Delta vfd lfrekv
 

Recently uploaded

309475979-Creativity-Innovation-notes-IV-Sem-2016-pdf.pdf
309475979-Creativity-Innovation-notes-IV-Sem-2016-pdf.pdf309475979-Creativity-Innovation-notes-IV-Sem-2016-pdf.pdf
309475979-Creativity-Innovation-notes-IV-Sem-2016-pdf.pdf
Sou Tibon
 
Unit -II Spectroscopy - EC I B.Tech.pdf
Unit -II Spectroscopy - EC  I B.Tech.pdfUnit -II Spectroscopy - EC  I B.Tech.pdf
Unit -II Spectroscopy - EC I B.Tech.pdf
TeluguBadi
 
Properties of Fluids, Fluid Statics, Pressure Measurement
Properties of Fluids, Fluid Statics, Pressure MeasurementProperties of Fluids, Fluid Statics, Pressure Measurement
Properties of Fluids, Fluid Statics, Pressure Measurement
Indrajeet sahu
 
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
upoux
 
Open Channel Flow: fluid flow with a free surface
Open Channel Flow: fluid flow with a free surfaceOpen Channel Flow: fluid flow with a free surface
Open Channel Flow: fluid flow with a free surface
Indrajeet sahu
 
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
sydezfe
 
ELS: 2.4.1 POWER ELECTRONICS Course objectives: This course will enable stude...
ELS: 2.4.1 POWER ELECTRONICS Course objectives: This course will enable stude...ELS: 2.4.1 POWER ELECTRONICS Course objectives: This course will enable stude...
ELS: 2.4.1 POWER ELECTRONICS Course objectives: This course will enable stude...
Kuvempu University
 
OOPS_Lab_Manual - programs using C++ programming language
OOPS_Lab_Manual - programs using C++ programming languageOOPS_Lab_Manual - programs using C++ programming language
OOPS_Lab_Manual - programs using C++ programming language
PreethaV16
 
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptxSENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
b0754201
 
Introduction to Artificial Intelligence.
Introduction to Artificial Intelligence.Introduction to Artificial Intelligence.
Introduction to Artificial Intelligence.
supriyaDicholkar1
 
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
ydzowc
 
Impartiality as per ISO /IEC 17025:2017 Standard
Impartiality as per ISO /IEC 17025:2017 StandardImpartiality as per ISO /IEC 17025:2017 Standard
Impartiality as per ISO /IEC 17025:2017 Standard
MuhammadJazib15
 
DESIGN AND MANUFACTURE OF CEILING BOARD USING SAWDUST AND WASTE CARTON MATERI...
DESIGN AND MANUFACTURE OF CEILING BOARD USING SAWDUST AND WASTE CARTON MATERI...DESIGN AND MANUFACTURE OF CEILING BOARD USING SAWDUST AND WASTE CARTON MATERI...
DESIGN AND MANUFACTURE OF CEILING BOARD USING SAWDUST AND WASTE CARTON MATERI...
OKORIE1
 
FUNDAMENTALS OF MECHANICAL ENGINEERING.pdf
FUNDAMENTALS OF MECHANICAL ENGINEERING.pdfFUNDAMENTALS OF MECHANICAL ENGINEERING.pdf
FUNDAMENTALS OF MECHANICAL ENGINEERING.pdf
EMERSON EDUARDO RODRIGUES
 
一比一原版(USF毕业证)旧金山大学毕业证如何办理
一比一原版(USF毕业证)旧金山大学毕业证如何办理一比一原版(USF毕业证)旧金山大学毕业证如何办理
一比一原版(USF毕业证)旧金山大学毕业证如何办理
uqyfuc
 
3rd International Conference on Artificial Intelligence Advances (AIAD 2024)
3rd International Conference on Artificial Intelligence Advances (AIAD 2024)3rd International Conference on Artificial Intelligence Advances (AIAD 2024)
3rd International Conference on Artificial Intelligence Advances (AIAD 2024)
GiselleginaGloria
 
Determination of Equivalent Circuit parameters and performance characteristic...
Determination of Equivalent Circuit parameters and performance characteristic...Determination of Equivalent Circuit parameters and performance characteristic...
Determination of Equivalent Circuit parameters and performance characteristic...
pvpriya2
 
Particle Swarm Optimization–Long Short-Term Memory based Channel Estimation w...
Particle Swarm Optimization–Long Short-Term Memory based Channel Estimation w...Particle Swarm Optimization–Long Short-Term Memory based Channel Estimation w...
Particle Swarm Optimization–Long Short-Term Memory based Channel Estimation w...
IJCNCJournal
 
Call For Paper -3rd International Conference on Artificial Intelligence Advan...
Call For Paper -3rd International Conference on Artificial Intelligence Advan...Call For Paper -3rd International Conference on Artificial Intelligence Advan...
Call For Paper -3rd International Conference on Artificial Intelligence Advan...
ijseajournal
 
paper relate Chozhavendhan et al. 2020.pdf
paper relate Chozhavendhan et al. 2020.pdfpaper relate Chozhavendhan et al. 2020.pdf
paper relate Chozhavendhan et al. 2020.pdf
ShurooqTaib
 

Recently uploaded (20)

309475979-Creativity-Innovation-notes-IV-Sem-2016-pdf.pdf
309475979-Creativity-Innovation-notes-IV-Sem-2016-pdf.pdf309475979-Creativity-Innovation-notes-IV-Sem-2016-pdf.pdf
309475979-Creativity-Innovation-notes-IV-Sem-2016-pdf.pdf
 
Unit -II Spectroscopy - EC I B.Tech.pdf
Unit -II Spectroscopy - EC  I B.Tech.pdfUnit -II Spectroscopy - EC  I B.Tech.pdf
Unit -II Spectroscopy - EC I B.Tech.pdf
 
Properties of Fluids, Fluid Statics, Pressure Measurement
Properties of Fluids, Fluid Statics, Pressure MeasurementProperties of Fluids, Fluid Statics, Pressure Measurement
Properties of Fluids, Fluid Statics, Pressure Measurement
 
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
 
Open Channel Flow: fluid flow with a free surface
Open Channel Flow: fluid flow with a free surfaceOpen Channel Flow: fluid flow with a free surface
Open Channel Flow: fluid flow with a free surface
 
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
 
ELS: 2.4.1 POWER ELECTRONICS Course objectives: This course will enable stude...
ELS: 2.4.1 POWER ELECTRONICS Course objectives: This course will enable stude...ELS: 2.4.1 POWER ELECTRONICS Course objectives: This course will enable stude...
ELS: 2.4.1 POWER ELECTRONICS Course objectives: This course will enable stude...
 
OOPS_Lab_Manual - programs using C++ programming language
OOPS_Lab_Manual - programs using C++ programming languageOOPS_Lab_Manual - programs using C++ programming language
OOPS_Lab_Manual - programs using C++ programming language
 
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptxSENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
 
Introduction to Artificial Intelligence.
Introduction to Artificial Intelligence.Introduction to Artificial Intelligence.
Introduction to Artificial Intelligence.
 
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
 
Impartiality as per ISO /IEC 17025:2017 Standard
Impartiality as per ISO /IEC 17025:2017 StandardImpartiality as per ISO /IEC 17025:2017 Standard
Impartiality as per ISO /IEC 17025:2017 Standard
 
DESIGN AND MANUFACTURE OF CEILING BOARD USING SAWDUST AND WASTE CARTON MATERI...
DESIGN AND MANUFACTURE OF CEILING BOARD USING SAWDUST AND WASTE CARTON MATERI...DESIGN AND MANUFACTURE OF CEILING BOARD USING SAWDUST AND WASTE CARTON MATERI...
DESIGN AND MANUFACTURE OF CEILING BOARD USING SAWDUST AND WASTE CARTON MATERI...
 
FUNDAMENTALS OF MECHANICAL ENGINEERING.pdf
FUNDAMENTALS OF MECHANICAL ENGINEERING.pdfFUNDAMENTALS OF MECHANICAL ENGINEERING.pdf
FUNDAMENTALS OF MECHANICAL ENGINEERING.pdf
 
一比一原版(USF毕业证)旧金山大学毕业证如何办理
一比一原版(USF毕业证)旧金山大学毕业证如何办理一比一原版(USF毕业证)旧金山大学毕业证如何办理
一比一原版(USF毕业证)旧金山大学毕业证如何办理
 
3rd International Conference on Artificial Intelligence Advances (AIAD 2024)
3rd International Conference on Artificial Intelligence Advances (AIAD 2024)3rd International Conference on Artificial Intelligence Advances (AIAD 2024)
3rd International Conference on Artificial Intelligence Advances (AIAD 2024)
 
Determination of Equivalent Circuit parameters and performance characteristic...
Determination of Equivalent Circuit parameters and performance characteristic...Determination of Equivalent Circuit parameters and performance characteristic...
Determination of Equivalent Circuit parameters and performance characteristic...
 
Particle Swarm Optimization–Long Short-Term Memory based Channel Estimation w...
Particle Swarm Optimization–Long Short-Term Memory based Channel Estimation w...Particle Swarm Optimization–Long Short-Term Memory based Channel Estimation w...
Particle Swarm Optimization–Long Short-Term Memory based Channel Estimation w...
 
Call For Paper -3rd International Conference on Artificial Intelligence Advan...
Call For Paper -3rd International Conference on Artificial Intelligence Advan...Call For Paper -3rd International Conference on Artificial Intelligence Advan...
Call For Paper -3rd International Conference on Artificial Intelligence Advan...
 
paper relate Chozhavendhan et al. 2020.pdf
paper relate Chozhavendhan et al. 2020.pdfpaper relate Chozhavendhan et al. 2020.pdf
paper relate Chozhavendhan et al. 2020.pdf
 

TR25-1 Annex B - T&C Checklist.pdf

  • 1. TR 25-1:2022 84 COPYRIGHT Annex B (normative) Checklist for new charger / parts replacement / modification to EVCS Purpose of use: Checklist for New charger☐ / Parts replacement☐ / Modification to EVCS☐ Particulars of EVCS (one report is to be used for each charger) Brand/model of EV charger(s): S/No.: Name of owner/operator: (Responsible for the EVCS) Address of installation: (Indicate carpark lot number and floor level where applicable) To be performed by equipment specialist Description Compliance Remarks/ measurement value1 C NC NA A Authority requirement A1 Letter of no objection (LNO) is obtained from relevant authority / TR25 certificate of compliance is obtained A2 For building with EMA EI License, letter of consent is obtained from building LEW B External and environmental checks (with EVCS power TURN-OFF at isolator) B1 Installed outside hazardous zones where flammable/combustible gas or material may be present B2 Enclosure is not dented, damaged, corroded or in any rusty condition B3 Space around the EVCS is adequate for easy access and maintenance work B4 Sealing rubber of all doors are in order, and doors including lockset (if any) can be opened and closed easily B5 No sign of insects inside EVCS. Openings or vents are not blocked, no excess foreign particles B6 Detachable parts are not loose or falling off and not in a rusty condition B7 No visible moisture, waterlogging or burnt marks at the EVCS and connector charging pins B8 Floor or wall mounting of EVCS remains rigid and strong Single user licence only, no reproduction or circulation. Copying and networking prohibited Licensed to Mr Benjamin Tan, Member, WG, compliments of Enterprise Singapore
  • 2. TR 25-1:2022 85 COPYRIGHT Description Compliance Remarks/ measurement value1 C NC NA B9 Vehicle connector cable, mounting and support is secured and not damaged B10 Electrical warning labels is clear and prominent B11 Source of DB for EVCS is clearly labelled and electrical source DB is accessible for operation B12 Bollards or continuous kerb(s) or other means of crash protection is installed provide adequate protection against moving vehicle B13 Charger specification plate is clear, legible and prominent according TR25 requirement B14 Owner/operator contact details label is legible and prominent B15 Fail-safe emergency stop button (in red and yellow) is prominent and not damaged. For outdoor installation it shall be weatherproof. Clear directional signs shall be provided for multiple charger installation. B16 Adequate lighting for charging operation B17 Inspection label provided as below. Last inspection date: B18 EVCS's display and all UI accessories (eg, press button, RFID reader etc.) are not damaged and working properly B19 Incoming power supply cable including circuit protective conductor connections and termination(s) are properly made and tightened B20 Measurement of PP-PE resistance value and compare with IEC given value PP-PE : (Ohm) B21 Manufacturer handbook and instruction manuals given to owner/operator C Functionality checks and tests (with EVCS power TURN-ON at isolator) C1 Inspect RCCB(s) protecting connecting points shall be at least type A 30mA of symbol and perform manual trip test to all RCCB(s) for Mode 2/2A1/2B1/3 chargers For mode 4 chargers, earth leakage protection device trip setting should comply with requirements in 411.5.3L of SS 638:2018 1 Modes 2A and 2B chargers with galvanic isolation shall be at least type AC C2 Perform the sequence of normal start and stop on every charging point C3 While charging, check EV ventilation fan (if any) is working Single user licence only, no reproduction or circulation. Copying and networking prohibited Licensed to Mr Benjamin Tan, Member, WG, compliments of Enterprise Singapore
  • 3. TR 25-1:2022 86 COPYRIGHT Description Compliance Remarks/ measurement value1 C NC NA C4 While charging, test all the fail-safe emergency stop button(s) to ensure it is functioning. (EVSE shall reset to state A upon releasing) C5 Perform CP short fault simulation for every charging point. (EVSE shall reset to state A when fault is cleared) C6 (For AC charger) – connector 1 Perform functionality test for mode 2/2A/2B/3 charging point EVCS is able to complete energisation and de- energisation sequence C7 (For AC charger) – connector 2 (if any) Perform functionality test for mode 2/2A/2B/3 charging point EVCS is able to complete energisation and de- energisation sequence C8 (For DC charger) – connector 1 Perform functionality test for mode 4 charging point (IEC 61851-23) EVCS is able to complete energisation and de- energisation sequence C9 (For DC charger) – connector 2 (if any) Perform functionality test for mode 4 charging point (IEC 61851-23) EVCS is able to complete energisation and de- energisation sequence D Additional item not listed but required in the manufacturer’s instructions (Please list accordingly or indicate as NA where appropriate) D1 D2 D3 To be performed by skilled person (LEW) Description Compliance Remarks/ measurement value1 C NC NA E Electrical checks and tests E1 Perform earth loop impedance test and record value complies with SS 638 (For TT and TNS system) Ohm E2 Record the incoming power supply and charging cable insulation resistance value is more than 1 M-Ohm M-ohm Single user licence only, no reproduction or circulation. Copying and networking prohibited Licensed to Mr Benjamin Tan, Member, WG, compliments of Enterprise Singapore
  • 4. TR 25-1:2022 87 COPYRIGHT Description Compliance Remarks/ measurement value1 C NC NA E3 Tripping time of 30 mA RCCB type A (min) as measured by an RCCB tester using AC and DC injection curve is acceptable according to SS 97 tripping time for mode 2 and mode 3 chargers For mode 4 charger, the trip setting should comply with 411.5.3L of SS 638:2018 0 deg: ________ ms 180 deg: ______ ms E4 EVCS installation tally with single line diagram (SLD) provided by owner/operator. Means of isolation, lockable at OFF position (2P for 1ph and 3P/4P for 3ph), is provided for maintenance switching E5 Rating of incoming cable from source DB and charging cable are adequate for max rated charging current. 1) Measured values where required shall be recorded in this report. 2) EV charging station installed in petrol kiosks shall comply with SCDF's requirements. General remarks: Recommended date of next inspection: (Extract from TR 25-1:2022) Non-restricted access EVCS – every 6 months (required) Restricted access EVCS – every 24 months (recommended) Endorsed by LEW The results obtained in E (Electrical checks and tests) is acceptable to the best of my knowledge Name of LEW : Licence No: Signature: Date: Endorsed by equipment specialist I have inspected and tested the EVCS. To the best of my knowledge, I declare that the EVCS is *fit and safe / unfit and unsafe for operation *Please delete as appropriate Name of equipment specialist: Company: Designation: Signature: Date: Single user licence only, no reproduction or circulation. Copying and networking prohibited Licensed to Mr Benjamin Tan, Member, WG, compliments of Enterprise Singapore
  • 5. TR 25-1:2022 88 COPYRIGHT The inspection was witnessed by owner/operator of EVCS Name of owner/operator representative: Company: Designation: Signature: Date: (Extract from TR 25-1:2022) NOTE 1 – It is the responsibility of the operator/owner of the EVCSs to perform the necessary maintenance routines as recommended by the equipment specialist or manufacturer to ensure the safe use of the EVCS and any potential hazard due to lack of maintenance. NOTE 2 – Fault reporting procedure If any EV charging station or charging point is found to be unsafe or unsuitable for operation, the following steps shall be taken: a) The supply to the equipment shall be switched off; b) The means of isolation shall be off and locked to prevent re-connection of supply; c) A clear label notifying users that the equipment is out of service shall be displayed prominently;and d) The operator/owner shall be informed immediately. Single user licence only, no reproduction or circulation. Copying and networking prohibited Licensed to Mr Benjamin Tan, Member, WG, compliments of Enterprise Singapore