In accordance with the District Act, District staff has prepared an annual report on the Protection and Augmentation of Water Supplies, which was filed with the Clerk of the Board on February 26, 2016.
The Report is the 45th annual report on the Santa Clara Valley Water District’s (District) activities in the protection and augmentation of the water supplies. This Report is prepared in accordance with the requirements of the District Act, section 26.5. The Report provides information on water requirements and water supply availability, and financial analysis of the District’s water utility system. The financial analysis includes future capital improvement and maintenance requirements, operating requirements, financing methods and staff’s recommended groundwater production and other water charges by zone for fiscal year 2016–17.
This document provides the recommendations of the Water Planning Committee regarding the City of Goodyear's five-year water and wastewater rate structure. It finds that significant investment is needed to increase water production, pumping, and storage capacity. The Committee recommends: 1) implementing all projects in the $51.5 million Five-Year Capital Improvement Plan, 2) adopting a phased-in approach to funding line oversizing and impact fees, and 3) adopting the proposed utility rate increases presented on May 19th. Under this plan, typical residential customers would see water/wastewater bills increase 9.9% in 2016 with yearly increases under 9% through 2020 to fully fund infrastructure investments.
TWCA Annual Convention: Securing the Water Future of the Greater Houston Regi...TWCA
The document summarizes efforts by various organizations in the Houston region to collaboratively plan and develop water supplies to meet future demand while reducing subsidence rates. It describes how groundwater use previously caused subsidence but regulation and development of surface water projects like Lake Livingston and Lake Houston have helped. It outlines challenges in developing new supplies like the Luce Bayou project and water treatment plant expansions. Funding these large regional projects requires cooperation and financial support from state programs like SWIFT. Long term planning continues to focus on strategies like reuse, importing additional surface water, and desalination.
The document summarizes Austin Water's financial impacts and response to the Central Texas drought from 2008-2015. It describes how extreme drought conditions led to long-term water restrictions that significantly reduced water demand and caused revenue losses of up to $52 million per year. In response, Austin Water implemented a new financial model with tiered fixed fees, increased the fixed revenue percentage, established a reserve fund, and raised rates gradually to stabilize finances and improve bond ratings. The future outlook has improved now that drought conditions have eased.
The document discusses water supply planning for the City Council. It summarizes that the city's permitted water supply from wells in the Simsboro aquifer is currently adequate but development, legislation, and groundwater regulations must be monitored. It outlines the water master plan process including upcoming updates, involvement in regional water planning which will prioritize projects for state funding, and potential pursuit of low-interest loans from the new State Water Implementation Fund for Texas (SWIFT).
2013 Florida Legislative Summary - Environmental and Water BillsThomas F. Mullin
The document summarizes key bills passed by the 2013 Florida legislature related to water resources, environmental regulation, and land use. Major topics included expanding funding for Everglades restoration, establishing numeric nutrient criteria, regulating onsite sewage systems, facilitating public-private partnerships, and reforming aspects of water management and permitting.
This document summarizes SJRA's Groundwater Reduction Plan program in Montgomery County. It discusses that Montgomery County faced a water supply problem due to groundwater regulations. SJRA proposed a conjunctive use solution pumping surface water from Lake Conroe, which 85 local entities agreed to. Phase 1 of the program included a 30 mgd water treatment plant, 52 mile transmission system, and modifications to deliver surface water to six participants and reduce groundwater use. The $490 million project is the largest civil works project in the county. It highlights construction communication strategies, customer review committees, transparency reporting, and using competitive proposals to engage local vendors for the project.
TWCA Annual Convention: Federal Water Finance, Mark LimbaughTWCA
The document summarizes new federal water supply funding and financing tools that are emerging, including the Water Infrastructure Finance and Innovation Act (WIFIA) and proposed legislation around drought response. WIFIA establishes a pilot program to provide low-interest loans for water infrastructure projects. Proposed Senate drought legislation includes a Reclamation Infrastructure Finance and Innovation Act (RIFIA) modeled after WIFIA, expansion of the WaterSMART grant program, and reforms to water recycling and reuse grants. The funding tools aim to boost water sustainability, resilience, and infrastructure investments through public-private partnerships and financing.
The document summarizes the water supply issues facing a city and provides recommendations to address them. The city's water plant capacity is insufficient to meet projected demands by 2020. Well capacity has been temporarily reduced due to saltwater intrusion concerns. The city needs solutions to resolve restrictions on land development approvals and comprehensive plan revisions within two months to meet deadlines. The recommendations are to pursue additional raw water supply from the county or finished water supply from a neighboring city to address the urgent two-month deadline while continuing efforts to re-establish one of the city's wells.
This document provides the recommendations of the Water Planning Committee regarding the City of Goodyear's five-year water and wastewater rate structure. It finds that significant investment is needed to increase water production, pumping, and storage capacity. The Committee recommends: 1) implementing all projects in the $51.5 million Five-Year Capital Improvement Plan, 2) adopting a phased-in approach to funding line oversizing and impact fees, and 3) adopting the proposed utility rate increases presented on May 19th. Under this plan, typical residential customers would see water/wastewater bills increase 9.9% in 2016 with yearly increases under 9% through 2020 to fully fund infrastructure investments.
TWCA Annual Convention: Securing the Water Future of the Greater Houston Regi...TWCA
The document summarizes efforts by various organizations in the Houston region to collaboratively plan and develop water supplies to meet future demand while reducing subsidence rates. It describes how groundwater use previously caused subsidence but regulation and development of surface water projects like Lake Livingston and Lake Houston have helped. It outlines challenges in developing new supplies like the Luce Bayou project and water treatment plant expansions. Funding these large regional projects requires cooperation and financial support from state programs like SWIFT. Long term planning continues to focus on strategies like reuse, importing additional surface water, and desalination.
The document summarizes Austin Water's financial impacts and response to the Central Texas drought from 2008-2015. It describes how extreme drought conditions led to long-term water restrictions that significantly reduced water demand and caused revenue losses of up to $52 million per year. In response, Austin Water implemented a new financial model with tiered fixed fees, increased the fixed revenue percentage, established a reserve fund, and raised rates gradually to stabilize finances and improve bond ratings. The future outlook has improved now that drought conditions have eased.
The document discusses water supply planning for the City Council. It summarizes that the city's permitted water supply from wells in the Simsboro aquifer is currently adequate but development, legislation, and groundwater regulations must be monitored. It outlines the water master plan process including upcoming updates, involvement in regional water planning which will prioritize projects for state funding, and potential pursuit of low-interest loans from the new State Water Implementation Fund for Texas (SWIFT).
2013 Florida Legislative Summary - Environmental and Water BillsThomas F. Mullin
The document summarizes key bills passed by the 2013 Florida legislature related to water resources, environmental regulation, and land use. Major topics included expanding funding for Everglades restoration, establishing numeric nutrient criteria, regulating onsite sewage systems, facilitating public-private partnerships, and reforming aspects of water management and permitting.
This document summarizes SJRA's Groundwater Reduction Plan program in Montgomery County. It discusses that Montgomery County faced a water supply problem due to groundwater regulations. SJRA proposed a conjunctive use solution pumping surface water from Lake Conroe, which 85 local entities agreed to. Phase 1 of the program included a 30 mgd water treatment plant, 52 mile transmission system, and modifications to deliver surface water to six participants and reduce groundwater use. The $490 million project is the largest civil works project in the county. It highlights construction communication strategies, customer review committees, transparency reporting, and using competitive proposals to engage local vendors for the project.
TWCA Annual Convention: Federal Water Finance, Mark LimbaughTWCA
The document summarizes new federal water supply funding and financing tools that are emerging, including the Water Infrastructure Finance and Innovation Act (WIFIA) and proposed legislation around drought response. WIFIA establishes a pilot program to provide low-interest loans for water infrastructure projects. Proposed Senate drought legislation includes a Reclamation Infrastructure Finance and Innovation Act (RIFIA) modeled after WIFIA, expansion of the WaterSMART grant program, and reforms to water recycling and reuse grants. The funding tools aim to boost water sustainability, resilience, and infrastructure investments through public-private partnerships and financing.
The document summarizes the water supply issues facing a city and provides recommendations to address them. The city's water plant capacity is insufficient to meet projected demands by 2020. Well capacity has been temporarily reduced due to saltwater intrusion concerns. The city needs solutions to resolve restrictions on land development approvals and comprehensive plan revisions within two months to meet deadlines. The recommendations are to pursue additional raw water supply from the county or finished water supply from a neighboring city to address the urgent two-month deadline while continuing efforts to re-establish one of the city's wells.
This document discusses water metering projects in Lebanon that have helped reduce non-revenue water and improve cost recovery for water utilities. It notes that only 10% of subscribers are metered currently, but metering and consumption-based tariffs could save utilities an estimated 7 million cubic meters of water per year. The USAID funded projects that developed metering strategies and installed meters in model areas. These interventions helped the utilities lower production and distribution costs, increase hours of water service, boost collection rates, expand service coverage, and enhance customer satisfaction through fair consumption-based pricing.
Okanagan Waterwise: Trepanier Landscape Water Management PlanFiona9864
This document provides a summary of the final report of the Trepanier Landscape Unit water management plan. The report was commissioned by the Regional District of Central Okanagan and BC Ministry of Sustainable Resource Management to address growing pressures on water resources in the region from factors like population growth and climate change. Key findings of the report include that water usage in the TLU is very high at 789 litres per person per day, over twice the Canadian average, and actions will need to be taken to reduce water usage or find alternative sources to sustain economic growth while maintaining environmental quality as pressures increase in the coming decades. The report provides recommendations to improve water management in the TLU through actions such as establishing a leadership group and
The document proposes a rule change to the Texas Commission on Environmental Quality (TCEQ) to provide incentives for wastewater treatment plants to beneficially reuse treated effluent. Currently, land application permits (TLAP) do not provide credit for reuse, requiring plants to acquire more land than needed. The proposed rule would allow plants to claim a credit toward reducing the required size of disposal fields and ponds based on the volume of effluent that can be reliably reused through contracts. This would help plants expand capacity in a flexible manner without acquiring additional land, encourage water reuse, and reduce costs and permitting hurdles associated with population growth in central Texas.
The document discusses surface water issues that must be considered in the joint groundwater management planning process for Groundwater Management Area 7. It summarizes the major and minor aquifers in the area and efforts to develop groundwater availability models (GAMs). Desired future conditions (DFCs) must achieve a balance between various competing water interests while sustaining spring flows and surface water resources. Population growth and drought impact the region's water resources, and groundwater use in one district can affect neighboring districts and downstream water rights.
Presentation by Roy Herndon of Orange County Water District (OCWD) at the ASCE Orange County Branch Joint Sustainability + EWRI Orange County Luncheon on 4/7/2016 in Irvine, CA. This presentation covered the following topics:
-OC Basin and OCWD background
-Alternative Plan for SGMA compliance
-OCWD's sustainability track record
Water in the West - Session 1 - Hector Gonzalesatlanticcouncil
The document provides an overview of integrated water management strategies used by El Paso Water Utilities. It discusses how EPWU was created and oversees four utilities. It faces challenges like drought and growth while rehabilitating infrastructure. EPWU utilizes diversified water resources like surface water, groundwater, conservation, and desalination. It also discusses drought history, conservation programs, government affairs priorities, and research partnerships to develop new water technologies.
The North Harris County Regional Water Authority was created by the state legislature to provide a long-term water supply for North Harris County. It presented an overview of its creation, regulatory requirements to reduce groundwater usage, plans to obtain surface water from Houston via contracts, and its Groundwater Transfer Program to address short-term water needs while developing the regional water system. The Authority also discussed funding its initial projects through bond sales and water fees.
Presentation by Brian Powell of Eastern Municipal Water District (EMWD) at the ASCE Orange County Branch Joint Sustainability + EWRI Orange County Luncheon on 4/7/2016 in Irvine, CA. This presentation covered the following topics:
-Background on EMWD
-How SGMA addresses Adjudicated Basins
-How the San Jacinto Basin was Adjudicated
-Example of a Potential Multi-Agency GSA Governance Structure
-Potential Impacts without a GSA
Economic instruments in water resources management in ArmeniaOECD Environment
The document discusses the application of economic instruments in water resource management in Armenia. It outlines the legal provisions in Armenia's Water Code related to economic instruments. Currently, water abstraction and pollution fees collected are very low compared to full water management costs. Reforms are needed to fully apply the user-pays and polluter-pays principles. Short-term recommendations include increasing fees applied to hydropower, fisheries, and certain polluting industries to generate revenues sufficient to cover water management activities. While some reforms have occurred, further assistance is still required to reform water fees in other sectors.
This study evaluated the economic and environmental impacts of crop and land management practices in four watersheds in Manitoba, Canada. It analyzed the costs and benefits of practices like converting cropland to permanent forage, restoring wetlands, constructing small reservoirs and dams, installing holding ponds, and improving nutrient management. While practices like forage conversion and wetland restoration provided water quality benefits, their costs often outweighed private economic benefits to producers. Reduced fertilizer management on manured land did increase farm profits. The study aims to identify economically feasible locations for best management practices to reduce nutrient exports and meet water quality targets.
The presentation discussed the San Antonio Water System's (SAWS) Twin Oaks Brackish Groundwater Desalination Program. The program will develop brackish groundwater from the Carrizo-Wilcox and Gulf Coast aquifers using reverse osmosis treatment and deep well injection of concentrate. Phase I will provide 12 million gallons per day by 2016 at an estimated cost of $192.66 million. The program aims to ultimately supply 30 million gallons per day through phased expansions to help meet the region's increasing water demands through 2060 in a cost-effective and sustainable manner.
Presentation by Enrique Lopezcalva of RMC Water and Environment at the ASCE Orange County Branch Joint Sustainability + EWRI Orange County Luncheon on 4/7/2016 in Irvine, CA. This presentation covered the following topics:
-SGMA background and context.
-Main phases, timeline, and current efforts.
-GSA and GSP relevant aspects and funding opportunities.
The document discusses issues related to water supply for the city of Dania Beach and a proposed Regional Activity Center (RAC) Amendment. Water supply has become more complex due to increased demand, saltwater intrusion, and weather variations. The city's water supply plan and a proposed RAC amendment were found to be not in compliance due to population projections and long-term capacity deficiencies. The city is pursuing options to address the objections, including negotiating an agreement with Hollywood to purchase potable water capacity. A decision is needed by November 18th to resolve the issues for the RAC amendment.
A slideshow about Maryland's Bay Restoration Fund, a fee to pay for wastewater treatment and septic system upgrades to clean up nutrient pollution in the Chesapeake Bay. Presented by Jag Khuman, director of the Maryland Water Quality Financing Administration, during the Buzzards Bay Coalition's 2013 Decision Makers Workshop series. Learn more at www.savebuzzardsbay.org/DecisionMakers
An Overview of the Texas Alliance of Energy Producers’ Produced Water White P...TWCA
This document discusses sustainable produced water policy and management in the Texas oil and gas industry from 2019 onward. It defines produced water as water extracted during oil and gas production that may include formation water, injected water, and added fluids. The majority comes from Texas shale plays like the Permian Basin, which accounts for over 65% of the state's produced water volume. The goals of produced water policy in Texas are outlined, along with 2019 legislative activity and 10 policy recommendations. Meetings held by the Texas Alliance of Energy Producers in Washington D.C. with EPA, DOE, and legislators are summarized. The role of water midstream companies in infrastructure for sourcing, transporting, treating and recycling produced water is also
The document discusses the transfer of water and sewer utility regulation in Texas from the Texas Commission on Environmental Quality (TCEQ) to the Public Utility Commission of Texas (PUC) in 2013-2015. It outlines the PUC's mission and provides details on the new regulatory classifications and requirements for investor-owned utilities under the PUC, including more stringent filing requirements for larger Class A utilities. It also notes trends in the regulated water/sewer industry around infrastructure needs, sales of utilities, and conservation rate structures.
Stormwater Presentation to Friends of Lake Accotink Park 12-2019Fairfax County
This document provides information on Fairfax County's Stormwater Program, including an overview of stormwater management drivers and history of funding. It discusses regulatory programs, conveyance systems, dam safety, emergency response, streams and water quality improvements, and completed projects. Maps and photos of completed stream restoration, outfall restoration, pond retrofit, and dredging projects are shown. Ongoing and planned projects in Braddock District are outlined, including details on the Long Branch Central Watershed Management Area project and Lake Accotink dredging project.
The study was conducted to evaluate the groundwater
quality of Aligarh city, (India). Groundwater samples were
collected from 40 wells and analyzed for 20 water quality
parameters in post-monsoon seasons during the year 2013. High
coefficient of variance indicates variability of physico-chemical
parameters concentrations in ground water. The descriptive
statistical analysis was done beside Pearson correlation. From
correlation analysis it was observed that very strong correlations
exist between total hardness and Mg++ (0.99), TDS and total
hardness (0.88), TDS and Chloride (0.87). In 100% of the
samples recorded alkalinity and magnesium concentration were
found higher than maximum permissible limit prescribed by BIS.
Concentration of hardness, cadmium, pH, iron, lead, and total
dissolved solids were also found above the standard limits
prescribed by BIS. This reveals deterioration of water quality. It
is therefore, suggested to take up regular monitoring of
groundwater in areas of Aligarh city.
ground control and improvement, Xanthakos , 19948621
This chapter discusses groundwater lowering and drainage techniques. It covers common reasons to lower groundwater, such as construction dewatering. It also discusses design considerations like permeability, investigations methods, theoretical principles, dewatering methods, design of dewatering systems, and effects on adjacent structures. Case histories are presented as examples.
This document discusses water metering projects in Lebanon that have helped reduce non-revenue water and improve cost recovery for water utilities. It notes that only 10% of subscribers are metered currently, but metering and consumption-based tariffs could save utilities an estimated 7 million cubic meters of water per year. The USAID funded projects that developed metering strategies and installed meters in model areas. These interventions helped the utilities lower production and distribution costs, increase hours of water service, boost collection rates, expand service coverage, and enhance customer satisfaction through fair consumption-based pricing.
Okanagan Waterwise: Trepanier Landscape Water Management PlanFiona9864
This document provides a summary of the final report of the Trepanier Landscape Unit water management plan. The report was commissioned by the Regional District of Central Okanagan and BC Ministry of Sustainable Resource Management to address growing pressures on water resources in the region from factors like population growth and climate change. Key findings of the report include that water usage in the TLU is very high at 789 litres per person per day, over twice the Canadian average, and actions will need to be taken to reduce water usage or find alternative sources to sustain economic growth while maintaining environmental quality as pressures increase in the coming decades. The report provides recommendations to improve water management in the TLU through actions such as establishing a leadership group and
The document proposes a rule change to the Texas Commission on Environmental Quality (TCEQ) to provide incentives for wastewater treatment plants to beneficially reuse treated effluent. Currently, land application permits (TLAP) do not provide credit for reuse, requiring plants to acquire more land than needed. The proposed rule would allow plants to claim a credit toward reducing the required size of disposal fields and ponds based on the volume of effluent that can be reliably reused through contracts. This would help plants expand capacity in a flexible manner without acquiring additional land, encourage water reuse, and reduce costs and permitting hurdles associated with population growth in central Texas.
The document discusses surface water issues that must be considered in the joint groundwater management planning process for Groundwater Management Area 7. It summarizes the major and minor aquifers in the area and efforts to develop groundwater availability models (GAMs). Desired future conditions (DFCs) must achieve a balance between various competing water interests while sustaining spring flows and surface water resources. Population growth and drought impact the region's water resources, and groundwater use in one district can affect neighboring districts and downstream water rights.
Presentation by Roy Herndon of Orange County Water District (OCWD) at the ASCE Orange County Branch Joint Sustainability + EWRI Orange County Luncheon on 4/7/2016 in Irvine, CA. This presentation covered the following topics:
-OC Basin and OCWD background
-Alternative Plan for SGMA compliance
-OCWD's sustainability track record
Water in the West - Session 1 - Hector Gonzalesatlanticcouncil
The document provides an overview of integrated water management strategies used by El Paso Water Utilities. It discusses how EPWU was created and oversees four utilities. It faces challenges like drought and growth while rehabilitating infrastructure. EPWU utilizes diversified water resources like surface water, groundwater, conservation, and desalination. It also discusses drought history, conservation programs, government affairs priorities, and research partnerships to develop new water technologies.
The North Harris County Regional Water Authority was created by the state legislature to provide a long-term water supply for North Harris County. It presented an overview of its creation, regulatory requirements to reduce groundwater usage, plans to obtain surface water from Houston via contracts, and its Groundwater Transfer Program to address short-term water needs while developing the regional water system. The Authority also discussed funding its initial projects through bond sales and water fees.
Presentation by Brian Powell of Eastern Municipal Water District (EMWD) at the ASCE Orange County Branch Joint Sustainability + EWRI Orange County Luncheon on 4/7/2016 in Irvine, CA. This presentation covered the following topics:
-Background on EMWD
-How SGMA addresses Adjudicated Basins
-How the San Jacinto Basin was Adjudicated
-Example of a Potential Multi-Agency GSA Governance Structure
-Potential Impacts without a GSA
Economic instruments in water resources management in ArmeniaOECD Environment
The document discusses the application of economic instruments in water resource management in Armenia. It outlines the legal provisions in Armenia's Water Code related to economic instruments. Currently, water abstraction and pollution fees collected are very low compared to full water management costs. Reforms are needed to fully apply the user-pays and polluter-pays principles. Short-term recommendations include increasing fees applied to hydropower, fisheries, and certain polluting industries to generate revenues sufficient to cover water management activities. While some reforms have occurred, further assistance is still required to reform water fees in other sectors.
This study evaluated the economic and environmental impacts of crop and land management practices in four watersheds in Manitoba, Canada. It analyzed the costs and benefits of practices like converting cropland to permanent forage, restoring wetlands, constructing small reservoirs and dams, installing holding ponds, and improving nutrient management. While practices like forage conversion and wetland restoration provided water quality benefits, their costs often outweighed private economic benefits to producers. Reduced fertilizer management on manured land did increase farm profits. The study aims to identify economically feasible locations for best management practices to reduce nutrient exports and meet water quality targets.
The presentation discussed the San Antonio Water System's (SAWS) Twin Oaks Brackish Groundwater Desalination Program. The program will develop brackish groundwater from the Carrizo-Wilcox and Gulf Coast aquifers using reverse osmosis treatment and deep well injection of concentrate. Phase I will provide 12 million gallons per day by 2016 at an estimated cost of $192.66 million. The program aims to ultimately supply 30 million gallons per day through phased expansions to help meet the region's increasing water demands through 2060 in a cost-effective and sustainable manner.
Presentation by Enrique Lopezcalva of RMC Water and Environment at the ASCE Orange County Branch Joint Sustainability + EWRI Orange County Luncheon on 4/7/2016 in Irvine, CA. This presentation covered the following topics:
-SGMA background and context.
-Main phases, timeline, and current efforts.
-GSA and GSP relevant aspects and funding opportunities.
The document discusses issues related to water supply for the city of Dania Beach and a proposed Regional Activity Center (RAC) Amendment. Water supply has become more complex due to increased demand, saltwater intrusion, and weather variations. The city's water supply plan and a proposed RAC amendment were found to be not in compliance due to population projections and long-term capacity deficiencies. The city is pursuing options to address the objections, including negotiating an agreement with Hollywood to purchase potable water capacity. A decision is needed by November 18th to resolve the issues for the RAC amendment.
A slideshow about Maryland's Bay Restoration Fund, a fee to pay for wastewater treatment and septic system upgrades to clean up nutrient pollution in the Chesapeake Bay. Presented by Jag Khuman, director of the Maryland Water Quality Financing Administration, during the Buzzards Bay Coalition's 2013 Decision Makers Workshop series. Learn more at www.savebuzzardsbay.org/DecisionMakers
An Overview of the Texas Alliance of Energy Producers’ Produced Water White P...TWCA
This document discusses sustainable produced water policy and management in the Texas oil and gas industry from 2019 onward. It defines produced water as water extracted during oil and gas production that may include formation water, injected water, and added fluids. The majority comes from Texas shale plays like the Permian Basin, which accounts for over 65% of the state's produced water volume. The goals of produced water policy in Texas are outlined, along with 2019 legislative activity and 10 policy recommendations. Meetings held by the Texas Alliance of Energy Producers in Washington D.C. with EPA, DOE, and legislators are summarized. The role of water midstream companies in infrastructure for sourcing, transporting, treating and recycling produced water is also
The document discusses the transfer of water and sewer utility regulation in Texas from the Texas Commission on Environmental Quality (TCEQ) to the Public Utility Commission of Texas (PUC) in 2013-2015. It outlines the PUC's mission and provides details on the new regulatory classifications and requirements for investor-owned utilities under the PUC, including more stringent filing requirements for larger Class A utilities. It also notes trends in the regulated water/sewer industry around infrastructure needs, sales of utilities, and conservation rate structures.
Stormwater Presentation to Friends of Lake Accotink Park 12-2019Fairfax County
This document provides information on Fairfax County's Stormwater Program, including an overview of stormwater management drivers and history of funding. It discusses regulatory programs, conveyance systems, dam safety, emergency response, streams and water quality improvements, and completed projects. Maps and photos of completed stream restoration, outfall restoration, pond retrofit, and dredging projects are shown. Ongoing and planned projects in Braddock District are outlined, including details on the Long Branch Central Watershed Management Area project and Lake Accotink dredging project.
The study was conducted to evaluate the groundwater
quality of Aligarh city, (India). Groundwater samples were
collected from 40 wells and analyzed for 20 water quality
parameters in post-monsoon seasons during the year 2013. High
coefficient of variance indicates variability of physico-chemical
parameters concentrations in ground water. The descriptive
statistical analysis was done beside Pearson correlation. From
correlation analysis it was observed that very strong correlations
exist between total hardness and Mg++ (0.99), TDS and total
hardness (0.88), TDS and Chloride (0.87). In 100% of the
samples recorded alkalinity and magnesium concentration were
found higher than maximum permissible limit prescribed by BIS.
Concentration of hardness, cadmium, pH, iron, lead, and total
dissolved solids were also found above the standard limits
prescribed by BIS. This reveals deterioration of water quality. It
is therefore, suggested to take up regular monitoring of
groundwater in areas of Aligarh city.
ground control and improvement, Xanthakos , 19948621
This chapter discusses groundwater lowering and drainage techniques. It covers common reasons to lower groundwater, such as construction dewatering. It also discusses design considerations like permeability, investigations methods, theoretical principles, dewatering methods, design of dewatering systems, and effects on adjacent structures. Case histories are presented as examples.
This document contains questions and answers related to various ground improvement techniques. It discusses challenging soil conditions and problematic soils like expansive soils. It then lists and provides brief definitions for various ground improvement techniques like compaction, dewatering, preloading, vertical drains, vibro-compaction, stone columns, grouting, soil reinforcement and geosynthetics. The document is divided into various units that discuss these techniques in more detail along with their methods, applications, advantages and limitations.
This document discusses various methods for stabilizing soils and improving ground conditions for public works projects. It describes causes of unconsolidated soils like water, clays, and organics. Key methods covered include soil cement, lime admixtures, flyash, dewatering, heating/freezing, vitrification, stone columns, deep dynamic compaction, drainage/surcharge, electro-osmosis, compaction grouting, blasting, surface compaction, vertical drains, jet grouting, soil nailing, tiebacks, shotcrete walls, underpinning, and dynamic compaction. The objectives, equipment used, and factors affecting different compaction and ground improvement techniques are also summarized.
The document discusses various ground improvement techniques including dry soil mixing, dynamic compaction, injection systems, rapid impact compaction, rigid inclusions, vibro compaction, vibro concrete columns, vibro piers, and wet soil mixing. It provides details on each technique such as how it is performed, the types of soils it can be used to treat, and examples of how it has been used to improve soil properties like bearing capacity, settlement, and liquefaction potential.
Civil engineering materials & Construction - Soil explorationsGowtham G
This document provides information about site investigation and ground improvement techniques. It discusses the importance of site investigation, which involves preliminary investigations like reconnaissance and studying maps to understand soil conditions. Methods of site exploration include direct methods like test pits and indirect methods like the standard penetration test. The document also covers ground improvement techniques, noting the importance of determining a soil's safe bearing capacity. It discusses methods to test bearing capacity, like plate loading tests, and techniques to improve poor soils, as governed by relevant Indian Standards.
The document discusses various groundwater improvement techniques, including both direct and indirect artificial recharge methods. Direct surface methods like percolation tanks, flooding, stream augmentation, and ditch/furrow systems enhance groundwater infiltration. Direct subsurface methods include recharge wells, dug wells, and pits/shafts that allow direct recharge. Indirect methods are induced recharge, which uses pumping to induce surface water infiltration, and aquifer modification methods that alter characteristics to improve storage and flow. The techniques described can help maximize storage, improve water quality, and replenish overexploited aquifers.
The water contamination is a widely common problem relating to the field of environmental and water resource engineering. It requires very sophisticated techniques to prevent the occurrence of contamination in ground or shallow water resources by all available prevention methods. This research discusses the different sources of ground water contamination and the effects of contaminated water on the health and environment. In addition to some details about the protection methods to keep water usable and finally recommendations and conclusion.
Addressing your water questions | Brunswick County GovernmentBrunswick County
The Brunswick County Commissioners decided in 2018 to install an advanced low-pressure reverse osmosis treatment system at the Northwest Water Treatment Plant to remove GenX and PFAS from the water. In 2018, Brunswick County also joined lawsuits against DuPont and Chemours seeking monetary damages to pay for the new treatment system. The recommended new water rates that would go into effect in 2022 are needed to pay for the raw water main, treatment plant expansion, and reverse osmosis system, with debt service starting in 2022.
Item #s 12 & 13 - Groundwater Use Reduction Program & Feesahcitycouncil
The document summarizes a proposed ordinance to amend the City of Alamo Heights' groundwater conservation code. The ordinance would add indicators for the city's groundwater use reduction program stages, revise reduction measures, and enact groundwater use surcharge fees. The city relies solely on the Edwards Aquifer for its water supply and must comply with pumping restrictions imposed by the Edwards Aquifer Authority during drought conditions. The proposed changes are intended to help the city meet its pumping reduction goals.
Item # 7 - Water Surcharge Fee Amendmentahcitycouncil
The ordinance amends Chapter 19 of the City Code concerning water and sewers to adopt groundwater use surcharge fees. The City relies solely on the Edwards Aquifer for its water supply and must comply with pumping restrictions imposed by the Edwards Aquifer Authority during drought conditions. The proposed surcharge fees will be assessed on monthly water use exceeding thresholds for different account types when the City is in Stages 1-5 of pumping restrictions to encourage conservation and help the City meet its required reductions.
Item # 4 - Water Restrictions Amendmentahcitycouncil
The document is a city council agenda memorandum proposing an ordinance to amend the city code regarding groundwater conservation. Specifically, it proposes adding stage V indicators to the groundwater use reduction program, revising the reduction measures, and enacting groundwater use surcharge fees. The surcharge fees would be applied to water accounts using over 2,301 cubic feet per month during critical drought stages to further encourage water conservation and compliance with pumping restrictions from the Edwards Aquifer Authority, which is the city's sole water source.
Tim Broeder
Marcie Nolan
Jo Sesodia
Bob Daniels
The Sunshine State will always experience growth, whether rapid or slow. This growth will continue to drain the cheap and easy water resources of the State. This session will provide an overview of how three local governments have completely redesigned their long range planning program to incorporate potable water issues into their comprehensive and current plans. The
determination of demand, the single utility provider structure, and the costs of these infrastructure projects will be discussed. For local planners, the need and ability to implement long range plans through collaboration between the utility engineer and the planner will be stressed.
The document outlines Barnstable's Comprehensive Wastewater Management Plan to address nitrogen pollution threatening its coastal waters and meet federal water quality standards. It notes that septic systems account for 80% of nitrogen pollution and that the plan will extend sewer service to 11,800 properties over 30 years, removing 100% of the nitrogen needed. It discusses financing the $1.4 billion plan through room occupancy taxes, meals taxes, sewer assessments on property owners, and sewer rates. The draft Sewer Assessment Ordinance proposes assessing properties up to $17,000 upon connection to offset costs.
The document discusses the impacts of installing different pollution controls at the Navajo Generating Station on the Central Arizona Project. It finds that installing selective catalytic reduction controls would increase the Central Arizona Project's energy charges by about $8.33 per acre foot and reduce revenues for the Basin Development Fund by $149 million between 2016-2036. Closing the Navajo Generating Station could increase the Central Arizona Project's pumping costs by 50-300% and replace $50 million or more in annual revenues used to repay debts.
The document discusses monitoring water indicators for SDG Target 6.4 on water use efficiency and water stress. It outlines the definitions, methods of computation, and rationale for two indicators - 6.4.1 on change in water use efficiency over time, and 6.4.2 on level of water stress as freshwater withdrawal as a proportion of available resources. It provides country-level data on the indicators and discusses challenges countries may face in monitoring them and how FAO can provide support.
This document provides an overview and analysis of key issues related to the Bay Delta Conservation Plan (BDCP) from the perspective of the Metropolitan Water District Program. It summarizes the BDCP's capital and operating cost estimates, outlines the proposed funding sources including contributions from water exporters and state/federal governments, and analyzes potential cost allocation scenarios and their financial impacts. Key uncertainties noted include the lack of a finalized cost allocation and questions around assurances that future state and federal funding will meet regulatory requirements.
The West Harris County Regional Water Authority (WHCRWA) was created in 2001 by the Texas Legislature to facilitate reducing reliance on groundwater and ensuring a long-term supply of surface water for municipal utility districts in its boundaries. The WHCRWA negotiated a surface water contract and has constructed over 50 miles of pipelines and other infrastructure at a cost of over $500 million to meet groundwater reduction mandates of 30% by 2010, 70% by 2020, and 80% by 2030. Water rates have increased over time to fund ongoing construction projects needed to secure water supplies for future demands, though the WHCRWA aims to keep costs as low as possible.
PPT Item # 7 - Water Surcharge Fee Amendmentahcitycouncil
The assistant city manager is presenting proposed updates to water restrictions and groundwater surcharge fees to reduce water consumption. The proposals include establishing stricter groundwater surcharge fees that increase for higher levels of usage above account thresholds set at the top 25% of users. Fees would be deposited into the utility fund and used for drought management, water rights, and conservation efforts. Approval of the updated fees would help the city comply with its reduced allotment from the Edward Aquifer Authority and reduce the risk of fines.
PPT Item # 4 - Water Restrictions Amendmentahcitycouncil
- The document discusses proposed updates to the city's water restriction strategies and municipal code based on recent high water consumption and feedback from council and public meetings. It includes incorporating a Stage 5 water restriction, enhancing enforcement of violations, and revising the groundwater use surcharge fee threshold and calculation methodology.
- Water usage in 2023 has been the highest since 2011 and projected pumping amounts would exceed the city's allotment from the Edward Aquifer Authority. The proposed changes aim to reduce water usage and avoid penalties from the EAA.
This document provides an environmental impact analysis of a proposed redevelopment project at Mount Yamashiro regarding water/wastewater and noise impacts. It finds that the project would increase impervious surfaces and stormwater runoff but implement best management practices to prevent water quality impacts. Wastewater generation during construction and operation would not exceed treatment plant capacity. Noise impacts during construction and from increased visitors are also assessed. Mitigation measures are proposed, such as low-flow fixtures and sewer line upgrades, to reduce impacts to less than significant levels.
Presentation by Stu Feinglas, Senior Water Resources Analyst at City of Westminster, at the 2018 Gulf Coast Water Conservation Symposium in Houston, Texas.
The document proposes allocating the town's wastewater treatment capacity for the upcoming fiscal year. It analyzes current wastewater flows, committed capacity not yet used, and reserve capacity to determine 256,665 gpd is available for allocation. This is proposed to be allocated with approximately 33,340 gpd for new uses and the remainder held in reserve. Residential growth is estimated to require 11,840 gpd and 7,500 gpd is proposed to be allocated for new commercial/industrial uses.
Approval of Shortage Management Actions in Response to MWD Supply Cutbacks and SWRCB Emergency Regulation
Special Board Meeting, May 14, 2015
Presentation by: Dana Friehauf, Water Resources Manager
The document provides an analysis of water risk trends in the United States in 2021. It finds that (1) 36% of the US experienced severe or extreme drought, (2) water infrastructure received poor grades on the Infrastructure Report Card, and (3) 6 billion gallons of treated water are wasted every day from water main breaks. The analysis examines factors that influence water usage and risk at the property level like leaks, water rates, appliance flow rates, and regional rainfall variations. It shows how Banyan Water's software identifies leaks, saves customers millions in water costs, and helps adapt to risks from climate change and infrastructure issues.
SDG target 6.4: water use efficiency and water stress indicatorsFAO
The document discusses indicators for monitoring progress on SDG Target 6.4 related to water use efficiency and scarcity. It describes the definitions, methods of computation, data needs and interpretation for two indicators - 6.4.1 on change in water use efficiency over time, and 6.4.2 on level of water stress as measured by freshwater withdrawals as a proportion of available resources. Key challenges for implementation include collecting necessary sectoral water use and economic data at national and sub-national levels over time. FAO can provide support through building on existing data collection efforts, working with countries to progressively improve monitoring systems, and compiling global data sets.
The document discusses Manukau Water Limited's water demand management strategy and implementation. The strategy set targets for bulk water demand, non-revenue water levels, and per capita water usage. It identified 10 core business processes to achieve the targets, including managing bulk water demand through improved metering and monitoring, a water leak reduction program, pressure management, and customer communication initiatives. Performance in the first year of implementation met or exceeded all three targets. The strategy provides a model for other water retailers to effectively manage customer demand.
2023 Winter Springs Water and Wastewater Rate Study PresentationVictoriaColangelo
This document presents a comprehensive study on water and wastewater rates for Winter Springs, covering the scope of projects, historical trends, comparisons with surrounding municipalities, and leveraging additional funding sources. It includes detailed forecasts, assumptions, capital improvement program funding, existing and proposed rate adjustments, monthly utility bill projections, revenue sufficiency analysis, and comparisons of local rates. The study concludes with findings and recommendations for rate adjustments over the next five fiscal years to ensure revenue sufficiency and account for capital improvement needs and inflationary impacts.
Hindu Temple Terms & Conditions INSTRUCTORS.pdfRishi Kumar
The document outlines the terms and conditions for instructors volunteering at the Saratoga Hindu Temple & Community Center (SHTCC). It details that instructors must agree to assume all risks of injury or loss and waive any claims against SHTCC or the City of Saratoga. Instructors also agree to indemnify SHTCC for any claims or damages. The terms cover copyright of materials, logistics of running classes, use of photos, medical authorization, and dispute resolution through arbitration.
The document summarizes Anna Eshoo's positions on key issues as a member of Congress representing California's 18th district. It discusses her work on issues like responding to wildfires, protecting the US Postal Service, addressing the COVID pandemic, reforming policing practices, lowering healthcare and prescription drug costs, protecting reproductive rights, addressing the housing crisis, enacting gun safety laws, reforming immigration policies, and closing partisan divisions. The document provides details on legislation she has introduced or supported regarding each issue area.
Advice letter 569 - surcharges 2021 San Jose Water companyRishi Kumar
San Jose Water Company (SJWC) filed Advice Letter 569 requesting authorization from the California Public Utilities Commission (CPUC) to activate Stage 3 of its Schedule 14.1 Water Shortage Contingency Plan. Schedule 14.1 allows for mandatory water use reductions and drought surcharges during drought emergencies. SJWC is seeking to activate Stage 3 in response to emergency drought conditions in Santa Clara County. The activation would establish a minimum monthly water allocation and surcharges for customers exceeding 15% of their 2019 usage to encourage conservation. SJWC held a public meeting on October 28th to provide information and receive feedback regarding the request. The CPUC will review the request and determine if authorization is reasonable.
This project by the Santa Clara Valley Water District aims to clean up homeless encampments along creeks to reduce water contamination and protect water infrastructure. It coordinates with local agencies and non-profits to address environmental issues caused by encampments while also connecting homeless individuals with social services. The project has exceeded its commitment of 52 annual cleanups by conducting over 400 cleanups per year and removing nearly 1,000 tons of trash and debris. Funding comes from voter-approved water management funds and additional allocations to address rising demands and safety concerns for cleanup crews.
The document is a letter from the City of Palo Alto commenting on the Plan Bay Area 2050 Final Blueprint and Draft RHNA Methodology. Some key points made in the letter include:
- Palo Alto supports the objectives of PBA50 but has concerns about the housing allocation and job growth projections.
- Palo Alto has taken many steps to promote more housing and improve jobs-housing balance, including capping office development growth.
- The RHNA numbers and housing projections for Palo Alto remain unrealistic given its size and limited redevelopment opportunities.
- PBA50's job and housing projections should incorporate Palo Alto's office development cap and allow for increased long-term telecommuting
The document raises several issues with the Quito Village SB35 project that may disqualify it from streamlined approval under SB35. It discusses easements on the property that would require separate agency approval to vacate. It also notes that the project includes a vesting tentative map that would require Planning Commission approval and findings after public hearings. Further, the document states that the project did not provide required Phase I and Phase II environmental assessments, and the site was listed on EPA databases for hazardous materials due to a dry cleaner previously on the site, which could disqualify it from SB35 if not remediated. The author urges the Planning Department to address these issues to fully review the project's eligibility for streamlined approval.
The Saratoga City Council will receive a report on options for generating additional revenue for roadway maintenance. The report will recommend that the Council either include $150,000 in the FY 2021/22 budget to evaluate placing a ballot measure before voters in November 2022, or have staff report back in 2023 after the next Pavement Management System report. The background provided notes that additional revenue will be needed to maintain Saratoga's current pavement condition index score of 67 based on the most recent report.
Saratoga 04 07-2021 city council agenda -webRishi Kumar
The document provides the agenda for the Saratoga City Council meeting on April 7, 2021. It will be conducted virtually via Zoom due to COVID-19. The agenda includes discussing the Mayoral Rotation Policy, approving previous meeting minutes and financial reports, designating a historic landmark and entering into a Mills Act agreement, reallocating community event grant funds, and accepting artwork for utility boxes through the Paint the City program. Public participation will occur virtually and the meeting procedures are described.
Capital Improvement Saratoga 03 31-2021 council agenda packetRishi Kumar
The Saratoga City Council agenda for March 31, 2021 includes a Capital Improvement Plan (CIP) budget study session and discussion of additional revenue for roadway maintenance. The agenda provides teleconference information for public participation and allows oral communications on non-agendized items. The study session will prioritize projects for FY 2021/22 CIP funding and discuss options to modify the goal to maintain city streets or pursue a possible ballot measure for additional revenue.
California 2021 redistricting preview the cook political reportRishi Kumar
This document provides a preview of California's 2021 redistricting process. It notes that California is projected to lose one of its 53 congressional seats. An independent redistricting commission will redraw district boundaries, without regard for incumbents, based on 2020 Census data and public hearings. The document analyzes how population changes could affect various districts, with Los Angeles County likely to see the biggest changes due to slower growth. It also speculates on potential impacts to competitive Central Valley and Northern California districts.
The City of Monte Sereno strongly objects to San Jose Water Company's (SJWC) request for a total $88 million rate increase over three years. The letter argues SJWC has not used past rate increases efficiently and requests the CPUC deny any increases until SJWC benchmarks against other utilities. It also urges analyzing SJWC's financials to justify infrastructure spending and considering large past increases have far outpaced inflation, hurting residents. The city believes protecting consumers from unreasonable rate hikes is the CPUC's duty.
The document summarizes several California bills related to community development and housing from 2020. Key bills discussed include AB 725, which requires jurisdictions like Saratoga to zone for more moderate and above-moderate income housing, AB 168 relating to tribal consultation for housing projects, and AB 2345 which increases density bonuses for affordable housing developments. The document also outlines bills on accessory dwelling units, COVID-19 extensions for housing approvals, and transit and infrastructure projects.
The California Senate has introduced a housing package of 10 bills to address the state's severe housing crisis. The package aims to create more affordable housing and homeownership opportunities through measures like establishing a housing bond, allowing residential development on commercial lots, streamlining environmental reviews, and increasing flexibility for homeowners to build additional units. The bills together comprise a comprehensive approach to boost housing production and stabilize housing for vulnerable groups.
This document provides an overview of several key housing laws and legislation in California, including:
The Housing Accountability Act, which limits a local government's ability to deny or reduce the density of residential projects.
The Density Bonus Law, which seeks to relax development standards for qualifying projects in exchange for designated affordable units or senior housing.
Streamlined Ministerial Approval (SB 35), which allows for by-right approval of projects in jurisdictions not meeting housing needs allocation goals.
The Housing Crisis Act of 2019, which prohibits actions that would reduce housing density or intensity and streamlines the approval process.
The Housing Element Law, which requires cities and counties to plan and zone for sufficient affordable housing to
The City of Saratoga must update its Housing Element to plan for a significant increase in the number of housing units needed between 2023-2031. The draft regional housing needs allocation from the Association of Bay Area Governments assigns Saratoga a goal of 1,712 new housing units, up from 439 units in the previous period. This draft allocation breaks down units needed by income level: 454 very low income units, 261 low income units, 278 moderate income units and 719 above moderate income units. City staff will work with the City Council to identify adequate sites to meet this goal and submit the updated Housing Element to the state for review and certification by 2023.
This document provides an overview of Saratoga's Housing Element update process. It discusses the requirements to plan for housing needs, the draft Regional Housing Needs Allocation of 1,712 units across income levels, and the components of the Housing Element including site inventory, goals and policies. It notes a shortage of 1,162 units based on current sites and estimates. The document outlines next steps such as engaging the community on priorities and a timeline for adoption.
New Flightpath affecting Santa Cruz (and Santa Clara county) Rishi Kumar
The FAA proposes to amend two air traffic arrival procedures serving San Francisco International Airport and San Jose International Airport. As part of the review process under Section 106 of the National Historic Preservation Act, the FAA is consulting with the County of Santa Cruz on identifying historic properties within the undertaking's area of potential effect. The letter defines the proposed flight procedure amendments, delineates the area of potential effect based on current flight track data, and provides maps showing the area of potential effect and flight track data. It initiates consultation on identifying historic properties that could experience adverse effects from the undertaking.
2020 05-20. resignation letter Lucas M. Pastuszka .saratoga planning commissi...Rishi Kumar
I am greatly disappointed in what I consider to be scandalous conduct by Mr. Miller, Ms. Bernald, Mr. Cappello, and Mr. Ahuja surrounding the Mountain Winery Annexation Project. I believe that Mr. Miller, Ms. Bernald, Mr. Cappello, and Mr. Ahuja have abused their power, disrespected myself and Planning Commissioners, disrespected the Saratoga community, and failed to take responsibility for their actions. I expected more out of Saratoga leadership and I refuse to serve under leaders devoid of all ethics, dignity, and integrity
Rishi kumar for Congress 2020. Who is Rishi and context to Rishi's run for Un...Rishi Kumar
#1 Rishi's priorities at RishiKumar.com/priorities
#2 The voice of voters https://rishikumar.com/voter_voice
#3 The facts https://rishikumar.com/The-facts-with-this-congressional-race-between-democrat-Rishi-Kumar-running-for-United-States-Congress-and-Congresswoman-Anna-Eshoo
#4 Contrast of ballot statement https://rishikumar.com/Contrasting-and-Comparing-the-candidate-statements-of-Anna-Eshoo-and-Rishi-Kumar
This is mailer #1 - Dated February 4th 2020
#5 Rishi's vision plan https://rishikumar.com/Mega-Silicon-Valley-Vision-Plan-addressing-housing-transportation-homelessness-of-Democrat-Rishi-Kumar-running-for-United-States-Congress-against-Congresswoman-Anna-Eshoo
How To Cultivate Community Affinity Throughout The Generosity JourneyAggregage
This session will dive into how to create rich generosity experiences that foster long-lasting relationships. You’ll walk away with actionable insights to redefine how you engage with your supporters — emphasizing trust, engagement, and community!
Contributi dei parlamentari del PD - Contributi L. 3/2019Partito democratico
DI SEGUITO SONO PUBBLICATI, AI SENSI DELL'ART. 11 DELLA LEGGE N. 3/2019, GLI IMPORTI RICEVUTI DALL'ENTRATA IN VIGORE DELLA SUDDETTA NORMA (31/01/2019) E FINO AL MESE SOLARE ANTECEDENTE QUELLO DELLA PUBBLICAZIONE SUL PRESENTE SITO
Food safety, prepare for the unexpected - So what can be done in order to be ready to address food safety, food Consumers, food producers and manufacturers, food transporters, food businesses, food retailers can ...
RFP for Reno's Community Assistance CenterThis Is Reno
Property appraisals completed in May for downtown Reno’s Community Assistance and Triage Centers (CAC) reveal that repairing the buildings to bring them back into service would cost an estimated $10.1 million—nearly four times the amount previously reported by city staff.
karnataka housing board schemes . all schemesnarinav14
The Karnataka government, along with the central government’s Pradhan Mantri Awas Yojana (PMAY), offers various housing schemes to cater to the diverse needs of citizens across the state. This article provides a comprehensive overview of the major housing schemes available in the Karnataka housing board for both urban and rural areas in 2024.
United Nations World Oceans Day 2024; June 8th " Awaken new dephts".Christina Parmionova
The program will expand our perspectives and appreciation for our blue planet, build new foundations for our relationship to the ocean, and ignite a wave of action toward necessary change.
The Antyodaya Saral Haryana Portal is a pioneering initiative by the Government of Haryana aimed at providing citizens with seamless access to a wide range of government services
Jennifer Schaus and Associates hosts a complimentary webinar series on The FAR in 2024. Join the webinars on Wednesdays and Fridays at noon, eastern.
Recordings are on YouTube and the company website.
https://www.youtube.com/@jenniferschaus/videos
Bharat Mata - History of Indian culture.pdfBharat Mata
Bharat Mata Channel is an initiative towards keeping the culture of this country alive. Our effort is to spread the knowledge of Indian history, culture, religion and Vedas to the masses.
1. Attachment 1
Page 1 of 13
Staff Report
In accordance with the District Act, District staff has prepared an annual report on the Protection
and Augmentation of Water Supplies, which was filed with the Clerk of the Board on February
26, 2016.
The Report is the 45th
annual report on the Santa Clara Valley Water District’s (District) activities
in the protection and augmentation of the water supplies. This Report is prepared in accordance
with the requirements of the District Act, section 26.5. The Report provides information on water
requirements and water supply availability, and financial analysis of the District’s water utility
system. The financial analysis includes future capital improvement and maintenance
requirements, operating requirements, financing methods and staff’s recommended
groundwater production and other water charges by zone for fiscal year 2016–17.
The Rate Setting Process
According to Section 26.3 of the District Act, proceeds from groundwater production charges
can be used for the following purposes:
1. Pay for construction, operation and maintenance of imported water facilities
2. Pay for imported water purchases
3. Pay for constructing, maintaining and operating facilities which will conserve or distribute
water including facilities for groundwater recharge, surface distribution, and purification
and treatment
4. Pay for debt incurred for purposes 1, 2 and 3.
This year, as in past years, staff has carefully evaluated the activities that can be paid for by
groundwater production charges. The work of the district is divided into projects. Every project
has a project plan which is prepared by the project manager. The project plan is a detailed
description of the project including objectives, milestones, and an estimate of resources needed
to deliver the project. To ensure compliance with the District Act, each project plan contains a
justification as to whether or not groundwater production charges can be used to pay for the
activities associated with it. The financial analysis presented in the annual report is based on
these project plans.
Resolution 99-21 guides staff in the development of the overall pricing structure based on
principles established in 1971. The general approach is to charge the recipients of the various
benefits for the benefits received. More specifically, pricing is structured to manage surface
water, groundwater supplies and recycled water conjunctively to prevent the over use or under
use of the groundwater basin. Consequently, staff is very careful to recommend pricing for
groundwater production charges, treated water charges, surface water charges and recycled
water charges that work in concert to achieve the effective use of available resources.
This year’s rate setting process is being conducted consistent with Board Resolutions 99-21,
12-10 and 12-11, as well as Proposition 218’s requirements for property-related fees for water
services. As in the past, the Board will continue to hold public hearings and seek input from its
advisory committees and the public before rendering a final decision on groundwater production
and other water charges for FY 2016–17.
2. Attachment 1
Page 2 of 13
Staff Recommendations
Exhibit 1 shows the proposed groundwater production charges and other charges for FY 2016–
17. Since the publishing of the District’s Annual Report on the Protection and Augmentation of
Water Supplies (PAWS), staff has reduced the operations cost projection for FY 2106-17 by
$2.5 million driven mainly by a salary savings adjustment. Consequently, the following staff
proposed charges are lower than the proposed maximum charges shown in the published
annual PAWS report.
Exhibit 1
Summary of Charges
(Dollars Per Acre Foot, $/AF)
FY 2014–15 FY 2015–16
Proposed
FY 2016–17
Zone W-2 (North County)
Basic User/Groundwater Production Charge
Municipal & Industrial 747.00 894.00 1,072.00
Agricultural 19.14 21.36 23.59
Surface Water Charge
Surface Water Master Charge 18.60 22.60 27.46
Total Surface Water, Municipal & Industrial* 765.60 916.60 1,099.46
Total Surface Water, Agricultural* 37.74 43.96 51.05
Treated Water Charges
Contract Surcharge 100.00 100.00 100.00
Total Treated Water Contract Charge** 847.00 994.00 1,172.00
Non-Contract Surcharge 150.00 200.00 200.00
Total Treated Water Non-Contract Charge*** 897.00 1,094.00 1,272.00
Zone W-5 (South County)
Basic User/Groundwater Production Charge
Municipal & Industrial 319.00 356.00 393.00
Agricultural 19.14 21.36 23.59
Surface Water Charge
Surface Water Master Charge 18.60 22.60 27.46
Total Surface Water, Municipal & Industrial* 337.60 378.60 420.46
Total Surface Water, Agricultural* 37.74 43.96 51.05
Recycled Water Charges
Municipal & Industrial 299.00 336.00 373.00
Agricultural 42.94 45.16 47.38
*Note: The total surface water charge is the sum of the basic user charge (which equals the groundwater production charge) plus the water master charge
**Note: The total treated water contract charge is the sum of the basic user charge (which equals the groundwater production charge) plus the contract surcharge
***Note: The total treated water non- contract charge is the sum of the basic user charge (which equals the groundwater production charge) plus the non- contract surcharge
Dollars Per Acre Foot
3. Attachment 1
Page 3 of 13
The proposed increases in water charges are necessary to pay for critical investments in water
supply infrastructure, imported water supply reliability and for future supplies, most notably
purified water. Additionally, due to the continued historic drought, a lower projected water use
has reduced the revenue projection by $33M versus the prior year projection.
Given the financial needs summarized above, staff proposes a 19.9% increase in the North
County (Zone W-2) Municipal and Industrial groundwater production charge from $894/AF to
$1,072/AF. Staff recommends maintaining the treated water surcharge at $100/AF, and the non-
contract treated water surcharge at $200/AF. The proposal equates to a monthly bill increase for
the average household of $6.13 or about 20 cents a day.
In the South County (Zone W-5), staff proposes a 10.4% increase in the M&I groundwater
production charge from $356/AF to $393/AF. The proposal equates to a monthly bill increase for
the average household of $1.27 or about 4 cents per day.
Staff recommends a 10.4% increase in the agricultural groundwater production charge in both
zones from $21.36/AF to $23.59/AF. The staff recommendation equates to a $0.37 increase per
month per acre for an agricultural water user who pumps 2 acre-feet per acre per year.
Staff recommends a 21.5% increase to the surface water master charge from $22.60/AF to
$27.46/AF to bring revenues in line with costs related to managing, operating and billing for
surface water diversions. This increase results in a 19.9% increase in the overall North County
municipal and industrial surface water charge and 11.1% increase in the overall South County
municipal and industrial surface water charge. The overall agricultural surface water charge in
either zone would increase by 16.1%. Due to the severity of the drought, the water district
suspended nearly all raw surface water deliveries in 2014.
For recycled water, staff recommends increasing the M&I charge by 11.0% to $373/AF. For
agricultural recycled water, staff recommends a 4.9% increase to $47.38/AF. The increase
maximizes cost recovery while concurrently providing an economic incentive to use recycled
water. This pricing is consistent with the provisions of the “Wholesale-Retailer Agreement for
Supply of Recycled Water Between Santa Clara Valley Water District and City of Gilroy.”
Staff recommends setting the State Water Project Tax at $33 million for FY 2016–17. This
translates to a property tax bill for the average single family residence of roughly $55.00 per
year. The District incurs an annual indebtedness to the State of California pursuant to its Water
Supply Contract dated November 20, 1961. Such indebtedness is proportional to the District’s
allocation of water from the State Water Project and pays for construction, maintenance and
operation of state water project infrastructure and facilities. Staff anticipates that the District’s
contractual indebtedness to the State under the State Water Supply Contract for FY 2016–17
will be at least $34 million. Staff’s recommendation regarding the State Water Project tax is
consistent with the District’s past practice and with the approach of other water districts and
agencies that maintain State water supply contracts.
The water district understands the seriousness of increasing rates, so staff is careful to be cost-
effective in providing a clean, reliable water supply. If drought conditions improve or if alternate
funding sources are found, the Board may choose to adopt an increase that is lower than the
staff proposal.
4. Attachment 1
Page 4 of 13
Projections
Exhibit 2 shows actual and projected District-managed water use. FY 2014–15 water usage
came in at roughly 237,000 AF. The water usage for FY 2015–16 is budgeted at 229,000 AF but
the actual could be as low as 205,000 AF based on year-to-date water usage. This reduction is
due to the water district Board’s call for a 30 percent water use at its March 25, 2015 board
meeting, staff’s effort to promote water conservation in the community, and the community’s
attempt to meet the target. For FY 2016–17, total District-managed water use is projected at
205,000 AF, which is flat to the FY 2015-16 estimated actual, roughly 34,000 AF lower than
projected last year, and represents a 28 percent reduction relative to calendar year 2013. Water
use is projected to ramp up to 253,000 AF by FY 2025-26.
Exhibit 2
District-managed Water Use Projection (1,000’s AF)
Exhibit 3 shows key financial indicators with staff’s recommendation projected to FY 2020-21.
The debt service coverage ratio, which is a ratio of revenue less operations expenses divided by
annual debt service, is targeted at 2.0 or better which helps to ensure financial stability and
continued high credit ratings keeping cost to borrow low.
0
50
100
150
200
250
300
350
FY05 FY06 FY07 FY08 FY09 FY10 FY11 FY12 FY13 FY14 FY15 FY16 FY17 FY18 FY19 FY20
Acre-feet(1,000s)
Actuals FY 15 Estimate Projection
Treated Water
Wet Spring
Wet Spring
Drought/Recession
278KAF
266KAF
250KAF 251KAF
285KAF
304KAF
302KAF
274KAF275KAF
285KAF
$150 $50 $50Non-contract TW
surcharge ($/AF)
$100$100 $50 $75 $150$60$50
current FY 16 est.
28% reduction
Historic Drought
237KAF
229KAF
239KAF
249KAF
260KAF 260KAF
$200
205KAF
217KAF
227KAF
239KAF
Prior Year
Projection
5. Attachment 1
Page 5 of 13
Exhibit 3
5 Year Charge and Financial Indicator Projection
A portion of the projected increases in the groundwater production charge are driven by the
capital improvement program as shown in Exhibit 4. Over $2.1 billion in capital investments,
primarily to repair and rehabilitate aging infrastructure, are planned for the next 10 years. FY
2016–17 operations and operating project costs are projected to decrease by 7.1% versus the
FY 2015–16 adjusted budget, due primarily to the reduction in drought response costs relative
to the prior year. On a longer term basis, operating outlays are projected to increase an average
of 6.4% per year for the next 10 years due to estimated investments to solve the statewide issue
of the Bay Delta, and new operations costs related to the expansion of purified water facilities.
Debt service is projected to rise from $27.3 million in FY 2016–17 to $124.5 million in FY 2025–
26 as a result of periodic debt issuances to fund the capital program.
Exhibit 4
Cost Projection by Cost Center ($M)
Projected
Base Case 2015–16 2016–17 2017–18 2018–19 2019–20 2020–21
No. County (W-2) M&I GWP charge ($/AF) $894 $1,072 $1,251 $1,445 $1,654 $1,829
Y-Y Growth % 19.7% 19.9% 16.7% 15.5% 14.5% 10.6%
So. County (W-5) M&I GWP charge ($/AF) $356 $393 $418 $441 $463 $485
Y-Y Growth % 11.6% 10.4% 6.4% 5.5% 5.0% 4.8%
Ag GWP charge ($/AF) $21.36 $23.59 $25.09 $26.47 $27.79 $29.11
Y-Y Growth % 11.6% 10.4% 6.4% 5.5% 5.0% 4.8%
Operating & Capital Reserve $18,415 $34,962 $39,634 $42,526 $51,669 $57,880
Supplemental Water Supply Reserve ($K) $12,763 $14,277 $14,677 $15,077 $15,477 $15,877
Sr. Lien Debt Svc Cov Ratio (1.25 min) 1.71 2.00 2.00 2.00 2.10 2.08
South County (Deficit)/Reserves ($K) $6,822 $2,747 $2,323 $2,505 $3,629 $3,890
-
100
200
300
400
500
600
700
800
2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026
Millions$
Fiscal Year
Capital
DebtService
SupportSvcs
Water Treatment
and T&D E-2.3
Raw Water T&D E-
2.2
Source of Supply E-
2.1
235 241
368 360
448
646
693
607
518
593
555535
479
6. Attachment 1
Page 6 of 13
Exhibit 5 shows the groundwater production charge projection for the next 10 years and
assumes a continuation of the level of service provided in FY 2015–16 and funding of the
preliminary FY 2017-2026 Capital Improvement Program (CIP). Note that there are initiatives
and potential uncertainties that could result in the identification of additional capital or operations
projects that are not reflected in projection.
Exhibit 5
10 Year Groundwater Charge Projection
Exhibit 6 shows a comparison of the adjusted proposed groundwater production and treated
water charges relative to the anticipated increases for the following similar agencies:
Metropolitan Water District, Orange County Water District, San Diego County Water Authority,
San Francisco PUC (Hetch Hetchy), and Zone 7 .
747
894
1,072
1,251
1,445
1,654
1,829
1,996
2,128
2,202
2,268
2,332
319 356 393 418 441 463 485 507 530 554 579 604
420 435 475 520 520 520 569 622
680
215 230 255 275 275 275 285 295 305
0
200
400
600
800
1000
1200
1400
1600
1800
2000
2200
2400
2600
2800
3000
$/Acre-Foot
Fiscal Year
Groundwater Production Charges
SouthCounty M&I
(Zone W5)
NorthCounty M&I
(Zone W-2)
Adjusted
Proposal
SouthCounty Agricultural
GroundwaterProductionCharge
TW Surcharge
SFPUCTreatedWater
w/ BAWSCAsurcharge
7. Attachment 1
Page 7 of 13
Exhibit 6
Anticipated FY 2016–17 Water Charge Increases for Similar Agencies
Exhibit 7 shows a comparison of the average monthly bill for several of the District’s retail
customers (e.g. SJWC, City of Santa Clara, City of Morgan Hill, and City of Gilroy) relative
to the District’s perennial list of retail agency comparators across the state. SCVWD retailer
rates shown include the SCVWD proposed adjusted increase for FY 2016-17. North County
and South County well owner rates are also shown, which exclude pumping costs (e.g.
electricity) and well maintenance costs.
Exhibit 7
Retail Agency Benchmarks
% inc. % inc. % inc. Projection
'13 to '14 '14 to '15 '15 to '16 FY 16 FY 173
SCVWD North W-2 (Groundwater prdctn per AF) 9% 10% 20% $894 19.9%
SCVWD North W-2 (Treated Water per AF) 8% 9% 17% $994 17.9%
SCVWD South W-5 (Groundwater prdctn per AF) 3% 5% 12% $356 10.4%
Metropolitan WD (Untreated Water per AF)1
3% -1% 1% $706 7.8%
Metropolitan WD (Treated Water per AF)1
6% 3% 1% $1,054 1.9%
Orange County WD (Groundwater per AF) 4% 7% 10% $322 TBD
San Diego County WA (Treated Water per AF)1
4% 3% 6% $1,519 TBD
San Francisco PUC (Treated Water per AF)2
-2% 17% 25% $1,817 7.0%
Zone 7 (Treated Water per AF)1
3% 3% 37% $1,372 -7.0%
1) MWD, SDCWA and Zone 7 rates based on calendar year (i.e. 2017 rate would be effective on 1/1/2017)
2) SFPUC rates include BAWSCA bond surcharge estimate of $183/AF
3) SCVWD FY 17 projection includes staff proposed adjustments to proposed maximum
$13.53
$23.20
$30.94
$35.31
$36.92
$39.34
$42.33
$53.31
$54.23
$63.47
$63.59
$66.51
$66.87
$68.31
$68.53
$82.03
$83.18
$94.14
$101.94
$112.08
$133.90
$139.63
$- $20.00 $40.00 $60.00 $80.00 $100.00 $120.00 $140.00 $160.00
South County M&I well owner
Bakersfield
Riverside
Gilroy
North County M&I well owner
Sacramento
Morgan Hill
Hollister
Napa
Newport Beach
Alameda (EBMUD)
Livermore (Cal Water/Zone 7)
Mill Valley (Marin MWD)
LosAngeles
Santa Clara
San Diego
LongBeach (Golden State)
San Jose (SJWC)
San Carlos (Cal Water)
San Francisco
Santa Barbara
Palo Alto
Meterand volumetric charges only as of January,
2016 (unless otherwise noted)
Monthly billing for 5/8” meterand 1,500 cubic feet
usage
8. Attachment 1
Page 8 of 13
Cost of Service
The cost of service analyses for FY 2016–17 is shown in Exhibit 8 for North County and Exhibit
9 for South County. The exhibits are laid out in a format that follows six industry standard rate
making steps.
1. Identify utility pricing objectives and constraints
2. Identify revenue requirements
3. Allocate costs to customer classes
4. Reduce costs by revenue offsets or non-rate related funding sources
5. Develop unit costs by customer class or net revenue requirements by customer
class
6. Develop unit rates by customer class
Step 2 includes identifying and segregating Water Utility Fund costs from Watershed and
Administrative Funds and allocating Water Utility costs between zones W-2 (North) and W-5
(South) according to benefit provided. Step 3 involves allocating costs by customer class either
directly or based on water usage. Steps 4 and 5 result in unit costs by customer class after
applying non-rate related offsets.
Step 6 includes two adjustments. The first adjustment is the application of fungible revenue, in
this case 1% ad valorem property taxes, to offset the costs of agricultural water in accordance
with Board Resolution 99-21. For FY 2016-17, staff is proposing a $1.2M transfer of 1% ad
valorem property taxes from the General Fund and $1.2M from the Watershed Stream
Stewardship Fund as sources for this adjustment also known as the “Open Space Credit.”
The second adjustment involves reallocating a portion of the cost of treated water (or recycled
water in the case of South County) to groundwater and surface water users. Treated and
recycled water offsets the need to pump groundwater and therefore increases the volume of
stored groundwater and improves reliability. The reallocation of a portion of the treated water
cost for example represents the value of treated water to groundwater and surface water users
and facilitates a pricing structure that prevents the over use of the groundwater basin.
Preventing over use not only preserves groundwater for use in times of drought, but also
prevents land subsidence or sinking of the land, which can cause serious infrastructure issues.
Another aspect of the second adjustment is related to setting the basic user charge for surface
water equal to the groundwater production charge. Surface water use is effectively in-lieu
groundwater use permitted by the District to help preserve the groundwater basin. As such, the
costs related to preserving the groundwater basin provide value to surface water users because
it makes available District surface water, which otherwise would only be used for groundwater
recharge. Similarly, the costs related to providing surface water benefit groundwater users
because surface water usage helps preserve the groundwater basin. The second adjustment
reallocates costs between surface water and groundwater customers in order to set the basic
user charge for surface water equal to the groundwater production charge in recognition of this
conjunctive use relationship, and in accordance with board policy. A 2015 study was conducted
by Raftelis Financial Consultants, Inc (RFC) that confirms the reasonableness of such an
adjustment. The report titled “Report Documenting the Reasonableness of the Conjunctive Use
Benefit of Surface Water and Recycled Water to Groundwater Customers” documents the
support and justification for the water district’s cost of service methodology and can be found on
the District’s website.
9. Attachment 1
Page 9 of 13
Exhibit 8
Cost of Service North County Zone W-2 ($K)
FY '17 Projection ($K)
TW Total W-2
M&I AG M&I M&I Ag
1 Operating Outlays
2 Operations/Operating Projects 39,599 401 85,585 679 16 126,281
3 SWP Imported Water Costs 8,698 90 27,009 501 12 36,310
4 Debt Service 6,467 67 20,694 90 2 27,320
5 Total Operating Outlays 54,764 558 133,288 1,270 31 189,911
6
7 Capital & Transfers
8 Operating Transfers Out 571 6 832 14 0 1,422
9 Capital Outlays excl. carryforward 28,069 289 99,039 640 16 128,053
10 Total Capital & Transfers 28,640 295 99,871 654 16 129,476
11 Total Annual Program Costs 83,404 853 233,159 1,924 47 319,387
12
13 Revenue Requirement Offsets
14 Capital Cost Recovery (1,920) (20) (2,799) (46) (1) (4,786)
15 Debt Proceeds (28,058) (289) (98,998) (640) (16) (128,000)
16 Inter-governmental Services (417) (4) (607) (10) (0) (1,039)
17 SWP Property Tax (7,069) (73) (23,468) (400) (10) (31,020)
18 South County Deficit/Reserve 307 3 447 7 0 765
19 Interest Earnings (253) (3) (368) (6) (0) (629)
20 Inter-zone Interest 12 0 18 0 0 31
21 Capital Contributions (1,128) (12) (1,644) (27) (1) (2,811)
22 Other (965) (10) (879) (15) (0) (1,870)
23 Reserve Requirements 15,589 58 56,972 356 3 72,978
24 Adjusted Revenue Requirement (FY 17) 59,504 504 161,832 1,144 22 223,006
25 Adjusted Revenue Requirement (FY 14 adj) 768 (24) (45,897) (234) (10) (45,397)
26 Total Adjusted Revenue Requirement 60,272 479 115,935 910 12 177,609
27 Volume (KAF) 63.1 0.7 92.0 1.5 0.0 157
28
29 Revenue Requirement per AF 955$ 737$ 1,260$ 607$ 341$
30
31 Adjustments for Agricultural Preservation
32 Allocate WU 1% Ad Valorem Prop Tax 0 (464) - - (11) (475)
33 Transfer GF 1% Ad valorem Prop Tax - - - - - -
34 Transfer WS 1% Ad Valorem Prop Tax - - - - - -
35 Revenue Requirement per AF 955.2$ 23.6$ 1,260$ 607$ 51.0$
36
37 Adjustments to Facilitate Conjunctive Use
38 Reallocate TW/SW/RW costs 7,371 - (8,111) 739 - (0)
39 Charge per AF 1,072$ 23.6$ 1,172$ 1,099$ 51.0$
40 Total Revenue ($K) $67,643 $15 $107,825 $1,649 $2 177,134
Zone W-2
GW SW
Step2-
Identifyrevenue
reqmnts
Step4-
Reduce costsby
revenue offsets
Step3 - Allocate costs to customerclasses
Step5 - Developunitcosts bycustomerclass
Step6 - Rate Design
10. Attachment 1
Page 10 of 13
Exhibit 9
Cost of Service South County Zone W-5 ($K)
FY '17 Projection ($K)
Total W-5
M&I AG M&I AG M&I AG
1 Operating Outlays
2 Operations/Operating Projects 8,316 8,445 219 560 192 164 17,897
3 SWP Imported Water Costs - - - - - - -
4 Debt Service - - - - - - -
5 Total Operating Outlays 8,316 8,445 219 560 192 164 17,897
6
7 Capital & Transfers
8 Operating Transfers Out - - - - - - -
9 Capital Outlays excl. carryforward - - - - - - -
10 Total Capital & Transfers - - - - - - -
11 Total Annual Program Costs 8,316 8,445 219 560 192 164 17,897
12
13 Revenue Requirement Offsets
14 Capital Cost Recovery 1,730 1,809 39 102 595 510 4,786
15 Debt Proceeds - - - - - - -
16 Inter-governmental Services (69) (72) (2) (4) - - (146)
17 SWP Property Tax (906) (947) (21) (54) (29) (25) (1,980)
18 South County Deficit/Reserve (350) (366) (8) (21) (11) (10) (765)
19 Interest Earnings - - - - - - -
20 Inter-zone Interest (14) (15) (0) (1) (0) (0) (31)
21 Capital Contributions - - - - - - -
22 Other (80) (84) (1) (2) - - (168)
23 Reserve Requirements - - - - - - -
24 Adjusted Revenue Requirement (FY 17) 8,627 8,770 227 581 747 640 19,593
25 Adjusted Revenue Requirement (FY 14 adj) (467) (1,135) 0 (24) (16) (324) (1,967)
26 Total Adjusted Revenue Requirement 8,160 7,635 227 557 730 316 17,626
27 Volume (KAF) 22.0 23.0 0.5 1.3 0.7 0.6 48
28
29 Revenue Requirement per AF 371$ 332$ 455$ 429$ 1,043$ 527$
30
31 Adjustments for Agricultural Preservation
32 Allocate WU 1% Ad Valorem Prop Tax - (5,508) - - - - (5,508)
33 Transfer GF 1% Ad valorem Prop Tax - (1,181) - - - - (1,181)
34 Transfer WS 1% Ad Valorem Prop Tax - (403) - (491) - (288) (1,182)
35 Revenue Requirement per AF 371$ 23.6$ 455$ 51.0$ 1,043$ 47.4$
36
37 Adjustments to Facilitate Conjunctive Use
38 Reallocate TW/SW/RW costs 486 - (17) - (469) - (0)
39 Charge per AF 393$ 23.6$ 420$ 51$ 373$ 47.4$
40 Total Revenue ($K) $8,646 $542 $210 $66 $261 $28 9,755
Zone W-5
GW SW RW
Step2-
Identifyrevenue
reqmnts
Step4-
Reduce costsby
revenue offsets
Step5 - Developunitcosts bycustomerclass
Step3 - Allocate costs to customerclasses
Step6 - Rate Design
11. Attachment 1
Page 11 of 13
Open Space Credit
The District Act limits agricultural groundwater production charges to a maximum of 25
percent of the M&I groundwater production charges. Current board policy adds an “open
space” credit to agricultural revenues. The purpose of the credit is to preserve the open
space benefits provided by agricultural lands by keeping agricultural groundwater
production charges low. To the extent that Proposition 218 applies to the groundwater
production charge, it requires that costs to end users be proportional such that one class of
users is not subsidizing another.
The recommended agricultural groundwater production charge for FY 2016–17 is $23.59 per
acre foot, which is 6 percent of the proposed M&I groundwater production charge in South
County. To comply with the current agricultural groundwater production charge setting
policy, staff recommends the open space credit received by South County be $7.9 million in
FY 2016-17 (funded by 1 percent ad valorem property taxes). This includes an adjustment
that reconciles FY 2013–14 actuals against what was projected. The $7.9 million is comprised
of a $4.2 million transfer from North County Water Utility 1% ad valorem property taxes, a $1.3
million contribution from South County Water Utility 1% ad valorem property taxes, a $1.2
million transfer of 1% ad valorem property taxes from the General Fund and $1.2 million from
the Watershed Stream Stewardship Fund. As shown in Exhibit 10, the Open Space Credit is
projected to grow to over $15.2 million by FY 2025-26.
Exhibit 10
Open Space Credit Trend
-
1,000
2,000
3,000
4,000
5,000
6,000
7,000
8,000
9,000
10,000
11,000
12,000
13,000
14,000
15,000
16,000
17,000
$K
Fiscal Year
South County Property Taxes Transfer North County 1% Prop Taxes
Transfer General Fund 1% Prop Taxes Transfer Watersheds Property Taxes
12. Attachment 1
Page 12 of 13
Components of Groundwater Production Charge Increase
The proposed groundwater production charge increases are comprised of two components:
First, a planned increase for FY 2016-17 as part of long-range planning to pay for critical
investments in water supply infrastructure, imported water supply reliability and for future
supplies, most notably purified water; and second, a drought component. The drought
component is driven by increased drought related operations costs mainly to secure additional
water supplies, and lower projected water use, which has reduced the revenue projection by
$33M versus the prior year projection. As mentioned earlier, since publishing the District’s
Annual Report on the Protection and Augmentation of Water Supplies (PAWS), staff has
reduced the operations cost projection for FY 2106-17 by $2.5 million driven mainly by a salary
savings adjustment. Consequently, the drought component has been adjusted accordingly, and
the total proposed increases shown in the exhibit are lower than the proposed maximum
charges shown in the published annual PAWS report.
Exhibit 11
Components of Groundwater Production Charge Increase
North County South County
GW Production Charge
Increase Components
FY 17 Planned Increase 12.8% 5.9%
Drought Component 10.8% 5.9%
Total % Increase 23.6% 11.8%
Monthly Bill Increase*
FY 17 Planned Increase $3.93 $0.72
Drought Component $3.34 $0.72
Total Increase $7.27 $1.44
7.1%
19.9%
4.5%
10.4%
$6.13
$2.20 $0.55
$1.27
13. Attachment 1
Page 13 of 13
Hearings and Meetings Schedule
Exhibit 12 presents the schedule for the annual groundwater production charge setting process.
Exhibit 12
Hearings and Meetings Schedule – 2016
Date Hearing/Meeting
December 8 Board Workshop: Planning for FY 17 Groundwater Production Charges
January 12 Board Meeting on Preliminary Groundwater Production Charge Analysis
February 26 Mail notice of public hearing and file PAWS report
March 16 Water Retailers Meeting
April 4 Agricultural Water Advisory Committee Meeting
April 5 Landscape Committee Meeting
April 12 Open Public Hearing
April 13 Water Commission Meeting
April 14 Continue Public Hearing in Gilroy (Informational Open House)
April 18 Environmental & Water Resources Committee
April 26 Conclude Public Hearing
May 10 Adopt Budget & Groundwater Production and Other Water Charges