   DN12 1PL          G59 APPROVAL FOR A 25,000W GRID-TIED PHOTOVOLTAIC ARRAY
THE BRIEF

DAS Solar undertook the feasibility study on the site of a converted Junior school on the outskirts of Doncaster. The
site is now home to a resource and learning centre run by an independent charity. The site was made up of one
building centred on a large open courtyard. Built in the 1930s its structure and composition were the first priority
when assessing the site. The roof is of traditional construction with flat roofed areas covering entrance halls and of
later construction the main joining corridor within the quadrant. The tiled roof was covered with handmade
rosemary type tiles original to the building. Sarking felt under these tiles was absent and there was evidence of
damage on all roofs. The basic structure however was in good condition with no evidence of water ingress, damp or
structural fragility.

The site is in use every day and gets very busy at times. Special attention was going to have to be given to protection
of the general public and staff within. The project would have to go ahead while the centre was still in use.

Return on investment was paramount to the funding of the project. We calculated the system would pay for itself in
less than seven years, a terrific investment for our client.

The electrical system with in building is brand-new with several sub-metered distribution boards scattered
throughout. The three phase supply continued to all these boards and lent itself perfectly to the retro fit PV array
proposed.




PROPOSAL ACCEPTED

The office based team swing immediately into action. Planning applications, G59 applications and an Energy
Performance certificate are standard requirement of the project. These are made along with the instruction of
Charted Structural Surveyor, Access Contractor and Health and Safety Assessor. These reports are received and
findings reviewed. These are then discussed with the client and fixes and alternatives agreed.
THE EPC ARRIVES

It’s not good news. The boiler and main source of heating is coal fired. This fact alone means the property will never
reach the required D band needed to qualify for the top rate of financial return without spending in the region of ten
thousand pounds. We adjust the figures to compensate analysed the costing and maintain the overall return on
investment would be almost identical if we scaled down the installation to just 12 kW. We chose the north roof as
access, safe working and electrical connection are considerably more cost effective.

With PV Installed                                          Without PV Installed




SOME QUICK MATHS, IT STILL MAKES SENSE .
STRUCTURE

On this occasion the roof needed significant structural work. The calculations are made and the correct methods
employed to ensure this will never become an issue. Over 120 lm of timber along with heavy gauge nuts, bolts, and
washers are used to pin the roof fabric together following the structural reports instruction to the letter.
REMEDIAL WORKS

King trusses, perlins and rafters not strong enough?




We strengthen and brace the entire roof structure. Available roof space will allow a 12kW array to be installed on
each of the two main south facing roofs. The total weight of each array is well over a ton.




                                                                                                                     f
ELECTRICAL DESIGN

Main three phase cabling within requires no upgrade. Arrays can be fed directly into sub-distribution boards within 3
meters of the loft mounted inverters.

Each array is separately metered ensuring the most accurate production figures are available. Use of two
independent GSM modem units means this information is available at the touch of a button and in real time. All this
adds up to minimal voltage drop losses and an excellent efficiency for the client and the environment. Our
specification included the market leading SMA Tri-power TL Inverters. Two units were required as the arrays were on
opposite edges of the site.

The electrical drawings and calculations are completed and distributed to the relevant network connection authority
for consideration.




FINE TUNING

We produce 3D animations of the suns path over the site. This allows our engineers to select the best possible
module configuration. All shading issues are overcome to allow optimum operation. These calculations are checked
and double checked by our electrical engineers.
PLANNING APPLICATION ACCEPTED

We get the go ahead from the local authority.




DISTRICT NETWORK OPERATOR APPROVES CONNECTION

At long last we can proceed to site.
ESTABLISH SITE AND ERECT SUITABLE ACCESS

The fun part starts and our highly skilled installation crews arrive on site. Our scaffolder is on site the same day. An
exclusion zone is created beneath the work area and maintained throughout the installation. Notices are placed and
safety briefings given. The premises general manager is briefed on the schedule of works and works with us to
ensure a safe working site at all times.




Measurements are checked and the installation begins.
THE INVERTER

We position the inverter in the centre of the loft directly above the distribution board. A dwarf support wall is
chosen to mount the inverter. The existing loft hatch is too small to accommodate the large unit. It’s stripped out
and reinstated with a larger diameter hatch to allow future removal of the unit if required.




DC isolation switches are fitted to the reverse of the wall and channelled through to feed the inverter. Once inverted
the AC power then runs back through a separate channel to the main isolation switch. Everything is labelled and is
easily identified. The new loft hatch is made and fitted by our joiner’s onsite.
THE ROOF

Known as “pigs” in the solar industry, the reputation of these roof tiles is well known. Normal Rosemary tiles are
difficult to work with but the tiles on this roof were handmade, much larger than the modern Rosemary and almost
impossible to match.




Repairs were made to ensure roof integrity beneath the array; we give a water tight guarantee on all our projects.
THE ARRAY

We install 48 modules in landscape orientation. This maximises the potential of the roof space and array. Each row is
a single string of 12 making any future string diagnostic issues straight forward.




Anchors are set at the very edge of the array giving complete stability during heavy winds and periods of prolonged
winter weather. We test every module as it comes up on the roof and check this against the factory flash tests.
COMMISSION

The most important part of the installation is the testing of the entire electrical system. We label up all distribution
boards, isolators, wiring runs, MCBs and meter positions. We test all the existing hard wiring within the building
before connecting our installation.




 Each string is tested and checked before connection into the inverter. All AC testing and earthing arrangements are
double checked, tested and recorded as needed for the installation certificate and also to satisfy the DNO’s
requirements. On this occasion a representative from BRE attends site on behalf of the client and inspects the
works.
HANDOVER

Having fulfilled our obligations and satisfied the inspection the site is cleared and handed back. All paperwork is
completed and handed over in the operation and maintenance manual. Wiring schematics are finalised and
published. All relevant authorities are made aware of the installation as prescribed in engineering recommendation
G59-1.
MONITORING AND MAINTENANCE

DAS solar will monitor and maintain this installation for the next 25 years. The Estler A1100 GSM meter gives us
instant access to array performance in real time. The system is monitored remotely and can be accessed online by
both ourselves and the client. The data is recorded and assessed on a daily basis to maintain the highest possible
yield and operational performance. All components are tested periodically and by our skilled electrical engineers
ensuring optimum production. We recommend cleaning the modules, as a minimum, once a year and is part of our
inspection.

This 12kW system will exceed our expectations by a minimum of 20% paying back the initial £22,000 investment
fivefold and continue to produce clean renewable electricity for the next 40 years.




It will produce over 300,000 kilowatt hours of sustainable electricity saving over £££££££tons of co2.
THE OPS TEAM

                                     THE EDDLINGTON CENTRE

BRAD “UGLY” KIRKBRIDE




         LEE WOODS                  NIGEL”DUMBLEDOR”WHITE               STEVE SPENCER




              WAYNE “WIGGY” CLARK                            DARREN GRAHAM
The Eddlington Centre, Eddlington, Doncaster

More Related Content

What's hot

Energy efficient home
Energy efficient homeEnergy efficient home
Energy efficient home
PlayersGuide
 
Jmv presentation smart process plant
Jmv  presentation  smart process plantJmv  presentation  smart process plant
Jmv presentation smart process plant
Mahesh Chandra Manav
 
Solar PV project development
Solar PV project developmentSolar PV project development
Solar PV project development
GreenQ Partners
 
Solar PV panels Sungen
Solar PV panels SungenSolar PV panels Sungen
Solar PV panels Sungen
solargangster
 
Smart Grid Operational Services The Impact Of Renewables On The Electric Grid...
Smart Grid Operational Services The Impact Of Renewables On The Electric Grid...Smart Grid Operational Services The Impact Of Renewables On The Electric Grid...
Smart Grid Operational Services The Impact Of Renewables On The Electric Grid...Gord Reynolds
 
Gensol Solar EPC: IIT Kanpur Case Study
Gensol Solar EPC: IIT Kanpur Case StudyGensol Solar EPC: IIT Kanpur Case Study
Gensol Solar EPC: IIT Kanpur Case Study
Gensol Engineering Limited
 
Typical Electrical Design philosophy.
Typical Electrical Design philosophy.Typical Electrical Design philosophy.
Typical Electrical Design philosophy.
Wambasi Fred
 
Iaetsd analysis of output dc current injection in 100k w grid
Iaetsd analysis of output dc current injection in 100k w gridIaetsd analysis of output dc current injection in 100k w grid
Iaetsd analysis of output dc current injection in 100k w grid
Iaetsd Iaetsd
 
Rec brochure rec_solarbox_en_web_20141112
Rec brochure rec_solarbox_en_web_20141112Rec brochure rec_solarbox_en_web_20141112
Rec brochure rec_solarbox_en_web_20141112
Dr. VIJAY ARUMUGAM
 
Proposal solar
Proposal solarProposal solar
Proposal solar
Sashikant Tiwari
 
A Report on solar power plant installation
A Report on solar power plant installationA Report on solar power plant installation
A Report on solar power plant installation
Amitesh Kumar
 
Better Builder Issue 7
Better Builder Issue 7Better Builder Issue 7
Better Builder Issue 7
Anna-Marie McDonald
 
Внедрение распределенной энергетики в систему централизованного энергоснабжен...
Внедрение распределенной энергетики в систему централизованного энергоснабжен...Внедрение распределенной энергетики в систему централизованного энергоснабжен...
Внедрение распределенной энергетики в систему централизованного энергоснабжен...
НП "Сообщество потребителей энергии"
 
Solar PV Codes and Standards
Solar PV Codes and StandardsSolar PV Codes and Standards
Solar PV Codes and Standards
Solar Reference
 
Solar Driven Asia Proposal
Solar Driven Asia Proposal Solar Driven Asia Proposal
Solar Driven Asia Proposal
Maurice Williams
 
Bs bab 1
Bs bab 1Bs bab 1
Bs bab 1
Natalie Ulza
 

What's hot (20)

Energy efficient home
Energy efficient homeEnergy efficient home
Energy efficient home
 
Jmv presentation smart process plant
Jmv  presentation  smart process plantJmv  presentation  smart process plant
Jmv presentation smart process plant
 
OutdoorLighting
OutdoorLightingOutdoorLighting
OutdoorLighting
 
Solar PV project development
Solar PV project developmentSolar PV project development
Solar PV project development
 
Solar water heaters
Solar water heatersSolar water heaters
Solar water heaters
 
Solar PV panels Sungen
Solar PV panels SungenSolar PV panels Sungen
Solar PV panels Sungen
 
Smart Grid Operational Services The Impact Of Renewables On The Electric Grid...
Smart Grid Operational Services The Impact Of Renewables On The Electric Grid...Smart Grid Operational Services The Impact Of Renewables On The Electric Grid...
Smart Grid Operational Services The Impact Of Renewables On The Electric Grid...
 
Gensol Solar EPC: IIT Kanpur Case Study
Gensol Solar EPC: IIT Kanpur Case StudyGensol Solar EPC: IIT Kanpur Case Study
Gensol Solar EPC: IIT Kanpur Case Study
 
Typical Electrical Design philosophy.
Typical Electrical Design philosophy.Typical Electrical Design philosophy.
Typical Electrical Design philosophy.
 
Iaetsd analysis of output dc current injection in 100k w grid
Iaetsd analysis of output dc current injection in 100k w gridIaetsd analysis of output dc current injection in 100k w grid
Iaetsd analysis of output dc current injection in 100k w grid
 
Rec brochure rec_solarbox_en_web_20141112
Rec brochure rec_solarbox_en_web_20141112Rec brochure rec_solarbox_en_web_20141112
Rec brochure rec_solarbox_en_web_20141112
 
Proposal solar
Proposal solarProposal solar
Proposal solar
 
A Report on solar power plant installation
A Report on solar power plant installationA Report on solar power plant installation
A Report on solar power plant installation
 
Better Builder Issue 7
Better Builder Issue 7Better Builder Issue 7
Better Builder Issue 7
 
IRE Info Trifold
IRE Info TrifoldIRE Info Trifold
IRE Info Trifold
 
Внедрение распределенной энергетики в систему централизованного энергоснабжен...
Внедрение распределенной энергетики в систему централизованного энергоснабжен...Внедрение распределенной энергетики в систему централизованного энергоснабжен...
Внедрение распределенной энергетики в систему централизованного энергоснабжен...
 
Solar PV Codes and Standards
Solar PV Codes and StandardsSolar PV Codes and Standards
Solar PV Codes and Standards
 
Solar Driven Asia Proposal
Solar Driven Asia Proposal Solar Driven Asia Proposal
Solar Driven Asia Proposal
 
Bs bab 1
Bs bab 1Bs bab 1
Bs bab 1
 
Jakson_report_Final
Jakson_report_FinalJakson_report_Final
Jakson_report_Final
 

Viewers also liked

Criação de blogs
Criação de blogsCriação de blogs
Criação de blogs
cissaguri
 
49.5 k w
49.5 k w49.5 k w
Tech online collab
Tech online collabTech online collab
Tech online collabkydokko
 
Ashley Wilson's Social Media Portfolio
Ashley Wilson's Social Media PortfolioAshley Wilson's Social Media Portfolio
Ashley Wilson's Social Media Portfolio
Ashley Wilson
 
Aula 4 doc
Aula 4 docAula 4 doc
Aula 4 doc
Elias Oliveira
 
Benda asing pada bola mata
Benda asing pada bola mataBenda asing pada bola mata
Benda asing pada bola mata
Ich Bin Fandy
 

Viewers also liked (12)

Parcial 1
Parcial 1Parcial 1
Parcial 1
 
Criação de blogs
Criação de blogsCriação de blogs
Criação de blogs
 
Grid (2012), pantalles, continguts i
Grid (2012), pantalles, continguts iGrid (2012), pantalles, continguts i
Grid (2012), pantalles, continguts i
 
49.5 k w
49.5 k w49.5 k w
49.5 k w
 
Tech online collab
Tech online collabTech online collab
Tech online collab
 
Ashley Wilson's Social Media Portfolio
Ashley Wilson's Social Media PortfolioAshley Wilson's Social Media Portfolio
Ashley Wilson's Social Media Portfolio
 
Ck mau cndd
Ck mau   cnddCk mau   cndd
Ck mau cndd
 
Aula 4 doc
Aula 4 docAula 4 doc
Aula 4 doc
 
London presentation
London presentationLondon presentation
London presentation
 
валютын зах зээл
валютын зах зээлвалютын зах зээл
валютын зах зээл
 
Benda asing pada bola mata
Benda asing pada bola mataBenda asing pada bola mata
Benda asing pada bola mata
 
Teknik k v tinggi
Teknik k v tinggiTeknik k v tinggi
Teknik k v tinggi
 

Similar to The Eddlington Centre, Eddlington, Doncaster

Leisure Center. Part 2
Leisure Center. Part 2Leisure Center. Part 2
Leisure Center. Part 2
Tej Raj Upreti
 
RELINK - benefit of micro inverters
RELINK - benefit of micro invertersRELINK - benefit of micro inverters
RELINK - benefit of micro inverters
Marco Achilli
 
Intelligent building case study
Intelligent building case studyIntelligent building case study
Intelligent building case study
Hamid Hussain
 
RELINK - unveils new PV micro inverter
RELINK - unveils new PV micro inverterRELINK - unveils new PV micro inverter
RELINK - unveils new PV micro inverter
Marco Achilli
 
WATTSCORE ENERGY
WATTSCORE ENERGYWATTSCORE ENERGY
WATTSCORE ENERGY
WattscoreEnergy
 
Corporate presentation for l&t solar div by jmv lps
Corporate presentation  for l&t solar div by jmv lpsCorporate presentation  for l&t solar div by jmv lps
Corporate presentation for l&t solar div by jmv lps
Mahesh Chandra Manav
 
Lobel Solar Latetst Specification
Lobel Solar Latetst SpecificationLobel Solar Latetst Specification
Lobel Solar Latetst Specification
L'Obel Solar Power System
 
Maximizing Power Production for Small Commercial Projects
Maximizing Power Production for Small Commercial ProjectsMaximizing Power Production for Small Commercial Projects
Maximizing Power Production for Small Commercial Projects
allearthrenewables
 
Gensol Rooftop EPC - Steps & Quality Management
Gensol Rooftop EPC - Steps & Quality ManagementGensol Rooftop EPC - Steps & Quality Management
Gensol Rooftop EPC - Steps & Quality Management
Gensol Engineering Limited
 
Solar pv plant and india
Solar pv plant and indiaSolar pv plant and india
Solar pv plant and india
Mahesh Chandra Manav
 
3. Soladi Buyers Guide FA 2
3. Soladi Buyers Guide FA 23. Soladi Buyers Guide FA 2
3. Soladi Buyers Guide FA 2Will Gubb
 
Lightning protection as per iec62035
Lightning protection as per iec62035Lightning protection as per iec62035
Lightning protection as per iec62035
Mahesh Chandra Manav
 
Supply of technology by l'obel solar power system
Supply of technology by l'obel solar power systemSupply of technology by l'obel solar power system
Supply of technology by l'obel solar power system
Chintan Gandhi
 
Gc going green step by step
Gc going green step by stepGc going green step by step
Gc going green step by step
Green Constitutes Sdn Bhd
 
Solar pv-module-india
Solar pv-module-indiaSolar pv-module-india
Solar pv-module-india
Solar Maxx
 
Mini ee 11 solar powered grass cutting robo with switch control Electrical en...
Mini ee 11 solar powered grass cutting robo with switch control Electrical en...Mini ee 11 solar powered grass cutting robo with switch control Electrical en...
Mini ee 11 solar powered grass cutting robo with switch control Electrical en...
1000kv technologies
 
SolarEdge Company Presentation for North America
SolarEdge Company Presentation for North AmericaSolarEdge Company Presentation for North America
SolarEdge Company Presentation for North AmericaSolarEdge Technologies
 
Supply of technology by l'obel solar power system
Supply of technology by l'obel solar power systemSupply of technology by l'obel solar power system
Supply of technology by l'obel solar power system
L'Obel Solar Power System
 

Similar to The Eddlington Centre, Eddlington, Doncaster (20)

Solar doc
Solar docSolar doc
Solar doc
 
Leisure Center. Part 2
Leisure Center. Part 2Leisure Center. Part 2
Leisure Center. Part 2
 
RELINK - benefit of micro inverters
RELINK - benefit of micro invertersRELINK - benefit of micro inverters
RELINK - benefit of micro inverters
 
Intelligent building case study
Intelligent building case studyIntelligent building case study
Intelligent building case study
 
RELINK - unveils new PV micro inverter
RELINK - unveils new PV micro inverterRELINK - unveils new PV micro inverter
RELINK - unveils new PV micro inverter
 
WATTSCORE ENERGY
WATTSCORE ENERGYWATTSCORE ENERGY
WATTSCORE ENERGY
 
Corporate presentation for l&t solar div by jmv lps
Corporate presentation  for l&t solar div by jmv lpsCorporate presentation  for l&t solar div by jmv lps
Corporate presentation for l&t solar div by jmv lps
 
Lightening Story
Lightening StoryLightening Story
Lightening Story
 
Lobel Solar Latetst Specification
Lobel Solar Latetst SpecificationLobel Solar Latetst Specification
Lobel Solar Latetst Specification
 
Maximizing Power Production for Small Commercial Projects
Maximizing Power Production for Small Commercial ProjectsMaximizing Power Production for Small Commercial Projects
Maximizing Power Production for Small Commercial Projects
 
Gensol Rooftop EPC - Steps & Quality Management
Gensol Rooftop EPC - Steps & Quality ManagementGensol Rooftop EPC - Steps & Quality Management
Gensol Rooftop EPC - Steps & Quality Management
 
Solar pv plant and india
Solar pv plant and indiaSolar pv plant and india
Solar pv plant and india
 
3. Soladi Buyers Guide FA 2
3. Soladi Buyers Guide FA 23. Soladi Buyers Guide FA 2
3. Soladi Buyers Guide FA 2
 
Lightning protection as per iec62035
Lightning protection as per iec62035Lightning protection as per iec62035
Lightning protection as per iec62035
 
Supply of technology by l'obel solar power system
Supply of technology by l'obel solar power systemSupply of technology by l'obel solar power system
Supply of technology by l'obel solar power system
 
Gc going green step by step
Gc going green step by stepGc going green step by step
Gc going green step by step
 
Solar pv-module-india
Solar pv-module-indiaSolar pv-module-india
Solar pv-module-india
 
Mini ee 11 solar powered grass cutting robo with switch control Electrical en...
Mini ee 11 solar powered grass cutting robo with switch control Electrical en...Mini ee 11 solar powered grass cutting robo with switch control Electrical en...
Mini ee 11 solar powered grass cutting robo with switch control Electrical en...
 
SolarEdge Company Presentation for North America
SolarEdge Company Presentation for North AmericaSolarEdge Company Presentation for North America
SolarEdge Company Presentation for North America
 
Supply of technology by l'obel solar power system
Supply of technology by l'obel solar power systemSupply of technology by l'obel solar power system
Supply of technology by l'obel solar power system
 

Recently uploaded

Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...
Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...
Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...
Thierry Lestable
 
FIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdf
FIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdfFIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdf
FIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdf
FIDO Alliance
 
Essentials of Automations: Optimizing FME Workflows with Parameters
Essentials of Automations: Optimizing FME Workflows with ParametersEssentials of Automations: Optimizing FME Workflows with Parameters
Essentials of Automations: Optimizing FME Workflows with Parameters
Safe Software
 
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
Product School
 
Introduction to CHERI technology - Cybersecurity
Introduction to CHERI technology - CybersecurityIntroduction to CHERI technology - Cybersecurity
Introduction to CHERI technology - Cybersecurity
mikeeftimakis1
 
FIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance Osaka Seminar: Overview.pdfFIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance
 
Quantum Computing: Current Landscape and the Future Role of APIs
Quantum Computing: Current Landscape and the Future Role of APIsQuantum Computing: Current Landscape and the Future Role of APIs
Quantum Computing: Current Landscape and the Future Role of APIs
Vlad Stirbu
 
Epistemic Interaction - tuning interfaces to provide information for AI support
Epistemic Interaction - tuning interfaces to provide information for AI supportEpistemic Interaction - tuning interfaces to provide information for AI support
Epistemic Interaction - tuning interfaces to provide information for AI support
Alan Dix
 
GraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge GraphGraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge Graph
Guy Korland
 
Accelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish CachingAccelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish Caching
Thijs Feryn
 
Free Complete Python - A step towards Data Science
Free Complete Python - A step towards Data ScienceFree Complete Python - A step towards Data Science
Free Complete Python - A step towards Data Science
RinaMondal9
 
Observability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdf
Observability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdfObservability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdf
Observability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdf
Paige Cruz
 
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdfFIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance
 
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
DanBrown980551
 
Le nuove frontiere dell'AI nell'RPA con UiPath Autopilot™
Le nuove frontiere dell'AI nell'RPA con UiPath Autopilot™Le nuove frontiere dell'AI nell'RPA con UiPath Autopilot™
Le nuove frontiere dell'AI nell'RPA con UiPath Autopilot™
UiPathCommunity
 
By Design, not by Accident - Agile Venture Bolzano 2024
By Design, not by Accident - Agile Venture Bolzano 2024By Design, not by Accident - Agile Venture Bolzano 2024
By Design, not by Accident - Agile Venture Bolzano 2024
Pierluigi Pugliese
 
Generative AI Deep Dive: Advancing from Proof of Concept to Production
Generative AI Deep Dive: Advancing from Proof of Concept to ProductionGenerative AI Deep Dive: Advancing from Proof of Concept to Production
Generative AI Deep Dive: Advancing from Proof of Concept to Production
Aggregage
 
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdfFIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance
 
The Future of Platform Engineering
The Future of Platform EngineeringThe Future of Platform Engineering
The Future of Platform Engineering
Jemma Hussein Allen
 
Bits & Pixels using AI for Good.........
Bits & Pixels using AI for Good.........Bits & Pixels using AI for Good.........
Bits & Pixels using AI for Good.........
Alison B. Lowndes
 

Recently uploaded (20)

Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...
Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...
Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...
 
FIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdf
FIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdfFIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdf
FIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdf
 
Essentials of Automations: Optimizing FME Workflows with Parameters
Essentials of Automations: Optimizing FME Workflows with ParametersEssentials of Automations: Optimizing FME Workflows with Parameters
Essentials of Automations: Optimizing FME Workflows with Parameters
 
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
 
Introduction to CHERI technology - Cybersecurity
Introduction to CHERI technology - CybersecurityIntroduction to CHERI technology - Cybersecurity
Introduction to CHERI technology - Cybersecurity
 
FIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance Osaka Seminar: Overview.pdfFIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance Osaka Seminar: Overview.pdf
 
Quantum Computing: Current Landscape and the Future Role of APIs
Quantum Computing: Current Landscape and the Future Role of APIsQuantum Computing: Current Landscape and the Future Role of APIs
Quantum Computing: Current Landscape and the Future Role of APIs
 
Epistemic Interaction - tuning interfaces to provide information for AI support
Epistemic Interaction - tuning interfaces to provide information for AI supportEpistemic Interaction - tuning interfaces to provide information for AI support
Epistemic Interaction - tuning interfaces to provide information for AI support
 
GraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge GraphGraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge Graph
 
Accelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish CachingAccelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish Caching
 
Free Complete Python - A step towards Data Science
Free Complete Python - A step towards Data ScienceFree Complete Python - A step towards Data Science
Free Complete Python - A step towards Data Science
 
Observability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdf
Observability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdfObservability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdf
Observability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdf
 
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdfFIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
 
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
 
Le nuove frontiere dell'AI nell'RPA con UiPath Autopilot™
Le nuove frontiere dell'AI nell'RPA con UiPath Autopilot™Le nuove frontiere dell'AI nell'RPA con UiPath Autopilot™
Le nuove frontiere dell'AI nell'RPA con UiPath Autopilot™
 
By Design, not by Accident - Agile Venture Bolzano 2024
By Design, not by Accident - Agile Venture Bolzano 2024By Design, not by Accident - Agile Venture Bolzano 2024
By Design, not by Accident - Agile Venture Bolzano 2024
 
Generative AI Deep Dive: Advancing from Proof of Concept to Production
Generative AI Deep Dive: Advancing from Proof of Concept to ProductionGenerative AI Deep Dive: Advancing from Proof of Concept to Production
Generative AI Deep Dive: Advancing from Proof of Concept to Production
 
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdfFIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
 
The Future of Platform Engineering
The Future of Platform EngineeringThe Future of Platform Engineering
The Future of Platform Engineering
 
Bits & Pixels using AI for Good.........
Bits & Pixels using AI for Good.........Bits & Pixels using AI for Good.........
Bits & Pixels using AI for Good.........
 

The Eddlington Centre, Eddlington, Doncaster

  • 1. THE EDDLINGTON CENTRE EDDLINGTON LANE EDDLINGTON DONCASTER DN12 1PL G59 APPROVAL FOR A 25,000W GRID-TIED PHOTOVOLTAIC ARRAY
  • 2. THE BRIEF DAS Solar undertook the feasibility study on the site of a converted Junior school on the outskirts of Doncaster. The site is now home to a resource and learning centre run by an independent charity. The site was made up of one building centred on a large open courtyard. Built in the 1930s its structure and composition were the first priority when assessing the site. The roof is of traditional construction with flat roofed areas covering entrance halls and of later construction the main joining corridor within the quadrant. The tiled roof was covered with handmade rosemary type tiles original to the building. Sarking felt under these tiles was absent and there was evidence of damage on all roofs. The basic structure however was in good condition with no evidence of water ingress, damp or structural fragility. The site is in use every day and gets very busy at times. Special attention was going to have to be given to protection of the general public and staff within. The project would have to go ahead while the centre was still in use. Return on investment was paramount to the funding of the project. We calculated the system would pay for itself in less than seven years, a terrific investment for our client. The electrical system with in building is brand-new with several sub-metered distribution boards scattered throughout. The three phase supply continued to all these boards and lent itself perfectly to the retro fit PV array proposed. PROPOSAL ACCEPTED The office based team swing immediately into action. Planning applications, G59 applications and an Energy Performance certificate are standard requirement of the project. These are made along with the instruction of Charted Structural Surveyor, Access Contractor and Health and Safety Assessor. These reports are received and findings reviewed. These are then discussed with the client and fixes and alternatives agreed.
  • 3. THE EPC ARRIVES It’s not good news. The boiler and main source of heating is coal fired. This fact alone means the property will never reach the required D band needed to qualify for the top rate of financial return without spending in the region of ten thousand pounds. We adjust the figures to compensate analysed the costing and maintain the overall return on investment would be almost identical if we scaled down the installation to just 12 kW. We chose the north roof as access, safe working and electrical connection are considerably more cost effective. With PV Installed Without PV Installed SOME QUICK MATHS, IT STILL MAKES SENSE .
  • 4. STRUCTURE On this occasion the roof needed significant structural work. The calculations are made and the correct methods employed to ensure this will never become an issue. Over 120 lm of timber along with heavy gauge nuts, bolts, and washers are used to pin the roof fabric together following the structural reports instruction to the letter.
  • 5. REMEDIAL WORKS King trusses, perlins and rafters not strong enough? We strengthen and brace the entire roof structure. Available roof space will allow a 12kW array to be installed on each of the two main south facing roofs. The total weight of each array is well over a ton. f
  • 6. ELECTRICAL DESIGN Main three phase cabling within requires no upgrade. Arrays can be fed directly into sub-distribution boards within 3 meters of the loft mounted inverters. Each array is separately metered ensuring the most accurate production figures are available. Use of two independent GSM modem units means this information is available at the touch of a button and in real time. All this adds up to minimal voltage drop losses and an excellent efficiency for the client and the environment. Our specification included the market leading SMA Tri-power TL Inverters. Two units were required as the arrays were on opposite edges of the site. The electrical drawings and calculations are completed and distributed to the relevant network connection authority for consideration. FINE TUNING We produce 3D animations of the suns path over the site. This allows our engineers to select the best possible module configuration. All shading issues are overcome to allow optimum operation. These calculations are checked and double checked by our electrical engineers.
  • 7. PLANNING APPLICATION ACCEPTED We get the go ahead from the local authority. DISTRICT NETWORK OPERATOR APPROVES CONNECTION At long last we can proceed to site.
  • 8. ESTABLISH SITE AND ERECT SUITABLE ACCESS The fun part starts and our highly skilled installation crews arrive on site. Our scaffolder is on site the same day. An exclusion zone is created beneath the work area and maintained throughout the installation. Notices are placed and safety briefings given. The premises general manager is briefed on the schedule of works and works with us to ensure a safe working site at all times. Measurements are checked and the installation begins.
  • 9. THE INVERTER We position the inverter in the centre of the loft directly above the distribution board. A dwarf support wall is chosen to mount the inverter. The existing loft hatch is too small to accommodate the large unit. It’s stripped out and reinstated with a larger diameter hatch to allow future removal of the unit if required. DC isolation switches are fitted to the reverse of the wall and channelled through to feed the inverter. Once inverted the AC power then runs back through a separate channel to the main isolation switch. Everything is labelled and is easily identified. The new loft hatch is made and fitted by our joiner’s onsite.
  • 10. THE ROOF Known as “pigs” in the solar industry, the reputation of these roof tiles is well known. Normal Rosemary tiles are difficult to work with but the tiles on this roof were handmade, much larger than the modern Rosemary and almost impossible to match. Repairs were made to ensure roof integrity beneath the array; we give a water tight guarantee on all our projects.
  • 11. THE ARRAY We install 48 modules in landscape orientation. This maximises the potential of the roof space and array. Each row is a single string of 12 making any future string diagnostic issues straight forward. Anchors are set at the very edge of the array giving complete stability during heavy winds and periods of prolonged winter weather. We test every module as it comes up on the roof and check this against the factory flash tests.
  • 12. COMMISSION The most important part of the installation is the testing of the entire electrical system. We label up all distribution boards, isolators, wiring runs, MCBs and meter positions. We test all the existing hard wiring within the building before connecting our installation. Each string is tested and checked before connection into the inverter. All AC testing and earthing arrangements are double checked, tested and recorded as needed for the installation certificate and also to satisfy the DNO’s requirements. On this occasion a representative from BRE attends site on behalf of the client and inspects the works.
  • 13. HANDOVER Having fulfilled our obligations and satisfied the inspection the site is cleared and handed back. All paperwork is completed and handed over in the operation and maintenance manual. Wiring schematics are finalised and published. All relevant authorities are made aware of the installation as prescribed in engineering recommendation G59-1.
  • 14. MONITORING AND MAINTENANCE DAS solar will monitor and maintain this installation for the next 25 years. The Estler A1100 GSM meter gives us instant access to array performance in real time. The system is monitored remotely and can be accessed online by both ourselves and the client. The data is recorded and assessed on a daily basis to maintain the highest possible yield and operational performance. All components are tested periodically and by our skilled electrical engineers ensuring optimum production. We recommend cleaning the modules, as a minimum, once a year and is part of our inspection. This 12kW system will exceed our expectations by a minimum of 20% paying back the initial £22,000 investment fivefold and continue to produce clean renewable electricity for the next 40 years. It will produce over 300,000 kilowatt hours of sustainable electricity saving over £££££££tons of co2.
  • 15. THE OPS TEAM THE EDDLINGTON CENTRE BRAD “UGLY” KIRKBRIDE LEE WOODS NIGEL”DUMBLEDOR”WHITE STEVE SPENCER WAYNE “WIGGY” CLARK DARREN GRAHAM