SlideShare a Scribd company logo
MARKO POLO BRIDGE
DUBROVNIK-NERETVA COUNTY
REPUBLIC OF CROATIA
BUILDING ON THE PAST…
TO REACH THE FUTURE
JULY 16 2012. V5.7



            Concept and images/design are the exclusive property of
                                              and Lotus Architecti.
  Reproduction or unauthorized use is not permitted and will be prosecuted to the
                             fullest extent of the law.
EXECUTIVE SUMMARY
•   Achieves Croatia’s territorial cohesion one
    month before Croatia’s EU accession and
    establish full sovereignty over Croatian
    territory for the first time in 314 years
•   Requires € 36MM investment; can be from
    private investors
•   200 new jobs created during bridge
    construction and €9 million in VAT to the
    government; under normal bridge
    operations, 20 full-time jobs created with an
    average net monthly wage of €1.622,
    government will receive nearly €2 million
    per year in VAT revenues from toll fees.
•   No more real estate needed
•   Components made in Croatia
•   No weight / vehicle type restrictions
•   Safe, cost-effective, environmentally-
    friendly and permanent solution
•   Passage duration: 3 minutes
•   Daily capacity: 42.000 vehicles
•   Average toll: € 5,00 plus tax
TARGET SITE IS IDEAL
FOR FLOATING BRIDGE
 •      Deep water; soft sea floor
 •      Calm surface with little wind; mild water currents and small tidal variation
 •      Little to no large boat traffic




     Sources: Stanford University Center for Turbulence Research; Dartmouth College School of Engineering;
     Hrvatski hidrometeorološki zavod
SOLUTION WITHOUT COMPROMISE
•   Croatia maintains complete
    sovereignty over its territory for
    first time in 314 years
•   BiH has no legal right to obstruct
    construction since continuous
    open access to sea is assured                     Croatia
•   No additional real estate required,
    thus no one can profit from                                                                    BiH
    speculation or delay project
•   Bridge capacity exceeds traffic
    demand for 50 years (42,000
    vehicles daily capacity)
•   Preserves water quality in
    important aquaculture zone
•   Integrates subtle design motives
    from the whole County’s culture
    and history
•   All electricity required for
    operations shall be produced by
    solar panels on the roof of the toll
    both plaza




    Source: European Parliament, Directorate-General for Internal Policies: “Jurisdictional Waters in the
    Mediterranean and Black Seas” http://www.dur.ac.uk/resources/ibru/publications/full/bsb7-4_klemencic.pdf
CONSTRUCTION PLAN
•   Individual pontoons are built on dry land
    next to a waterway
•   Then they are floated and towed like
    barges to the site
•   Pieced together like “legos” starting at the
    edge toward the center
•   Pontoons are held in place by enormous
    steel cables connected to heavy concrete
    anchors on the seabed
•   Once in place, then the roadway material
    and other items are added on to the
    pontoon surface
•   Pontoons are water-tight concrete that
    does not erode over time and require no
    maintenance
•   The weight of the water displaced by the
    pontoons is equal to the weight of the
    structure (including all traffic), which
    allows the bridge to float safely
PROFESSIONAL COLLABORATION
Four components of bridge:
                                                           1
1.   Access roads and toll plazas
2.   Approach bridges                                  3       2
                                                   4
3.   Pontoon bridge
4.   Large vessel gate (center)
Success will require close             2       3
collaboration between Hrvatske
Ceste, The Adriatic Group, Lotus
Architecti, Marinetek and Investors.

                                           1
SOCIO-ECONOMIC
 DEVELOPMENT VALUE
+ 200 new jobs created during
  construction and 20 full-time for
  operations (average monthly net wage:
  €1.622)
+ Government VAT earnings from the
  bridge will be € 9 million in VAT in next
  10 months from construction and
  nearly € 2 million per year from toll
  fees.
+ Added values from connecting Neretva
  and Pelješca regions
+ Significant decrease in costs:
  transportation, distribution, cost of
  living, etc
+ Cost decreases help Croatian tourism
  offer competitive in Mediterranean
± Negligible increase in real estate
  values for Peljesac, Dubrovnik or
  Korcula
CONFIRMATION FROM MARINETEK OF ABILITY
TO CONSTRUCT PONTOON BRIDGE
MARINETEK CREDENTIALS
 Croatian Boat Registry   ISO 9001   ISO 14001
FOR MORE INFORMATION,
PLEASE CONTACT:

JAMES PRICE CHUCK
E: JAMESPRICECHUCK@THEADRIATICGROUP.COM

MAJA BRUČIĆ
E: MAJA@LOTUSARCHITECTI.COM

Film: http://www.youtube.com/watch?v=DNSkMIgFxMo


      Concept and images/design are the exclusive property of
                                       and Lotus Architecti.
     Reproduction or unauthorized use is not permitted and will be
             prosecuted to the fullest extent of the law.
APPENDIX
July 17, 2012
In this letter and the attached document, please find additional information and detail on our floating bridge proposal to fulfill Croatia’s
requirement of territorial cohesion prior to EU accession in a manner that adheres to the vision, mission and goals of the Dubrovnik-Neretva
Zupanija, Hrvatske Ceste and the Croatian Ministry of the Sea, Transport and Infrastructure.
Floating bridges provide safe, cost-effective, environmentally-friendly and permanent solutions to transportation challenges on every continent
(except Antarctica). Notable examples are in Norway (longest floating bridge in Europe) and the United States of America (longest floating bridge
in the world). More than 115.000 vehicles of all types cross the American bridge each day, which represents a daily vehicle volume equal to the
entire population of the Dubrovnik-Neretva County.
Our proposed floating bridge would be the longest in Europe, but the journey across would last only 3 minutes. The bridge’s daily capacity of
42.000 vehicles is nearly 3x greater than the current peak seasonal traffic volume at the HR-BiH border in question, so no additional construction
will be needed to handle large volume increases. The average toll for one vehicle and one person would be EUR 5,00 plus tax and there are no
technical restrictions to weight, size or type of vehicle. All cargo and passenger vehicles may move freely across the bridge. The construction and
operation of our bridge proposal would have no negative environmental impact because it is a closed system in which no waste reaches the
water and no sea bed digging is needed. Our bridge can be constructed for EUR 36 million and completed by June 2013. Given correct operating
concession terms, our proposal could be completely funded by private investors at no cost to Croatia.
In contrast, the ferry boat solution’s capacity is 50% smaller, would require 6.7x more time per crossing per vehicle (not including waiting for a
ferry), cost 2.5x more on average and put tons of pollutants into the fragile aquaculture environment of the malostonski canal. The EUR 36 million
cost of implementing the ferry boat option (EUR 12 million in construction works and EUR 24 million for two large ferry boats) would be borne by
the Croatian government directly or indirectly via state-owned Jadrolinija. Though construction of the ferry terminal and ferry boats (if built in
Croatia) would provide the same PDV revenues, ongoing and annual PDV contribution from ferry operations would be 50% or less than that of
our floating bridge due to the capacity constraints of the ferry boats.
Bridge construction will create at least 100 new jobs until completion and provide €9 million in PDV over the next 10 months. Bridge operations
will require at least 20 fulltime employees earning an average net wage of €1622 per month and will provide the Government with approximately
€2 million annually in PDV generated from toll fares.
We hope that the attached presentation document provides a clear overview of the technology, beauty and value of our floating bridge proposal.
We hope that it is clear that our proposal meets and exceeds the requirements of Croatia’s EU accession and the goals of the Dubrovnik-Neretva
County. We would welcome the opportunity to discuss our proposal with you in person at your convenience.
We look forward to leading the implementation of this safe, cost-effective, environmentally-friendly and permanent solution in the Dubrovnik-
Neretva County.
Sincerely,
Maja Bručić i James Price Chuck

More Related Content

What's hot

Ukrainian infrastructure: open for investors
Ukrainian infrastructure: open for investorsUkrainian infrastructure: open for investors
Ukrainian infrastructure: open for investors
Міністерство інфраструктури України
 
MedaPorts16 | Admiral AbdelKader Darwish
MedaPorts16 | Admiral AbdelKader DarwishMedaPorts16 | Admiral AbdelKader Darwish
MedaPorts16 | Admiral AbdelKader Darwish
ASCAME
 
Euro rail eng_full
Euro rail eng_fullEuro rail eng_full
Euro rail eng_full
investinlviv
 
MedaPorts16 | Nicolas Debaisieux
MedaPorts16 | Nicolas DebaisieuxMedaPorts16 | Nicolas Debaisieux
MedaPorts16 | Nicolas Debaisieux
ASCAME
 
Port Integration - International freight logistics and port information syste...
Port Integration - International freight logistics and port information syste...Port Integration - International freight logistics and port information syste...
Port Integration - International freight logistics and port information syste...
Port of Riga
 
Ferryservicesummary
FerryservicesummaryFerryservicesummary
Ferryservicesummary
Rose Klein
 
Fineast Bay Area analysis - Global Risk Trends
Fineast Bay Area analysis - Global Risk Trends Fineast Bay Area analysis - Global Risk Trends
Fineast Bay Area analysis - Global Risk Trends
Nhi Nguyen (Katherine)
 
Ten t corridors forerunners of a sustainable mobility system - e. bergkvist
Ten t corridors forerunners of a sustainable mobility system - e. bergkvistTen t corridors forerunners of a sustainable mobility system - e. bergkvist
Ten t corridors forerunners of a sustainable mobility system - e. bergkvist
European Commission
 
Planning offshore hubs observations and guidelines 14012017
Planning offshore hubs observations and guidelines  14012017Planning offshore hubs observations and guidelines  14012017
Planning offshore hubs observations and guidelines 14012017
Marco Pluijm
 
Investment Potential of Port Infrastructure Projects in Ukraine: Opportunitie...
Investment Potential of Port Infrastructure Projects in Ukraine: Opportunitie...Investment Potential of Port Infrastructure Projects in Ukraine: Opportunitie...
Investment Potential of Port Infrastructure Projects in Ukraine: Opportunitie...
NIC Office
 
Port of boston
Port of bostonPort of boston
Port of boston
Vivek Mukkavalli
 
BC Sir John A. MacDonald BC In A Pet.
BC Sir John A. MacDonald BC In A Pet.BC Sir John A. MacDonald BC In A Pet.
BC Sir John A. MacDonald BC In A Pet.
P. Anna Paddon
 
Ministerial conclusions signed CEF
Ministerial conclusions signed CEFMinisterial conclusions signed CEF
Ministerial conclusions signed CEF
ARVD - Waterborne Transport Development Agency
 
Corridors progrreport version1_2014
Corridors progrreport version1_2014Corridors progrreport version1_2014
Corridors progrreport version1_2014
johnrubial
 
Keynote speech, Minister Varvitsiotis' Message
Keynote speech, Minister Varvitsiotis' MessageKeynote speech, Minister Varvitsiotis' Message
Keynote speech, Minister Varvitsiotis' Message
Yannis Koliousis
 
Land transportation
Land transportationLand transportation
Land transportation
Badr Banar
 
Baltic adriatique corridor k. bodewig
Baltic adriatique corridor   k. bodewigBaltic adriatique corridor   k. bodewig
Baltic adriatique corridor k. bodewig
European Commission
 
Story_2_Kosciuszko_Bridge
Story_2_Kosciuszko_BridgeStory_2_Kosciuszko_Bridge
Story_2_Kosciuszko_Bridge
Theresa Casey, FSMPS, CPSM
 
BTJ coal terminal market
BTJ coal terminal marketBTJ coal terminal market
BTJ coal terminal market
Olga Gopkalo
 
Donor meeting. Ministry of Infrastructure of Ukraine 6th of December
Donor meeting. Ministry of Infrastructure of Ukraine 6th of DecemberDonor meeting. Ministry of Infrastructure of Ukraine 6th of December
Donor meeting. Ministry of Infrastructure of Ukraine 6th of December
Міністерство інфраструктури України
 

What's hot (20)

Ukrainian infrastructure: open for investors
Ukrainian infrastructure: open for investorsUkrainian infrastructure: open for investors
Ukrainian infrastructure: open for investors
 
MedaPorts16 | Admiral AbdelKader Darwish
MedaPorts16 | Admiral AbdelKader DarwishMedaPorts16 | Admiral AbdelKader Darwish
MedaPorts16 | Admiral AbdelKader Darwish
 
Euro rail eng_full
Euro rail eng_fullEuro rail eng_full
Euro rail eng_full
 
MedaPorts16 | Nicolas Debaisieux
MedaPorts16 | Nicolas DebaisieuxMedaPorts16 | Nicolas Debaisieux
MedaPorts16 | Nicolas Debaisieux
 
Port Integration - International freight logistics and port information syste...
Port Integration - International freight logistics and port information syste...Port Integration - International freight logistics and port information syste...
Port Integration - International freight logistics and port information syste...
 
Ferryservicesummary
FerryservicesummaryFerryservicesummary
Ferryservicesummary
 
Fineast Bay Area analysis - Global Risk Trends
Fineast Bay Area analysis - Global Risk Trends Fineast Bay Area analysis - Global Risk Trends
Fineast Bay Area analysis - Global Risk Trends
 
Ten t corridors forerunners of a sustainable mobility system - e. bergkvist
Ten t corridors forerunners of a sustainable mobility system - e. bergkvistTen t corridors forerunners of a sustainable mobility system - e. bergkvist
Ten t corridors forerunners of a sustainable mobility system - e. bergkvist
 
Planning offshore hubs observations and guidelines 14012017
Planning offshore hubs observations and guidelines  14012017Planning offshore hubs observations and guidelines  14012017
Planning offshore hubs observations and guidelines 14012017
 
Investment Potential of Port Infrastructure Projects in Ukraine: Opportunitie...
Investment Potential of Port Infrastructure Projects in Ukraine: Opportunitie...Investment Potential of Port Infrastructure Projects in Ukraine: Opportunitie...
Investment Potential of Port Infrastructure Projects in Ukraine: Opportunitie...
 
Port of boston
Port of bostonPort of boston
Port of boston
 
BC Sir John A. MacDonald BC In A Pet.
BC Sir John A. MacDonald BC In A Pet.BC Sir John A. MacDonald BC In A Pet.
BC Sir John A. MacDonald BC In A Pet.
 
Ministerial conclusions signed CEF
Ministerial conclusions signed CEFMinisterial conclusions signed CEF
Ministerial conclusions signed CEF
 
Corridors progrreport version1_2014
Corridors progrreport version1_2014Corridors progrreport version1_2014
Corridors progrreport version1_2014
 
Keynote speech, Minister Varvitsiotis' Message
Keynote speech, Minister Varvitsiotis' MessageKeynote speech, Minister Varvitsiotis' Message
Keynote speech, Minister Varvitsiotis' Message
 
Land transportation
Land transportationLand transportation
Land transportation
 
Baltic adriatique corridor k. bodewig
Baltic adriatique corridor   k. bodewigBaltic adriatique corridor   k. bodewig
Baltic adriatique corridor k. bodewig
 
Story_2_Kosciuszko_Bridge
Story_2_Kosciuszko_BridgeStory_2_Kosciuszko_Bridge
Story_2_Kosciuszko_Bridge
 
BTJ coal terminal market
BTJ coal terminal marketBTJ coal terminal market
BTJ coal terminal market
 
Donor meeting. Ministry of Infrastructure of Ukraine 6th of December
Donor meeting. Ministry of Infrastructure of Ukraine 6th of DecemberDonor meeting. Ministry of Infrastructure of Ukraine 6th of December
Donor meeting. Ministry of Infrastructure of Ukraine 6th of December
 

Similar to The Adriatic Group's Marko Polo Bridge Proposal

3 laichanrasti
 3 laichanrasti 3 laichanrasti
3 laichanrasti
Eugene Tkachenko
 
Overview of EBRD and the Transport Sector
Overview of EBRD and the Transport SectorOverview of EBRD and the Transport Sector
Overview of EBRD and the Transport Sector
Eugene Tkachenko
 
ISMED Training: PPPs in Egypt's River Transport_ERBD
ISMED Training: PPPs in Egypt's River Transport_ERBDISMED Training: PPPs in Egypt's River Transport_ERBD
ISMED Training: PPPs in Egypt's River Transport_ERBD
OECDGlobalRelations
 
EMR H2 Booster study, the current state of the H2 economy - 16 March 2023
EMR H2 Booster study, the current state of the H2 economy - 16 March 2023EMR H2 Booster study, the current state of the H2 economy - 16 March 2023
EMR H2 Booster study, the current state of the H2 economy - 16 March 2023
Cluster TWEED
 
Jan Willem - Importancia de las vias navegables y puertos interiores en el co...
Jan Willem - Importancia de las vias navegables y puertos interiores en el co...Jan Willem - Importancia de las vias navegables y puertos interiores en el co...
Jan Willem - Importancia de las vias navegables y puertos interiores en el co...
latinports
 
Ports of Ukraine: Competition obstacles in stevedoring: reforms de-jure and d...
Ports of Ukraine: Competition obstacles in stevedoring: reforms de-jure and d...Ports of Ukraine: Competition obstacles in stevedoring: reforms de-jure and d...
Ports of Ukraine: Competition obstacles in stevedoring: reforms de-jure and d...
Eugene Tkachenko
 
Futuremed fvg region 11jul2012_a_rev3
Futuremed fvg region 11jul2012_a_rev3Futuremed fvg region 11jul2012_a_rev3
Futuremed fvg region 11jul2012_a_rev3
Andrea Campagna (Ph.D.)
 
Presentation - Dry Ports 1-1 revised.pdf
Presentation - Dry Ports 1-1 revised.pdfPresentation - Dry Ports 1-1 revised.pdf
Presentation - Dry Ports 1-1 revised.pdf
XolaniRadebeRadebe
 
Pwft tbilisi snamprogetti port study 179 pages verry good engineering ii
Pwft tbilisi  snamprogetti port study 179 pages verry good engineering iiPwft tbilisi  snamprogetti port study 179 pages verry good engineering ii
Pwft tbilisi snamprogetti port study 179 pages verry good engineering ii
Gerard Gesman
 
Current concession projects in sea port sector of Ukraine (by SPILNO)
Current concession projects in sea port sector of Ukraine (by SPILNO)Current concession projects in sea port sector of Ukraine (by SPILNO)
Current concession projects in sea port sector of Ukraine (by SPILNO)
EasyBusiness
 
Ocean finance
Ocean financeOcean finance
Ocean finance
Mark Peterson
 
The European Union's Southeast Europe programme supporting …
The European Union's Southeast Europe programme supporting …The European Union's Southeast Europe programme supporting …
The European Union's Southeast Europe programme supporting …
Cláudio Carneiro
 
CV Rezart Arkaxhiu_Sep2018
CV Rezart Arkaxhiu_Sep2018CV Rezart Arkaxhiu_Sep2018
CV Rezart Arkaxhiu_Sep2018
Rezart Arkaxhiu
 
Coeck
CoeckCoeck
Coeck
forestbold
 
Coeck
CoeckCoeck
European Gateway Services.pptx
European Gateway Services.pptxEuropean Gateway Services.pptx
European Gateway Services.pptx
Soe Min Aung
 
Atlantic corridor c. secchi
Atlantic corridor   c. secchiAtlantic corridor   c. secchi
Atlantic corridor c. secchi
European Commission
 
Presentation Odessa (Ukraine) invest-project
Presentation Odessa (Ukraine) invest-projectPresentation Odessa (Ukraine) invest-project
Presentation Odessa (Ukraine) invest-project
AQUATECTURA
 
2012 04-24 hanse office ports policy espo verhoeven
2012 04-24 hanse office ports policy espo verhoeven2012 04-24 hanse office ports policy espo verhoeven
2012 04-24 hanse office ports policy espo verhoeven
European Sea Ports Organisation
 
Rotterdam port
Rotterdam portRotterdam port
Rotterdam port
Soe Min Aung
 

Similar to The Adriatic Group's Marko Polo Bridge Proposal (20)

3 laichanrasti
 3 laichanrasti 3 laichanrasti
3 laichanrasti
 
Overview of EBRD and the Transport Sector
Overview of EBRD and the Transport SectorOverview of EBRD and the Transport Sector
Overview of EBRD and the Transport Sector
 
ISMED Training: PPPs in Egypt's River Transport_ERBD
ISMED Training: PPPs in Egypt's River Transport_ERBDISMED Training: PPPs in Egypt's River Transport_ERBD
ISMED Training: PPPs in Egypt's River Transport_ERBD
 
EMR H2 Booster study, the current state of the H2 economy - 16 March 2023
EMR H2 Booster study, the current state of the H2 economy - 16 March 2023EMR H2 Booster study, the current state of the H2 economy - 16 March 2023
EMR H2 Booster study, the current state of the H2 economy - 16 March 2023
 
Jan Willem - Importancia de las vias navegables y puertos interiores en el co...
Jan Willem - Importancia de las vias navegables y puertos interiores en el co...Jan Willem - Importancia de las vias navegables y puertos interiores en el co...
Jan Willem - Importancia de las vias navegables y puertos interiores en el co...
 
Ports of Ukraine: Competition obstacles in stevedoring: reforms de-jure and d...
Ports of Ukraine: Competition obstacles in stevedoring: reforms de-jure and d...Ports of Ukraine: Competition obstacles in stevedoring: reforms de-jure and d...
Ports of Ukraine: Competition obstacles in stevedoring: reforms de-jure and d...
 
Futuremed fvg region 11jul2012_a_rev3
Futuremed fvg region 11jul2012_a_rev3Futuremed fvg region 11jul2012_a_rev3
Futuremed fvg region 11jul2012_a_rev3
 
Presentation - Dry Ports 1-1 revised.pdf
Presentation - Dry Ports 1-1 revised.pdfPresentation - Dry Ports 1-1 revised.pdf
Presentation - Dry Ports 1-1 revised.pdf
 
Pwft tbilisi snamprogetti port study 179 pages verry good engineering ii
Pwft tbilisi  snamprogetti port study 179 pages verry good engineering iiPwft tbilisi  snamprogetti port study 179 pages verry good engineering ii
Pwft tbilisi snamprogetti port study 179 pages verry good engineering ii
 
Current concession projects in sea port sector of Ukraine (by SPILNO)
Current concession projects in sea port sector of Ukraine (by SPILNO)Current concession projects in sea port sector of Ukraine (by SPILNO)
Current concession projects in sea port sector of Ukraine (by SPILNO)
 
Ocean finance
Ocean financeOcean finance
Ocean finance
 
The European Union's Southeast Europe programme supporting …
The European Union's Southeast Europe programme supporting …The European Union's Southeast Europe programme supporting …
The European Union's Southeast Europe programme supporting …
 
CV Rezart Arkaxhiu_Sep2018
CV Rezart Arkaxhiu_Sep2018CV Rezart Arkaxhiu_Sep2018
CV Rezart Arkaxhiu_Sep2018
 
Coeck
CoeckCoeck
Coeck
 
Coeck
CoeckCoeck
Coeck
 
European Gateway Services.pptx
European Gateway Services.pptxEuropean Gateway Services.pptx
European Gateway Services.pptx
 
Atlantic corridor c. secchi
Atlantic corridor   c. secchiAtlantic corridor   c. secchi
Atlantic corridor c. secchi
 
Presentation Odessa (Ukraine) invest-project
Presentation Odessa (Ukraine) invest-projectPresentation Odessa (Ukraine) invest-project
Presentation Odessa (Ukraine) invest-project
 
2012 04-24 hanse office ports policy espo verhoeven
2012 04-24 hanse office ports policy espo verhoeven2012 04-24 hanse office ports policy espo verhoeven
2012 04-24 hanse office ports policy espo verhoeven
 
Rotterdam port
Rotterdam portRotterdam port
Rotterdam port
 

Recently uploaded

GraphRAG for Life Science to increase LLM accuracy
GraphRAG for Life Science to increase LLM accuracyGraphRAG for Life Science to increase LLM accuracy
GraphRAG for Life Science to increase LLM accuracy
Tomaz Bratanic
 
HCL Notes and Domino License Cost Reduction in the World of DLAU
HCL Notes and Domino License Cost Reduction in the World of DLAUHCL Notes and Domino License Cost Reduction in the World of DLAU
HCL Notes and Domino License Cost Reduction in the World of DLAU
panagenda
 
Climate Impact of Software Testing at Nordic Testing Days
Climate Impact of Software Testing at Nordic Testing DaysClimate Impact of Software Testing at Nordic Testing Days
Climate Impact of Software Testing at Nordic Testing Days
Kari Kakkonen
 
How to Get CNIC Information System with Paksim Ga.pptx
How to Get CNIC Information System with Paksim Ga.pptxHow to Get CNIC Information System with Paksim Ga.pptx
How to Get CNIC Information System with Paksim Ga.pptx
danishmna97
 
GraphSummit Singapore | The Future of Agility: Supercharging Digital Transfor...
GraphSummit Singapore | The Future of Agility: Supercharging Digital Transfor...GraphSummit Singapore | The Future of Agility: Supercharging Digital Transfor...
GraphSummit Singapore | The Future of Agility: Supercharging Digital Transfor...
Neo4j
 
AI 101: An Introduction to the Basics and Impact of Artificial Intelligence
AI 101: An Introduction to the Basics and Impact of Artificial IntelligenceAI 101: An Introduction to the Basics and Impact of Artificial Intelligence
AI 101: An Introduction to the Basics and Impact of Artificial Intelligence
IndexBug
 
GenAI Pilot Implementation in the organizations
GenAI Pilot Implementation in the organizationsGenAI Pilot Implementation in the organizations
GenAI Pilot Implementation in the organizations
kumardaparthi1024
 
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
SOFTTECHHUB
 
Artificial Intelligence for XMLDevelopment
Artificial Intelligence for XMLDevelopmentArtificial Intelligence for XMLDevelopment
Artificial Intelligence for XMLDevelopment
Octavian Nadolu
 
Presentation of the OECD Artificial Intelligence Review of Germany
Presentation of the OECD Artificial Intelligence Review of GermanyPresentation of the OECD Artificial Intelligence Review of Germany
Presentation of the OECD Artificial Intelligence Review of Germany
innovationoecd
 
“Building and Scaling AI Applications with the Nx AI Manager,” a Presentation...
“Building and Scaling AI Applications with the Nx AI Manager,” a Presentation...“Building and Scaling AI Applications with the Nx AI Manager,” a Presentation...
“Building and Scaling AI Applications with the Nx AI Manager,” a Presentation...
Edge AI and Vision Alliance
 
RESUME BUILDER APPLICATION Project for students
RESUME BUILDER APPLICATION Project for studentsRESUME BUILDER APPLICATION Project for students
RESUME BUILDER APPLICATION Project for students
KAMESHS29
 
TrustArc Webinar - 2024 Global Privacy Survey
TrustArc Webinar - 2024 Global Privacy SurveyTrustArc Webinar - 2024 Global Privacy Survey
TrustArc Webinar - 2024 Global Privacy Survey
TrustArc
 
Driving Business Innovation: Latest Generative AI Advancements & Success Story
Driving Business Innovation: Latest Generative AI Advancements & Success StoryDriving Business Innovation: Latest Generative AI Advancements & Success Story
Driving Business Innovation: Latest Generative AI Advancements & Success Story
Safe Software
 
Communications Mining Series - Zero to Hero - Session 1
Communications Mining Series - Zero to Hero - Session 1Communications Mining Series - Zero to Hero - Session 1
Communications Mining Series - Zero to Hero - Session 1
DianaGray10
 
みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...
みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...
みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...
名前 です男
 
Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...
Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...
Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...
SOFTTECHHUB
 
“I’m still / I’m still / Chaining from the Block”
“I’m still / I’m still / Chaining from the Block”“I’m still / I’m still / Chaining from the Block”
“I’m still / I’m still / Chaining from the Block”
Claudio Di Ciccio
 
Essentials of Automations: The Art of Triggers and Actions in FME
Essentials of Automations: The Art of Triggers and Actions in FMEEssentials of Automations: The Art of Triggers and Actions in FME
Essentials of Automations: The Art of Triggers and Actions in FME
Safe Software
 
Unlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdf
Unlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdfUnlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdf
Unlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdf
Malak Abu Hammad
 

Recently uploaded (20)

GraphRAG for Life Science to increase LLM accuracy
GraphRAG for Life Science to increase LLM accuracyGraphRAG for Life Science to increase LLM accuracy
GraphRAG for Life Science to increase LLM accuracy
 
HCL Notes and Domino License Cost Reduction in the World of DLAU
HCL Notes and Domino License Cost Reduction in the World of DLAUHCL Notes and Domino License Cost Reduction in the World of DLAU
HCL Notes and Domino License Cost Reduction in the World of DLAU
 
Climate Impact of Software Testing at Nordic Testing Days
Climate Impact of Software Testing at Nordic Testing DaysClimate Impact of Software Testing at Nordic Testing Days
Climate Impact of Software Testing at Nordic Testing Days
 
How to Get CNIC Information System with Paksim Ga.pptx
How to Get CNIC Information System with Paksim Ga.pptxHow to Get CNIC Information System with Paksim Ga.pptx
How to Get CNIC Information System with Paksim Ga.pptx
 
GraphSummit Singapore | The Future of Agility: Supercharging Digital Transfor...
GraphSummit Singapore | The Future of Agility: Supercharging Digital Transfor...GraphSummit Singapore | The Future of Agility: Supercharging Digital Transfor...
GraphSummit Singapore | The Future of Agility: Supercharging Digital Transfor...
 
AI 101: An Introduction to the Basics and Impact of Artificial Intelligence
AI 101: An Introduction to the Basics and Impact of Artificial IntelligenceAI 101: An Introduction to the Basics and Impact of Artificial Intelligence
AI 101: An Introduction to the Basics and Impact of Artificial Intelligence
 
GenAI Pilot Implementation in the organizations
GenAI Pilot Implementation in the organizationsGenAI Pilot Implementation in the organizations
GenAI Pilot Implementation in the organizations
 
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
 
Artificial Intelligence for XMLDevelopment
Artificial Intelligence for XMLDevelopmentArtificial Intelligence for XMLDevelopment
Artificial Intelligence for XMLDevelopment
 
Presentation of the OECD Artificial Intelligence Review of Germany
Presentation of the OECD Artificial Intelligence Review of GermanyPresentation of the OECD Artificial Intelligence Review of Germany
Presentation of the OECD Artificial Intelligence Review of Germany
 
“Building and Scaling AI Applications with the Nx AI Manager,” a Presentation...
“Building and Scaling AI Applications with the Nx AI Manager,” a Presentation...“Building and Scaling AI Applications with the Nx AI Manager,” a Presentation...
“Building and Scaling AI Applications with the Nx AI Manager,” a Presentation...
 
RESUME BUILDER APPLICATION Project for students
RESUME BUILDER APPLICATION Project for studentsRESUME BUILDER APPLICATION Project for students
RESUME BUILDER APPLICATION Project for students
 
TrustArc Webinar - 2024 Global Privacy Survey
TrustArc Webinar - 2024 Global Privacy SurveyTrustArc Webinar - 2024 Global Privacy Survey
TrustArc Webinar - 2024 Global Privacy Survey
 
Driving Business Innovation: Latest Generative AI Advancements & Success Story
Driving Business Innovation: Latest Generative AI Advancements & Success StoryDriving Business Innovation: Latest Generative AI Advancements & Success Story
Driving Business Innovation: Latest Generative AI Advancements & Success Story
 
Communications Mining Series - Zero to Hero - Session 1
Communications Mining Series - Zero to Hero - Session 1Communications Mining Series - Zero to Hero - Session 1
Communications Mining Series - Zero to Hero - Session 1
 
みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...
みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...
みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...
 
Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...
Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...
Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...
 
“I’m still / I’m still / Chaining from the Block”
“I’m still / I’m still / Chaining from the Block”“I’m still / I’m still / Chaining from the Block”
“I’m still / I’m still / Chaining from the Block”
 
Essentials of Automations: The Art of Triggers and Actions in FME
Essentials of Automations: The Art of Triggers and Actions in FMEEssentials of Automations: The Art of Triggers and Actions in FME
Essentials of Automations: The Art of Triggers and Actions in FME
 
Unlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdf
Unlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdfUnlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdf
Unlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdf
 

The Adriatic Group's Marko Polo Bridge Proposal

  • 1. MARKO POLO BRIDGE DUBROVNIK-NERETVA COUNTY REPUBLIC OF CROATIA BUILDING ON THE PAST… TO REACH THE FUTURE JULY 16 2012. V5.7 Concept and images/design are the exclusive property of and Lotus Architecti. Reproduction or unauthorized use is not permitted and will be prosecuted to the fullest extent of the law.
  • 2. EXECUTIVE SUMMARY • Achieves Croatia’s territorial cohesion one month before Croatia’s EU accession and establish full sovereignty over Croatian territory for the first time in 314 years • Requires € 36MM investment; can be from private investors • 200 new jobs created during bridge construction and €9 million in VAT to the government; under normal bridge operations, 20 full-time jobs created with an average net monthly wage of €1.622, government will receive nearly €2 million per year in VAT revenues from toll fees. • No more real estate needed • Components made in Croatia • No weight / vehicle type restrictions • Safe, cost-effective, environmentally- friendly and permanent solution • Passage duration: 3 minutes • Daily capacity: 42.000 vehicles • Average toll: € 5,00 plus tax
  • 3.
  • 4. TARGET SITE IS IDEAL FOR FLOATING BRIDGE • Deep water; soft sea floor • Calm surface with little wind; mild water currents and small tidal variation • Little to no large boat traffic Sources: Stanford University Center for Turbulence Research; Dartmouth College School of Engineering; Hrvatski hidrometeorološki zavod
  • 5.
  • 6. SOLUTION WITHOUT COMPROMISE • Croatia maintains complete sovereignty over its territory for first time in 314 years • BiH has no legal right to obstruct construction since continuous open access to sea is assured Croatia • No additional real estate required, thus no one can profit from BiH speculation or delay project • Bridge capacity exceeds traffic demand for 50 years (42,000 vehicles daily capacity) • Preserves water quality in important aquaculture zone • Integrates subtle design motives from the whole County’s culture and history • All electricity required for operations shall be produced by solar panels on the roof of the toll both plaza Source: European Parliament, Directorate-General for Internal Policies: “Jurisdictional Waters in the Mediterranean and Black Seas” http://www.dur.ac.uk/resources/ibru/publications/full/bsb7-4_klemencic.pdf
  • 7.
  • 8. CONSTRUCTION PLAN • Individual pontoons are built on dry land next to a waterway • Then they are floated and towed like barges to the site • Pieced together like “legos” starting at the edge toward the center • Pontoons are held in place by enormous steel cables connected to heavy concrete anchors on the seabed • Once in place, then the roadway material and other items are added on to the pontoon surface • Pontoons are water-tight concrete that does not erode over time and require no maintenance • The weight of the water displaced by the pontoons is equal to the weight of the structure (including all traffic), which allows the bridge to float safely
  • 9.
  • 10. PROFESSIONAL COLLABORATION Four components of bridge: 1 1. Access roads and toll plazas 2. Approach bridges 3 2 4 3. Pontoon bridge 4. Large vessel gate (center) Success will require close 2 3 collaboration between Hrvatske Ceste, The Adriatic Group, Lotus Architecti, Marinetek and Investors. 1
  • 11.
  • 12. SOCIO-ECONOMIC DEVELOPMENT VALUE + 200 new jobs created during construction and 20 full-time for operations (average monthly net wage: €1.622) + Government VAT earnings from the bridge will be € 9 million in VAT in next 10 months from construction and nearly € 2 million per year from toll fees. + Added values from connecting Neretva and Pelješca regions + Significant decrease in costs: transportation, distribution, cost of living, etc + Cost decreases help Croatian tourism offer competitive in Mediterranean ± Negligible increase in real estate values for Peljesac, Dubrovnik or Korcula
  • 13.
  • 14. CONFIRMATION FROM MARINETEK OF ABILITY TO CONSTRUCT PONTOON BRIDGE
  • 15. MARINETEK CREDENTIALS Croatian Boat Registry ISO 9001 ISO 14001
  • 16. FOR MORE INFORMATION, PLEASE CONTACT: JAMES PRICE CHUCK E: JAMESPRICECHUCK@THEADRIATICGROUP.COM MAJA BRUČIĆ E: MAJA@LOTUSARCHITECTI.COM Film: http://www.youtube.com/watch?v=DNSkMIgFxMo Concept and images/design are the exclusive property of and Lotus Architecti. Reproduction or unauthorized use is not permitted and will be prosecuted to the fullest extent of the law.
  • 18. July 17, 2012 In this letter and the attached document, please find additional information and detail on our floating bridge proposal to fulfill Croatia’s requirement of territorial cohesion prior to EU accession in a manner that adheres to the vision, mission and goals of the Dubrovnik-Neretva Zupanija, Hrvatske Ceste and the Croatian Ministry of the Sea, Transport and Infrastructure. Floating bridges provide safe, cost-effective, environmentally-friendly and permanent solutions to transportation challenges on every continent (except Antarctica). Notable examples are in Norway (longest floating bridge in Europe) and the United States of America (longest floating bridge in the world). More than 115.000 vehicles of all types cross the American bridge each day, which represents a daily vehicle volume equal to the entire population of the Dubrovnik-Neretva County. Our proposed floating bridge would be the longest in Europe, but the journey across would last only 3 minutes. The bridge’s daily capacity of 42.000 vehicles is nearly 3x greater than the current peak seasonal traffic volume at the HR-BiH border in question, so no additional construction will be needed to handle large volume increases. The average toll for one vehicle and one person would be EUR 5,00 plus tax and there are no technical restrictions to weight, size or type of vehicle. All cargo and passenger vehicles may move freely across the bridge. The construction and operation of our bridge proposal would have no negative environmental impact because it is a closed system in which no waste reaches the water and no sea bed digging is needed. Our bridge can be constructed for EUR 36 million and completed by June 2013. Given correct operating concession terms, our proposal could be completely funded by private investors at no cost to Croatia. In contrast, the ferry boat solution’s capacity is 50% smaller, would require 6.7x more time per crossing per vehicle (not including waiting for a ferry), cost 2.5x more on average and put tons of pollutants into the fragile aquaculture environment of the malostonski canal. The EUR 36 million cost of implementing the ferry boat option (EUR 12 million in construction works and EUR 24 million for two large ferry boats) would be borne by the Croatian government directly or indirectly via state-owned Jadrolinija. Though construction of the ferry terminal and ferry boats (if built in Croatia) would provide the same PDV revenues, ongoing and annual PDV contribution from ferry operations would be 50% or less than that of our floating bridge due to the capacity constraints of the ferry boats. Bridge construction will create at least 100 new jobs until completion and provide €9 million in PDV over the next 10 months. Bridge operations will require at least 20 fulltime employees earning an average net wage of €1622 per month and will provide the Government with approximately €2 million annually in PDV generated from toll fares. We hope that the attached presentation document provides a clear overview of the technology, beauty and value of our floating bridge proposal. We hope that it is clear that our proposal meets and exceeds the requirements of Croatia’s EU accession and the goals of the Dubrovnik-Neretva County. We would welcome the opportunity to discuss our proposal with you in person at your convenience. We look forward to leading the implementation of this safe, cost-effective, environmentally-friendly and permanent solution in the Dubrovnik- Neretva County. Sincerely, Maja Bručić i James Price Chuck