Why Evaluate?
Excuses, Excuses, Excuses….
• I don’t have the time.
• I don’t have to…it’s not required.
• The district does it.
• Grades are my evaluation
• Follow-ups are a waste of time
• Others???
Evaluation Myth #8
“I don’t need to justify my existence, I
have a proven track record.”
- Phillips, 1991
Data (Where do I find it?)
Hard Data
– Output (in basic work units)
– Quality (quality of the output)
– Cost (operating, administrative, & capital
expenditures)
– Time (savings)
*** If these are not available ***
try to convert soft data
Data (Where do I find it?)
Soft Data
– Work Habits
– New Skills
– Work Climate
– Development/Advancement
– Feeling/Attitudes
– Initiative
Evaluation Myth #9
“The emphasis on evaluation should
be the same in all organizations.”
- Phillips, 1991
Evaluation Myth #11
“Evaluation would probably
cost too much.”
- Phillips, 1991
Retrospective Analysis
An Example from a law firm:
When does it work?
When:
• Learners don’t….
– Know what they don’t know
• There is insufficient time for pre-test.
• In other words: When you must have post-
knowledge to self-measure pre-knowledge
Why does it work?
• More accurate measure of actual learning
• Provide more differentiation in learning
• There is insufficient time for pre-testing.
In other words: When you must have post-
knowledge to self-measure pre-knowledge
Dr. Jeff M.
Allen
University of North
Texas
Department of Technology
and Cognition
P.O. Box 311337
Denton, Texas 76203-1337
Email: Jallen@unt.edu
Phone: (940)565-2093

Texasbusmark2005 retrospective

  • 1.
    Why Evaluate? Excuses, Excuses,Excuses…. • I don’t have the time. • I don’t have to…it’s not required. • The district does it. • Grades are my evaluation • Follow-ups are a waste of time • Others???
  • 2.
    Evaluation Myth #8 “Idon’t need to justify my existence, I have a proven track record.” - Phillips, 1991
  • 3.
    Data (Where doI find it?) Hard Data – Output (in basic work units) – Quality (quality of the output) – Cost (operating, administrative, & capital expenditures) – Time (savings) *** If these are not available *** try to convert soft data
  • 4.
    Data (Where doI find it?) Soft Data – Work Habits – New Skills – Work Climate – Development/Advancement – Feeling/Attitudes – Initiative
  • 5.
    Evaluation Myth #9 “Theemphasis on evaluation should be the same in all organizations.” - Phillips, 1991
  • 6.
    Evaluation Myth #11 “Evaluationwould probably cost too much.” - Phillips, 1991
  • 7.
  • 8.
    When does itwork? When: • Learners don’t…. – Know what they don’t know • There is insufficient time for pre-test. • In other words: When you must have post- knowledge to self-measure pre-knowledge
  • 9.
    Why does itwork? • More accurate measure of actual learning • Provide more differentiation in learning • There is insufficient time for pre-testing. In other words: When you must have post- knowledge to self-measure pre-knowledge
  • 10.
    Dr. Jeff M. Allen Universityof North Texas Department of Technology and Cognition P.O. Box 311337 Denton, Texas 76203-1337 Email: Jallen@unt.edu Phone: (940)565-2093