Technical
Bulletin 19-09
Setting basement floor elevation
above the groundwater table (SHWT)
in residential construction
WHY?
• Protect the homeowner
• Protect adjacent properties
Which Plan Types?
Single-family dwellings:
• Infill Lot Grading Plans,
• Conservation Plans (CON),
• Bonded Lot Grading Plans
(SDGP/SPGP)
• Rough Grading Plans (RGP)
Which Plan Types?
Townhouses:
• Site Plans (SP),
• Rough Grading Plans (RGP),
and
• Bonded Lot Grading Plans
(SPGP).
WHEN does it apply?
• When a Soils Report is already
required (Class III and IV
problem soils)
Determine Seasonal High Water Table (PFM)
•Direct Observation November through May, should not
use during June through October unless the value of the
Palmer Drought Severity Index is > 2.0 (i.e., wet).
•Soil morphology can be used throughout the year by a
certified / licensed professional
FREEBOARD
Case 1
Sump Crock
2.5 ft.
• No groundwater mitigation req’d
• Std. perimeter underdrains
connected to a sump
• Include foundation drain details
on civil plans
Freeboard > 2.5 feet
SHWT
2.5 ft.
Case 2
Sump Crock
FREEBOARD
Freeboard 1 to 2.5 ft.
• Raise basement to Case 1. If not
feasible but topo allows for gravity
outfall, install U/D system
connected to a structure in gravity
storm drain or gravity outfall.
• If still not feasible install dual sump
pump system with backup power
SHWT
• Try to raise the basement or lowest
FF to Freeboard > 2.5 ft.
• If still not feasible, use crawl-space
or no basement
Case 3
Sump Crock
2.5 ft.
Freeboard < 1 ft or
SHWT above basement /lowest FF
• If not feasible, raise
basement or lowest FF to
Case 2 (gravity outfall)
NEGATIVE
FREEBOARD
SHWT
Technical
Bulletin 19-09
QUESTIONS?

More Related Content

More from Fairfax County

More from Fairfax County (20)

Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationScotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
 
Sully Community Center Construction Progress
Sully Community Center Construction ProgressSully Community Center Construction Progress
Sully Community Center Construction Progress
 
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxRiverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
 
Burke VRE Connector Phase IV
Burke VRE Connector Phase IVBurke VRE Connector Phase IV
Burke VRE Connector Phase IV
 
Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022
 
Workhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxWorkhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick Offpptx
 
Workhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilWorkhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing Council
 
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
 
Reston Arts Community Center Feasibility - Wrap Up
 Reston Arts Community Center Feasibility - Wrap Up Reston Arts Community Center Feasibility - Wrap Up
Reston Arts Community Center Feasibility - Wrap Up
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
 
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
 
Oak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction Project
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
 
Reston Arts Center Feasibility - Focus Group Visual Arts
Reston Arts Center Feasibility -  Focus Group Visual ArtsReston Arts Center Feasibility -  Focus Group Visual Arts
Reston Arts Center Feasibility - Focus Group Visual Arts
 
Reston Arts Center Feasibility Focus Groups Visual, March 14, 2022
Reston Arts Center Feasibility Focus Groups Visual, March 14, 2022Reston Arts Center Feasibility Focus Groups Visual, March 14, 2022
Reston Arts Center Feasibility Focus Groups Visual, March 14, 2022
 
Reston Fire Station #25
Reston Fire Station #25Reston Fire Station #25
Reston Fire Station #25
 
Reston Arts Center Community Meeting 02-28-22
Reston Arts Center Community Meeting 02-28-22Reston Arts Center Community Meeting 02-28-22
Reston Arts Center Community Meeting 02-28-22
 
Lakevale Estates Collection Improvements Community Meeting
Lakevale Estates Collection Improvements Community MeetingLakevale Estates Collection Improvements Community Meeting
Lakevale Estates Collection Improvements Community Meeting
 
Little Pimmit Run at Chesterbrook Stream Restoration Project and Little Pimmi...
Little Pimmit Run at Chesterbrook Stream Restoration Project and Little Pimmi...Little Pimmit Run at Chesterbrook Stream Restoration Project and Little Pimmi...
Little Pimmit Run at Chesterbrook Stream Restoration Project and Little Pimmi...
 

Recently uploaded

Program Kickoff- Cohort 4______ (2).pptx
Program Kickoff- Cohort 4______ (2).pptxProgram Kickoff- Cohort 4______ (2).pptx
Program Kickoff- Cohort 4______ (2).pptx
ScottMeyers35
 
一比一原版(Westminster毕业证)威斯敏斯特大学毕业证成绩单
一比一原版(Westminster毕业证)威斯敏斯特大学毕业证成绩单一比一原版(Westminster毕业证)威斯敏斯特大学毕业证成绩单
一比一原版(Westminster毕业证)威斯敏斯特大学毕业证成绩单
ygymyy
 
Daftar Rumpun, Pohon, dan Cabang Ilmu (2024) - Daftar Rumpun, Pohon, dan Caba...
Daftar Rumpun, Pohon, dan Cabang Ilmu (2024) - Daftar Rumpun, Pohon, dan Caba...Daftar Rumpun, Pohon, dan Cabang Ilmu (2024) - Daftar Rumpun, Pohon, dan Caba...
Daftar Rumpun, Pohon, dan Cabang Ilmu (2024) - Daftar Rumpun, Pohon, dan Caba...
suryaaamsyah
 
Advancing Impact Measurement | Public Good App House
Advancing Impact Measurement | Public Good App HouseAdvancing Impact Measurement | Public Good App House
Advancing Impact Measurement | Public Good App House
TechSoup
 
researching client.pptxffffffffffffffffffffffffff
researching client.pptxffffffffffffffffffffffffffresearching client.pptxffffffffffffffffffffffffff
researching client.pptxffffffffffffffffffffffffff
lolsDocherty
 
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
enbam
 
Program Kickoff- Cohort......_4 (1).pptx
Program Kickoff- Cohort......_4 (1).pptxProgram Kickoff- Cohort......_4 (1).pptx
Program Kickoff- Cohort......_4 (1).pptx
ScottMeyers35
 
一比一原版(IC毕业证)帝国理工大学毕业证成绩单
一比一原版(IC毕业证)帝国理工大学毕业证成绩单一比一原版(IC毕业证)帝国理工大学毕业证成绩单
一比一原版(IC毕业证)帝国理工大学毕业证成绩单
exuyk
 
Low Atmospheric Pressure Stunning is not a humane alternative to Carbon Dioxi...
Low Atmospheric Pressure Stunning is not a humane alternative to Carbon Dioxi...Low Atmospheric Pressure Stunning is not a humane alternative to Carbon Dioxi...
Low Atmospheric Pressure Stunning is not a humane alternative to Carbon Dioxi...
Harm Kiezebrink
 
一比一原版(Monash毕业证)莫纳什大学毕业证成绩单
一比一原版(Monash毕业证)莫纳什大学毕业证成绩单一比一原版(Monash毕业证)莫纳什大学毕业证成绩单
一比一原版(Monash毕业证)莫纳什大学毕业证成绩单
enbam
 

Recently uploaded (20)

Program Kickoff- Cohort 4______ (2).pptx
Program Kickoff- Cohort 4______ (2).pptxProgram Kickoff- Cohort 4______ (2).pptx
Program Kickoff- Cohort 4______ (2).pptx
 
一比一原版(Westminster毕业证)威斯敏斯特大学毕业证成绩单
一比一原版(Westminster毕业证)威斯敏斯特大学毕业证成绩单一比一原版(Westminster毕业证)威斯敏斯特大学毕业证成绩单
一比一原版(Westminster毕业证)威斯敏斯特大学毕业证成绩单
 
Daftar Rumpun, Pohon, dan Cabang Ilmu (2024) - Daftar Rumpun, Pohon, dan Caba...
Daftar Rumpun, Pohon, dan Cabang Ilmu (2024) - Daftar Rumpun, Pohon, dan Caba...Daftar Rumpun, Pohon, dan Cabang Ilmu (2024) - Daftar Rumpun, Pohon, dan Caba...
Daftar Rumpun, Pohon, dan Cabang Ilmu (2024) - Daftar Rumpun, Pohon, dan Caba...
 
EDI Executive Education Master Class- 15thMay 2024 (updated) (2)
EDI Executive Education Master Class- 15thMay 2024 (updated) (2)EDI Executive Education Master Class- 15thMay 2024 (updated) (2)
EDI Executive Education Master Class- 15thMay 2024 (updated) (2)
 
bee engaged with youth - World Bee Day 2024
bee engaged with youth - World Bee Day 2024bee engaged with youth - World Bee Day 2024
bee engaged with youth - World Bee Day 2024
 
Advancing Impact Measurement | Public Good App House
Advancing Impact Measurement | Public Good App HouseAdvancing Impact Measurement | Public Good App House
Advancing Impact Measurement | Public Good App House
 
Effective governance in the modern charity
Effective governance in the modern charityEffective governance in the modern charity
Effective governance in the modern charity
 
researching client.pptxffffffffffffffffffffffffff
researching client.pptxffffffffffffffffffffffffffresearching client.pptxffffffffffffffffffffffffff
researching client.pptxffffffffffffffffffffffffff
 
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
 
Setting a new path to greater, shared prosperity
Setting a new path to greater, shared prosperitySetting a new path to greater, shared prosperity
Setting a new path to greater, shared prosperity
 
Inflation scarring: How has the cost-of-living crisis changed Britain?
Inflation scarring: How has the cost-of-living crisis changed Britain?Inflation scarring: How has the cost-of-living crisis changed Britain?
Inflation scarring: How has the cost-of-living crisis changed Britain?
 
Proposed Facility Types: Chesapeake Trails and Connectivity Plan
Proposed Facility Types: Chesapeake Trails and Connectivity PlanProposed Facility Types: Chesapeake Trails and Connectivity Plan
Proposed Facility Types: Chesapeake Trails and Connectivity Plan
 
Program Kickoff- Cohort......_4 (1).pptx
Program Kickoff- Cohort......_4 (1).pptxProgram Kickoff- Cohort......_4 (1).pptx
Program Kickoff- Cohort......_4 (1).pptx
 
一比一原版(IC毕业证)帝国理工大学毕业证成绩单
一比一原版(IC毕业证)帝国理工大学毕业证成绩单一比一原版(IC毕业证)帝国理工大学毕业证成绩单
一比一原版(IC毕业证)帝国理工大学毕业证成绩单
 
Low Atmospheric Pressure Stunning is not a humane alternative to Carbon Dioxi...
Low Atmospheric Pressure Stunning is not a humane alternative to Carbon Dioxi...Low Atmospheric Pressure Stunning is not a humane alternative to Carbon Dioxi...
Low Atmospheric Pressure Stunning is not a humane alternative to Carbon Dioxi...
 
Honeycomb for The Hive Design Inspirations
Honeycomb for The Hive Design InspirationsHoneycomb for The Hive Design Inspirations
Honeycomb for The Hive Design Inspirations
 
Near and Not Lost Yale Historical Review
Near and Not Lost Yale Historical ReviewNear and Not Lost Yale Historical Review
Near and Not Lost Yale Historical Review
 
Creating an Effective Veteran Policy in Ukraine
Creating an Effective Veteran Policy in UkraineCreating an Effective Veteran Policy in Ukraine
Creating an Effective Veteran Policy in Ukraine
 
一比一原版(Monash毕业证)莫纳什大学毕业证成绩单
一比一原版(Monash毕业证)莫纳什大学毕业证成绩单一比一原版(Monash毕业证)莫纳什大学毕业证成绩单
一比一原版(Monash毕业证)莫纳什大学毕业证成绩单
 
International Tea Day 2024; May 21st - United Nations.
International Tea Day 2024; May 21st - United Nations.International Tea Day 2024; May 21st - United Nations.
International Tea Day 2024; May 21st - United Nations.
 

Tech bulletin 19 09 presentation

  • 1. Technical Bulletin 19-09 Setting basement floor elevation above the groundwater table (SHWT) in residential construction
  • 2. WHY? • Protect the homeowner • Protect adjacent properties
  • 3. Which Plan Types? Single-family dwellings: • Infill Lot Grading Plans, • Conservation Plans (CON), • Bonded Lot Grading Plans (SDGP/SPGP) • Rough Grading Plans (RGP)
  • 4. Which Plan Types? Townhouses: • Site Plans (SP), • Rough Grading Plans (RGP), and • Bonded Lot Grading Plans (SPGP).
  • 5. WHEN does it apply? • When a Soils Report is already required (Class III and IV problem soils)
  • 6. Determine Seasonal High Water Table (PFM) •Direct Observation November through May, should not use during June through October unless the value of the Palmer Drought Severity Index is > 2.0 (i.e., wet). •Soil morphology can be used throughout the year by a certified / licensed professional
  • 7. FREEBOARD Case 1 Sump Crock 2.5 ft. • No groundwater mitigation req’d • Std. perimeter underdrains connected to a sump • Include foundation drain details on civil plans Freeboard > 2.5 feet SHWT
  • 8. 2.5 ft. Case 2 Sump Crock FREEBOARD Freeboard 1 to 2.5 ft. • Raise basement to Case 1. If not feasible but topo allows for gravity outfall, install U/D system connected to a structure in gravity storm drain or gravity outfall. • If still not feasible install dual sump pump system with backup power SHWT
  • 9. • Try to raise the basement or lowest FF to Freeboard > 2.5 ft. • If still not feasible, use crawl-space or no basement Case 3 Sump Crock 2.5 ft. Freeboard < 1 ft or SHWT above basement /lowest FF • If not feasible, raise basement or lowest FF to Case 2 (gravity outfall) NEGATIVE FREEBOARD SHWT