TCI INSPECTIONS LIST OF PIPE MILL PROJECTS
1. API 5L STEEL PIPES PRODUCTION,
COATING, LINING & SHIPPING INSPECTION
PROJECTS
Since 2007, when our Inspections Team started providing TPI Services for Pipe Mill
Projects (under the name of TCI Inspections Hellas Ltd), we have successfully completed
the following Projects:
2015-2016
WILLIAMS GULF TRACE & ASR PROJECTS
325 Km, HSSAW pipes 30”, 36” & 42” according to API 5L ID & OD
Coated.Production, FBE/ARO OD Coating, ID Coating & Loading Inspection.
PLACE: BORUSAN MANNESMANN / GEMLIK – TURKEY
DURATION: In Process
2. 2015-2016
DNV GL (SONATRACH ORAN PROJECT)
94 Km, HSSAW pipes (various diameters, OD & ID coated) according to ISO
3183.
PLACE: BORUSAN MANNESMANN / GEMLIK – TURKEY& ERCIYAS /
DUZCE – TURKEY
DURATION: 7 months
3. 2015-2016
WILLIAMS (DALTON EXPANSION PROJECT)
192 Km, ERW & HSSAW pipes 16”, 20”, 24” & 30” according to API 5L, FBE
ID & OD Coated. Production, FBE/ARO OD Coating, ID Coating & Loading
Inspection.
PLACE: CORINTH PIPEWORKS / THISVI - GREECE
DURATION: 8 months
4. 2015
INGL – SOUTH JORDAN CONNECTION PROJECT
26 Km, ERW / HFI, 12’’, X70M, API5L, PSL2.
PLACE: CORINTH PIPEWORKS / THISVI - GREECE
DURATION: 1 month
5. 2015
ENERGY TRANSFER LONESTAR PIPELINE PROJECT
490 Km, HSSAW, FBE / ARO Coating Mills, 30” OD, X70M, API 5L, PSL2.
Steel & Pipes production, FBE Coating & Loading Inspection.
PLACE:
Steel: THYSSENKRUPP STEEL EUROPE AG - GERMANY
Pipes: BORUSAN MANNESMANN/GEMLIK - TURKEY
DURATION: 8 months
6. 2014-2015
ENERGY TRANSFER "ROVER" & "DAPL" PIPELINE PROJECTS
550 Km, HSSAW, ERW, OD & ID Coated Pipes, Various Diameters, X70M &
X65M, API5L, PSL2.Production, FBE Coating, Lining & Loading Inspection.
PLACE: CORINTH PIPEWORKS / THISVI - GREECE
DURATION: 10 months
7. 2014
WILLIAMS PROJECT (Seamless Pipes ArcelorMittal Mill, Roman,
ROMANIA)
40 Km, Seamless Pipes, Diameter 14’’, Grade X42 & X52, API 5L. Production
inspection.
PLACE: ARCELORMITTAL SEAMLESS PIPES MILL / ROMAN - ROMANIA
DURATION: 4 months
8. 2013
WILLIAMS
34 Km, HFW, Diameter 24’’, Grade X65M, API 5L.Production inspection.
PLACE: SALZGITTER MANNESMAN LINE PIPE / HAMM MILL
- GERMANY
DURATION: 2 months
9. 2012-2013
INGL (ISRAEL NATURAL GAS LINES) PROJECT – IN COLLABORATION WITH
GLIS ITALIA
42 Km, SSAW pipes, Diameter 18’’ & 36”, API 5L. Production & Coating
Inspection.
PLACE: NOKSEL Celik Boru Sanayi / ISKENDERUN & HENDEK MILLS
- TURKEY
DURATION: 9 months
11. 2011-2012
CPW – GRT GAZ DE FRANCE PROJECT
Unloading Inspection of 38.5 Km SSAW API 5L Coated Pipes
PLACE: DUNKERQUE PORT - FRANCE
DURATION: 3 months
15. 2010-2011
CPW - BONATTI PROJECT (CPW)
Loading and Unloading Inspection of ERW/HFI, API 5L, externally coated pipes
at Thisvi Port (Greece) and Mostaganem Port (Algeria).
PLACE: THISVI PORT - GREECE & MOSTAGANEM PORT - ALGERIA
DURATION: 7 months
16. 2010
8’’ TRUCK LINES FOR JK FIELDS – J&P OVERSEAS – IN COLLABORATION
WITH GLIS ITALIA
22 Km, HFI, Diameter 8’’, Grade X42, API 5L.Production, Coating & Loading
Inspection.
PLACE: CORINTH PIPEWORKS / THISVI - GREECE
DURATION: 2 months
17. 2009
EL MERK PROJECT, OFFSITES FACILITY (LOTS 3 &4) , ABB SpA-P.A.
DIVISION – IN COLLABORATION WITH GLIS ITALIA
56 Km, HFI, Diameter 14’’, Grade X65M, API 5L. 54 Km, HFI, Diameter 18’’,
Grade X65M, API 5L.4.5 Km, HFI, Diameter 12¾" , Grade X42M, API 5L. 22
Km, HFI, Diameter 10¾", Grade X42M, API 5L. Production, Coating & Loading
Inspection.
PLACE: CORINTH PIPEWORKS / THISVI- GREECE
DURATION: 3 months
18. 2009
TIPS PROJECT (ENERGY TRANSFER)
240 Km, SSAW pipes 42”, Grade X70 according to API 5L, Externally &
Internally Coated. Production, Coating, Lining & Loading Inspection.
PLACE: CORINTH PIPEWORKS /THISVI - GREECE
DURATION: 5 months
19. 2009
CPW MENZEL PROJECT
Unloading Inspection of ERW/HFI, API 5L externally Coated Pipes at
Mostaganem Port.
PLACE: MOSTAGANEM PORT - ALGERIA
DURATION: 5 months
20. 2008-2009
36” ADDITIONAL PIPES PROJECT (ENERGY TRANSFER)
32 Km, SSAW pipe 36” Grade X70 according to API 5L, Externally
Coated. Production, Coating & Loading Inspection.
PLACE: CORINTH PIPEWORKS / THISVI - GREECE
DURATION: 2 months
21. 2008-2009
GAZ DE FRANCE (CPW)
Unloading Inspection of API 5L HFI Pipes.
PLACE: ROTTERDAM - HOLLAND
DURATION: 2 months
22. 2008-2009
SENTINEL PROJECT (WILLIAMS)
20 Km, SSAW pipe 42” Grade X70 PSL2 according to API 5L, Internally &
Externally Coated. Production, Coating, Lining & Loading Inspection.
PLACE: CORINTH PIPEWORKS / THISVI - GREECE
DURATION: 2 months
23. 2008
CS TO KATY PROJECT (ENERGY TRANSFER)
85 Km, SSAW pipe 36” Grade X70 according to API 5L, Externally FBE
Coated. Production, Coating & Loading Inspection.
PLACE: CORINTH PIPEWORKS / THISVI - GREECE
DURATION: 4 months
24. 2008
GRT GAS PROJECT (CPW)
Unloading Inspection of API 5L HFI Pipes.
PLACE: ROUEN - FRANCE
DURATION: 3 months
25. 2007-2008
TEXOMA TO CARTHAGE PROJECT (ENERGY TRANSFER)
90 Km, SSAW pipe 36” Grade X70 according to API 5L . 44 Km, SSAW pipe 42”
Grade X70 according to API 5L, externally FBE Coated.Production, Coating &
Loading Inspection.
PLACE: CORINTH PIPEWORKS (CPW) / THISVI - GREECE
DURATION: 6 months
26. 2007
CPW PROJECT FOR AZERBAIDJAN
12.75” ERW/HFI API 5L, X52 pipes, Unloading Inspection in Poti / Georgia and
Bakou / Azerbaidjan
PLACE: POTI - GEORGIA & BAKOU - AZERBAIDJAN
DURATION: 4 months
27. 2007
MAFUMERIA PROJECT (CPW)
23 Km, Single FBE - 3.5 Km, Dual FBE - 6.5 Km Concrete - 6.5 Km
Anode Installation on 12”pipes. Coating & Loading Inspection. Production,
Coating & Loading Inspection.
PLACE: SOCOTHERM / ADRIA - ITALY
DURATION: 3 months
28. 2007-2008
SOUTHEAST SUPPLY HEADER PROJECT (SPECTRA ENERGY) – IN
COLLABORATION WITH PPI
440 Km, SSAW pipe 36” and 42” Grade X70 and X80 according to API 5L,
Externally FBE Coated.
Production, Coating & Loading Inspection.
PLACE: CORINTH PIPEWORKS (CPW) / THISVI - GREECE
DURATION: 8 months
29. 2007
BG HASDRUBAL PROJECT (CORINTH PIPEWORKS- CPW)
Manufacture of 18” line pipes SAW grade L450 according to DNV OS-F101 and
NACE.Manufacturing Inspection
PLACE: EBK / KREUTZAL – GERMANY
DURATION: 4 months