API 5L STEEL PIPES PRODUCTION,
COATING, LINING & SHIPPING INSPECTION
PROJECTS
Since 2007, when our Inspections Team started providing TPI Services for Pipe Mill
Projects (under the name of TCI Inspections Hellas Ltd), we have successfully completed
the following Projects:
2015-2016
WILLIAMS GULF TRACE & ASR PROJECTS
325 Km, HSSAW pipes 30”, 36” & 42” according to API 5L ID & OD
Coated.Production, FBE/ARO OD Coating, ID Coating & Loading Inspection.
PLACE: BORUSAN MANNESMANN / GEMLIK – TURKEY
DURATION: In Process
2015-2016
DNV GL (SONATRACH ORAN PROJECT)
94 Km, HSSAW pipes (various diameters, OD & ID coated) according to ISO
3183.
PLACE: BORUSAN MANNESMANN / GEMLIK – TURKEY& ERCIYAS /
DUZCE – TURKEY
DURATION: 7 months
2015-2016
WILLIAMS (DALTON EXPANSION PROJECT)
192 Km, ERW & HSSAW pipes 16”, 20”, 24” & 30” according to API 5L, FBE
ID & OD Coated. Production, FBE/ARO OD Coating, ID Coating & Loading
Inspection.
PLACE: CORINTH PIPEWORKS / THISVI - GREECE
DURATION: 8 months
2015
INGL – SOUTH JORDAN CONNECTION PROJECT
26 Km, ERW / HFI, 12’’, X70M, API5L, PSL2.
PLACE: CORINTH PIPEWORKS / THISVI - GREECE
DURATION: 1 month
2015
ENERGY TRANSFER LONESTAR PIPELINE PROJECT
490 Km, HSSAW, FBE / ARO Coating Mills, 30” OD, X70M, API 5L, PSL2.
Steel & Pipes production, FBE Coating & Loading Inspection.
PLACE:
Steel: THYSSENKRUPP STEEL EUROPE AG - GERMANY
Pipes: BORUSAN MANNESMANN/GEMLIK - TURKEY
DURATION: 8 months
2014-2015
ENERGY TRANSFER "ROVER" & "DAPL" PIPELINE PROJECTS
550 Km, HSSAW, ERW, OD & ID Coated Pipes, Various Diameters, X70M &
X65M, API5L, PSL2.Production, FBE Coating, Lining & Loading Inspection.
PLACE: CORINTH PIPEWORKS / THISVI - GREECE
DURATION: 10 months
2014
WILLIAMS PROJECT (Seamless Pipes ArcelorMittal Mill, Roman,
ROMANIA)
40 Km, Seamless Pipes, Diameter 14’’, Grade X42 & X52, API 5L. Production
inspection.
PLACE: ARCELORMITTAL SEAMLESS PIPES MILL / ROMAN - ROMANIA
DURATION: 4 months
2013
WILLIAMS
34 Km, HFW, Diameter 24’’, Grade X65M, API 5L.Production inspection.
PLACE: SALZGITTER MANNESMAN LINE PIPE / HAMM MILL
- GERMANY
DURATION: 2 months
2012-2013
INGL (ISRAEL NATURAL GAS LINES) PROJECT – IN COLLABORATION WITH
GLIS ITALIA
42 Km, SSAW pipes, Diameter 18’’ & 36”, API 5L. Production & Coating
Inspection.
PLACE: NOKSEL Celik Boru Sanayi / ISKENDERUN & HENDEK MILLS
- TURKEY
DURATION: 9 months
2012
MRC / DCP (USA) – SOUTHERN HILLS PROJECT
245 Km, HFW pipes, Diameter 8.625’’, 12.75” & 16”, Grade X52M, API
5L. Production & Loading Inspection.
PLACE: SALZGITTER MANNESMAN LINE PIPE / SIEGEN & HAMM MILLS
- GERMANY
DURATION: 4 months
2011-2012
CPW – GRT GAZ DE FRANCE PROJECT
Unloading Inspection of 38.5 Km SSAW API 5L Coated Pipes
PLACE: DUNKERQUE PORT - FRANCE
DURATION: 3 months
2011-2012
MRC /DCP (USA) – SANDHILLS PROJECT
395 Km, HFW pipes, Diameter 20’’, Grade X60M, API 5L. Production & Loading
Inspection.
PLACE: CORINTH PIPEWORKS / THISVI - GREECE
DURATION: 5 months
2011
SPECTRA CANADA PROJECT
47 Km, SSAW pipe 36” Grade X70 according to API 5L. Production, Coating,
Lining & Loading Inspection.
PLACE: CORINTH PIPEWORKS / THISVI - GREECE
DURATION: 3 months
2010-2011
26’’ EXPANSION PROJECT-PO 537683 (WILLIAMS)
25 Km, HFW, Diameter 26’’, Grade X70M, API 5L. 500m, SSAW, Diameter 26’’,
Grade X70M, API 5L. Production, Coating, Lining & Loading Inspection.
PLACE: CORINTH PIPEWORKS / THISVI - GREECE
DURATION: 4 months
2010-2011
CPW - BONATTI PROJECT (CPW)
Loading and Unloading Inspection of ERW/HFI, API 5L, externally coated pipes
at Thisvi Port (Greece) and Mostaganem Port (Algeria).
PLACE: THISVI PORT - GREECE & MOSTAGANEM PORT - ALGERIA
DURATION: 7 months
2010
8’’ TRUCK LINES FOR JK FIELDS – J&P OVERSEAS – IN COLLABORATION
WITH GLIS ITALIA
22 Km, HFI, Diameter 8’’, Grade X42, API 5L.Production, Coating & Loading
Inspection.
PLACE: CORINTH PIPEWORKS / THISVI - GREECE
DURATION: 2 months
2009
EL MERK PROJECT, OFFSITES FACILITY (LOTS 3 &4) , ABB SpA-P.A.
DIVISION – IN COLLABORATION WITH GLIS ITALIA
56 Km, HFI, Diameter 14’’, Grade X65M, API 5L. 54 Km, HFI, Diameter 18’’,
Grade X65M, API 5L.4.5 Km, HFI, Diameter 12¾" , Grade X42M, API 5L. 22
Km, HFI, Diameter 10¾", Grade X42M, API 5L. Production, Coating & Loading
Inspection.
PLACE: CORINTH PIPEWORKS / THISVI- GREECE
DURATION: 3 months
2009
TIPS PROJECT (ENERGY TRANSFER)
240 Km, SSAW pipes 42”, Grade X70 according to API 5L, Externally &
Internally Coated. Production, Coating, Lining & Loading Inspection.
PLACE: CORINTH PIPEWORKS /THISVI - GREECE
DURATION: 5 months
2009
CPW MENZEL PROJECT
Unloading Inspection of ERW/HFI, API 5L externally Coated Pipes at
Mostaganem Port.
PLACE: MOSTAGANEM PORT - ALGERIA
DURATION: 5 months
2008-2009
36” ADDITIONAL PIPES PROJECT (ENERGY TRANSFER)
32 Km, SSAW pipe 36” Grade X70 according to API 5L, Externally
Coated. Production, Coating & Loading Inspection.
PLACE: CORINTH PIPEWORKS / THISVI - GREECE
DURATION: 2 months
2008-2009
GAZ DE FRANCE (CPW)
Unloading Inspection of API 5L HFI Pipes.
PLACE: ROTTERDAM - HOLLAND
DURATION: 2 months
2008-2009
SENTINEL PROJECT (WILLIAMS)
20 Km, SSAW pipe 42” Grade X70 PSL2 according to API 5L, Internally &
Externally Coated. Production, Coating, Lining & Loading Inspection.
PLACE: CORINTH PIPEWORKS / THISVI - GREECE
DURATION: 2 months
2008
CS TO KATY PROJECT (ENERGY TRANSFER)
85 Km, SSAW pipe 36” Grade X70 according to API 5L, Externally FBE
Coated. Production, Coating & Loading Inspection.
PLACE: CORINTH PIPEWORKS / THISVI - GREECE
DURATION: 4 months
2008
GRT GAS PROJECT (CPW)
Unloading Inspection of API 5L HFI Pipes.
PLACE: ROUEN - FRANCE
DURATION: 3 months
2007-2008
TEXOMA TO CARTHAGE PROJECT (ENERGY TRANSFER)
90 Km, SSAW pipe 36” Grade X70 according to API 5L . 44 Km, SSAW pipe 42”
Grade X70 according to API 5L, externally FBE Coated.Production, Coating &
Loading Inspection.
PLACE: CORINTH PIPEWORKS (CPW) / THISVI - GREECE
DURATION: 6 months
2007
CPW PROJECT FOR AZERBAIDJAN
12.75” ERW/HFI API 5L, X52 pipes, Unloading Inspection in Poti / Georgia and
Bakou / Azerbaidjan
PLACE: POTI - GEORGIA & BAKOU - AZERBAIDJAN
DURATION: 4 months
2007
MAFUMERIA PROJECT (CPW)
23 Km, Single FBE - 3.5 Km, Dual FBE - 6.5 Km Concrete - 6.5 Km
Anode Installation on 12”pipes. Coating & Loading Inspection. Production,
Coating & Loading Inspection.
PLACE: SOCOTHERM / ADRIA - ITALY
DURATION: 3 months
2007-2008
SOUTHEAST SUPPLY HEADER PROJECT (SPECTRA ENERGY) – IN
COLLABORATION WITH PPI
440 Km, SSAW pipe 36” and 42” Grade X70 and X80 according to API 5L,
Externally FBE Coated.
Production, Coating & Loading Inspection.
PLACE: CORINTH PIPEWORKS (CPW) / THISVI - GREECE
DURATION: 8 months
2007
BG HASDRUBAL PROJECT (CORINTH PIPEWORKS- CPW)
Manufacture of 18” line pipes SAW grade L450 according to DNV OS-F101 and
NACE.Manufacturing Inspection
PLACE: EBK / KREUTZAL – GERMANY
DURATION: 4 months

More Related Content

What's hot (14)

OKHANI TED MOST RECENT
OKHANI TED MOST RECENTOKHANI TED MOST RECENT
OKHANI TED MOST RECENT
 
DOGANGUNES - Presentation - 2015
DOGANGUNES - Presentation - 2015DOGANGUNES - Presentation - 2015
DOGANGUNES - Presentation - 2015
 
CV-2
CV-2CV-2
CV-2
 
RAJESH RAMU CV
RAJESH RAMU CVRAJESH RAMU CV
RAJESH RAMU CV
 
Cv Update_resume
Cv Update_resumeCv Update_resume
Cv Update_resume
 
Mr. maherc.v Q.C_2
Mr. maherc.v Q.C_2Mr. maherc.v Q.C_2
Mr. maherc.v Q.C_2
 
Civil Consultant Resume
Civil Consultant ResumeCivil Consultant Resume
Civil Consultant Resume
 
Resume for Sr.Land Surveyor
Resume for Sr.Land SurveyorResume for Sr.Land Surveyor
Resume for Sr.Land Surveyor
 
azhar ali cv
azhar ali cvazhar ali cv
azhar ali cv
 
HAmmad Resume
HAmmad ResumeHAmmad Resume
HAmmad Resume
 
Raafat C.V October.14
Raafat C.V October.14Raafat C.V October.14
Raafat C.V October.14
 
SSD Newsletter 2016
SSD Newsletter 2016SSD Newsletter 2016
SSD Newsletter 2016
 
LOTAN_KHAJA_HUSSAIN
LOTAN_KHAJA_HUSSAINLOTAN_KHAJA_HUSSAIN
LOTAN_KHAJA_HUSSAIN
 
CV-_SDhiman_27-04-2016
CV-_SDhiman_27-04-2016CV-_SDhiman_27-04-2016
CV-_SDhiman_27-04-2016
 

Similar to TCI INSPECTIONS LIST OF PIPE MILL PROJECTS

Eyad alkurdi Cv 2
Eyad alkurdi Cv  2Eyad alkurdi Cv  2
Eyad alkurdi Cv 2
???? ??????
 
curiculum vitae azlan (latest)
curiculum vitae azlan (latest)curiculum vitae azlan (latest)
curiculum vitae azlan (latest)
Azlan Shah
 
Resume - Sr.QC Inspector-Mech.welding-painting-piping-pipeline
Resume -   Sr.QC Inspector-Mech.welding-painting-piping-pipelineResume -   Sr.QC Inspector-Mech.welding-painting-piping-pipeline
Resume - Sr.QC Inspector-Mech.welding-painting-piping-pipeline
UDAYAKUMAR P C PANICKER
 
CV_Rolando M. Garcia_Feb 2016
CV_Rolando M. Garcia_Feb 2016CV_Rolando M. Garcia_Feb 2016
CV_Rolando M. Garcia_Feb 2016
Rolando Garcia
 
A. zouaghi drilling fluids & waste management engineer cv
A. zouaghi drilling fluids & waste management engineer cvA. zouaghi drilling fluids & waste management engineer cv
A. zouaghi drilling fluids & waste management engineer cv
Abderrazak Zouaghi
 
(QA_QC Welding,piping engineer
(QA_QC  Welding,piping engineer(QA_QC  Welding,piping engineer
(QA_QC Welding,piping engineer
Ahmed Hamdy
 
Arafat Syed Rashid Latest Updated 20.04.2015
Arafat Syed Rashid  Latest Updated 20.04.2015Arafat Syed Rashid  Latest Updated 20.04.2015
Arafat Syed Rashid Latest Updated 20.04.2015
rashid Arafat
 
CV-English_Bartilotti-16-12-2014
CV-English_Bartilotti-16-12-2014CV-English_Bartilotti-16-12-2014
CV-English_Bartilotti-16-12-2014
Manuel Bartilotti
 

Similar to TCI INSPECTIONS LIST OF PIPE MILL PROJECTS (20)

ALPESH_CV
ALPESH_CVALPESH_CV
ALPESH_CV
 
Antony_Joy_CV.DOC
Antony_Joy_CV.DOCAntony_Joy_CV.DOC
Antony_Joy_CV.DOC
 
Eagle LNG Terminal and Pipeline - Efficient solutions for the Balkans
Eagle LNG Terminal and Pipeline - Efficient solutions for the BalkansEagle LNG Terminal and Pipeline - Efficient solutions for the Balkans
Eagle LNG Terminal and Pipeline - Efficient solutions for the Balkans
 
03_WP-CPL_0704_LR
03_WP-CPL_0704_LR03_WP-CPL_0704_LR
03_WP-CPL_0704_LR
 
navjay
navjaynavjay
navjay
 
Eyad alkurdi Cv 2
Eyad alkurdi Cv  2Eyad alkurdi Cv  2
Eyad alkurdi Cv 2
 
Santhosh-CV
Santhosh-CVSanthosh-CV
Santhosh-CV
 
SELVAM DOSS QAQC CV
SELVAM DOSS QAQC CVSELVAM DOSS QAQC CV
SELVAM DOSS QAQC CV
 
curiculum vitae azlan (latest)
curiculum vitae azlan (latest)curiculum vitae azlan (latest)
curiculum vitae azlan (latest)
 
Resume - Sr.QC Inspector-Mech.welding-painting-piping-pipeline
Resume -   Sr.QC Inspector-Mech.welding-painting-piping-pipelineResume -   Sr.QC Inspector-Mech.welding-painting-piping-pipeline
Resume - Sr.QC Inspector-Mech.welding-painting-piping-pipeline
 
Jeff Cartwright CV May 2016
Jeff Cartwright CV May 2016Jeff Cartwright CV May 2016
Jeff Cartwright CV May 2016
 
Amal modular yard rev03 20150921 -pdf
Amal modular yard rev03 20150921 -pdfAmal modular yard rev03 20150921 -pdf
Amal modular yard rev03 20150921 -pdf
 
CV NEW March2016
CV NEW March2016CV NEW March2016
CV NEW March2016
 
CV_Rolando M. Garcia_Feb 2016
CV_Rolando M. Garcia_Feb 2016CV_Rolando M. Garcia_Feb 2016
CV_Rolando M. Garcia_Feb 2016
 
Rengaraj nagappan cv aug 15done
Rengaraj nagappan cv aug 15doneRengaraj nagappan cv aug 15done
Rengaraj nagappan cv aug 15done
 
A. zouaghi drilling fluids & waste management engineer cv
A. zouaghi drilling fluids & waste management engineer cvA. zouaghi drilling fluids & waste management engineer cv
A. zouaghi drilling fluids & waste management engineer cv
 
(QA_QC Welding,piping engineer
(QA_QC  Welding,piping engineer(QA_QC  Welding,piping engineer
(QA_QC Welding,piping engineer
 
Arafat Syed Rashid Latest Updated 20.04.2015
Arafat Syed Rashid  Latest Updated 20.04.2015Arafat Syed Rashid  Latest Updated 20.04.2015
Arafat Syed Rashid Latest Updated 20.04.2015
 
CV-English_Bartilotti-16-12-2014
CV-English_Bartilotti-16-12-2014CV-English_Bartilotti-16-12-2014
CV-English_Bartilotti-16-12-2014
 
SPE 165151 The Long-Term Production Performance of Deep HPHT Gas Condensate ...
SPE 165151  The Long-Term Production Performance of Deep HPHT Gas Condensate ...SPE 165151  The Long-Term Production Performance of Deep HPHT Gas Condensate ...
SPE 165151 The Long-Term Production Performance of Deep HPHT Gas Condensate ...
 

TCI INSPECTIONS LIST OF PIPE MILL PROJECTS

  • 1. API 5L STEEL PIPES PRODUCTION, COATING, LINING & SHIPPING INSPECTION PROJECTS Since 2007, when our Inspections Team started providing TPI Services for Pipe Mill Projects (under the name of TCI Inspections Hellas Ltd), we have successfully completed the following Projects: 2015-2016 WILLIAMS GULF TRACE & ASR PROJECTS 325 Km, HSSAW pipes 30”, 36” & 42” according to API 5L ID & OD Coated.Production, FBE/ARO OD Coating, ID Coating & Loading Inspection. PLACE: BORUSAN MANNESMANN / GEMLIK – TURKEY DURATION: In Process
  • 2. 2015-2016 DNV GL (SONATRACH ORAN PROJECT) 94 Km, HSSAW pipes (various diameters, OD & ID coated) according to ISO 3183. PLACE: BORUSAN MANNESMANN / GEMLIK – TURKEY& ERCIYAS / DUZCE – TURKEY DURATION: 7 months
  • 3. 2015-2016 WILLIAMS (DALTON EXPANSION PROJECT) 192 Km, ERW & HSSAW pipes 16”, 20”, 24” & 30” according to API 5L, FBE ID & OD Coated. Production, FBE/ARO OD Coating, ID Coating & Loading Inspection. PLACE: CORINTH PIPEWORKS / THISVI - GREECE DURATION: 8 months
  • 4. 2015 INGL – SOUTH JORDAN CONNECTION PROJECT 26 Km, ERW / HFI, 12’’, X70M, API5L, PSL2. PLACE: CORINTH PIPEWORKS / THISVI - GREECE DURATION: 1 month
  • 5. 2015 ENERGY TRANSFER LONESTAR PIPELINE PROJECT 490 Km, HSSAW, FBE / ARO Coating Mills, 30” OD, X70M, API 5L, PSL2. Steel & Pipes production, FBE Coating & Loading Inspection. PLACE: Steel: THYSSENKRUPP STEEL EUROPE AG - GERMANY Pipes: BORUSAN MANNESMANN/GEMLIK - TURKEY DURATION: 8 months
  • 6. 2014-2015 ENERGY TRANSFER "ROVER" & "DAPL" PIPELINE PROJECTS 550 Km, HSSAW, ERW, OD & ID Coated Pipes, Various Diameters, X70M & X65M, API5L, PSL2.Production, FBE Coating, Lining & Loading Inspection. PLACE: CORINTH PIPEWORKS / THISVI - GREECE DURATION: 10 months
  • 7. 2014 WILLIAMS PROJECT (Seamless Pipes ArcelorMittal Mill, Roman, ROMANIA) 40 Km, Seamless Pipes, Diameter 14’’, Grade X42 & X52, API 5L. Production inspection. PLACE: ARCELORMITTAL SEAMLESS PIPES MILL / ROMAN - ROMANIA DURATION: 4 months
  • 8. 2013 WILLIAMS 34 Km, HFW, Diameter 24’’, Grade X65M, API 5L.Production inspection. PLACE: SALZGITTER MANNESMAN LINE PIPE / HAMM MILL - GERMANY DURATION: 2 months
  • 9. 2012-2013 INGL (ISRAEL NATURAL GAS LINES) PROJECT – IN COLLABORATION WITH GLIS ITALIA 42 Km, SSAW pipes, Diameter 18’’ & 36”, API 5L. Production & Coating Inspection. PLACE: NOKSEL Celik Boru Sanayi / ISKENDERUN & HENDEK MILLS - TURKEY DURATION: 9 months
  • 10. 2012 MRC / DCP (USA) – SOUTHERN HILLS PROJECT 245 Km, HFW pipes, Diameter 8.625’’, 12.75” & 16”, Grade X52M, API 5L. Production & Loading Inspection. PLACE: SALZGITTER MANNESMAN LINE PIPE / SIEGEN & HAMM MILLS - GERMANY DURATION: 4 months
  • 11. 2011-2012 CPW – GRT GAZ DE FRANCE PROJECT Unloading Inspection of 38.5 Km SSAW API 5L Coated Pipes PLACE: DUNKERQUE PORT - FRANCE DURATION: 3 months
  • 12. 2011-2012 MRC /DCP (USA) – SANDHILLS PROJECT 395 Km, HFW pipes, Diameter 20’’, Grade X60M, API 5L. Production & Loading Inspection. PLACE: CORINTH PIPEWORKS / THISVI - GREECE DURATION: 5 months
  • 13. 2011 SPECTRA CANADA PROJECT 47 Km, SSAW pipe 36” Grade X70 according to API 5L. Production, Coating, Lining & Loading Inspection. PLACE: CORINTH PIPEWORKS / THISVI - GREECE DURATION: 3 months
  • 14. 2010-2011 26’’ EXPANSION PROJECT-PO 537683 (WILLIAMS) 25 Km, HFW, Diameter 26’’, Grade X70M, API 5L. 500m, SSAW, Diameter 26’’, Grade X70M, API 5L. Production, Coating, Lining & Loading Inspection. PLACE: CORINTH PIPEWORKS / THISVI - GREECE DURATION: 4 months
  • 15. 2010-2011 CPW - BONATTI PROJECT (CPW) Loading and Unloading Inspection of ERW/HFI, API 5L, externally coated pipes at Thisvi Port (Greece) and Mostaganem Port (Algeria). PLACE: THISVI PORT - GREECE & MOSTAGANEM PORT - ALGERIA DURATION: 7 months
  • 16. 2010 8’’ TRUCK LINES FOR JK FIELDS – J&P OVERSEAS – IN COLLABORATION WITH GLIS ITALIA 22 Km, HFI, Diameter 8’’, Grade X42, API 5L.Production, Coating & Loading Inspection. PLACE: CORINTH PIPEWORKS / THISVI - GREECE DURATION: 2 months
  • 17. 2009 EL MERK PROJECT, OFFSITES FACILITY (LOTS 3 &4) , ABB SpA-P.A. DIVISION – IN COLLABORATION WITH GLIS ITALIA 56 Km, HFI, Diameter 14’’, Grade X65M, API 5L. 54 Km, HFI, Diameter 18’’, Grade X65M, API 5L.4.5 Km, HFI, Diameter 12¾" , Grade X42M, API 5L. 22 Km, HFI, Diameter 10¾", Grade X42M, API 5L. Production, Coating & Loading Inspection. PLACE: CORINTH PIPEWORKS / THISVI- GREECE DURATION: 3 months
  • 18. 2009 TIPS PROJECT (ENERGY TRANSFER) 240 Km, SSAW pipes 42”, Grade X70 according to API 5L, Externally & Internally Coated. Production, Coating, Lining & Loading Inspection. PLACE: CORINTH PIPEWORKS /THISVI - GREECE DURATION: 5 months
  • 19. 2009 CPW MENZEL PROJECT Unloading Inspection of ERW/HFI, API 5L externally Coated Pipes at Mostaganem Port. PLACE: MOSTAGANEM PORT - ALGERIA DURATION: 5 months
  • 20. 2008-2009 36” ADDITIONAL PIPES PROJECT (ENERGY TRANSFER) 32 Km, SSAW pipe 36” Grade X70 according to API 5L, Externally Coated. Production, Coating & Loading Inspection. PLACE: CORINTH PIPEWORKS / THISVI - GREECE DURATION: 2 months
  • 21. 2008-2009 GAZ DE FRANCE (CPW) Unloading Inspection of API 5L HFI Pipes. PLACE: ROTTERDAM - HOLLAND DURATION: 2 months
  • 22. 2008-2009 SENTINEL PROJECT (WILLIAMS) 20 Km, SSAW pipe 42” Grade X70 PSL2 according to API 5L, Internally & Externally Coated. Production, Coating, Lining & Loading Inspection. PLACE: CORINTH PIPEWORKS / THISVI - GREECE DURATION: 2 months
  • 23. 2008 CS TO KATY PROJECT (ENERGY TRANSFER) 85 Km, SSAW pipe 36” Grade X70 according to API 5L, Externally FBE Coated. Production, Coating & Loading Inspection. PLACE: CORINTH PIPEWORKS / THISVI - GREECE DURATION: 4 months
  • 24. 2008 GRT GAS PROJECT (CPW) Unloading Inspection of API 5L HFI Pipes. PLACE: ROUEN - FRANCE DURATION: 3 months
  • 25. 2007-2008 TEXOMA TO CARTHAGE PROJECT (ENERGY TRANSFER) 90 Km, SSAW pipe 36” Grade X70 according to API 5L . 44 Km, SSAW pipe 42” Grade X70 according to API 5L, externally FBE Coated.Production, Coating & Loading Inspection. PLACE: CORINTH PIPEWORKS (CPW) / THISVI - GREECE DURATION: 6 months
  • 26. 2007 CPW PROJECT FOR AZERBAIDJAN 12.75” ERW/HFI API 5L, X52 pipes, Unloading Inspection in Poti / Georgia and Bakou / Azerbaidjan PLACE: POTI - GEORGIA & BAKOU - AZERBAIDJAN DURATION: 4 months
  • 27. 2007 MAFUMERIA PROJECT (CPW) 23 Km, Single FBE - 3.5 Km, Dual FBE - 6.5 Km Concrete - 6.5 Km Anode Installation on 12”pipes. Coating & Loading Inspection. Production, Coating & Loading Inspection. PLACE: SOCOTHERM / ADRIA - ITALY DURATION: 3 months
  • 28. 2007-2008 SOUTHEAST SUPPLY HEADER PROJECT (SPECTRA ENERGY) – IN COLLABORATION WITH PPI 440 Km, SSAW pipe 36” and 42” Grade X70 and X80 according to API 5L, Externally FBE Coated. Production, Coating & Loading Inspection. PLACE: CORINTH PIPEWORKS (CPW) / THISVI - GREECE DURATION: 8 months
  • 29. 2007 BG HASDRUBAL PROJECT (CORINTH PIPEWORKS- CPW) Manufacture of 18” line pipes SAW grade L450 according to DNV OS-F101 and NACE.Manufacturing Inspection PLACE: EBK / KREUTZAL – GERMANY DURATION: 4 months