The document describes several job postings for industrial engineer and mechanical engineer positions.
1) The first posting is for an Industrial Engineer position at Vista Point Technologies, a camera module manufacturer, located in Bukit Raja, Selangor. Responsibilities include layout and optimization, process improvement activities, and cycle time analysis. Requirements include a bachelor's degree in engineering and 3+ years of relevant experience.
2) The second posting is for a Senior Industrial Engineer position at Flextronics in Perai, Penang. Responsibilities include line layout, process optimization, and productivity improvement projects. Requirements include a bachelor's degree in industrial or mechanical engineering and 4-6 years of experience.
3