SlideShare a Scribd company logo
Unit 4 Pre-Production Portfolio Learning AimD
Project Management Task
What Went Well
Logistics Finance Creative Processes
Managing People
Managingpeople while doingthe
production was done by the use of call
sheets which meant that everyone
already knew where they had to be and
the time they had to be there for.
Because I had good management of people,
the production was ableto go smoothly and
meant that I didn’t need people any longer
than the set time.
I made sure that I managed the people as
effectively as possible.I did this by makingcall
sheets which showed content such as dates,
times and locations.
Management of
Resources (both human
and
physical)
I managed all theresources by usinga
day rate so I could be sureof the total
cost. In doing this,I would be ableto see
how longand how much equipment
would cost.
By me usingcall sheets and booking sheets I
decreased the amount of time I needed with
both the actors as well as the equipment
because itwas already completed before the
filmingwas started. This meant I didn’t need
to pay for any extra things such as actors.
Call sheets and booking forms were signed for
the use of equipment. This is how I managed
resources duringpre-production.
Managing Time
I managed my time by making sureeach
shot was already planned out ahead of
time. Also making surethe shot was
accurateto the storyboard scene.
Because I planned time efficiently,I reduced
the time I needed for actors and equipment,
meaning I didn’t have to pay as much, saving
more money.
I made production schedules to prepare and
plan every day of the filming.I also included the
times it would take to set up equipment. I had
also used the scripts and storyboardsI madeto
plan out the times it would take to filmevery
scene.
Being Professional
I planned the scheduleand was positive
that all equipment was ready to start
filming.I also madesure that all of the
required documents where correctly
filled in,which includes,call sheets,
booking forms and risk assessments.
I shaved off a lot of time by planningand
makingsure that all documents were
correctly filled out, meaning that I saved
money and didn’t need any extra time.
I made sure that all the documents such as call
sheets and bookingforms were all filled out
right. I also made surethat both the crew and
the castwere availableduringthe times I
needed them.
Ensuring Progress is
Sustained
Progress was always beingmade during
this time becauseI had made a schedule
of when tasks had to be completed.
Such as filmingand getting equipment
set up in the rightpositions.I had kept
note of what was done on every day.
I used a scheduleto ensure that the day was
planned out ahead of time.
Unit 4 Pre-Production Portfolio Learning AimD
Managing Risk
Managing Crisis
I was ableto manage crisis’by makinga
good plan of the production which
meant that
I managed to lessen the budget by usingcall
sheets and budget plans efficiently.This
made production finish quicker.
I made risk assessments to try and lower the
probability of any injuries or damages.
Keeping Documentation
up-to-date and relevant
I kept the documents up to date. I did
this by keeping track of all things
production related such as all of the
shots.
The budget was not affected by this as I was
not required to use more time to do stuff
such as fillingoutforms.
The plan of production was used to note all
progress made of the production.
Aspect
What Could be Improved
Logistics Finance Creative Processes
Summary of any problems
with project management
Project management was affected by a
few things such as the time it took to set
up the equipment, lightingin certain
places and some actors were slightly
delayed by other things.
Financewas not affected, as the overall
production was short.
This could be improved by addingmore detail
to the storyboards as well as thescript
Ways you could be better
in future productions
I would improve by givingequipment set
up more time whilesacrificingtimeon
other things such as props.I would also
try and have lightingsetup more quickly
as this is a factor that increased the
overall time of production.
The financewould not need much
improvement as itdidn’t exceed the expected
amount. However, money could be saved by
hiringequipment for less days if it isn't
needed.
I would add more detail to the storyboards by
addingarrows to show the direction the
camera would pan and also arrows to show
which way the actor will move in the shot.
I made a risk assessmentinan
attemptto lowerthe chance of
injuriesonset.
To loweranychance of the budget
beingincreaseddue todamages,a
riskassessmentwascreatedtomake
people more aware
I made a risk assessmentinorderto
reduce the chance of anyone getting
hurt duringproduction.

More Related Content

Similar to table

Stan media unit 4 learning aim d
Stan media unit 4 learning aim dStan media unit 4 learning aim d
Stan media unit 4 learning aim d
StanDaurrelMassoumou
 
Learning aim-d-evaluation-grid-v2 (1)
Learning aim-d-evaluation-grid-v2 (1)Learning aim-d-evaluation-grid-v2 (1)
Learning aim-d-evaluation-grid-v2 (1)
jessicabasra123
 
Grid
GridGrid
Grid
ramboFTR
 
Learning Aim D grid!
Learning Aim D grid!Learning Aim D grid!
Learning Aim D grid!
EmilFTR
 
Project Management
Project Management Project Management
Project Management
lashaemunroe
 
Evaluation of pre production
Evaluation of pre productionEvaluation of pre production
Evaluation of pre production
lauren whyt
 
Learning aim-d-evaluation-grid-v2
Learning aim-d-evaluation-grid-v2Learning aim-d-evaluation-grid-v2
Learning aim-d-evaluation-grid-v2
DeJarnaG
 
Learning aim D
Learning aim DLearning aim D
Learning aim D
thomascrowson01
 
Evaluation Grid
Evaluation Grid Evaluation Grid
Evaluation Grid
GabijaJanickaite
 
Learning aim-d-evaluation-grid-v2
Learning aim-d-evaluation-grid-v2Learning aim-d-evaluation-grid-v2
Learning aim-d-evaluation-grid-v2
bethhill24
 
Luke la d evaluation
Luke la d evaluationLuke la d evaluation
Luke la d evaluation
Heath Park, Wolverhampton
 
Research gathered for evaluation
Research gathered for evaluationResearch gathered for evaluation
Research gathered for evaluation
Heath Park, Wolverhampton
 
Learning aim-d-evaluation-grid
Learning aim-d-evaluation-gridLearning aim-d-evaluation-grid
Learning aim-d-evaluation-grid
EmilFTR
 
Evaluation
EvaluationEvaluation
Evaluation
EmilFTR
 
Pp eval
Pp evalPp eval
Evaluation
EvaluationEvaluation
Evaluation
EmilFTR
 
Evaluate the documentation
Evaluate the documentationEvaluate the documentation
Evaluate the documentation
libertytheg
 
Be able to prepare pre
Be able to prepare preBe able to prepare pre
Be able to prepare prewastedkingy474
 
Distinction Task
Distinction Task Distinction Task
Distinction Task
damanpritsingh
 
Evaluation factual
Evaluation factualEvaluation factual
Evaluation factual
LaurenceArcher1
 

Similar to table (20)

Stan media unit 4 learning aim d
Stan media unit 4 learning aim dStan media unit 4 learning aim d
Stan media unit 4 learning aim d
 
Learning aim-d-evaluation-grid-v2 (1)
Learning aim-d-evaluation-grid-v2 (1)Learning aim-d-evaluation-grid-v2 (1)
Learning aim-d-evaluation-grid-v2 (1)
 
Grid
GridGrid
Grid
 
Learning Aim D grid!
Learning Aim D grid!Learning Aim D grid!
Learning Aim D grid!
 
Project Management
Project Management Project Management
Project Management
 
Evaluation of pre production
Evaluation of pre productionEvaluation of pre production
Evaluation of pre production
 
Learning aim-d-evaluation-grid-v2
Learning aim-d-evaluation-grid-v2Learning aim-d-evaluation-grid-v2
Learning aim-d-evaluation-grid-v2
 
Learning aim D
Learning aim DLearning aim D
Learning aim D
 
Evaluation Grid
Evaluation Grid Evaluation Grid
Evaluation Grid
 
Learning aim-d-evaluation-grid-v2
Learning aim-d-evaluation-grid-v2Learning aim-d-evaluation-grid-v2
Learning aim-d-evaluation-grid-v2
 
Luke la d evaluation
Luke la d evaluationLuke la d evaluation
Luke la d evaluation
 
Research gathered for evaluation
Research gathered for evaluationResearch gathered for evaluation
Research gathered for evaluation
 
Learning aim-d-evaluation-grid
Learning aim-d-evaluation-gridLearning aim-d-evaluation-grid
Learning aim-d-evaluation-grid
 
Evaluation
EvaluationEvaluation
Evaluation
 
Pp eval
Pp evalPp eval
Pp eval
 
Evaluation
EvaluationEvaluation
Evaluation
 
Evaluate the documentation
Evaluate the documentationEvaluate the documentation
Evaluate the documentation
 
Be able to prepare pre
Be able to prepare preBe able to prepare pre
Be able to prepare pre
 
Distinction Task
Distinction Task Distinction Task
Distinction Task
 
Evaluation factual
Evaluation factualEvaluation factual
Evaluation factual
 

More from ChristianRathbone

More from ChristianRathbone (6)

Production schedule
Production scheduleProduction schedule
Production schedule
 
Production schedule
Production scheduleProduction schedule
Production schedule
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Filming schedule
Filming scheduleFilming schedule
Filming schedule
 
Call sheets
Call sheetsCall sheets
Call sheets
 
Budget
BudgetBudget
Budget
 

Recently uploaded

Wondering if Your Mercedes EIS is at Fault Here’s How to Tell
Wondering if Your Mercedes EIS is at Fault Here’s How to TellWondering if Your Mercedes EIS is at Fault Here’s How to Tell
Wondering if Your Mercedes EIS is at Fault Here’s How to Tell
Vic Auto Collision & Repair
 
Ec460b lc Excavator Volvo Service Repair.pdf
Ec460b lc Excavator Volvo Service Repair.pdfEc460b lc Excavator Volvo Service Repair.pdf
Ec460b lc Excavator Volvo Service Repair.pdf
Excavator
 
Ec330B Lc Excavator Volvo Service Repair.pdf
Ec330B Lc Excavator Volvo Service Repair.pdfEc330B Lc Excavator Volvo Service Repair.pdf
Ec330B Lc Excavator Volvo Service Repair.pdf
Excavator
 
What Causes 'Trans Failsafe Prog' to Trigger in BMW X5
What Causes 'Trans Failsafe Prog' to Trigger in BMW X5What Causes 'Trans Failsafe Prog' to Trigger in BMW X5
What Causes 'Trans Failsafe Prog' to Trigger in BMW X5
European Service Center
 
欧洲杯比赛投注官网-欧洲杯比赛投注官网网站-欧洲杯比赛投注官网|【​网址​🎉ac123.net🎉​】
欧洲杯比赛投注官网-欧洲杯比赛投注官网网站-欧洲杯比赛投注官网|【​网址​🎉ac123.net🎉​】欧洲杯比赛投注官网-欧洲杯比赛投注官网网站-欧洲杯比赛投注官网|【​网址​🎉ac123.net🎉​】
欧洲杯比赛投注官网-欧洲杯比赛投注官网网站-欧洲杯比赛投注官网|【​网址​🎉ac123.net🎉​】
ahmedendrise81
 
Tyre Industrymarket overview with examples of CEAT
Tyre Industrymarket overview with examples of CEATTyre Industrymarket overview with examples of CEAT
Tyre Industrymarket overview with examples of CEAT
kshamashah95
 
5 Warning Signs Your BMW's Intelligent Battery Sensor Needs Attention
5 Warning Signs Your BMW's Intelligent Battery Sensor Needs Attention5 Warning Signs Your BMW's Intelligent Battery Sensor Needs Attention
5 Warning Signs Your BMW's Intelligent Battery Sensor Needs Attention
Bertini's German Motors
 
一比一原版(AUT毕业证)奥克兰理工大学毕业证成绩单如何办理
一比一原版(AUT毕业证)奥克兰理工大学毕业证成绩单如何办理一比一原版(AUT毕业证)奥克兰理工大学毕业证成绩单如何办理
一比一原版(AUT毕业证)奥克兰理工大学毕业证成绩单如何办理
mymwpc
 
一比一原版(AIS毕业证)奥克兰商学院毕业证成绩单如何办理
一比一原版(AIS毕业证)奥克兰商学院毕业证成绩单如何办理一比一原版(AIS毕业证)奥克兰商学院毕业证成绩单如何办理
一比一原版(AIS毕业证)奥克兰商学院毕业证成绩单如何办理
eygkup
 
Empowering Limpopo Entrepreneurs Consulting SMEs.pptx
Empowering Limpopo Entrepreneurs  Consulting SMEs.pptxEmpowering Limpopo Entrepreneurs  Consulting SMEs.pptx
Empowering Limpopo Entrepreneurs Consulting SMEs.pptx
Precious Mvulane CA (SA),RA
 
Antique Plastic Traders Company Profile
Antique Plastic Traders Company ProfileAntique Plastic Traders Company Profile
Antique Plastic Traders Company Profile
Antique Plastic Traders
 
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.docBài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
daothibichhang1
 
What Exactly Is The Common Rail Direct Injection System & How Does It Work
What Exactly Is The Common Rail Direct Injection System & How Does It WorkWhat Exactly Is The Common Rail Direct Injection System & How Does It Work
What Exactly Is The Common Rail Direct Injection System & How Does It Work
Motor Cars International
 
What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...
What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...
What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...
Autohaus Service and Sales
 
Core technology of Hyundai Motor Group's EV platform 'E-GMP'
Core technology of Hyundai Motor Group's EV platform 'E-GMP'Core technology of Hyundai Motor Group's EV platform 'E-GMP'
Core technology of Hyundai Motor Group's EV platform 'E-GMP'
Hyundai Motor Group
 
Why Is Your BMW X3 Hood Not Responding To Release Commands
Why Is Your BMW X3 Hood Not Responding To Release CommandsWhy Is Your BMW X3 Hood Not Responding To Release Commands
Why Is Your BMW X3 Hood Not Responding To Release Commands
Dart Auto
 
What do the symbols on vehicle dashboard mean?
What do the symbols on vehicle dashboard mean?What do the symbols on vehicle dashboard mean?
What do the symbols on vehicle dashboard mean?
Hyundai Motor Group
 
Statistics5,c.xz,c.;c.;d.c;d;ssssss.pptx
Statistics5,c.xz,c.;c.;d.c;d;ssssss.pptxStatistics5,c.xz,c.;c.;d.c;d;ssssss.pptx
Statistics5,c.xz,c.;c.;d.c;d;ssssss.pptx
coc7987515756
 
Digital Fleet Management - Why Your Business Need It?
Digital Fleet Management - Why Your Business Need It?Digital Fleet Management - Why Your Business Need It?
Digital Fleet Management - Why Your Business Need It?
jennifermiller8137
 
Why Isn't Your BMW X5's Comfort Access Functioning Properly Find Out Here
Why Isn't Your BMW X5's Comfort Access Functioning Properly Find Out HereWhy Isn't Your BMW X5's Comfort Access Functioning Properly Find Out Here
Why Isn't Your BMW X5's Comfort Access Functioning Properly Find Out Here
Masters European & Gapanese Auto Repair
 

Recently uploaded (20)

Wondering if Your Mercedes EIS is at Fault Here’s How to Tell
Wondering if Your Mercedes EIS is at Fault Here’s How to TellWondering if Your Mercedes EIS is at Fault Here’s How to Tell
Wondering if Your Mercedes EIS is at Fault Here’s How to Tell
 
Ec460b lc Excavator Volvo Service Repair.pdf
Ec460b lc Excavator Volvo Service Repair.pdfEc460b lc Excavator Volvo Service Repair.pdf
Ec460b lc Excavator Volvo Service Repair.pdf
 
Ec330B Lc Excavator Volvo Service Repair.pdf
Ec330B Lc Excavator Volvo Service Repair.pdfEc330B Lc Excavator Volvo Service Repair.pdf
Ec330B Lc Excavator Volvo Service Repair.pdf
 
What Causes 'Trans Failsafe Prog' to Trigger in BMW X5
What Causes 'Trans Failsafe Prog' to Trigger in BMW X5What Causes 'Trans Failsafe Prog' to Trigger in BMW X5
What Causes 'Trans Failsafe Prog' to Trigger in BMW X5
 
欧洲杯比赛投注官网-欧洲杯比赛投注官网网站-欧洲杯比赛投注官网|【​网址​🎉ac123.net🎉​】
欧洲杯比赛投注官网-欧洲杯比赛投注官网网站-欧洲杯比赛投注官网|【​网址​🎉ac123.net🎉​】欧洲杯比赛投注官网-欧洲杯比赛投注官网网站-欧洲杯比赛投注官网|【​网址​🎉ac123.net🎉​】
欧洲杯比赛投注官网-欧洲杯比赛投注官网网站-欧洲杯比赛投注官网|【​网址​🎉ac123.net🎉​】
 
Tyre Industrymarket overview with examples of CEAT
Tyre Industrymarket overview with examples of CEATTyre Industrymarket overview with examples of CEAT
Tyre Industrymarket overview with examples of CEAT
 
5 Warning Signs Your BMW's Intelligent Battery Sensor Needs Attention
5 Warning Signs Your BMW's Intelligent Battery Sensor Needs Attention5 Warning Signs Your BMW's Intelligent Battery Sensor Needs Attention
5 Warning Signs Your BMW's Intelligent Battery Sensor Needs Attention
 
一比一原版(AUT毕业证)奥克兰理工大学毕业证成绩单如何办理
一比一原版(AUT毕业证)奥克兰理工大学毕业证成绩单如何办理一比一原版(AUT毕业证)奥克兰理工大学毕业证成绩单如何办理
一比一原版(AUT毕业证)奥克兰理工大学毕业证成绩单如何办理
 
一比一原版(AIS毕业证)奥克兰商学院毕业证成绩单如何办理
一比一原版(AIS毕业证)奥克兰商学院毕业证成绩单如何办理一比一原版(AIS毕业证)奥克兰商学院毕业证成绩单如何办理
一比一原版(AIS毕业证)奥克兰商学院毕业证成绩单如何办理
 
Empowering Limpopo Entrepreneurs Consulting SMEs.pptx
Empowering Limpopo Entrepreneurs  Consulting SMEs.pptxEmpowering Limpopo Entrepreneurs  Consulting SMEs.pptx
Empowering Limpopo Entrepreneurs Consulting SMEs.pptx
 
Antique Plastic Traders Company Profile
Antique Plastic Traders Company ProfileAntique Plastic Traders Company Profile
Antique Plastic Traders Company Profile
 
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.docBài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
 
What Exactly Is The Common Rail Direct Injection System & How Does It Work
What Exactly Is The Common Rail Direct Injection System & How Does It WorkWhat Exactly Is The Common Rail Direct Injection System & How Does It Work
What Exactly Is The Common Rail Direct Injection System & How Does It Work
 
What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...
What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...
What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...
 
Core technology of Hyundai Motor Group's EV platform 'E-GMP'
Core technology of Hyundai Motor Group's EV platform 'E-GMP'Core technology of Hyundai Motor Group's EV platform 'E-GMP'
Core technology of Hyundai Motor Group's EV platform 'E-GMP'
 
Why Is Your BMW X3 Hood Not Responding To Release Commands
Why Is Your BMW X3 Hood Not Responding To Release CommandsWhy Is Your BMW X3 Hood Not Responding To Release Commands
Why Is Your BMW X3 Hood Not Responding To Release Commands
 
What do the symbols on vehicle dashboard mean?
What do the symbols on vehicle dashboard mean?What do the symbols on vehicle dashboard mean?
What do the symbols on vehicle dashboard mean?
 
Statistics5,c.xz,c.;c.;d.c;d;ssssss.pptx
Statistics5,c.xz,c.;c.;d.c;d;ssssss.pptxStatistics5,c.xz,c.;c.;d.c;d;ssssss.pptx
Statistics5,c.xz,c.;c.;d.c;d;ssssss.pptx
 
Digital Fleet Management - Why Your Business Need It?
Digital Fleet Management - Why Your Business Need It?Digital Fleet Management - Why Your Business Need It?
Digital Fleet Management - Why Your Business Need It?
 
Why Isn't Your BMW X5's Comfort Access Functioning Properly Find Out Here
Why Isn't Your BMW X5's Comfort Access Functioning Properly Find Out HereWhy Isn't Your BMW X5's Comfort Access Functioning Properly Find Out Here
Why Isn't Your BMW X5's Comfort Access Functioning Properly Find Out Here
 

table

  • 1. Unit 4 Pre-Production Portfolio Learning AimD Project Management Task What Went Well Logistics Finance Creative Processes Managing People Managingpeople while doingthe production was done by the use of call sheets which meant that everyone already knew where they had to be and the time they had to be there for. Because I had good management of people, the production was ableto go smoothly and meant that I didn’t need people any longer than the set time. I made sure that I managed the people as effectively as possible.I did this by makingcall sheets which showed content such as dates, times and locations. Management of Resources (both human and physical) I managed all theresources by usinga day rate so I could be sureof the total cost. In doing this,I would be ableto see how longand how much equipment would cost. By me usingcall sheets and booking sheets I decreased the amount of time I needed with both the actors as well as the equipment because itwas already completed before the filmingwas started. This meant I didn’t need to pay for any extra things such as actors. Call sheets and booking forms were signed for the use of equipment. This is how I managed resources duringpre-production. Managing Time I managed my time by making sureeach shot was already planned out ahead of time. Also making surethe shot was accurateto the storyboard scene. Because I planned time efficiently,I reduced the time I needed for actors and equipment, meaning I didn’t have to pay as much, saving more money. I made production schedules to prepare and plan every day of the filming.I also included the times it would take to set up equipment. I had also used the scripts and storyboardsI madeto plan out the times it would take to filmevery scene. Being Professional I planned the scheduleand was positive that all equipment was ready to start filming.I also madesure that all of the required documents where correctly filled in,which includes,call sheets, booking forms and risk assessments. I shaved off a lot of time by planningand makingsure that all documents were correctly filled out, meaning that I saved money and didn’t need any extra time. I made sure that all the documents such as call sheets and bookingforms were all filled out right. I also made surethat both the crew and the castwere availableduringthe times I needed them. Ensuring Progress is Sustained Progress was always beingmade during this time becauseI had made a schedule of when tasks had to be completed. Such as filmingand getting equipment set up in the rightpositions.I had kept note of what was done on every day. I used a scheduleto ensure that the day was planned out ahead of time.
  • 2. Unit 4 Pre-Production Portfolio Learning AimD Managing Risk Managing Crisis I was ableto manage crisis’by makinga good plan of the production which meant that I managed to lessen the budget by usingcall sheets and budget plans efficiently.This made production finish quicker. I made risk assessments to try and lower the probability of any injuries or damages. Keeping Documentation up-to-date and relevant I kept the documents up to date. I did this by keeping track of all things production related such as all of the shots. The budget was not affected by this as I was not required to use more time to do stuff such as fillingoutforms. The plan of production was used to note all progress made of the production. Aspect What Could be Improved Logistics Finance Creative Processes Summary of any problems with project management Project management was affected by a few things such as the time it took to set up the equipment, lightingin certain places and some actors were slightly delayed by other things. Financewas not affected, as the overall production was short. This could be improved by addingmore detail to the storyboards as well as thescript Ways you could be better in future productions I would improve by givingequipment set up more time whilesacrificingtimeon other things such as props.I would also try and have lightingsetup more quickly as this is a factor that increased the overall time of production. The financewould not need much improvement as itdidn’t exceed the expected amount. However, money could be saved by hiringequipment for less days if it isn't needed. I would add more detail to the storyboards by addingarrows to show the direction the camera would pan and also arrows to show which way the actor will move in the shot. I made a risk assessmentinan attemptto lowerthe chance of injuriesonset. To loweranychance of the budget beingincreaseddue todamages,a riskassessmentwascreatedtomake people more aware I made a risk assessmentinorderto reduce the chance of anyone getting hurt duringproduction.