SWOT ANALYSIS
i) Strength
>Our site is located nearby the edges of the main road. It has a high
accessibility where roads can be built upon connecting to our site.
>The site is located nearby the residential areas. It will attract the
residence to drop by and pay a visit since its connected to the main
roads which makes it convenient for them.
ii)Weakness
>There is a cesspool nearby the area. Although its quite a distant from our
site, but barriers must be done in order to separate the cesspool.
iii)Opportunity
>It is a huge undeveloped land. This big open space is a great place
whereby it can be expanded and developed into a useful piece of land
that can be served a purpose for the residence of Putra Heights.
iv)Threats
>The site is covered by weed. This condition might attract animals like the
snakes. The weed must be completely cleared off before starting the
construction project.
>Weed will still grow in the future with the presence of sunlight and rainfall.
Therefore, it must be maintained by having a maintenance plan for that
area. Maintenance activity like trimming must be carried out once in two
weeks in order to have a safe and clean environment.

Swot analysis

  • 1.
    SWOT ANALYSIS i) Strength >Oursite is located nearby the edges of the main road. It has a high accessibility where roads can be built upon connecting to our site. >The site is located nearby the residential areas. It will attract the residence to drop by and pay a visit since its connected to the main roads which makes it convenient for them. ii)Weakness >There is a cesspool nearby the area. Although its quite a distant from our site, but barriers must be done in order to separate the cesspool. iii)Opportunity >It is a huge undeveloped land. This big open space is a great place whereby it can be expanded and developed into a useful piece of land that can be served a purpose for the residence of Putra Heights. iv)Threats >The site is covered by weed. This condition might attract animals like the snakes. The weed must be completely cleared off before starting the construction project. >Weed will still grow in the future with the presence of sunlight and rainfall. Therefore, it must be maintained by having a maintenance plan for that area. Maintenance activity like trimming must be carried out once in two
  • 2.
    weeks in orderto have a safe and clean environment.