INSTALLATION 8.11
8.6. SUPPORT STRUCTURES FOR PRESSURE PIPES
Pipes under pressure need support at fittings, valves and ends to avoid stress peaks. The support
blocks are made of reinforced concrete. The calculations and design should be based on a pressure
1,5 times the design pressure. The design should be done in a way so that the strength values of the
soil and concrete are not exceeded. Butt-welded bends, T-pieces and other fittings are completely
surrounded by concrete. The pipe should be supported before the pressure test in site.
Horizontal bend Vertical bend up
Vertical bend down T-Branch
End of pipe
At least
Be1 = De+de/2 Be1 = 200 mm+de/2
OR
Be2 = de+De/2 Be2 = 200mm+De/2
INSTALLATION 8.12
Reaction Force in a Pipe Bend
P = p A = p p D2
/ 4 R = 2 P sin a / 2
where p = pressure
D = pipe diameter under water pressure
a = pipe bend
INSTALLATION 8.13
Support length (l) mm h b Reinforcement
Bend = mm mm Steel A 40 H
Pipe 100 (300) 400 500 300 150 ø 8 k/k 200 #
150 (500) 600 800 450 150 ø 8 k/k 200 #
I.D. 200 (400) 600 700 1000 600 200 ø 8 k/k 200 #
250 (500) 800 1000 1400 700 200 ø 10 k/k 200 #
mm 300 700 1000 1200 1800 800 250 ø 10 k/k 180 #
400 900 1400 1800 2500 1000 300 ø 10 k/k 150 #
500 1100 1600 2100 3000 1300 350 ø 12 k/k 200 #
600 1300 1900 2400 3400 1600 400 ø 12 k/k 190 #
INSTALLATION 8.14
Design of support
1. Basic table in frictional soil.
Friction angle = 28°.
Density 17 kN / m3
(1.7 t / m3
).
Depth of the pipe - center line Z = 2 m.
Pressure in the pipe 10 bar, 1 MPa.
2. If the friction angle > 35° (ex. gravel) the support slab can be decreased
by 30% (factor 0.7).
In cohesive and intermediate soils the slab must be increased by 50% (factor 1.5),
if the shear strength is higher than 1.5 kPa (1.5 t / m2
), and 100% (factor 2.0) if the
shear strength is higher than 10 kPa (1.0 t / m2
) and smaller than 15 kPa (1.5 t / m2
).
3. The depth of the pipe is paid attention to by using a correction factor 2 / Z.
Z is the depth of the center line of the pipe.
EXAMPLE 1.
D = 300 mm
= 68°, frictional soil
= 40°
Z = 2,5 m
A = 2 / Z x 0.7 (1.4 x 0.2) = 0.63 m2
, take 800 mm x 800 mm = 0.64 m2
EXAMPLE 2.
T-piece
= 90°
Soil clay, shear strength 12 kPa
Z = 1.8 m
A = 2 / 1.8 x 2.0 x (1.0 x 0.6) m2
= 1.33 m2
, take 2250 mm x 600 mm

More Related Content

Viewers also liked

Etapas del niño
Etapas del niñoEtapas del niño
Etapas del niño
Janii Corona Valadez
 
Encyclopedia Brown and the Case of the Slippery Salamander story slides
Encyclopedia Brown and the Case of the Slippery Salamander story slidesEncyclopedia Brown and the Case of the Slippery Salamander story slides
Encyclopedia Brown and the Case of the Slippery Salamander story slides
deturner4
 
Wioski tematyczne - prezentacja na Forum Obszarów Wiejskich
Wioski tematyczne - prezentacja na Forum Obszarów WiejskichWioski tematyczne - prezentacja na Forum Obszarów Wiejskich
Wioski tematyczne - prezentacja na Forum Obszarów WiejskichKarol Gutsze
 
Media gallery9
Media gallery9Media gallery9
Media gallery9
seongju son
 
Presentation1
Presentation1Presentation1
Presentation1Trisnaa
 
Presentation Bab 1
Presentation Bab 1Presentation Bab 1
Presentation Bab 1
Adlu Panser Brutal
 
Products cataloque tap
Products cataloque tapProducts cataloque tap
Popular Cement and concrete products b2b Marketplace
Popular  Cement and concrete products b2b MarketplacePopular  Cement and concrete products b2b Marketplace
Popular Cement and concrete products b2b Marketplaceb2b-website-bizbilla
 
Ptasia Wioska - Adamkowo
Ptasia Wioska - AdamkowoPtasia Wioska - Adamkowo
Ptasia Wioska - Adamkowo
Karol Gutsze
 
Authors Purpose
Authors PurposeAuthors Purpose
Authors Purpose
deturner4
 
Rails: geležinkelio romantika ir buitis
Rails: geležinkelio romantika ir buitisRails: geležinkelio romantika ir buitis
Rails: geležinkelio romantika ir buitis
Adomas Sliužinskas
 
Tap company profile english
Tap company profile englishTap company profile english
Buried pipe design by neste
Buried pipe design by nesteBuried pipe design by neste
Artie 8分鐘投影片
Artie 8分鐘投影片Artie 8分鐘投影片
Artie 8分鐘投影片怡儒 黃
 
Metacognition During the Lesson
Metacognition During the LessonMetacognition During the Lesson
Metacognition During the Lesson
jonnagrossman
 

Viewers also liked (17)

Etapas del niño
Etapas del niñoEtapas del niño
Etapas del niño
 
Encyclopedia Brown and the Case of the Slippery Salamander story slides
Encyclopedia Brown and the Case of the Slippery Salamander story slidesEncyclopedia Brown and the Case of the Slippery Salamander story slides
Encyclopedia Brown and the Case of the Slippery Salamander story slides
 
Wioski tematyczne - prezentacja na Forum Obszarów Wiejskich
Wioski tematyczne - prezentacja na Forum Obszarów WiejskichWioski tematyczne - prezentacja na Forum Obszarów Wiejskich
Wioski tematyczne - prezentacja na Forum Obszarów Wiejskich
 
Media gallery9
Media gallery9Media gallery9
Media gallery9
 
Presentation1
Presentation1Presentation1
Presentation1
 
Presentation Bab 1
Presentation Bab 1Presentation Bab 1
Presentation Bab 1
 
Huoneentaulu
HuoneentauluHuoneentaulu
Huoneentaulu
 
Products cataloque tap
Products cataloque tapProducts cataloque tap
Products cataloque tap
 
Popular Cement and concrete products b2b Marketplace
Popular  Cement and concrete products b2b MarketplacePopular  Cement and concrete products b2b Marketplace
Popular Cement and concrete products b2b Marketplace
 
Ptasia Wioska - Adamkowo
Ptasia Wioska - AdamkowoPtasia Wioska - Adamkowo
Ptasia Wioska - Adamkowo
 
Authors Purpose
Authors PurposeAuthors Purpose
Authors Purpose
 
Rails: geležinkelio romantika ir buitis
Rails: geležinkelio romantika ir buitisRails: geležinkelio romantika ir buitis
Rails: geležinkelio romantika ir buitis
 
หนังสือรับรอง Hdpe มาตรฐาน มอก.982 2548
หนังสือรับรอง Hdpe มาตรฐาน มอก.982 2548หนังสือรับรอง Hdpe มาตรฐาน มอก.982 2548
หนังสือรับรอง Hdpe มาตรฐาน มอก.982 2548
 
Tap company profile english
Tap company profile englishTap company profile english
Tap company profile english
 
Buried pipe design by neste
Buried pipe design by nesteBuried pipe design by neste
Buried pipe design by neste
 
Artie 8分鐘投影片
Artie 8分鐘投影片Artie 8分鐘投影片
Artie 8分鐘投影片
 
Metacognition During the Lesson
Metacognition During the LessonMetacognition During the Lesson
Metacognition During the Lesson
 

Similar to Support structure for hdpe

Bo q for shelter
Bo q  for shelterBo q  for shelter
Bo q for shelter
SantinoDengAchuilAth
 
L21 MOS OCT 2020.pptx .
L21 MOS OCT 2020.pptx                           .L21 MOS OCT 2020.pptx                           .
L21 MOS OCT 2020.pptx .
happycocoman
 
Jury Presenatation.pptx
Jury Presenatation.pptxJury Presenatation.pptx
Jury Presenatation.pptx
AmokBajracharya2
 
FL AWWA Steel Pipelines_0.pdf
FL AWWA Steel Pipelines_0.pdfFL AWWA Steel Pipelines_0.pdf
FL AWWA Steel Pipelines_0.pdf
ad_gordon
 
Intze Tank.ppt
Intze Tank.pptIntze Tank.ppt
Intze Tank.ppt
EmilyMuthiga1
 
Intze Tankd s sad sa das dsjkj kkk kds s kkksk
Intze Tankd s sad sa das dsjkj kkk kds s kkkskIntze Tankd s sad sa das dsjkj kkk kds s kkksk
Intze Tankd s sad sa das dsjkj kkk kds s kkksk
Krish Bhavsar
 
Design of RCC Column footing
Design of RCC Column footingDesign of RCC Column footing
Design of RCC Column footing
Arun Kurali
 
Isolated footing design
Isolated footing designIsolated footing design
Isolated footing design
srinu_anduri
 
1 resistance
1 resistance1 resistance
1 resistance
Refee Lubong
 
onw way slab design
onw way slab designonw way slab design
onw way slab design
Palak Patel
 
0 ne way slab
0 ne way slab0 ne way slab
0 ne way slab
Golu Singh
 
Water tank 1
Water tank 1Water tank 1
Water tank 1
SachinThakre10
 
phase 2ppt.pptx
phase 2ppt.pptxphase 2ppt.pptx
phase 2ppt.pptx
Gokul408032
 
6-Eccecntric Footing.pdf shajasjakssjssjwjs
6-Eccecntric Footing.pdf shajasjakssjssjwjs6-Eccecntric Footing.pdf shajasjakssjssjwjs
6-Eccecntric Footing.pdf shajasjakssjssjwjs
BrajeshRanjanAcharya
 
350 kl overhead water intze tank design
350 kl overhead water intze tank design350 kl overhead water intze tank design
350 kl overhead water intze tank design
Harish Mahavar
 
Prestressed pipes,tanks,poles
Prestressed pipes,tanks,polesPrestressed pipes,tanks,poles
Prestressed pipes,tanks,poles
PraveenKumar Shanmugam
 
Introduction & under ground water tank problem
Introduction & under ground water tank problemIntroduction & under ground water tank problem
Introduction & under ground water tank problem
dhineshkumar002
 
2008 - NOV.pdf
2008 - NOV.pdf2008 - NOV.pdf
2008 - NOV.pdf
EdmarTabinas1
 
Structural design of 350 kl overhead water tank at telibagh,lucknow
Structural design of 350 kl overhead water tank at telibagh,lucknowStructural design of 350 kl overhead water tank at telibagh,lucknow
Structural design of 350 kl overhead water tank at telibagh,lucknow
Anchit Agrawal
 
post tensioning slabs
post tensioning slabspost tensioning slabs
post tensioning slabs
gopichand's
 

Similar to Support structure for hdpe (20)

Bo q for shelter
Bo q  for shelterBo q  for shelter
Bo q for shelter
 
L21 MOS OCT 2020.pptx .
L21 MOS OCT 2020.pptx                           .L21 MOS OCT 2020.pptx                           .
L21 MOS OCT 2020.pptx .
 
Jury Presenatation.pptx
Jury Presenatation.pptxJury Presenatation.pptx
Jury Presenatation.pptx
 
FL AWWA Steel Pipelines_0.pdf
FL AWWA Steel Pipelines_0.pdfFL AWWA Steel Pipelines_0.pdf
FL AWWA Steel Pipelines_0.pdf
 
Intze Tank.ppt
Intze Tank.pptIntze Tank.ppt
Intze Tank.ppt
 
Intze Tankd s sad sa das dsjkj kkk kds s kkksk
Intze Tankd s sad sa das dsjkj kkk kds s kkkskIntze Tankd s sad sa das dsjkj kkk kds s kkksk
Intze Tankd s sad sa das dsjkj kkk kds s kkksk
 
Design of RCC Column footing
Design of RCC Column footingDesign of RCC Column footing
Design of RCC Column footing
 
Isolated footing design
Isolated footing designIsolated footing design
Isolated footing design
 
1 resistance
1 resistance1 resistance
1 resistance
 
onw way slab design
onw way slab designonw way slab design
onw way slab design
 
0 ne way slab
0 ne way slab0 ne way slab
0 ne way slab
 
Water tank 1
Water tank 1Water tank 1
Water tank 1
 
phase 2ppt.pptx
phase 2ppt.pptxphase 2ppt.pptx
phase 2ppt.pptx
 
6-Eccecntric Footing.pdf shajasjakssjssjwjs
6-Eccecntric Footing.pdf shajasjakssjssjwjs6-Eccecntric Footing.pdf shajasjakssjssjwjs
6-Eccecntric Footing.pdf shajasjakssjssjwjs
 
350 kl overhead water intze tank design
350 kl overhead water intze tank design350 kl overhead water intze tank design
350 kl overhead water intze tank design
 
Prestressed pipes,tanks,poles
Prestressed pipes,tanks,polesPrestressed pipes,tanks,poles
Prestressed pipes,tanks,poles
 
Introduction & under ground water tank problem
Introduction & under ground water tank problemIntroduction & under ground water tank problem
Introduction & under ground water tank problem
 
2008 - NOV.pdf
2008 - NOV.pdf2008 - NOV.pdf
2008 - NOV.pdf
 
Structural design of 350 kl overhead water tank at telibagh,lucknow
Structural design of 350 kl overhead water tank at telibagh,lucknowStructural design of 350 kl overhead water tank at telibagh,lucknow
Structural design of 350 kl overhead water tank at telibagh,lucknow
 
post tensioning slabs
post tensioning slabspost tensioning slabs
post tensioning slabs
 

More from ไทยเอเชีย บริหารขาย

Tap welding guideline_english
Tap welding guideline_englishTap welding guideline_english
Standard dvs for butt fusion welding 2
Standard dvs for butt fusion welding 2Standard dvs for butt fusion welding 2
Standard dvs for butt fusion welding 2
ไทยเอเชีย บริหารขาย
 
Standard dvs for butt fusion welding
Standard dvs for butt fusion weldingStandard dvs for butt fusion welding
Standard dvs for butt fusion welding
ไทยเอเชีย บริหารขาย
 
Safetyfactor pe80
Safetyfactor pe80Safetyfactor pe80
Safety factor pe100
Safety factor pe100Safety factor pe100
Safety factor pe80
Safety factor pe80Safety factor pe80
Pipe friction nomogram (loss)
Pipe friction nomogram (loss)Pipe friction nomogram (loss)
Hdpe pipe laying วิธีฝักกลบท่อ hdpe
Hdpe pipe laying  วิธีฝักกลบท่อ hdpeHdpe pipe laying  วิธีฝักกลบท่อ hdpe
Hdpe pipe laying วิธีฝักกลบท่อ hdpe
ไทยเอเชีย บริหารขาย
 

More from ไทยเอเชีย บริหารขาย (20)

เลขที่บัญชีไทยเอเซีย
เลขที่บัญชีไทยเอเซียเลขที่บัญชีไทยเอเซีย
เลขที่บัญชีไทยเอเซีย
 
เลขที่บัญชี ไทย เอเซียฯ
เลขที่บัญชี ไทย เอเซียฯเลขที่บัญชี ไทย เอเซียฯ
เลขที่บัญชี ไทย เอเซียฯ
 
ภพ20และหนังสือรับรอง
ภพ20และหนังสือรับรองภพ20และหนังสือรับรอง
ภพ20และหนังสือรับรอง
 
แค๊ทตาล๊อค Approve ท่อน้ำ v2
แค๊ทตาล๊อค Approve ท่อน้ำ v2แค๊ทตาล๊อค Approve ท่อน้ำ v2
แค๊ทตาล๊อค Approve ท่อน้ำ v2
 
ค่าแรงเชื่อมท่อและสตับเอ็น
ค่าแรงเชื่อมท่อและสตับเอ็นค่าแรงเชื่อมท่อและสตับเอ็น
ค่าแรงเชื่อมท่อและสตับเอ็น
 
ข้อกำหนด มอก.982 2548 ตัวต้นฉบับ
ข้อกำหนด มอก.982 2548 ตัวต้นฉบับข้อกำหนด มอก.982 2548 ตัวต้นฉบับ
ข้อกำหนด มอก.982 2548 ตัวต้นฉบับ
 
Weilding machine by tap
Weilding machine by tapWeilding machine by tap
Weilding machine by tap
 
Technical information
Technical informationTechnical information
Technical information
 
Tap welding guideline_english
Tap welding guideline_englishTap welding guideline_english
Tap welding guideline_english
 
Standard sfs for site test butt fusion welding
Standard sfs for site test butt fusion weldingStandard sfs for site test butt fusion welding
Standard sfs for site test butt fusion welding
 
Standard dvs for butt fusion welding 2
Standard dvs for butt fusion welding 2Standard dvs for butt fusion welding 2
Standard dvs for butt fusion welding 2
 
Standard dvs for butt fusion welding
Standard dvs for butt fusion weldingStandard dvs for butt fusion welding
Standard dvs for butt fusion welding
 
Safetyfactor pe80
Safetyfactor pe80Safetyfactor pe80
Safetyfactor pe80
 
Safety factor pe100
Safety factor pe100Safety factor pe100
Safety factor pe100
 
Safety factor pe80
Safety factor pe80Safety factor pe80
Safety factor pe80
 
Quality control by tap
Quality control by tapQuality control by tap
Quality control by tap
 
Pipe friction nomogram (loss)
Pipe friction nomogram (loss)Pipe friction nomogram (loss)
Pipe friction nomogram (loss)
 
Iso 9001 new
Iso 9001 newIso 9001 new
Iso 9001 new
 
Install tapkorr
Install tapkorrInstall tapkorr
Install tapkorr
 
Hdpe pipe laying วิธีฝักกลบท่อ hdpe
Hdpe pipe laying  วิธีฝักกลบท่อ hdpeHdpe pipe laying  วิธีฝักกลบท่อ hdpe
Hdpe pipe laying วิธีฝักกลบท่อ hdpe
 

Support structure for hdpe

  • 1. INSTALLATION 8.11 8.6. SUPPORT STRUCTURES FOR PRESSURE PIPES Pipes under pressure need support at fittings, valves and ends to avoid stress peaks. The support blocks are made of reinforced concrete. The calculations and design should be based on a pressure 1,5 times the design pressure. The design should be done in a way so that the strength values of the soil and concrete are not exceeded. Butt-welded bends, T-pieces and other fittings are completely surrounded by concrete. The pipe should be supported before the pressure test in site. Horizontal bend Vertical bend up Vertical bend down T-Branch End of pipe At least Be1 = De+de/2 Be1 = 200 mm+de/2 OR Be2 = de+De/2 Be2 = 200mm+De/2
  • 2. INSTALLATION 8.12 Reaction Force in a Pipe Bend P = p A = p p D2 / 4 R = 2 P sin a / 2 where p = pressure D = pipe diameter under water pressure a = pipe bend
  • 3. INSTALLATION 8.13 Support length (l) mm h b Reinforcement Bend = mm mm Steel A 40 H Pipe 100 (300) 400 500 300 150 ø 8 k/k 200 # 150 (500) 600 800 450 150 ø 8 k/k 200 # I.D. 200 (400) 600 700 1000 600 200 ø 8 k/k 200 # 250 (500) 800 1000 1400 700 200 ø 10 k/k 200 # mm 300 700 1000 1200 1800 800 250 ø 10 k/k 180 # 400 900 1400 1800 2500 1000 300 ø 10 k/k 150 # 500 1100 1600 2100 3000 1300 350 ø 12 k/k 200 # 600 1300 1900 2400 3400 1600 400 ø 12 k/k 190 #
  • 4. INSTALLATION 8.14 Design of support 1. Basic table in frictional soil. Friction angle = 28°. Density 17 kN / m3 (1.7 t / m3 ). Depth of the pipe - center line Z = 2 m. Pressure in the pipe 10 bar, 1 MPa. 2. If the friction angle > 35° (ex. gravel) the support slab can be decreased by 30% (factor 0.7). In cohesive and intermediate soils the slab must be increased by 50% (factor 1.5), if the shear strength is higher than 1.5 kPa (1.5 t / m2 ), and 100% (factor 2.0) if the shear strength is higher than 10 kPa (1.0 t / m2 ) and smaller than 15 kPa (1.5 t / m2 ). 3. The depth of the pipe is paid attention to by using a correction factor 2 / Z. Z is the depth of the center line of the pipe. EXAMPLE 1. D = 300 mm = 68°, frictional soil = 40° Z = 2,5 m A = 2 / Z x 0.7 (1.4 x 0.2) = 0.63 m2 , take 800 mm x 800 mm = 0.64 m2 EXAMPLE 2. T-piece = 90° Soil clay, shear strength 12 kPa Z = 1.8 m A = 2 / 1.8 x 2.0 x (1.0 x 0.6) m2 = 1.33 m2 , take 2250 mm x 600 mm