SlideShare a Scribd company logo
SUBSTATION DESIGN FOR 
ANHOLT OFFSHORE WIND FARM
Complete substation design for one of the world's
largest offshore wind farms which will produce
electricity to 400,000 households


A substation is the one of the core      offshore wind farms when it is in     The planned location of the wind
elements in the electrical grid of the   operation in 2013.                    farm in an area with very difficult
wind farm. It collects the power                                               seabed conditions, risk of ice loads
production from the wind turbines        The 400 MW wind farm will             during winter and heavy ship traffic
and transmits the energy to the          produce energy equivalent to the      have been important factors in the
land-based power transmission grid       annual energy consumption of          design process.
through submarine cables.                400,000 households, or 4%              
                                         of Denmark's total power
There are many shared technical          consumption. 111 wind turbines will   Two design proposals
details in the design of an offshore     produce the energy.                   The substructure design included
substation and traditional                                                     both detailed design of a steel
offshore facility platforms. At          The substation and shore cable are    jacket solution as well as tender
Ramboll we have transferred our          operated by the Danish energy         design of a combined concrete
experience in offshore                   provider Energinet.dk which is        GBS/Steel structure (GBS = Gravity
structures from the past 30 years to     owned by the Ministry of Energy       Based Structure).
become among the market leaders          and Climate. The state-owned           
in the design of substations for         energy company DONG Energy            The steel jacket solution was initially
offshore wind farms.                     owns and operates the wind farm.      selected by the client as being the
                                          

One substation - electricity to          Evaluation of scenarios
400,000 households                       Ramboll headed the detailed design
One of Ramboll's most recent major       of the substation platform,
substation projects is the Anholt        including substructure and
                                                                               CONTACT
Offshore Wind Farm, located 22 km        complete topside design. In the       Peter Busch Nielsen
off the coast of the island Anholt in    design process many different         Senior Project Manager, Structures
Denmark. The wind farm will              scenarios have been evaluated.         
                                                                               Tel +45 5161 7238 
become one of the world's largest         
                                                                               pbn@ramboll.com
                                                                                

RAMBOLL GROUP A/S
DESIGN IN ACCORDANCE WITH NEW STANDARDS

   The Anholt Offshore Wind Farm substation is one of the       renewable energy projects.
   first offshore substations to be designed according to the    
   DNV-OS-J201 standard for Offshore Substations for Wind       The new standard will become one of the future standard
   Farms.                                                       used for European offshore wind farms.
                                                                 
   The standard describes the basis for safe design, layout
   and operation of offshore wind farms. It is developed to
   provide a common set of safety requirements for all
   platforms associated with offshore wind farms and other




preferred solution. However, prior to      enclosed modules where the               The analysis included siting of the
tendering the fabrication contract         auxiliary equipment is placed.           farm and proposals for possible
of the platform, the client chose to                                                alternative sites, outline foundation
include a tender design by Ramboll         The topside structure is divided into    design, decommissioning of
of a GBS solution combining the            several platform deck levels,            structures and constructional and
installation benefits of a floating        including a helideck. The                operational risk analysis with
concrete structure with that of a          structure carries equipment for          respect to shipping traffic.
steel structure on top.                    high-voltage transmission and             
                                           distribution and other facilities such   In addition, Ramboll also performed
                                           as emergency generator, batteries        environmental assessment of the
Fit-for-purpose substation                 and panels for wind turbine control      establishment of a sea cable to the
The fit-for-purpose substation is          etc.                                     island of Anholt from the wind farm.
designed with due consideration to                                                   
the wishes and requirements laid           The substation will transfer energy
out by Energinet.dk as to                  from the 33kV radial cables of the       Ship collision analysis
serviceability, accessibility and the      wind turbines, transform the energy      In order to state the optimal
operation of the platform over the         and export it onshore via a 220 kV       location for the wind farm, the risk
expected lifetime of 25 years. The         cable where it will be connected to      of ship collision was essential to
substation is fully optimised in           the national grid.                       evaluate. Ramboll assisted with
space and weight dimensions.                                                        analysing the risk to the general
                                                                                    ship traffic from the ship traffic
                                           Site development and                     related to the construction of the
Essence of the transformer                 Environmental Impact Assessment          Anholt Offshore Wind Farm. 
platform                                   Ramboll has also performed site
The Anholt topside consists of a           development and full-scale
central area where the three main          Environmental Impact Assessment
transformers and 220 kV GIS                (EIA) on the Anholt Offshore Wind
switchgear are located, and                Farm project.




                                                                                    LEFT
                                                                                    The substructure
                                                                                    design initially
                                                                                    included a detail
                                                                                    design of a steel jacket
                                                                                    with traditional driven
                                                                                    piles as foundation.
                                                                                     
                                                                                     
                                                                                    RIGHT
                                                                                    The concrete GBS/
                                                                                    Steel structure
                                                                                    combines the
                                                                                    installation benefits of
                                                                                    a floating concrete
                                                                                    structure with that of a
                                                                                    steel structure on top.

More Related Content

Similar to Substation Design - Anholt Offshore Wind Farm

Project Summary
Project Summary Project Summary
Project Summary
Jinliang Li
 
introduction to concrete design
introduction to concrete designintroduction to concrete design
introduction to concrete design
queripan
 
cal_maritime_technical_design_report_1
cal_maritime_technical_design_report_1cal_maritime_technical_design_report_1
cal_maritime_technical_design_report_1
David Chang
 

Similar to Substation Design - Anholt Offshore Wind Farm (20)

Cal Marine Ltd. scam - executive summary ?- april 2008
Cal Marine Ltd.   scam - executive summary ?- april 2008Cal Marine Ltd.   scam - executive summary ?- april 2008
Cal Marine Ltd. scam - executive summary ?- april 2008
 
Renewable Energy Development for the Afghanistan National Security University...
Renewable Energy Development for the Afghanistan National Security University...Renewable Energy Development for the Afghanistan National Security University...
Renewable Energy Development for the Afghanistan National Security University...
 
2. Reactor Design Panel
2. Reactor Design Panel2. Reactor Design Panel
2. Reactor Design Panel
 
Offshore Renewables
Offshore RenewablesOffshore Renewables
Offshore Renewables
 
Project Summary
Project Summary Project Summary
Project Summary
 
RINA_Paper
RINA_PaperRINA_Paper
RINA_Paper
 
EPRI Low CO2 Emission Coal R&D For Kpic
EPRI Low CO2 Emission Coal R&D For KpicEPRI Low CO2 Emission Coal R&D For Kpic
EPRI Low CO2 Emission Coal R&D For Kpic
 
Offshore Floating Wind Turbine Platform
Offshore Floating Wind Turbine PlatformOffshore Floating Wind Turbine Platform
Offshore Floating Wind Turbine Platform
 
Yin Sun Shell - Shell (Projects & Technology)
Yin Sun Shell - Shell (Projects & Technology)Yin Sun Shell - Shell (Projects & Technology)
Yin Sun Shell - Shell (Projects & Technology)
 
introduction to concrete design
introduction to concrete designintroduction to concrete design
introduction to concrete design
 
E+PC Power & Energy Capability
E+PC Power & Energy CapabilityE+PC Power & Energy Capability
E+PC Power & Energy Capability
 
Eolic truss tower_offshore_may2011 (1)
Eolic truss tower_offshore_may2011 (1)Eolic truss tower_offshore_may2011 (1)
Eolic truss tower_offshore_may2011 (1)
 
Ece464 power electronics assignment solution
Ece464 power electronics assignment solutionEce464 power electronics assignment solution
Ece464 power electronics assignment solution
 
2015 Foundations for larger and deeper Offshore Wind
2015 Foundations for larger and deeper Offshore Wind 2015 Foundations for larger and deeper Offshore Wind
2015 Foundations for larger and deeper Offshore Wind
 
Pre-Swirl Augmented Vertical Axis Wind Turbine
Pre-Swirl Augmented Vertical Axis Wind TurbinePre-Swirl Augmented Vertical Axis Wind Turbine
Pre-Swirl Augmented Vertical Axis Wind Turbine
 
AJ Falcone ME
AJ Falcone MEAJ Falcone ME
AJ Falcone ME
 
IEA GHG_BoundaryDamReport_Aug31_FINAL
IEA GHG_BoundaryDamReport_Aug31_FINALIEA GHG_BoundaryDamReport_Aug31_FINAL
IEA GHG_BoundaryDamReport_Aug31_FINAL
 
cal_maritime_technical_design_report_1
cal_maritime_technical_design_report_1cal_maritime_technical_design_report_1
cal_maritime_technical_design_report_1
 
179 e2008h0802
179 e2008h0802179 e2008h0802
179 e2008h0802
 
Projects MeerkatII Copy
Projects MeerkatII CopyProjects MeerkatII Copy
Projects MeerkatII Copy
 

Recently uploaded

Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
creerey
 
anas about venice for grade 6f about venice
anas about venice for grade 6f about veniceanas about venice for grade 6f about venice
anas about venice for grade 6f about venice
anasabutalha2013
 
Memorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.pptMemorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.ppt
seri bangash
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
LR1709MUSIC
 

Recently uploaded (20)

5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer
 
Equinox Gold Corporate Deck May 24th 2024
Equinox Gold Corporate Deck May 24th 2024Equinox Gold Corporate Deck May 24th 2024
Equinox Gold Corporate Deck May 24th 2024
 
BeMetals Presentation_May_22_2024 .pdf
BeMetals Presentation_May_22_2024   .pdfBeMetals Presentation_May_22_2024   .pdf
BeMetals Presentation_May_22_2024 .pdf
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
 
India’s Recommended Women Surgeons to Watch in 2024.pdf
India’s Recommended Women Surgeons to Watch in 2024.pdfIndia’s Recommended Women Surgeons to Watch in 2024.pdf
India’s Recommended Women Surgeons to Watch in 2024.pdf
 
Using Generative AI for Content Marketing
Using Generative AI for Content MarketingUsing Generative AI for Content Marketing
Using Generative AI for Content Marketing
 
Evolution and Growth of Supply chain.pdf
Evolution and Growth of Supply chain.pdfEvolution and Growth of Supply chain.pdf
Evolution and Growth of Supply chain.pdf
 
Meaningful Technology for Humans: How Strategy Helps to Deliver Real Value fo...
Meaningful Technology for Humans: How Strategy Helps to Deliver Real Value fo...Meaningful Technology for Humans: How Strategy Helps to Deliver Real Value fo...
Meaningful Technology for Humans: How Strategy Helps to Deliver Real Value fo...
 
anas about venice for grade 6f about venice
anas about venice for grade 6f about veniceanas about venice for grade 6f about venice
anas about venice for grade 6f about venice
 
8 Questions B2B Commercial Teams Can Ask To Help Product Discovery
8 Questions B2B Commercial Teams Can Ask To Help Product Discovery8 Questions B2B Commercial Teams Can Ask To Help Product Discovery
8 Questions B2B Commercial Teams Can Ask To Help Product Discovery
 
Unlock Your TikTok Potential: Free TikTok Likes with InstBlast
Unlock Your TikTok Potential: Free TikTok Likes with InstBlastUnlock Your TikTok Potential: Free TikTok Likes with InstBlast
Unlock Your TikTok Potential: Free TikTok Likes with InstBlast
 
Did Paul Haggis Ever Win an Oscar for Best Filmmaker
Did Paul Haggis Ever Win an Oscar for Best FilmmakerDid Paul Haggis Ever Win an Oscar for Best Filmmaker
Did Paul Haggis Ever Win an Oscar for Best Filmmaker
 
Special Purpose Vehicle (Purpose, Formation & examples)
Special Purpose Vehicle (Purpose, Formation & examples)Special Purpose Vehicle (Purpose, Formation & examples)
Special Purpose Vehicle (Purpose, Formation & examples)
 
Memorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.pptMemorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.ppt
 
State of D2C in India: A Logistics Update
State of D2C in India: A Logistics UpdateState of D2C in India: A Logistics Update
State of D2C in India: A Logistics Update
 
HR and Employment law update: May 2024.
HR and Employment law update:  May 2024.HR and Employment law update:  May 2024.
HR and Employment law update: May 2024.
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
 
Improving profitability for small business
Improving profitability for small businessImproving profitability for small business
Improving profitability for small business
 
Business Valuation Principles for Entrepreneurs
Business Valuation Principles for EntrepreneursBusiness Valuation Principles for Entrepreneurs
Business Valuation Principles for Entrepreneurs
 
Hyundai capital 2024 1quarter Earnings release
Hyundai capital 2024 1quarter Earnings releaseHyundai capital 2024 1quarter Earnings release
Hyundai capital 2024 1quarter Earnings release
 

Substation Design - Anholt Offshore Wind Farm

  • 1. SUBSTATION DESIGN FOR  ANHOLT OFFSHORE WIND FARM Complete substation design for one of the world's largest offshore wind farms which will produce electricity to 400,000 households A substation is the one of the core offshore wind farms when it is in The planned location of the wind elements in the electrical grid of the operation in 2013. farm in an area with very difficult wind farm. It collects the power   seabed conditions, risk of ice loads production from the wind turbines The 400 MW wind farm will during winter and heavy ship traffic and transmits the energy to the produce energy equivalent to the have been important factors in the land-based power transmission grid annual energy consumption of design process. through submarine cables.  400,000 households, or 4%     of Denmark's total power There are many shared technical consumption. 111 wind turbines will Two design proposals details in the design of an offshore produce the energy. The substructure design included substation and traditional   both detailed design of a steel offshore facility platforms. At The substation and shore cable are jacket solution as well as tender Ramboll we have transferred our operated by the Danish energy design of a combined concrete experience in offshore provider Energinet.dk which is GBS/Steel structure (GBS = Gravity structures from the past 30 years to owned by the Ministry of Energy Based Structure). become among the market leaders and Climate. The state-owned   in the design of substations for energy company DONG Energy The steel jacket solution was initially offshore wind farms. owns and operates the wind farm. selected by the client as being the     One substation - electricity to Evaluation of scenarios 400,000 households Ramboll headed the detailed design One of Ramboll's most recent major of the substation platform, substation projects is the Anholt including substructure and CONTACT Offshore Wind Farm, located 22 km complete topside design. In the Peter Busch Nielsen off the coast of the island Anholt in design process many different Senior Project Manager, Structures Denmark. The wind farm will scenarios have been evaluated.   Tel +45 5161 7238  become one of the world's largest   pbn@ramboll.com   RAMBOLL GROUP A/S
  • 2. DESIGN IN ACCORDANCE WITH NEW STANDARDS The Anholt Offshore Wind Farm substation is one of the renewable energy projects. first offshore substations to be designed according to the   DNV-OS-J201 standard for Offshore Substations for Wind The new standard will become one of the future standard Farms. used for European offshore wind farms.     The standard describes the basis for safe design, layout and operation of offshore wind farms. It is developed to provide a common set of safety requirements for all platforms associated with offshore wind farms and other preferred solution. However, prior to enclosed modules where the The analysis included siting of the tendering the fabrication contract auxiliary equipment is placed. farm and proposals for possible of the platform, the client chose to   alternative sites, outline foundation include a tender design by Ramboll The topside structure is divided into design, decommissioning of of a GBS solution combining the several platform deck levels, structures and constructional and installation benefits of a floating including a helideck. The operational risk analysis with concrete structure with that of a structure carries equipment for respect to shipping traffic. steel structure on top. high-voltage transmission and     distribution and other facilities such In addition, Ramboll also performed as emergency generator, batteries environmental assessment of the Fit-for-purpose substation and panels for wind turbine control establishment of a sea cable to the The fit-for-purpose substation is etc. island of Anholt from the wind farm. designed with due consideration to     the wishes and requirements laid The substation will transfer energy out by Energinet.dk as to from the 33kV radial cables of the Ship collision analysis serviceability, accessibility and the wind turbines, transform the energy In order to state the optimal operation of the platform over the and export it onshore via a 220 kV location for the wind farm, the risk expected lifetime of 25 years. The cable where it will be connected to of ship collision was essential to substation is fully optimised in the national grid. evaluate. Ramboll assisted with space and weight dimensions.   analysing the risk to the general   ship traffic from the ship traffic Site development and related to the construction of the Essence of the transformer Environmental Impact Assessment Anholt Offshore Wind Farm.  platform Ramboll has also performed site The Anholt topside consists of a development and full-scale central area where the three main Environmental Impact Assessment transformers and 220 kV GIS (EIA) on the Anholt Offshore Wind switchgear are located, and Farm project. LEFT The substructure design initially included a detail design of a steel jacket with traditional driven piles as foundation.     RIGHT The concrete GBS/ Steel structure combines the installation benefits of a floating concrete structure with that of a steel structure on top.