STRESSMANAGEMENT
Contents:- Definition
Meaning
Forms, Stages.
Causes, Effects and Stratigies.
Stress is the pressure people feel while
at work and in private life.
 Stress become very harmful and leads to
mind and heart problems.
 It creates many Physical, Psychological and
Behavioral symptoms.
 Stress directly impacts the mind and body.
 Pressure on employee about target ,heavy
work load, longer hours, ill-treatment,
harassment etc leads to stress.
 Stressful body becomes burdensome to the
employee.
 Physical symptoms like Head ache,
High blood pressure, and Heart diseases
 Psychological symptoms like Anxiety
Depression, and Decrease in job satisfaction
 Behavioral symptoms like productivity
Labour turnover, and Absenteeism
This leads to develop sleeplessness and some
worries and taking alcohol, smoking and
finally drug addict
 Main impact on mind and people unhappy
and dissatisfied.
 Mental disorder leads to body
disequilibrium, ulcer and other several
diseases like liver, kidneys, blood vessels etc.
 Life span will be deteriorated
 There is no concentration on job and family
and also.
 Stress is visible and non-visible concepts
DEFINITION
 BEEHR AND NEWMAN-” A condition
arising from interaction of people and their
job and characterized by changes within
people that force them to deviate their normal
functioning”
 IVANCEVICH and MATTERSON” The
interaction of the individual with the
environment”
 GENERAL DEFINITION “ Response to an
external situation that results in physical,
psychological and behavioral deviations of
the organizational participants”
 The word stress is taken from Greek word
“eustress”. Which means ‘’good form stress”
eu means” good
FORMS OF STRESS
There are three forms of stress
 Milder
 Stiffer and
 Chronic
MILDER FORM
The milder form of stress is visible in
digestive problem i.e. high blood pressing,
nervousness and inability to relax and
sleeplessness.
STIFFER FORM
If the stress is not prevented in the stage of
milder then is leads to stiffer stage.
CHRONIC FORM
 CHRONIC WORRY
 INSOMNIA
 FRUSTRATION
 INSTABILITY AND UNCOOPERTIVE
ATTITUDE TO DEVELOP STRESS
THIS CONTINOUSLY LEADS TO LONGER
STRESS
The next stage of chronic form
 The next stage of chronic form has two parts
i.e. Burn-out and trauma.
BURN-OUT
Intellectuals and professionals face Burn-out
 Longer stress on the body leads to Burn-out
 Employees are emotionally exhausted under
burn-out .
 Managers and executives are in this category,
When they work continuously, they face
irritation, errors in work, frustration, job
monotony etc,.
 Physical and psychological therapy to reduce the
burn-out (YOGA & MEDITATION)
TRAUMA( mental shock):
 The work place is also contributes trauma.
 Work strains-heavy workload
 Social reactions to the jobs
 Insecurity.
 Harassment.
 Wrongful termination
 Biased attitudes and discrimination.
 To avoid trauma is only classification and
satisfaction and mutual help.
STAGES
According to HANS SELVE there are three
stages of stress management
ALARM
This is the first stage of stress. This is internal stress
system. Many physiological and chemical reactions
are observed during the alarm stage.
 INCREASED PITUITARY.
 INCREASED RESPERATION.
 HEART TROUBLE.
 HIGH BLOOD PRESURE DURING THIS
STAGE.
RESISTANCE
The second stage of stress is resistance. In the
stage of alarm is not prevented and to develop
the resistance.
 Nervousness and tension
 Individual unable to relax like insomnia
 Leads to conflicts, frustration and uneasiness
illness and diseases to resistance
EXHAUSTION
Resistance creates exhaustion
Exhaustion develops –
MOODINESS
LAZY
NEGATIVE EMOTIONS
HELPNESS ETC
 Stress is influenced the physiological, psychological
and behavior of employees
 To reduce the effectiveness of employees.
 Finally ,the organization work is affected
.
Now ,the multinational organizations have
started stress education system to prevented
the stress
CAUSES
The causes of stress is classified into four ways
 ENVIRONMENTAL FACTORS.
 ORGANISATIONAL FACTORS.
 GROUP RELATED FACTORS.
 INDIVIDVAL FACTORS.
ENVORNMENTAL FACTORS
 POLITICAL AND ECONOMIC FACTORS
influence the behavior of employees.
 LAW AND ORDER PROBLEMS create the tension
in the minds of employees.
 TECHNOLOGICAL UNCERTAINITIES have
impact stress
 SOCIO-ECONOMIC FACTORS
 FINANCIAL,CULTURAL AND FAMILY
FACTORS
 These problems to reduce the efficiency and
effectiveness of the employees, Children’s
education and health conditions also
influence the stress.
 TO REDUCE THE ENVORONMENTAL
STRESS MAIN IS HEALTH CHECK
UPS,CIVIC FACILITIESAND SOCIAL
ETC,
II ORGANISATIONAL FACTORS
 MANAGEMENT-LABOUR RELATIONS
 WORKING CONDITIONS
 RESOURCE ALLOCATIONS
 ROLE OF TRADE UNIONS
 BEHAVIOUR OF CO-WORKERS
 ORGNISATIONAL POLICES
 WORKING PROCEDURE
 TOO-MUCH AUTOCRACY
 CENTRALISATION
 LESS CHANCES OF PROMOTION
 LINE AND STAFF CONFLICTS
 INTER-DEPARTMENTAL RIFTS
 LESS ATTENTION ON MERITORIOUS
EMPLOYEES
Will influence the stress of physical and
psychological employees.
 Trade unions create, more problems and
demands are also not reasonable. Multi unions
create more problems. Those problems not
solve them.
WORKING CONDITIONS ARE ALSO
INFLUENCE THE STRESS- LIKE
 TEMPARATURE
 DUST
 HEAT
 NATURE OF BUSINESS
 LACK OF SECURITY LACK OF PRIVACY
 CHEMICAL REACTIONS
 AIR POLLUTION
 IN-ADQUATE LIGHTING ETC,.
 ORGNISATIONAL POLICIES AND
PROCEDURE
 UN-FAIR AND INADQUATE PAY
 RIGID RULES
 ROTATIONAMBIGUOUS POLICIES
 UN REALISTIC JOB DESIN
 TASK-DESIGN IMPACT ON STRESS
 ROLE DEMAND SUCH AS ROLE
CONFLICTS
 LACK OF SOCIAL SUPPORT
 ROLE OF CHIEF EXCUTIVE
 RETRENCHMENT
 LAY-OFF AND OTHER NCERTAINITIES
LEADS TO DISATIFACTION.
GROUP RELATED FACTORS
Any Organization includes group and individual who
influence each other and are influenced by the
Other.
 LACK OF GROUP COHESIVENESS
 LACK OF SOCIAL SUPPORT
 GROUP CONFLICTS INCLUDES
INCOMPALIBILITY OF GOALS AND
OBJECTIVES
 FAMILY PROBLEMS
INDIVIDUAL FACTORS
 PERSONAL CHARACTERS
 LIFE CHANGES; Fast changes are more
dangerous than slow changes Life style to
produce stress in some times.
 ROLE PERCETIONS; A person has to work
as father ,husband, boss, junior, friend etc.
EFFECTS THE STRESS
The consequences of stress are divided into
3positions
A. Physiological effects.
B. Psychological effects.
C. Behaviourial effects.
PHYSIOLOGICAL EFFECTS
 INCREASE IF HEARTBEATS AND
BREATHING RATES
 HEADACHE AND HIGH BLOOD
PRESSURE
Recently the researchers are identified not only
the above problems and another problems like
 ULCERS
 ARTHRITIS
 CANSCER ETC,
To avoid the stress to keep employees healthy
and active to achieve the organizational
goals.
Psychological effects
 Anxiety
 Depression
 Nervousness
 Tension
 Irritation and so many negative consequences.
 Facial Expressions
 Harsh treatment to sub-ordinates.
Behavioral effects
 Behavioral factors are directly impact on the
employee mind and body.
 Alcoholism –during the work time it is a great
problem
 Speculation
 Increased smoking
 Absenteeism and labor turnover-reduce capacity .
 Too much drinking effect the duty and spoil the
health and disturb the work
STRATEGIES FOR REDUCING OR
PREVENTING STRESS
 According to job design , job rotation, job
description, Goal setting , Group dynamics
etc.
 There are strategies for stress is divided into
two parts i.e. Individual strategies and
Organizational strategies.
Individual strategies
 Employee will take care about him self to
reduce the strategy.
 Nearly 50 to 60 percent reducing stress on
him self.
The individual strategies are
Time management:-
 Time management is an effective technique to
control the stress
 Time management principles
 Time leads to punctuality, discipline, work
conditions and to avoid some bad habits and health.
 Allocation of time schedule
 Work completion also involves in the time
management.
Physical Exercises:-
 Blood pressure is controlled by jogging and
Heart diseases is prevented by regular
walking and so on.
 Physical exercise direct impact on reducing
tension and stress
 Now the majority of the large scale
organizations are maintaining Jim clubs.
Behavioral self control:-
 Self control – any disputes , clashes are arise
at the time , some maintain self control and
automatically solve all the problems like
personal disputes , group disputes etc.
Relaxation training
 Meditation ,
 Yoga-to maintain peace and control heart
beat etc.
Cognitive therapy:-
 Emotive and cognitive behavior
modification models to reduce job stress
 Cognitive therapy helps the self control of
people.
Social support:-
 Good listeners and Confidence builders are
to reduce the stress .
 Social support net work also to prevent the
stress.
ORGANIZATIONAL STRATIGIES
 The organizational strategies are attached with the
organizational structure i.e.
 Goal setting and job designing :-
 Set of goals to avoid the stress and conflict
 Goals provide motivation to work
 Goals must be clearly and specifically
 Designed job as per goal setting to reduce all sorts of
problems.
 Growth oriented people to solve all the problems and
conflicts.
Reducing conflicts:-
 Clarity
 Right design
 Clear cut Delegation of authority
 Performance award and organizational
award to reduce the stress conflicts.
 Developing career plans:-
 Training and development
 Practical training
 Real life example
 Self assessment
 Increased self understanding
 Work shops
 Educational and experimental programmers etc.
 Creating health climate:-
 A congenial atmosphere of work and
relationships to reduce the stress.
 Friendly talk and healthy conditions to reduce
family tension
 If feels factory like home
 Personal issues are discussed
 Communication net work reduces uncertainty
Providing personal counseling
 Counseling is an exchange of ideas and feelings
between persons or parties.
 6 functions of counseling. i.e. advice, reassurance,
communication, release of emotional tension,
clarified thinking and reorientation.
 In addition to that non- directive , participative and
directive counseling is also to solve the stress
problems of the employees.

stress mgt ppt.ppt

  • 1.
  • 2.
    Stress is thepressure people feel while at work and in private life.  Stress become very harmful and leads to mind and heart problems.  It creates many Physical, Psychological and Behavioral symptoms.  Stress directly impacts the mind and body.
  • 3.
     Pressure onemployee about target ,heavy work load, longer hours, ill-treatment, harassment etc leads to stress.  Stressful body becomes burdensome to the employee.
  • 4.
     Physical symptomslike Head ache, High blood pressure, and Heart diseases  Psychological symptoms like Anxiety Depression, and Decrease in job satisfaction  Behavioral symptoms like productivity Labour turnover, and Absenteeism
  • 5.
    This leads todevelop sleeplessness and some worries and taking alcohol, smoking and finally drug addict
  • 6.
     Main impacton mind and people unhappy and dissatisfied.  Mental disorder leads to body disequilibrium, ulcer and other several diseases like liver, kidneys, blood vessels etc.
  • 7.
     Life spanwill be deteriorated  There is no concentration on job and family and also.  Stress is visible and non-visible concepts
  • 8.
    DEFINITION  BEEHR ANDNEWMAN-” A condition arising from interaction of people and their job and characterized by changes within people that force them to deviate their normal functioning”
  • 9.
     IVANCEVICH andMATTERSON” The interaction of the individual with the environment”
  • 10.
     GENERAL DEFINITION“ Response to an external situation that results in physical, psychological and behavioral deviations of the organizational participants”
  • 11.
     The wordstress is taken from Greek word “eustress”. Which means ‘’good form stress” eu means” good
  • 12.
    FORMS OF STRESS Thereare three forms of stress  Milder  Stiffer and  Chronic
  • 13.
    MILDER FORM The milderform of stress is visible in digestive problem i.e. high blood pressing, nervousness and inability to relax and sleeplessness.
  • 14.
    STIFFER FORM If thestress is not prevented in the stage of milder then is leads to stiffer stage.
  • 15.
    CHRONIC FORM  CHRONICWORRY  INSOMNIA  FRUSTRATION  INSTABILITY AND UNCOOPERTIVE ATTITUDE TO DEVELOP STRESS THIS CONTINOUSLY LEADS TO LONGER STRESS
  • 16.
    The next stageof chronic form  The next stage of chronic form has two parts i.e. Burn-out and trauma.
  • 17.
    BURN-OUT Intellectuals and professionalsface Burn-out  Longer stress on the body leads to Burn-out  Employees are emotionally exhausted under burn-out .  Managers and executives are in this category, When they work continuously, they face irritation, errors in work, frustration, job monotony etc,.  Physical and psychological therapy to reduce the burn-out (YOGA & MEDITATION)
  • 18.
    TRAUMA( mental shock): The work place is also contributes trauma.  Work strains-heavy workload  Social reactions to the jobs  Insecurity.  Harassment.  Wrongful termination  Biased attitudes and discrimination.  To avoid trauma is only classification and satisfaction and mutual help.
  • 19.
    STAGES According to HANSSELVE there are three stages of stress management
  • 20.
    ALARM This is thefirst stage of stress. This is internal stress system. Many physiological and chemical reactions are observed during the alarm stage.  INCREASED PITUITARY.  INCREASED RESPERATION.  HEART TROUBLE.  HIGH BLOOD PRESURE DURING THIS STAGE.
  • 21.
    RESISTANCE The second stageof stress is resistance. In the stage of alarm is not prevented and to develop the resistance.  Nervousness and tension  Individual unable to relax like insomnia  Leads to conflicts, frustration and uneasiness illness and diseases to resistance
  • 22.
    EXHAUSTION Resistance creates exhaustion Exhaustiondevelops – MOODINESS LAZY NEGATIVE EMOTIONS HELPNESS ETC  Stress is influenced the physiological, psychological and behavior of employees  To reduce the effectiveness of employees.  Finally ,the organization work is affected .
  • 23.
    Now ,the multinationalorganizations have started stress education system to prevented the stress
  • 24.
    CAUSES The causes ofstress is classified into four ways  ENVIRONMENTAL FACTORS.  ORGANISATIONAL FACTORS.  GROUP RELATED FACTORS.  INDIVIDVAL FACTORS.
  • 25.
    ENVORNMENTAL FACTORS  POLITICALAND ECONOMIC FACTORS influence the behavior of employees.  LAW AND ORDER PROBLEMS create the tension in the minds of employees.  TECHNOLOGICAL UNCERTAINITIES have impact stress  SOCIO-ECONOMIC FACTORS  FINANCIAL,CULTURAL AND FAMILY FACTORS
  • 26.
     These problemsto reduce the efficiency and effectiveness of the employees, Children’s education and health conditions also influence the stress.
  • 27.
     TO REDUCETHE ENVORONMENTAL STRESS MAIN IS HEALTH CHECK UPS,CIVIC FACILITIESAND SOCIAL ETC,
  • 28.
    II ORGANISATIONAL FACTORS MANAGEMENT-LABOUR RELATIONS  WORKING CONDITIONS  RESOURCE ALLOCATIONS  ROLE OF TRADE UNIONS  BEHAVIOUR OF CO-WORKERS
  • 29.
     ORGNISATIONAL POLICES WORKING PROCEDURE  TOO-MUCH AUTOCRACY  CENTRALISATION  LESS CHANCES OF PROMOTION  LINE AND STAFF CONFLICTS  INTER-DEPARTMENTAL RIFTS  LESS ATTENTION ON MERITORIOUS EMPLOYEES Will influence the stress of physical and psychological employees.
  • 30.
     Trade unionscreate, more problems and demands are also not reasonable. Multi unions create more problems. Those problems not solve them.
  • 31.
    WORKING CONDITIONS AREALSO INFLUENCE THE STRESS- LIKE  TEMPARATURE  DUST  HEAT  NATURE OF BUSINESS  LACK OF SECURITY LACK OF PRIVACY  CHEMICAL REACTIONS  AIR POLLUTION
  • 32.
     IN-ADQUATE LIGHTINGETC,.  ORGNISATIONAL POLICIES AND PROCEDURE  UN-FAIR AND INADQUATE PAY  RIGID RULES  ROTATIONAMBIGUOUS POLICIES  UN REALISTIC JOB DESIN
  • 33.
     TASK-DESIGN IMPACTON STRESS  ROLE DEMAND SUCH AS ROLE CONFLICTS  LACK OF SOCIAL SUPPORT  ROLE OF CHIEF EXCUTIVE  RETRENCHMENT  LAY-OFF AND OTHER NCERTAINITIES LEADS TO DISATIFACTION.
  • 34.
    GROUP RELATED FACTORS AnyOrganization includes group and individual who influence each other and are influenced by the Other.  LACK OF GROUP COHESIVENESS  LACK OF SOCIAL SUPPORT  GROUP CONFLICTS INCLUDES INCOMPALIBILITY OF GOALS AND OBJECTIVES  FAMILY PROBLEMS
  • 35.
    INDIVIDUAL FACTORS  PERSONALCHARACTERS  LIFE CHANGES; Fast changes are more dangerous than slow changes Life style to produce stress in some times.  ROLE PERCETIONS; A person has to work as father ,husband, boss, junior, friend etc.
  • 36.
    EFFECTS THE STRESS Theconsequences of stress are divided into 3positions A. Physiological effects. B. Psychological effects. C. Behaviourial effects.
  • 37.
    PHYSIOLOGICAL EFFECTS  INCREASEIF HEARTBEATS AND BREATHING RATES  HEADACHE AND HIGH BLOOD PRESSURE
  • 38.
    Recently the researchersare identified not only the above problems and another problems like  ULCERS  ARTHRITIS  CANSCER ETC, To avoid the stress to keep employees healthy and active to achieve the organizational goals.
  • 39.
    Psychological effects  Anxiety Depression  Nervousness  Tension  Irritation and so many negative consequences.  Facial Expressions  Harsh treatment to sub-ordinates.
  • 40.
    Behavioral effects  Behavioralfactors are directly impact on the employee mind and body.  Alcoholism –during the work time it is a great problem  Speculation  Increased smoking  Absenteeism and labor turnover-reduce capacity .  Too much drinking effect the duty and spoil the health and disturb the work
  • 41.
    STRATEGIES FOR REDUCINGOR PREVENTING STRESS  According to job design , job rotation, job description, Goal setting , Group dynamics etc.  There are strategies for stress is divided into two parts i.e. Individual strategies and Organizational strategies.
  • 42.
    Individual strategies  Employeewill take care about him self to reduce the strategy.  Nearly 50 to 60 percent reducing stress on him self.
  • 43.
    The individual strategiesare Time management:-  Time management is an effective technique to control the stress  Time management principles  Time leads to punctuality, discipline, work conditions and to avoid some bad habits and health.  Allocation of time schedule  Work completion also involves in the time management.
  • 44.
    Physical Exercises:-  Bloodpressure is controlled by jogging and Heart diseases is prevented by regular walking and so on.  Physical exercise direct impact on reducing tension and stress  Now the majority of the large scale organizations are maintaining Jim clubs.
  • 45.
    Behavioral self control:- Self control – any disputes , clashes are arise at the time , some maintain self control and automatically solve all the problems like personal disputes , group disputes etc.
  • 46.
    Relaxation training  Meditation,  Yoga-to maintain peace and control heart beat etc.
  • 47.
    Cognitive therapy:-  Emotiveand cognitive behavior modification models to reduce job stress  Cognitive therapy helps the self control of people.
  • 48.
    Social support:-  Goodlisteners and Confidence builders are to reduce the stress .  Social support net work also to prevent the stress.
  • 49.
    ORGANIZATIONAL STRATIGIES  Theorganizational strategies are attached with the organizational structure i.e.  Goal setting and job designing :-  Set of goals to avoid the stress and conflict  Goals provide motivation to work  Goals must be clearly and specifically  Designed job as per goal setting to reduce all sorts of problems.  Growth oriented people to solve all the problems and conflicts.
  • 50.
    Reducing conflicts:-  Clarity Right design  Clear cut Delegation of authority  Performance award and organizational award to reduce the stress conflicts.
  • 51.
     Developing careerplans:-  Training and development  Practical training  Real life example  Self assessment  Increased self understanding  Work shops  Educational and experimental programmers etc.
  • 52.
     Creating healthclimate:-  A congenial atmosphere of work and relationships to reduce the stress.  Friendly talk and healthy conditions to reduce family tension  If feels factory like home  Personal issues are discussed  Communication net work reduces uncertainty
  • 53.
    Providing personal counseling Counseling is an exchange of ideas and feelings between persons or parties.  6 functions of counseling. i.e. advice, reassurance, communication, release of emotional tension, clarified thinking and reorientation.  In addition to that non- directive , participative and directive counseling is also to solve the stress problems of the employees.