Steps in installation of gutters
http://thelegendgs.com.au/gutter-replacement-sydney/
Gutter system
• A correctly installed gutter system will increase the efficiency
of water transfer from roof to drainage system.
• This helps to maintain house structure by eliminating
problems often caused by leaking or badly positioned gutters.
• Rainwater is usually directed underground, but it can be
recycled. This can be done by collecting it in a rain barrel
positioned below a gutter downspout, or with a system of
water recycling for use in the household plumbing system.
#Step1
• Installation is simple, methodical process, but the technique
will vary slightly depending on the gutter type.
• Plan thoroughly the layout and component needed.
• In most cases it will simply be a case of replacing like with like,
so it may be worth making a sketch of how the components of
the old system are arranged.
• Familiarize yourself with how to assemble the joints used with
your system.
#Step2
• Calculate and purchase the total length of the gutter needed
,as well the correct number of necessary downspouts and
attachment brackets.
• Rain water gutter should be attached to the fascia and run the
entire length of the roof, ending with a downspout .
• If a gutter run will measure longer than 40 feet ,the gutter
should be positioned to pitch down from the middle, aimed
toward a downspout at each end.
#Step3
• Measure the snap layout line using a chalk line.
• Locate the starting point, or highest point, of the gutter run.
• Mark the point on the fascia, 1.25 inches (3.2 cm) below the
roof flashing.
• Locate the ending point, or the downspout location, of the
gutter run.
#Step4
• Cut the gutter to size .
• Use a hacksaw, or heavy duty
tin snips to cut the gutter
at the appropriate
measurement.
#Step5
• Brackets will either snap onto the gutters or will be mounted
into the face board first, depending on the type of gutters you
purchase.
• Review the manufacturer's recommendations for your type of
gutter.
#Step6
• Mark the location for the downspout opening on the gutter.
• Use a jigsaw to cut a square opening at the appropriate place
in the gutter.
#Step7
• Attach the downspout connector and end cap to the gutter
using silicone sealant and short metal screws.
• An end cap should be used on any open-ended run of gutter.
#Step8
• Mount the gutters, the bracket
should be mounted to the face
board every 18-24 inches.
• Use the stainless steel lag screw
long enough to penetrate
the face board at least 2
inches (5.1 cm).
#Step9
• Attach the downspout to the gutters via the downspout
connector.
• Make sure the tapered end of the downspout is facing down
and aimed in the appropriate direction.
#Step10
• Seal the gutter connection seams with a heavy bead of
sealant and allow it to dry overnight.
• There are many gutter replacement company in Sydney will
help you to choose the best gutter for the home with better
installation .
• To know more details about gutter service, gutter
Replacement visit http://thelegendgs.com.au/gutter-
replacement-sydney/
Contact us
Call @ 1300 109 021
Email: info@thelegendgs.com.au
Website: http://thelegendgs.com.au.
Thank you!!!

Steps in installation of gutters

  • 1.
    Steps in installationof gutters http://thelegendgs.com.au/gutter-replacement-sydney/
  • 2.
    Gutter system • Acorrectly installed gutter system will increase the efficiency of water transfer from roof to drainage system. • This helps to maintain house structure by eliminating problems often caused by leaking or badly positioned gutters. • Rainwater is usually directed underground, but it can be recycled. This can be done by collecting it in a rain barrel positioned below a gutter downspout, or with a system of water recycling for use in the household plumbing system.
  • 3.
    #Step1 • Installation issimple, methodical process, but the technique will vary slightly depending on the gutter type. • Plan thoroughly the layout and component needed. • In most cases it will simply be a case of replacing like with like, so it may be worth making a sketch of how the components of the old system are arranged. • Familiarize yourself with how to assemble the joints used with your system.
  • 5.
    #Step2 • Calculate andpurchase the total length of the gutter needed ,as well the correct number of necessary downspouts and attachment brackets. • Rain water gutter should be attached to the fascia and run the entire length of the roof, ending with a downspout . • If a gutter run will measure longer than 40 feet ,the gutter should be positioned to pitch down from the middle, aimed toward a downspout at each end.
  • 7.
    #Step3 • Measure thesnap layout line using a chalk line. • Locate the starting point, or highest point, of the gutter run. • Mark the point on the fascia, 1.25 inches (3.2 cm) below the roof flashing. • Locate the ending point, or the downspout location, of the gutter run.
  • 9.
    #Step4 • Cut thegutter to size . • Use a hacksaw, or heavy duty tin snips to cut the gutter at the appropriate measurement.
  • 10.
    #Step5 • Brackets willeither snap onto the gutters or will be mounted into the face board first, depending on the type of gutters you purchase. • Review the manufacturer's recommendations for your type of gutter.
  • 11.
    #Step6 • Mark thelocation for the downspout opening on the gutter. • Use a jigsaw to cut a square opening at the appropriate place in the gutter.
  • 12.
    #Step7 • Attach thedownspout connector and end cap to the gutter using silicone sealant and short metal screws. • An end cap should be used on any open-ended run of gutter.
  • 13.
    #Step8 • Mount thegutters, the bracket should be mounted to the face board every 18-24 inches. • Use the stainless steel lag screw long enough to penetrate the face board at least 2 inches (5.1 cm).
  • 14.
    #Step9 • Attach thedownspout to the gutters via the downspout connector. • Make sure the tapered end of the downspout is facing down and aimed in the appropriate direction.
  • 15.
    #Step10 • Seal thegutter connection seams with a heavy bead of sealant and allow it to dry overnight. • There are many gutter replacement company in Sydney will help you to choose the best gutter for the home with better installation . • To know more details about gutter service, gutter Replacement visit http://thelegendgs.com.au/gutter- replacement-sydney/
  • 16.
    Contact us Call @1300 109 021 Email: info@thelegendgs.com.au Website: http://thelegendgs.com.au.
  • 17.